METRADO DE CARGAS

Carga MVER:

Peso loza: 0.258 = 420 kg/m2

Peso acabado: 100 kg/m2

Peso tabiquera: 150 kg/m2

Total: 670 kg/m2

Carga viva:

Gym: 300 kg/m2

Carga viva tabiquera: 150 kg/m2

Total 450 150 kg/m2

Combinacion de cargas ultimas

Cu= 1.7 CV + 1.4 CM

Cu = 1.7(450) + 1.4 (670) = 1703 kg/m2

Conversion a metro lineal

W= 1703*0.4 = 681.2 kg/m2

Calculo de momentos

A) (-) Mmax = WL2 / 12 = 681.2*6.452/ 12 = 2361.64 kg.m

B) (+) Mmax = WL2 / 16 = 681.2*6.452/ 16 = 1771.23 kg.m

C) (-) Mmax = WL2 / 9 = 681.2*6.452/ 9 = 3148.95 kg.m

D) (+) Mmax = WL2 / 16 = 1771.23 kg.m

E) (-) Mmax = WL2 / 12 = 2361.64 kg.m

FORMULA

As+ = b = 40 cm

As- = b = 40 cm

1)
A) Si d = 5cm B) Si d = 4.34
As = 2.50 d= 4.41 As = 2.46 d = 4.34

C) Si d = 4.36cm D) Si d = 4.34
As = 2.46 d= 4.34 As = 2.46 d = 4.34
2)
A) Si d = 5cm B) Si d = 0.83
As = 1.87 d= 0.83 As = 1.72 d = 0.76

C) Si d = 0.76cm D) Si d = 0.75
As = 1.71 d= 0.75 As = 1.77 d = 0.75

3) A) Si d = 5cm B) Si d = 5.88
As = 3.33 d= 5.88 As = 3.40 d=6

C) Si d = 0.76cm D) Si d = 6.02
As = 3.47 d= 6.02 As = 3.47 d = 6.02

4) (+) = (2)
5) (-) = (1)

CORTANTE
1.15 2 1.15 6.81.2 6.452
VN = = = 16295.8
2 2

VC = 0.53* * b * d = 0.53 * 280 * 10 * 28 = 2660.78

VC > VN = NO PASO

b = 62 cm

VC = 16495.59

VC > VN = PASO