OUTLINE ASSIGNMENT 3

EQUIPMENT SIZING & MATERIAL CONSTRUCTION


PERANCANGAN PABRIK 2017

Kelompok : TB 3
Topik : Production of bio-asphalt from rubber or bio-oil

Pembahasan Oleh
EXECUTIVE SUMMARY Nur Annisa
CHAPTER 1. EQUIPMENT SIZING
1.1. Main Process
1.1.1. Screw Conveyor Nabila Hana Dhia
1.1.2. Shredder
1.1.3. Hopper
1.1.4. Bucket Elevator
1.1.5. Fluid Bed Dryer
1.1.6. Pyrolyser
1.1.7. Cyclone Separator
Silva Amanat Taqwa
1.1.8. Condenser
1.1.9. Blending Tank
1.1.10. Centrifuge
1.1.11. Flash Evaporator
1.1.12. Electric Heater
1.1.13. Electric Cooler Davita Kristabel Mandala
1.1.14. Blower
1.1.15. CO2 Injector
1.1.16. Pump
1.1.17. Heat Exchanger
1.1.18. Valve
1.1.19. Pipe
1.2. Utility
1.1.1. Boiler Nur Annisa
1.1.2. Condensate Drum
1.1.3. Storage Tank
1.1.4. Air Dehumidifier Nabila Putri Salsabila
1.1.5. Pump
1.1.6. Jacket Heating in Blending Tank
CHAPTER 2. PIPING AND INSTRUMENTATION DIAGRAM
(P&ID)
Piping and Instrumentation Diagram (P&ID) Nabila Putri Salsabila
CHAPTER 3. CONCLUSION
Conclusion Nur Annisa