NAMA : SLAMET TRYHARTONO

KELAS : 4LA

WAKTU
TOTAL HARGA UPAH PASANG TOTAL WAKTU
No. Pemasangan Material SATUAN VOLUME HARGA SATUAN BERSIH PASANG (menit) TOTAL UPAH (menit)
1 Kabel NYA Praba 2.5mm Meter 135,17 Rp2.925,00
Mangkokan Persegi
Rp3.200,00
2 Panasonic Buah 6
3 Pemasangan Isolasi Millenium Gulung 1 Rp8.000,00
Rp516.772,25 Rp1.744,00 2,1 Rp308.984,48 283,857
4 Kabel NYA T-Dos Arrow Buah 12 Rp950,00
5 Klem Pipa 17 Arrow Bungkus 1 Rp9.000,00
6 Elbow Arrow Buah 8 Rp475,00
7 Pipa PVC 5/8 Interna Batang 14 Rp5.000,00
8 Kabel BC 4mm Kg 1 Rp147.500,00
Pemasangan
9 Elektroda Pembumian Batang 1 Rp75.000,00 Rp87.500,00 105 Rp350.000,00 105
Pentanahan
10 Kuku Macan Buah 2 Rp16.875,00 Rp256.250,00
11 MCB Merlin Gerin 2A Buah 2 Rp53.500,00
Pemasangan
12 Kabel NYM Praba 3x4mm Meter 2 Rp15.525,00 Rp87.500,00 105 Rp437.500,00 105
MCB
13 Box MCB Presto 2 Grup Buah 1 Rp19.375,00 Rp157.425,00
Lampu Pijar Shukaku 18
Pemasangan W Rp27.000,00 Rp8.950,00 15 105
14 Buah 7 Rp62.650,00
Lampu
15 Fitting Lampu Delta Buah 7 Rp7.800,00 Rp243.600,00 Rp12.496,00 15 Rp87.472,00 105
16 Pemasangan Sakelar Tunggal Panasonic Buah 5 Rp20.850,00
17 Stopkontak dan Stopkontak Panasonic Buah 4 Rp13.850,00 Rp9.996,00 2 Rp99.960,00 20
18 Sakelar Sakelar Seri Panasonic Buah 1 Rp475,00 Rp160.125,00
19 Pembobokan Panjang Bobokan Meter 16,2 - Rp10.000,00 42 Rp162.000,00 680,4
TOTAL WAKTU PENGERJAAN 1404,257
TOTAL UPAH PEMASANGAN Rp1.508.566,48
TOTAL HARGA BAHAN Rp1.334.172,25
TOTAL HARGA KOTOR Rp4.090.141,39
TOTAL HARGA TENDER (PAJAK10%) Rp4.499.155,53