Professional Documents
Culture Documents
42
86.45 3 259.35
2.4 3 7.2
4.92 3 14.76
42.55 3 127.65
2.8 3 8.4
0.88 3 2.64
698.99 3 2096.97
46.7 3 140.1
3.27 3 9.81
0.45 3 1.35
494.33 3 1482.99
32.53 3 97.59
2.62 3 7.86
150.17 3 450.51
29.14 3 87.42
243 3 729
2017403.13
100870.157 44.53 2 89.06
145.94 2 291.88
8.48 2 16.96
3.15 2 6.3
8.76 2 17.52
1.72 2 3.44
326.7 2 653.4
19.48 2 38.96
1.01 2 2.02
19.23 2 38.46
13.24 2 26.48
19.77 2 39.54
1133.72 2 2267.44
87.12 2 174.24
2.41 2 4.82
138.13 2 276.26
27.79 2 55.58
231.49 2 462.98
3.8 79.9 0.35 0.15 4.19475 27.965
3.85 0.35
3.5 19.5755
3
1.6
0.7
1.8 2.95 56.4
2.05 3.5
2.05 3.85 53.76 1305
1.55 3.8 75.34 1828.84487
2.9
3.8
2.45 4 41
4 2.45
3.45 3.8
3.45
3.45
3.45 97.43 409.27
3.45 142.08 596.82933
1.6
24
Presupuesto de inversin a Precios Sociales
ALTERNATIVA 1
Componente Actividades
EXPEDIENTE TCNICO
08 AULAS
ALMACEN
COCINA Y COMEDOR
COBERTURA DE PATIO
Infraestructura
cumple ESCALERAS
estndares INSTALACIONES SANITARIAS COMUNES
normativos
INSTALACIONES ELECTRICAS EXTERIORES
OBRAS COMUNES
SUPERVISIN
GASTOS GENERALES Y UTILIDAD
SUB TOTAL
Mobiliario MOBILIARIO DE AULAS
cumple
estndares MOBILIARIO DE COCINA-COMEDOR
normativos
SUB TOTAL
Equipamiento
suficiente para
el rea de
Recursos
Tecnolgicos y
Auditorio
EQUIPAMIENTO AUDITORIO
SUB TOTAL
TRMINOS DE REFERENCIA
SUB TOTAL
TOTAL
Fuente: Elaborado por el equipo formulador
ersin a Precios Sociales
RNATIVA 1
ITEM DESCRIPCION
A Precios de Factor de Total a Precios
Mercado Correccin Sociales
CAPACITACI
N EN
7,749.06 0.847 6,563.45 04.00.00 METODOLO
GAS DE
ENSEANZA
86,219.06 73,027.54
500 0.847 423.50
119,026.79 77,736.17
581,150.67 581,150.67
181,377.87 60,459.29
272,191.88 144,157.71
300,410.62 300,410.97
143,208.79 60,681.69
NSTALACIONES SANITARIA 33,849.50 33,849.50
NSTALACIONES ELECTRICAS 49,199.54 18,130.46
OBRAS COMUNES 20,005.67 20,005.67
UPERVISIN 119,026.79 77,736.17
ASTOS GENERALES Y UTILI 278,262.50 214,444.61
MOBILIARIO DE AULAS 22,925.70 22,925.70
4,598.78 4,598.78
FLUJO DE COSTOS INCREMENTALES A PRECIOS DE SOCIALES
SITUACIN CON PROYECTO
Fase de Inver 0 1 2 3 4
C1:
Infraestructur
a cumple 2,097,710.62
estndares
normativos
C2:
Mobiliario
cumple 30,114.99
estndares
normativos
C3:
Equipamient
o suficiente
para el rea 86,219.06
de Recursos
Tecnolgicos
y Auditorio
Fase de post
Inversin
Costo de
Operacin y
mantenimien 367,769.25 367,769.25 381,196.74 367,769.25
to " con
proyecto"
COSTOS INCREMENTALES
Costos de 2,219,143.45
inversin
Costos de
Operacin y 42,950.74 42,950.74 43,797.74 42,950.74
Mantenimien
to
TOTAL
COSTOS 2,219,143.45 42,950.74 42,950.74 43,797.74 42,950.74
INCREMENT
ALES
Elaboracin: Propia
ENTALES A PRECIOS DE SOCIALES - ALTERNATIVA 1
TUACIN CON PROYECTO
5 6 7 8 9 10
OSTOS INCREMENTALES
Operacin y Mantenimiento
4 5 6 7 8 9 10
42,950.74 42,950.74 43,797.74 42,950.74 42,950.74 43,797.74 42,950.74
0.71 0.65 0.60 0.55 0.50 0.46 0.42
42,950.03 42,950.09 43,797.14 42,950.19 42,950.24 43,797.28 42,950.32
COSTOS DE INVERSION ALTERNATIVA 1 A PRECIOS DE MERCADO EN
NUEVOS SOLES
INVERSION E INFRAESTRUCTURA COSTOS
OBRAS PROVISIONALES 15,182.42
SISTEMA DE VIGILANCIA EQUIPAMIENTO 378,000.00
CENTRO DE MONITOREO Y CONTROL 544,279.41
CAPACITACION 12,345.00
COSTO DIRECTO 949,806.83
GASTOS GENERALES 75,984.55
UTILDAD 75,984.55
SUBTOTAL 1,101,775.93
IGV 18% 198,319.67
COSTO DE LA OBRA 1,300,095.60
EXPEDIENTE 65,004.78
SUPERVISION 65,004.78
MONTO DE INVERSION 1,430,105.16
INVERSION E INFRAESTRUCTURA
OBRAS PROVISIONALES
CAPACITACION
COSTO DIRECTO
GASTOS GENERALES
UTILDAD
SUBTOTAL
IGV 18%
COSTO DE LA OBRA
EXPEDIENTE
SUPERVISION
MONTO DE INVERSION
SION ALTERNATIVA 1 A PRECIOS DE
ADO EN NUEVOS SOLES
COSTOS
15,182.42
378,000.00
544,279.41
12,345.00
949,806.83
75,984.55
75,984.55
1,101,775.93
198,319.67
1,300,095.60
65,004.78
65,004.78
1,430,105.16
RUBRO 2003 2004
A) COSTOS
DE
INVERSIN ###
B) COSTOS
### 472,699
DE OPER..
102,216 166,608
1. Personal 143,615 269,007
### 37,084
2. Materiales 1,886 3,708
3.
### 33,375
Administracin
3.1
Mantenimient
o
3.2 Otros
Gastos
B) COSTOS
### 472,699
DE OPER..
102,216 166,608
1. Personal 143,615 269,007
### 37,084
2. Materiales 1,886 3,708
3.
### 33,375
Administracin
3.1
Mantenimient
o
3.2 Otros
Gastos
102,216 166,608
1. Personal
121,707 227,972
15,979 31,427
2. Materiales 1,598 3,143
3.
### 28,284
Administracin
3.1
Mantenimient
o
3.2 Otros
Gastos
539,646
166,608
327,843
45,195
4,519
40,675
539,646
2013
539,646
166,608
327,843
45,195
4,519
40,675
539,646
2012
482,742
166,608
277,833
38,301
3,830
34,470
482,742
RUBRO 2003 2004 2005 2006 2007
A) COSTOS
DE
INVERSIN ###
B) COSTOS
### 472,699 480,351 487,567 494,949
DE OPER.
COSTOS CON
PROYECTO
(A+B) ### 472,699 480,351 487,567 494,949
C) COSTOS
SIN
PROYECTO ### 268,747 272,911 276,837 280,853
COSTOS
INCREMN.
(A+B-C)
### 203,952 207,440 210,730 214,096
FA
### 0.8772 0.7695 0.675 0.5921
14%
2,352,253
VACT VAE 178,905 159,619 142,237 126,762
S/. 450,959
COSTOS
INCREMN.
(A+B-C)
### 182,663 185,619 188,407 191,260
FA
### 0.8772 0.7695 0.675 0.5921
14%
S/2,044,670
VACT VAE 160,230 142,828 127,170 113,241
S/391,991
2008 2009 2010 2011 2012 2013