You are on page 1of 30

PRESUPUESTO

SERVICIO DE MANTENIMIENTO DE LA GUARDERIA INFANTIL DE LA UNC DE CAJAMARCA

ENTIDAD : UNIVERSIDAD NACIONAL DE CAJAMARCA

LUGAR : CAJAMARCA-CAJAMARCA-CAJAMARCA

ITEM DESCRIPCION P. PARCIAL S/.


01 TRABAJOS PREMILINARES Y OBRAS PROVISIONALES 52,162.20

02 ESTRUCTURAS 15,562.01

03 COBERTURAS 39,627.40
04 ARQUITECTURA 182,964.85
05 CERCO PRERIMETRICO 69,953.19
07 INSTALACIONES ELECTRICAS 14,544.95
08 INSTALACIONES SANITARIAS GENERALES 38,455.47
09 VARIOS 14,423.86
10 FLETE 7,500.00
COSTO DIRECTO 442,947.75

GASTOS GENERALES 10% 44,294.78

UTILIDAD 7.988434301% 35,384.59

SUB TOTAL 522,627.12

IGV (18%) 18% 94,072.88

TOTAL PRESUPUESTO 616,700.00


PRESUPUESTO
SERVICIO DE MANTENIMIENTO DE LA GUARDERIA INFANTIL DE LA UNC DE CAJAMARCA
ENTIDAD : UNIVERSIDAD NACIONAL DE CAJAMARCA
LUGAR : CAJAMARCA-CAJAMARCA-CAJAMARCA

ITEM DESCRIPCION UND METRADO P. UNIT. S/.


01 TRABAJOS PREMILINARES Y OBRAS PROVISIONALES
1.01 TRABAJOS PRELIMINARES
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 2,000.00
01.01.02 ALMACEN DE OBRA m2 20.00 93.21
01.01.03 SEGURIDAD EN OBRA GLB 1.00 7,500.00
01.01.04 CERCO PROVICIONALES DE SEGURIDAD DE OBRAS m 150.00 7.67
01.01.05 TRAZO Y REPLANTEO PRELIMINAR m2 300.04 1.08
1.02 MOVIMIENTO DE TIERRAS
01.02.01 CORTE A NIVEL DE SUBRASANTE CON MAQQUINARIA m3 633.60 11.90
01.02.02 ELIMINACION MATERIAL EXEDENTE m3 792.00 16.59
01.02.03 PICADO DE VEREDAS PERIMETRALES m2 55.20 7.69
01.02.04 CORTADO DE PISO PARA INSTALACIONES SANITARIAS m2 9.40 31.58
1.03 CONCRETO SIMPLE
1.03.01 CONCRETO SIMPLE FC=120KG/CM2 m3 8.03 306.47
1.03.02 FALSO PISO DE CONCRETO H=15CM m2 182.40 84.77
02 ESTRUCTURAS
2.01 CARPINTERIA METALICA
02.01.01 COLUMNAS DE ACERO LAC m 79.20 69.04
01.01.02 PLATINAS DE FIJACION PARA COLUMNAS und 22.00 32.99
02.01.03 VIGAS DE ACERO LAC m 122.68 61.80
02.01.04 PINTADO DE CARPINTERIA METALICA m 201.88 8.85
03 COBERTURAS
3.01 ESTRUCTURAS METALICAS DE TECHO
03.01.01 CORREAS DE METAL PRINCIPAL m 82.08 37.70
03.01.02 TUBERIAS DE METAL EN CORONA m 20.16 61.80
03.01.03 CUPULA PRINCIPAL und 2.00 817.86
03.01.04 CORREAS VERTICALES m 194.40 37.70
03.01.05 CORREAS HORIZONTALES m 1.88 37.70
03.01.06 CORREAS DE SS.HH m 98.78 38.78
3.02 COBERTURA
03.02.01 COBERTURA TEJA ANDINA m2 401.52 37.28
03.02.02 COBEERTURA CUPULA m2 1.88 39.78
03.02.03 CUMBRERA m 98.78 28.84
3.03 PINTURA ANTICORROSIVA EN CARPINTERIA METALICA
03.03.01 PINTURAS EN CORREA DE METAL PRINCIPAL m 82.08 8.85
03.03.02 PINTURAS EN TUBERIA DE METAL CORONA m 20.16 8.85
03.03.03 PINTURA EN CUPULA PRINCIPAL und 2.00 387.01
03.03.04 PINTURA EN CORREAS VERTICALES m 194.40 8.85
03.03.05 PINTURA EN CORREAS HORIZONTALES m 46.01 8.85
03.03.06 PINTURA EN CORREAS DE SS.HH m 81.60 8.85
04 ARQUITECTURA
4.01 MAMPOSTERIA
04.01.01 MURO SECO DRYWALL m2 988.01 111.86
4.02 PISOS Y PAVIMENTOS
04.012.01 PISO DE CERAMICA DE 30 X 30cm m2 146.34 52.78
04.012.02 PISO DE CERAMICA ANTIDESLIZANTE 30x30cm m2 23.57 52.78
04.012.03 CONTRAPISO DE 2" m2 182.40 33.54
04.012.04 VEREDA DE CONCRETO FC=175 kg/cm2. e=10cm m2 82.20 45.67
4.03 CONTRAZOCALOS
04.03.01 CONTRAZOCALOS DE MADERA H=10cm m 99.83 20.60
4.04 ZOCALOS
04.04.01 ZOCALOS DE CERAMICA 20x20cm, H=10cm m2 51.65 57.13
4.05 PUERTAS Y VENTANAS

PUERTA DE MADERA CONTRPLACADA TRIPLAY Y SOBREVENTANA CON TABLERO


04.05.01 und 2.00 750.00
REBAJADO 45mm A= 1.00(P1)

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON


04.05.02 und 6.00 1,300.00
TABLERO REBAJADO 45mm A=1.00(P1)

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON


04.05.03 und 1.00 1,300.00
TABLERO REBAJADO 45mm A=0.90

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON


04.05.04 und 1.00 1,750.00
TABLERO REBAJADO 45mm 180 A=1.00(P4)
PUERTA DE MADERA CONTRAPLACADA TRIPLAY CON MARCO CON TABLERO
04.05.05 und 4.00 550.00
REBAJADO 10cm A=0.60(P5)
04.05.06 VENTANA METALICA V1 4.00xH1.60m und 3.00 850.00
04.05.07 VENTANA METALICA V2 3.00xH1.60m und 2.00 750.00
04.05.08 VENTANA METALICA V3 2.00xH1.60m und 2.00 600.00
04.05.09 VENTANA METALICA V4 0.96xH=0.60m und 1.00 350.00
04.05.10 VENTANA METALICA V5 2.00xH=0.60m und 1.00 500.00
04.05.11 VENTANA METALICA V6 0.81xH=0.60m und 2.00 300.00
04.05.12 VENTANA METALICA V7 1.70xH=0.60m und 2.00 450.00
4.06 CIELORRASOS
04.06.01 CIELO RASO SUSPENIDO m2 206.29 92.27
4.07 CERRAJERIA
04.07.01 CERROJO PARA VENTANAS und 26.00 12.54
04.07.02 MANIJA DE BRONCE DE 4" PARA PUERTAS und 9.00 25.00
04.07.03 BISAGRA CAPUCHINA ALUMINIZADA DE 3 1/2" x 3 1/25" und 42.00 16.92
04.07.04 CERRADUR ADE DOS GOLPES PARA PUERTA und 10.00 110.17
4.08 PINTURA
04.08.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES m2 429.59 7.93
04.08.02 PINTURA LATEX 2 MANOS EN MUROS EXPERIORES m2 207.41 7.93
05 CERCO PRERIMETRICO
5.01 MOVIMIENTO DE TIERRAS
05.01.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS m2 43.01 45.38
05.01.02 ELIMINACION CON TRANSPORTE(CARGUIO A MANO)REN=25m3/dia m2 38.71 82.16
5.02 CONCRETO SIMPLE
05.02.01 SOLADOS DE CONCRETO F c=100kg/cm2. H=2" m2 61.44 31.83
05.02.02 RELLENO CON MATERIAL PROPIO m3 3.84 18.75

05.02.03 CONCRETO CIMIENTOCORRIDOS 1:10 CEMENTO-HORMIGON+30%PIEDRA GRANDE m3 30.72 235.10


05.02.04 CONCRETO FC=140kg/cm2+30%PM. EN SOBRECIMIENTOS 25% PIEDRA MEDIANA m3 9.22 330.40

05.02.05 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS m2 122.88 198.42


5.03 JUNTAS
05.03.01 JUNTA DE DILATACION m 24.00 6.92
5.04 REVOQUES ENLUCIDOS Y MOLDURAS
05.04.01 TARRAJEO CEN SOBRECIMIENTOS m2 138.24 34.18
5.05 PINTURA
05.05.01 PINTURA EN SOBRECIMIENTOS m2 138.24 7.93
5.06 CARPINTERIA METALICA
SUMINISTRO E INSTALACION DE MALLA METALICA N08(2"X2"), ELECT.EN TUBO DE
05.06.01 m2 153.60 134.87
3"
05.06.02 TUBO DE METAL LAC 3"X3". 15cm EN CERCO PERIMETRICO und 45.00 31.99
06 PATIO DE GUARDEERIA
6.01 OBRAS PRELIMINARES
06.01.01 LIMPIEZA DE TERRENO MANUAL m2 35.40 3.30
6.02 MOVIMIENTOS DE TIERRA
06.02.01 TRAZO,NIVELES Y REPLANTEO m2 35.40 2.02
06.02.02 EXCAVACION A MANO EN TERRENO NORMAL m3 10.62 136.16
06.02.03 BASE PARA PAVIMENTO EN CONCRETO RIGIDO m2 35.40 34.48
06.02.04 NIVELACION Y APISONAMIENTO MANUAL m3 35.40 1.92
06.02.05 RELLENO CON MATERIAL GRANULAR EN CAPAZ DE 0.156m m3 5.31 70.06
06.02.06 ELIMINACION CON TRANSPORTE(CARGUIO A MANO)REN=25m3/dia m3 13.28 82.16
6.03 CONCRETO SIMPLE
08.03.01 ENCOFRADO Y DESENCOFRADO PARA PAVIMENTOS m2 7.92 198.42
08.03.02 CONCRETO RIGIDO DE FC=175kg/cm2 PARA PAVIMENTOS m3 5.31 338.29
07 INSTALACIONES ELECTRICAS
7.01 TABLEROS ELECTRICOS
07.01.01 TABLERO ELECTRICO DE DISTRIBUCION MONOFASICA 12 PLOSC/CAJA METAL(TD) und 2.00 884.22
7.02 SALIDAS PARA ALUMBRADO
07.02.01 SALIDA PARA CENTRO DE LUZ pto 16.00 44.21
07.02.02 SALIDA PARA INTERUPTOR SIMPLE pto 10.00 99.15
7.03 SALIDA PARA TOMACORRIENTES
07.03.01 SALIDA PA TOMA CORRIENTE DOBLE CON LINEA A TIERRA pto 14.00 95.79
7.04 ARTEFACTOS
07.04.01 ARTEFACTO TIPO LUMINARIAS CUADRADA C/REGILLA ADOSADA ALUM.4x18w und 11.00 231.84
07.04.02 ARTEFACTO TIPO PLAFON OVNI NIQUEL FOCO BOLA 25w LB-E27 und 5.00 88.73
7.05 PUESTA A TIERRA
07.05.01 EXCAVACION MANUAL DE HOYO A PUESTA A TIERRA und 2.00 113.46
07.05.02 INSTALACION DE PUESTA A TIERRA und 2.00 745.17
07.05.03 RELLENO Y COMPACTACION DE PAT CON MATERIAL PROPIO und 2.00 65.27
7.06 PRUEBAS ELECTRICAS
07.06.01 PRUEBAS Y PUESTA EN SERVICIOS glb 1.00 500.00
7.07 SALIDA PARA PUESTA A TIERRA
07.07.01 SALIDA PARA PUESTA A TIERRA PT1, CON CABLE DESNUDO cu 16mm2 m 2.30 7.22

07.07.02 SALIDA PARA PUESTA A TIERRA PT2, CON CABLE DESNUDO cu 16mm2 m 40.00 7.22
7.08 ALUMBRADO DE EMERGENCIA
07.08.01 ARTEFACTO LUMINARIA DE EMERGENCIA 20W und 10.00 93.77
07.08.02 CABLE TIPO LSOH-80,2.5mm2-PVCDIAM. 20mm m 40.00 5.89
7.09 CABLES Y TUBERIAS
07.09.01 ALAMBRE DE TWG 2.5mm2 m 233.61 4.30
07.09.02 ALAMBRE DE TWG 4mm2 m 119.90 4.30
07.09.03 TUBERIA PVC SAP ELECTRICA DE 20mm m 124.43 11.22
08 INSTALACIONES SANITARIAS GENERALES
8.01 SISTEMA DE DESAGUE Y VENTILACION
08.01.01 SALIDA DE PVC SAL DASAGUE 4" INODORO pto 5.00 80.42
08.01.02 SALIDA DE PVC SAL DESAGUE 2" LAVADERO Y LAVAMANOS pto 2.00 83.34
08.01.03 SALIDA DE PVC SAL DESAGUE 2" LAVADERO pto 1.00 83.34
08.01.04 SALIDA DE PVC SAL DASAGUE 2" URINARIO pto 1.00 83.34
08.01.05 SALIDA DE PVC SAL DE VENTILACION DE 2" pto 2.00 92.23
08.01.06 SUMINISTRO E INSTALACION TUBERIA PVC SAL 4" m 44.07 17.41
08.01.07 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" m 7.00 16.51
08.01.08 SUMINISTRO DE INSTALACION TUBERIA PVC SAL 2"-VENTILACION m 12.10 16.51
08.01.09 SUMIDEROS DE BRONCE 2" PROVICION Y COLOCACION und 5.00 56.68
08.01.10 SUMIDEROS DE BRONCE 4" PROVICION Y COLOCACION und 3.00 61.86
08.01.11 CAJA DE REGISTRO DE DESAGUE DE 12"X24" und 3.00 172.76
08.01.12 ACCESORIOS EN RED DE DESAGUE Y VENTILACION glb 1.00 840.00
8.02 SISTEMA DE AGUA FRIA
08.02.01 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2",INODORO pto 5.00 83.52

08.02.02 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2",LAVATORIO Y LAVAMANOS pto 5.00 83.52

08.02.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2", LAVADERO pto 1.00 83.52
08.02.04 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP PRESION C-10,3/4 m 8.25 13.88
08.02.05 SUMINISTRO DE INSTALACION TUBERIA PVC SAP PRESION C-10,1/2" m 63.65 13.54
08.02.06 SUMINISTRO E INSTALACION VALVULA TIPO ESFERICA 1/2" und 7.00 52.16
08.02.07 SUMINISTRO E INSTALACION VALVULA TIPO COMPUERTA 3/4" und 2.00 90.50
08.02.08 SUMINISTRO E INTLACION VALVULA TIPO CONPUERTA 1/2" und 4.00 88.03
08.02.09 ACCESORIOS EN LA RED DE AGUA glb 1.00 625.34
8.03 SISTEMA DE AGUA DE LLUVIA

08.03.01 SUMINISTRO E INSTALACION TUBERIA PVC SAL DE 4"P/AGUA DE LLUVIA m 70.00 24.83
SUMINISTRO E INSTALACIONES CANALETA DE SEMICIRCULAR PLANCHA
08.03.02 m 80.00 31.30
GALVANIZADA DIAMETRO 0.20m
08.03.03 ACCESORIOS EN EL RED DE AGUA DE LLUVIA glb 1.00 235.65
08.03.04 CUNETA EN VEREDA m 88.90 42.11
08.03.05 SUMINISTRO E INSTALACION DE REJILLA EN CUNETAS m 88.90 228.74
8.04 APARATOS SANITARIOS
08.04.01 SUMINISTRO DE APARATOS SANITARIOS-LAVOTORIOS und 2.00 120.00
08.04.02 SIMINISTRO DE APARTOS SANITARIOS-INODORO und 5.00 220.34
08.04.03 SUMINISTRO DE APARATO SANITARIO-LAVADERO DE ACERO INOXIDABLE und 1.00 220.00
08.04.04 URINARIO EN PISO und 1.00 550.23
08.04.05 COLOCACION DE ACCESORIOS SANITARIOS und 9.00 28.49
8.05 ACCESORIOS SANITARIOS
08.05.01 ACCESORIOS SANITARIOS und 5.00 42.38
08.05.02 COLOCACION DE ACCESORIOS SANITARIOS pza 10.00 7.05
09 VARIOS
9.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS GLB 1.00 2,000.00
9.02 LIMPIEZA FINAL DE OBRA m2 300.04 0.29
9.03 SEAL INDICATIVAS DE SALIDA EVACUACION und 7.00 3.42
9.04 SEAL IDE ADVERTENCIA DE RIESGO ELECTRICO und 3.00 3.42
9.05 EXTINTOR DE POLVO QUIMICO SECO TIPO ABC, COLGADO und 5.00 260.53
9.06 JUEGOS RECREATIVOS und 1.00 11,000.00
10 FLETE
10.01 FLETE TERRESTRE GLB 1.00 7,500.00
COSTO DIRECTO
GASTOS GENERALES(10%) 10%
UTILIDAD (8%) 7.988434301%
SUB TOTAL
IGV (18%) 18%
TOTAL PRESUPUESTO
MARCA

P. PARCIAL S/.
52,162.20
12,838.74
2,000.00
1,864.20
7,500.00
1,150.50
324.04
21,400.46
7,539.84
13,139.28
424.49
296.85
17,923.00
2,460.95
15,462.05
15,562.01
15,562.01
5,467.97
725.78
7,581.62
1,786.64
39,627.40
17,206.48
3,094.42
1,245.89
1,635.72
7,328.88
70.88
3,830.69
17,892.28
14,968.67
74.79
2,848.82
4,528.64
726.41
178.42
774.02
1,720.44
407.19
722.16
182,964.85
110,518.80
110,518.80
18,839.62
7,723.83
1,244.02
6,117.70
3,754.07
2,056.50
2,056.50
2,950.76
2,950.76
22,150.00

1,500.00

7,800.00

1,300.00

1,750.00

2,200.00

2,550.00
1,500.00
1,200.00
350.00
500.00
600.00
900.00
19,034.38
19,034.38
2,363.38
326.04
225.00
710.64
1,101.70
5,051.41
3,406.65
1,644.76
69,953.19
5,132.20
1,951.79
3,180.41
36,678.05
1,955.64
72.00

7,222.27
3,046.29

24,381.85
166.08
166.08
4,725.04
4,725.04
1,096.24
1,096.24
22,155.58
20,716.03
1,439.55
7,753.82
116.82
116.82
4,269.19
71.51
1,446.02
1,220.59
67.97
372.02
1,091.08
3,367.81
1,571.49
1,796.32
14,544.95
1,768.44
1,768.44
1,698.86
707.36
991.50
1,341.06
1,341.06
2,993.89
2,550.24
443.65
1,847.80
226.92
1,490.34
130.54
500.00
500.00
305.41
16.61

288.80
1,173.30
937.70
235.60
2,916.19
1,004.52
515.57
1,396.10
38,455.47
3,829.78
402.10
166.68
83.34
83.34
184.46
767.26
115.57
199.77
283.40
185.58
518.28
840.00
3,418.63
417.60

417.60

83.52
114.51
861.82
365.12
181.00
352.12
625.34
28,556.32

1,738.10

2,504.00

235.65
3,743.58
20,334.99
2,368.34
240.00
1,101.70
220.00
550.23
256.41
282.40
211.90
70.50
14,423.86
2,000.00
87.01
23.94
10.26
1,302.65
11,000.00
7,500.00
7,500.00
442,947.75
44,294.78
35,384.59
522,627.12
94,072.88
616,700.00
TRABAJOS PREMILINARES Y OBRAS PROVISIONALES
TRABAJOS PRELIMINARES

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA

ALMACEN DE OBRA

SEGURIDAD EN OBRA

CERCO PROVICIONALES DE SEGURIDAD DE OBRAS

TRAZO Y REPLANTEO PRELIMINAR

MOVIMIENTO DE TIERRAS

CORTE A NIVEL DE SUBRASANTE CON MAQUINARIA

ELIMINACION MATERIAL EXEDENTE

PICADO DE VEREDAS PERIMETRALES

CORTADO DE PISO PARA INSTALACIONES SANITARIAS

CONCRETO SIMPLE

CONCRETO SIMPLE FC=120KG/CM2

FALSO PISO DE CONCRETO H=15CM

ESTRUCTURAS
CARPINTERIA METALICA

COLUMNAS DE ACERO LAC

PLATINAS DE FIJACION PARA COLUMNAS


VIGAS DE ACERO LAC

PINTADO DE CARPINTERIA METALICA

COBERTURAS
ESTRUCTURAS METALICAS DE TECHO

CORREAS DE METAL PRINCIPAL

TUBERIAS DE METAL EN CORONA

CUPULA PRINCIPAL

CORREAS VERTICALES

CORREAS HORIZONTALES

CORREAS DE SS.HH

COBERTURA

COBERTURA TEJA ANDINA

COBEERTURA CUPULA

CUMBRERA

PINTURA ANTICORROSIVA EN CARPINTERIA METALICA

PINTURAS EN CORREA DE METAL PRINCIPAL

PINTURAS EN TUBERIA DE METAL CORONA

PINTURA EN CUPULA PRINCIPAL


PINTURA EN CORREAS VERTICALES

PINTURA EN CORREAS HORIZONTALES

PINTURA EN CORREAS DE SS.HH

ARQUITECTURA
MAMPOSTERIA

MURO SECO DRYWALL

PISOS Y PAVIMENTOS

PISO DE CERAMICA DE 30 X 30cm

PISO DE CERAMICA ANTIDESLIZANTE 30x30cm

CONTRAPISO DE 2"

VEREDA DE CONCRETO FC=175 kg/cm2. e=10cm

CONTRAZOCALOS

CONTRAZOCALOS DE MADERA H=10cm

ZOCALOS

ZOCALOS DE CERAMICA 20x20cm, H=10cm

PUERTAS Y VENTANAS

PUERTA DE MADERA CONTRPLACADA TRIPLAY Y SOBREVENTANA CON TABLERO REBAJADO 45mm A= 1.00(P1)

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON TABLERO REBAJADO 45mm A=1.00(P1)

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON TABLERO REBAJADO 45mm A=0.90

PUERTA DE MADERA APANELADA DE CEDRO CON MARCO Y SOBREVENTANA CON TABLERO REBAJADO 45mm 180 A=1.00
PUERTA DE MADERA CONTRAPLACADA TRIPLAY CON MARCO CON TABLERO REBAJADO 10cm A=0.60(P5)

VENTANA METALICA V1 4.00xH1.60m

VENTANA METALICA V2 3.00xH1.60m

VENTANA METALICA V3 2.00xH1.60m

VENTANA METALICA V4 0.96xH=0.60m

VENTANA METALICA V5 2.00xH=0.60m

VENTANA METALICA V6 0.81xH=0.60m

VENTANA METALICA V7 1.70xH=0.60m

CIELORRASOS

CIELO RASO SUSPENIDO

CERRAJERIA

CERROJO PARA VENTANAS

MANIJA DE BRONCE DE 4" PARA PUERTAS

BISAGRA CAPUCHINA ALUMINIZADA DE 3 1/2" x 3 1/25"

CERRADUR ADE DOS GOLPES PARA PUERTA

PINTURA

PINTURA LATEX 2 MANOS EN MUROS INTERIORES

PINTURA LATEX 2 MANOS EN MUROS EXPERIORES

CERCO PRERIMETRICO
MOVIMIENTO DE TIERRAS

EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS

ELIMINACION CON TRANSPORTE(CARGUIO A MANO)REN=25m3/dia

CONCRETO SIMPLE

SOLADOS DE CONCRETO F c=100kg/cm2. H=2"

RELLENO CON MATERIAL PROPIO

CONCRETO CIMIENTOCORRIDOS 1:10 CEMENTO-HORMIGON+30%PIEDRA GRANDE

CONCRETO FC=140kg/cm2+30%PM. EN SOBRECIMIENTOS 25% PIEDRA MEDIANA

ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTOS

JUNTAS

JUNTA DE DILATACION

REVOQUES ENLUCIDOS Y MOLDURAS

TARRAJEO CEN SOBRECIMIENTOS

PINTURA

PINTURA EN SOBRECIMIENTOS

CARPINTERIA METALICA

SUMINISTRO E INSTALACION DE MALLA METALICA N08(2"X2"), ELECT.EN TUBO DE 3"

TUBO DE METAL LAC 3"X3". 15cm EN CERCO PERIMETRICO

PATIO DE GUARDEERIA
OBRAS PRELIMINARES

LIMPIEZA DE TERRENO MANUAL

MOVIMIENTOS DE TIERRA
TRAZO,NIVELES Y REPLANTEO

EXCAVACION A MANO EN TERRENO NORMAL

BASE PARA PAVIMENTO EN CONCRETO RIGIDO

NIVELACION Y APISONAMIENTO MANUAL

RELLENO CON MATERIAL GRANULAR EN CAPAS DE 0.15m

ELIMINACION CON TRANSPORTE(CARGUIO A MANO)REN=25m3/dia

CONCRETO SIMPLE

ENCOFRADO Y DESENCOFRADO PARA PAVIMENTOS

CONCRETO RIGIDO DE FC=175kg/cm2 PARA PAVIMENTOS

INSTALACIONES ELECTRICAS
TABLEROS ELECTRICOS

TABLERO ELECTRICO DE DISTRIBUCION MONOFASICA 12 PLOSC/CAJA METAL(TD)

SALIDAS PARA ALUMBRADO

SALIDA PARA CENTRO DE LUZ

SALIDA PARA INTERUPTOR SIMPLE

SALIDA PARA TOMACORRIENTES

SALIDA PA TOMA CORRIENTE DOBLE CON LINEA A TIERRA

ARTEFACTOS

ARTEFACTO TIPO LUMINARIAS CUADRADA C/REGILLA ADOSADA ALUM.4x18w

ARTEFACTO TIPO PLAFON OVNI NIQUEL FOCO BOLA 25w LB-E27


PUESTA A TIERRA

EXCAVACION MANUAL DE HOYO A PUESTA A TIERRA

INSTALACION DE PUESTA A TIERRA

RELLENO Y COMPACTACION DE PAT CON MATERIAL PROPIO

PRUEBAS ELECTRICAS

PRUEBAS Y PUESTA EN SERVICIOS

SALIDA PARA PUESTA A TIERRA

SALIDA PARA PUESTA A TIERRA PT1, CON CABLE DESNUDO cu 16mm2

SALIDA PARA PUESTA A TIERRA PT2, CON CABLE DESNUDO cu 16mm2

ALUMBRADO DE EMERGENCIA

ARTEFACTO LUMINARIA DE EMERGENCIA 20W

CABLE TIPO LSOH-80,2.5mm2-PVCDIAM. 20mm

CABLES Y TUBERIAS

ALAMBRE DE TWG 2.5mm2

ALAMBRE DE TWG 4mm2

TUBERIA PVC SAP ELECTRICA DE 20mm

INSTALACIONES SANITARIAS GENERALES


SISTEMA DE DESAGUE Y VENTILACION

SALIDA DE PVC SAL DASAGUE 4" INODORO

SALIDA DE PVC SAL DESAGUE 2" LAVADERO Y LAVAMANOS

SALIDA DE PVC SAL DESAGUE 2" LAVADERO


SALIDA DE PVC SAL DASAGUE 2" URINARIO

SALIDA DE PVC SAL DE VENTILACION DE 2"

SUMINISTRO E INSTALACION TUBERIA PVC SAL 4"

SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2"

SUMINISTRO DE INSTALACION TUBERIA PVC SAL 2"-VENTILACION

SUMIDEROS DE BRONCE 2" PROVICION Y COLOCACION

SUMIDEROS DE BRONCE 4" PROVICION Y COLOCACION

CAJA DE REGISTRO DE DESAGUE DE 12"X24"

ACCESORIOS EN RED DE DESAGUE Y VENTILACION

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2",INODORO
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2",LAVATORIO Y LAVAMANOS
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2", LAVADERO
SUMINISTRO E INSTALACION DE TUBERIA PVC SAP PRESION C-10,3/4
SUMINISTRO DE INSTALACION TUBERIA PVC SAP PRESION C-10,1/2"
SUMINISTRO E INSTALACION VALVULA TIPO ESFERICA 1/2"
SUMINISTRO E INSTALACION VALVULA TIPO COMPUERTA 3/4"
SUMINISTRO E INTLACION VALVULA TIPO CONPUERTA 1/2"
ACCESORIOS EN LA RED DE AGUA
SISTEMA DE AGUA DE LLUVIA
SUMINISTRO E INSTALACION TUBERIA PVC SAL DE 4"P/AGUA DE LLUVIA
SUMINISTRO E INSTALACIONES CANALETA DE SEMICIRCULAR PLANCHA GALVANIZADA DIAMETRO 0.20m
ACCESORIOS EN EL RED DE AGUA DE LLUVIA
CUNETA EN VEREDA
SUMINISTRO E INSTALACION DE REJILLA EN CUNETAS
APARATOS SANITARIOS
SUMINISTRO DE APARATOS SANITARIOS-LAVOTORIOS
SIMINISTRO DE APARTOS SANITARIOS-INODORO
SUMINISTRO DE APARATO SANITARIO-LAVADERO DE ACERO INOXIDABLE
URINARIO EN PISO
COLOCACION DE ACCESORIOS SANITARIOS
ACCESORIOS SANITARIOS
ACCESORIOS SANITARIOS
COLOCACION DE ACCESORIOS SANITARIOS
VARIOS
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS
LIMPIEZA FINAL DE OBRA
SEAL INDICATIVAS DE SALIDA EVACUACION
SEAL IDE ADVERTENCIA DE RIESGO ELECTRICO
EXTINTOR DE POLVO QUIMICO SECO TIPO ABC, COLGADO
JUEGOS RECREATIVOS
FLETE
FLETE TERRESTRE
OCTUBRE NOVIEMBRE DICIEM

Semana 1Semana 2 Semana 3 Semana 4 Semana 5 Semana 6 Semana 7 Semana 8 Semana 9

52162.20
12838.74

2000.00

1864.20

7500.00

1150.50

324.04

21400.46

7539.84

13139.28

424.49

296.85

17923.00

2460.95

15462.05

15562.01
15562.01

5467.97

725.78
7581.62

1786.64

39627.40
17206.48

3094.42

1245.89

1635.72

7328.88

70.88

3830.69

17892.28

14968.67

74.79

2848.82

4528.64

726.41

178.42

774.02
1720.44

407.19

722.16

182964.85
110518.80

110518.80

18839.62

7723.83

1244.02

6117.70

3754.07

2056.50

2056.50

2950.76

2950.76

22150.00

1500.00

7800.00

1300.00

1750.00
2200.00

2550.00

1500.00

1200.00

350.00

500.00

600.00

900.00

19034.38

19034.38

2363.38

326.04

225.00

710.64

1101.70

5051.41

3406.65

1644.76

69953.19
5132.20

1951.79

3180.41

36678.05

1955.64

72.00

7222.27

3046.29

24381.85

166.08

166.08

4725.04

4725.04

1096.24

1096.24

22155.58

20716.03

1439.55

7753.82
116.82

116.82

4269.19
71.51

1446.02

1220.59

67.97

372.02

1091.08

3367.81

1571.49

1796.32

14544.95
1768.44

1768.44

1698.86

707.36

991.50

1341.06

1341.06

2993.89

2550.24

443.65
1847.80

226.92

1490.34

130.54

500.00

500.00

305.41

16.61

288.80

1173.30

937.70

235.60

2916.19

1004.52

515.57

1396.10

38455.47
3829.78

402.10

166.68

83.34
83.34

184.46

767.26

115.57

199.77

283.40

185.58

518.28

840.00

3418.63
417.60
417.60
83.52
114.51
861.82
365.12
181.00
352.12
625.34
28556.32
1738.10
2504.00
235.65
3743.58
20334.99
2368.34
240.00
1101.70
220.00
550.23
256.41
282.40
211.90
70.50
14423.86
2000.00
87.01
23.94
10.26
1302.65
11000.00
7500.00
7500.00
DICIEMBRE

Semana 10Semana 11Semana 12

You might also like