Perhitungan ME
Unit Diameter Penstock
Lambai 1 1.4
Lambai 2 1.6
Belangir 1.4
Perhitungan ME
ead Gross Head loss Head Net CF Daya Pembulatan
m 3.31 m 157.55 m 0.5708 5077 kW 2538.5 2500 kW
m 4.75 m 140.95 m 0.5767 6329 kW 3164.5 3150 kW
m 3.89 m 240.57 m 0.5971 4851 kW 2425.5 2400 kW
Total Daya 16257 kW 16100 kW
16.26 MW 16.1 MW
an ME
eter Penstock
m 14mm
m 16mm
m 16mm