You are on page 1of 3
oe Foes 4 URS Scott Wilson India Pvt. Ltd. - Rodic Consultants Pvt. Ltd. (JV) o= oy Team Leader Office Faridabad: H, No. 42, Sector-21D, Faridabad, Haryana - 121002, Tel.: 0129-4140080, Pax: 0129-4150080 Resident Engineer Office Mathura: 152, Onkareswar Colony, Township Mathura, Uttar Pradesh ~ 281005 Ref: URS-SWK/FBD/DATR/13/003 Date: 02.01.2013 To, DA Toll Road Pvt. Ltd. SCF-16 & 17, Sector-11B, Faridabad- 121 001, HR ‘Tel: 0129- 4100057-58 KA: Mr, Rajesh Madan, Authorized Signatory Sub: Six laning of Delhi ~ Agra Section of National Highway No. 2 in the State of Haryana and Uttar Pradesh from Km. 20.500 to Km. 200.000 under NHDP Phase-V as BOT (Toll), A ~__ Submission of Quality Assurance Plan Ref:- DATA/SITE/IE/2012/02/181 DATED 20" December, 2012. Dear Sir, With reference to above we have the following comments/observations on modified Quality Assurance Plan (QAP) submitted by you. We are returning the QAP draft copy with following comments, (1) The QAP submitted by you should cover all definition as mentions as below. a. Employer b. Independent Engineer . Concessionaire d. Vendor /Executing Agency e. Quality f. Quality Assurance 8. Quality Control h. Quality Audit i. Quality Plan i. Procedure k. Inspection & testing 1 NCR 5 m, Corrective Action . -- “Head Office: A-26/4, 1” Floor, Mohan Cooperative Industrial Estate, Mathura Road, New Delhi 110084 INDIA Tel: #91-11-46800100, 46800200, Fax: 91-11-41679350, WWW.urs-scottwilsonindia.com Page lof 1 n. Deviation 0. Repair p. Witness, q. Calibration NDT s. Check 1. Review u, Test Certificate v, Lab Test Report (2) Quality Assurance Plan was submitted by DA Toll Road, Itis after scrutinize by IE it was found that the QAP only showing the blank format and it is indicating the document prepare by between DA ia) Toll Road & L&T Contractor. (3) It is again highlight that QAP Plan has been not covered the all details as per NHAI Quality Assurance manual 2006. In most of the point has been indicated to be rectified as mentioned below:- ‘© The organization chart of Concessionaire, EPC Contractor & PMC should be given separately. + The name of difference executive agency/vendors engaged for different works should be given separately. ‘© The format of RFl and flow chart of RFI should also be mentioned. «In most of the Quality Test Report formats relevant IRC Code reference has not been mentioned. Ps ‘Flow Chart for DLC/PQC should also be included © Flow chart for Highway maintenance (Pot holes, Patch repair, Median Cleaning, drain Cleaning , Culvert Cleaning etc) «A Format for all tests conducting for different items of work including quantity of work done during the month may also be included. The frequency of test report to be carried out as per MORTH Specification and NHAI Quality assurance manual 2006. © “NCR“ Non Conformance Repot format is also to be included in QAP Laboratory Equipment List as per MORTH & as per requirement of the project should be given. ‘Head Office: A26/s, 1" Foor, Mohan Cooperative Industrial Estate, Mathura Road, New Delhi 110048 INDIA. Tel #91-11-46800300, 46800200, Fax: +91-11-41679350, WWW.urs-scattilsonindia.com Page 2of 2 * Check List for all activities of highway and structure work to be given. The check list should be as per NHAI Quality Assurance plan 2006 to be attached. © Check list for maintenance activities are to be included ‘+ Inspection Plan of Highway & Structure works each and every item to be included in QAP. ‘= QAP Submitted by you without numbering and without authorized signatory please revised ‘QAP to be submit with rectification. In Quality assurance plan submitted by you no where the name of concessionaire, PMC, EPC Contractor has been mentioned. Apparently it appears that L&T has prepared the QAP which keeping in mind the CA Provisions and NHAI Quality Assurance manual 2006 You may further modify/Improve the QAP further at your end if any things missing to make the preparation better Please resubmit within 3 days urgently. ‘Thanking You, bhr—~ KK. Gupta Team Leader For URS Scott Wilson India Pvt. Ltd. in |3V with RODIC Consultant Pvt. Ltd. Encl: As above CC: (1) Project Director, CMU Mathura (2) CGM (RO), Lucknow Head Office: A-26/4, 1" Floor, Mahan Cooperative Industrial Estate, Mathura Road, New Delhi~ 110044 INDIA Tol: #81-11-46800100, 46800200, Fax: 491-11-41679350, WWW.urs-scottwilsonindia.com Page 3of 3

You might also like