CHAPTER 1. EQUIPMENT SIZING
1.1. Main Process
1.1.1. Screw Conveyor Nabila Hana Dhia
1.1.2. Shredder
1.1.3. Hopper
1.1.4. Bucket Elevator
1.1.5. Fluid Bed Dryer
1.1.6. Pyrolyser
1.1.7. Cyclone Separator Silva Amanat Taqwa
1.1.8. Condenser
1.1.9. Blending Tank
1.1.10. Centrifuge
1.1.11. Flash Evaporator
1.1.12. Electric Heater
1.1.13. Electric Cooler Davita Kristabel Mandala
1.1.14. Blower
1.1.15. CO2 Injector
1.1.16. Pump
1.1.17. Heat Exchanger
1.1.18. Valve
1.1.19. Pipe
1.2. Utility
1.1.1. Boiler Nur Annisa
1.1.2. Condensate Drum
1.1.3. Storage Tank
1.1.4. Air Dehumidifier
1.1.5. Pump Nabila Putri Salsabila
1.1.6. Jacket Heating in Blending Tank
CHAPTER 2. PIPING AND INSTRUMENTATION DIAGRAM (P&ID)
Piping and Instrumentation Diagram (P&ID) Nabila Putri Salsabila
CHAPTER 3. CONCLUSION
Conclusion Nur Annisa