SPAD GUIDELINE
SUPPLEMENTARY PROPOSAL APPROVAL
Doc No.: SPAD/REL/GP/014/001
Date : 13.08.2014Suk UM ANT AYA
Cow es oe
Table of Contents
1.0 INTRODUCTION... isooctane
2.0 SUPPLEMENTARY PROPOSAL APRROVAL PROCESS
3.0 FORMS & OTHER RELATED DOCUMENTS...........
oc No.: SPAD/REL/GP/014/001
Date": 13,08,2014
Page 1 of 4SURU MAND Aes
Penner Ava Dana
IY x0, rustic taansronr
Se ee on
1.0 INTRODUCTION
This document is to provide guidelines on the process of handling the submission of
supplementary proposal of a new railway system or rolling stock.
Note:
Supplementary Proposal is a proposal of a new railway system or rolling stock
submitted by LRO, and which is not within the purview of Sections 83 and 84 of the
Land Public Transport Act 2010.
2.0 SUPPLEMENTARY PROPOSAL APRROVAL PROCESS
The process and requirements for Supplementary Proposal Approval is stipulated
under APPENDIX A and APPENDIX B.
3.0 FORMS & OTHER RELATED DOCUMENTS,
APPENDIX A - Supplementary Proposal Approval Process (General)
APPENDIX B - Document Review Comment Sheet.
Doc No.: SPAD/REL/GP/014/001
Date": 13.08.2014
Page 2 0f 4APPENDIX A ~ SUPPLEMENTARY PROPOSAL APPROVAL PROCESS (GENERAL}
Process Flow Description
Submission of Supplementary Proposal by
1. Receives application Project Owner! Operator.
+
+ Supplementary Proposal review process use
APPENDIX 8” Document Review Comment
Sheet) by $20,
+ Al eser shall be addressed and closed by
: Project Owner/Operator
2. Reviews Supplementary |, project Owner! Operator to submit reed
roposal ‘Supplementary Proposal after all issued has
been aosesed and closed
Note: If Supplementary Proposal is not approved,
refer to Point 8.
‘+ SPAD to inform Project Owner/ Operator on
3. Acceptance of the acceptance of the Supplementary
Supplementary Proposal Proposal.
Y
+ SPAD to conduct inspection during
Construction, manufacturing and assembly
4, Conduct Inspection stage.
+ SPAD to witness FAI FAT and test &
commissioning.
Y
+ SPAD to conduct Final Careful Inspection.
+ Project Owner/ Operator to conduct
5, Final Inspection emergency evacuation exercise.
|
+ Project Owner/ Operator to submit Technical
Report to SPAD.
+ Project. Owner/ Operator to provide
verification that the railway system/ rolling
6. Engineers Report stock has been completed and safe for
revenue service.
+ SPAD to prepare Engineers Report in
‘accordance with Land Public Transport Act
2010, Section 103(2)..
|
7. Approval
}
+ SPAD to prepare memo for Approval upon
Completion and acceptance of Point 6 & 7.
+ SPAD to inform Project Owner/Operator on.
the Approval of the railway system/ rolling
8. Informs LRO stock
Doc No.: SPAD/REL/GP/014/001
Date: 13.08.2014
Page 3 of 4falda
SM sree
APPENDIX B - DOCUMENT REVIEW COMMENT SHEET
| DOCUMENT REVIEW
COMMENT SHEET INFORMATION =
Reference
Date
DOCUMENT INFORMATION
Document Title
Document
Reference
Received Date
DOCUMENT REVIEWED BY
Name Signature
| [organization Date
REVIEW COMMENTS (ADD EXTRA LINES IF NECESSARY)
ITEM | SECTION & | PARAGRAPH, — | COMMENTS / QUESTIONS / PROPOSALS / | TYPE*
NO. | PAGENO. | FIGURE, TABLE OR CHANGE REQUEST
OTHER REF.
Remarks:
() 1 InfolMinorIsue, NO Response Required | 2= Moderate, Response Required | 3 = Major Issue, Response
Required
‘OVERALL ACCEPTANCE STATUS
Li Accepted Ti Accepted with comments | [] Rejected
Doc No.: SPAD/REL/FR/O14/001
Date "13.08.2014
Page 4 of 4