You are on page 1of 4

Gr-1089-core

John can be reached at Of course, these problems do not exist for the power cross test which is defined as a Hz waveform with a RMS voltage
and current value. Combined with the GRCORE requirements, the compliance engineer can be faced with an endless loop of changes for each
test. First level ac power fault. Here the voltage V is below the voltage-limiting protector and will not be reduced in any manner. If the unit
contains less than 12 pairs, then all pairs are tested. However, it is important to keep in mind that the other requirements could be affected by the
outcome of any of the tests. The test levels are based upon the assumption that the facility is protected by a voltage-limiting device with an
approximate breakdown voltage of V differential. Any indication of ignition, charring, or ejection of materials is to be considered a failure. The filter
allows the system to comply with EMC but the added weight could cause a change in the center of gravity, which, in turn, would cause a
noncompliance during the seismic test. Test surge 4 represents coupling to the grounding conductors and thus bypassing the protector. If the unit
contains more than 12 pairs, the pairs to be tested are to be chosen such that the distribution is as even as possible across the available pairs. If the
components in the filter might not be fire rated and could add to the fuel load, they may cause a failure during the fire test. These two documents
are known as the Network Equipment Building Systems NEBS requirements and are designed to assure the safe and efficient operation of the
Network in a wide range of harsh environments. This requires that the OCV must appear on all outputs simultaneously. This process continues until
all the outputs are shorted, and they all must meet the SCC requirement. He can be reached at Commercial ac power is usually not utilized in a
central office environment but is required to meet EN lightning test. Test surges 1, 2, 3, and 5 represent the V differential let-through voltage of the
protector. Therefore, the requirement consists of surges 1, 2, 4, and 5 or 3, 4, and 5. The initial reaction when designing such a generator is that
maintaining the waveshapes for OCV and SCC are almost impossible. The energy is approximately J. This would occur if the designer were having
difficulty meeting the SCC duration and solved the problem by having a very long OCV duration 2 or 3 times the requirement. Waveform 5 is a
special case where up to 12 tip-andring pairs are tested simultaneously. This waveform simulates a nearby strike coupling into the grounding
conductors. The tests in Table 4 will also need to be performed at just below the triggering threshold of the voltage or current limiting device. The
first level criteria require normal operation after the test surge without damage. Since the witness cloth may ignite, a fire extinguisher is nearby at all
times. The cloth is wrapped around the circuit pack, shelf, rack, or magazine under test. Additional tests are discussed in GR, but are established
as objectives and not requirements. The test in Table 3 will also need to be performed at just below the triggering threshold of the voltage or
current limiting device. Mark can be reached at or markbetts worldnet. The problem arises when the design is such that the duration on the OCV
is so large as to over test the equipment-under-test. If the unit contains a voltage or current limiting device such as a gas tube, then an additional
test is required to assure that the device will not trigger due to low level induced currents. This is enough energy to give someone a good jolt and
must be respected. The power cross requirement is derived from the possible condition that an electrical power line comes in contact with the
telecommunication line. In order to meet all NEBS requirement, a large database of knowledge and experience is required by the test engineers
and technicians. For instance, a system may fail lightning or EMC and thus require a larger filter on the power input. Second level lightning surge.
As a result of this growth, the Regional Bell Operating Companies RBOC and other service providers are attempting to bring new devices online
at a rapid pace. The values are obtained by using the proper source impedance for the generator. The latter test sequence is the most efficient. This
requires placement of a TranZorb, MOV, or diodes either on the board directly behind the connector or inside the connector. The simplest design
uses total isolation so no current will flow when V is placed between tip or ring and ground. The typical lightning protection design employs a fast
switch to divert all energy to ground prior to entering the equipment. If the unit has a primary protection device such as a heat coil, these devices
are to be removed for all tests except for test number 4. The second level lightning surge fire, fragmentation, or safety is summarized in Table 2.

Telcordia Releases GR-1089-CORE Issue 6 for NEBS Testing


Test surge 4 represents coupling to the grounding conductors and thus bypassing the protector. A description of the types of equipment that are
typically required to meet the Lightning and Power Fault test is provided. John can be reached at As a result of this growth, the Regional Bell
Operating Companies RBOC and other service providers are attempting to bring new devices online at a rapid pace. Working with a team of
people no one person is a NEBS expert experienced with all the NEBS testing will direct the compliance engineer to a cost-effective and timely
design solution. The initial reaction when designing such a generator is that maintaining the waveshapes for OCV and SCC are almost impossible.
The test levels are based upon the assumption that the facility is protected by a voltage-limiting device with an approximate breakdown voltage of
V differential. The second level criteria require that the unit not become a fire, fragmentation or electrical hazard. This would occur if the designer
were having difficulty meeting the SCC duration and solved the problem by having a very long OCV duration 2 or 3 times the requirement. First
level ac power fault. Obviously, calibration of the generators can be a time-consuming task. The ac power fault test will definitely kill if these
voltages came in contact with a person. If the fault occurs on a secondary line, the condition may persist for a long time until cleared by the power
company. The difficulty here is finding good power resistors and building a safe generator. Other tests are quite severe such as seismic, fire,
operating humidity, ESD, lightning, and power fault power cross. Tests include some rather benign requirements such as package vibration and
drop test. That is, faster rise times are allowed and slower durations are allowed. The tests in Table 4 will also need to be performed at just below
the triggering threshold of the voltage or current limiting device. He can be reached at A method of evacuating the atmosphere in the area quickly is
also required since the smoke may be toxic. Of course, these problems do not exist for the power cross test which is defined as a Hz waveform
with a RMS voltage and current value. The latter test sequence is the most efficient. This aspect is a direct result of the differential nature of the
telecommunication connection tip and ring. Commercial ac power is usually not utilized in a central office environment but is required to meet EN
lightning test. Additional tests are discussed in GR, but are established as objectives and not requirements. Testing and Measurement Techniques
Section 5: These criteria hold for both the lightning and power cross test. Here the voltage V is below the voltage-limiting protector and
will not be reduced in any manner. This paper will concentrate on the lightning and power cross test. If the unit contains more than 12 pairs, the
pairs to be tested are to be chosen such that the distribution is as even as possible across the available pairs. Not all five tests are required.
Industry Sponsors Click here to learn more about our Industry Sponsors! This process continues until all the outputs are shorted, and they all must
meet the SCC requirement. As can be seen, testing only a few telecommunication pairs could easily be a four to five day effort. However, it is
important to keep in mind that the other requirements could be affected by the outcome of any of the tests. This requires placement of a TranZorb,
MOV, or diodes either on the board directly behind the connector or inside the connector. The energy is approximately J. Combined with the
GRCORE requirements, the compliance engineer can be faced with an endless loop of changes for each test. For instance, a system may fail
lightning or EMC and thus require a larger filter on the power input. The first level criteria require normal operation after the test surge without
damage. The test in Table 3 will also need to be performed at just below the triggering threshold of the voltage or current limiting device. The
second level fire, fragmentation, or safety ac power fault test is summarized in Table 4.

Telcordia Releases GRCORE Issue 6 for NEBS Testing - MET Laboratories, Inc.
Commercial ac power is usually not utilized in a central office environment but is required to meet EN lightning test. As a result of this growth, gr-
1089-core Regional Bell Operating Companies RBOC and other service providers are attempting to bring new devices online at a rapid pace. The
initial gr-1089-core when designing such a generator is that maintaining the waveshapes for OCV gr-1089-core SCC are almost impossible. The
second level criteria require that the gr-1089-core not become a fire, fragmentation or electrical hazard. Gr-1089-core waveform simulates a
nearby strike coupling into the grounding conductors. Working with a team of people no one person is a NEBS expert experienced with all the
NEBS testing will direct the compliance engineer to a cost-effective and timely design solution. If the unit contains a gr-1089-core or current
limiting device such as a gas tube, then an additional test is required to gr-1089-core that the gr-1089-core will not trigger gr-1089-core to low
level induced currents. Here the voltage V gr-1089-core below the voltage-limiting protector and will not be reduced in any manner. A
description of the types of equipment that are typically required to meet the Lightning and Power Fault test is provided. Test surge 4 represents
coupling to the grounding conductors and thus bypassing the protector. First level lightning surge. The test in Table 3 will also need to gr-1089-
core performed at just below the triggering threshold of the voltage or current limiting device. Gr-1089-core, the requirement consists of surges 1,
2, 4, and 5 or 3, 4, and gr-1089-core. Of course, these problems do not exist for the power cross test which is defined as a Hz waveform with a
RMS voltage and current value. The test levels are based upon the assumption that the facility is protected gr-1089-core a voltage-limiting device
with gr-1089-core approximate breakdown voltage of V differential. John is responsible for site certifications and manages all commercial
programs at gr-1089-core Fullerton, Gr-1089-core Division. This aspect is a direct result of the differential nature of the telecommunication
connection tip and ring. If the unit gr-1089-core a primary protection device such as a heat coil, these devices are to be removed for all tests. The
values are obtained by using the proper source impedance for the generator. If the unit has a primary protection device such as a heat coil, these
devices are to be removed for all tests except for test number 4. Intra-building telecom lines are required to meet a less severe test requirement not
discussed. Industry Sponsors Click here to learn more about our Industry Sponsors! Gr-1089-core second level lightning surge fire,
fragmentation, or safety is summarized in Table gr-1089-core. This coupling would appear as a common mode voltage. Since these additional
tests are less severe than the second level tests, most customers attempt to meet the first level objectives during the second level test. This process
continues gr-1089-core all the outputs are shorted, gr-1089-core they all must meet the SCC requirement. The typical lightning protection gr-
1089-core employs a fast switch to divert all energy to ground prior to entering the equipment. Any indication of ignition, charring, or gr-1089-
core of materials gr-1089-core to be considered a failure. Waveform 5 is a special case where up to 12 tip-andring gr-1089-core are gr-
1089-core simultaneously. Gr-1089-core ac power gr-1089-core test requires power feeds directly from the main power source so the
disconnects and controls to this test device are locked and tagged out. The filter allows the system to comply with EMC but the added weight
could cause a change in the center of gravity, which, in turn, would cause a noncompliance during the seismic test. Note that the same calibration
procedure needs to be followed as described above i. Testing and Measurement Techniques gr-1089-core Section 5: Additional tests are gr-
1089-core in GR, but are established gr-1089-core objectives and not requirements. This second level criteria gr-1089-core confirmed through
the use of a witness cloth consisting of bleached, untreated cheesecloth. In gr-1089-core, if the unit contains a voltage gr-1089-core current
limiting device such as a gas tube, then an additional test is required to assure that the device will not trigger due to low level induced currents.
Mark can be reached gr-1089-core or markbetts gr-1089-core. Second level lightning surge. They are also exempt from the test. However, gr-
1089-core is important to keep in mind that the other requirements could be affected by the outcome of any of the tests. If the unit contains more
than 12 pairs, the pairs to be tested are to be chosen such that the distribution is as even as possible across the available pairs. Gr-1089-core all
five tests are required. The latter test sequence is the most efficient. The second level fire, fragmentation, or safety ac power fault test is
summarized in Table 4. Any conditions indicating a violation of the gr-1089-core operation of gr-1089-core system will also be considered a
failure. The gr-1089-core is wrapped around the circuit pack, shelf, rack, or magazine under test. The difficulty here is finding good power
resistors and building a safe generator. All tests are performed at 60 Hz. This requires that the OCV must appear on all outputs simultaneously.
Gr-1089-core the lightning and the power cross tests are applied to the telecommunication ports only. The dc power line is assumed to gr-1089-
core protected internally at the power source. If the fault occurs on a gr-1089-core line, the condition may persist for a long time until cleared by
the power company. The ac power fault test will definitely kill if these voltages came in contact with a person. A method of evacuating the
atmosphere in the area gr-1089-core is also required since the smoke may be toxic. As can be seen, gr-1089-core only a few telecommunication
pairs could easily be a four to five day gr-1089-core. This is enough energy to give someone a good jolt and must be respected. That is, faster rise
times are allowed and slower durations are allowed. John can be reached gr-1089-core The typical ac power fault protection design employs the
use of fuses to protect the system from the second level faults. These criteria hold for both the lightning and power cross test. Gr-1089-core would
gr-1089-core if the designer were having difficulty meeting the SCC duration gr-1089-core solved the problem by having a very long OCV
duration 2 or 3 times the requirement. These two documents are known as the Network Gr-1089-core Building Systems NEBS requirements and
are designed to assure the safe and efficient operation of the Network in a wide range of harsh environments. Tests include some rather benign
requirements gr-1089-core as package vibration and drop test. Jennifer can be reached at or jlawrence itouchcom. For instance, a system may fail
lightning or EMC and thus require a larger filter on the power input. The energy is approximately J. Fuses may still be supplied as a secondary
protection gr-1089-core case a low impedance is caused by the preceding tests. Gr-1089-core the witness cloth may ignite, a fire extinguisher is
gr-1089-core at all times.