You are on page 1of 55
BANGALORE METRO RAIL PROJECT, PHU, RB CLIENT: BMRCL. CONTRACTOR: NOCL GRAPHICAL REPRESENTATION OF IGIRDER CASTING (TRACK LEVEL) RFINO:NCCLRABICYIS G59, 30.36 | ReWFORCEMENT QUANTITY: 2:16 T ( station: Axjanapaxa Road Cross GIRDER TYPE: Post Tension 1 Givder GIRDERLOCATION: Grvied 09 40 cirverio: ApRC|TRK) 33 DATE OF CASTING: 1%°04-2.01% DATE OF STRESSING 02.08 201% DATE OF GROUTING : 09-08: 2014 CONGRETE QUANTITY; *F-T5A Cm STRAND QUANTITY : 0:39 OT SHEATHING PIPE: 24:00 rm}. he eea— NCCL REPRESENTATIVE [BMRCL REPRESENTATIVE, ee REQUEST FOR INSPECTION (RFI) ] Spa oS Sc ah SS ae pC WU Ch Tom PEA a a. a a, Prete | isuanast saeco ala agua arate Sanco ese oat Sao at Conan ee {roar —f ewes taoe = rine: Necel@nelerttalse9 Date 14-04-2013 _We hereby request for inspection of the following activity falling in the next 24 hrs. Tame: 16:G0AM) abated ae Facey ioe! Pak Teosion t Gieder | Casting | os infercemene . | ApRe|TRk| 33 Yara ae Gad 09 to Ao “Track Level z oe Goce femeesate, ee — Pa 013 10-00 4. name Sa a i (The checkiis: for the activity to be carried out shall be enc Dato 6 Time fa fig- to: 30 ah iy “The Works sited above have been inspected and app(eved/ not approved Comments by BMRCL's Ropreseratve which ae a7olows, Cae we, name Rajsoee= NI Nene: P'S éL v8 Designation AE Desigraton: =F Date & Time : 1F-0"F 0" - Date 8Time: | 2—F— 17 Resubmitng ater tending the remarks ‘Approve Conmonts NCCLS Representative BMRCL's Represeriave Name Name Designation Designation Date & Tine Date & Tine OE REQUEST FOR INSPECTION (RFI) Selects tm urenas ea cab tt iba eager tera eeesd ae ‘Siem ogee, ene etn Vt ga, gg. [BMRCUPHASEZIR4 EXTNVs & Sins2014 dated 27.01.2016 ie Bangatore Mero Rall Corporation Liited (BMRCL) MsNCCLintea Reino: Alccilee@levb.Glses ie hereby request for nspocon of he flowing atv fling inthe net 24 rs Time: 10:00am cena oye | ‘Daserpton of Wore Location Osan ‘Acviy Post Tension I Givdlex ApRc| TRe| Ss Gud 094050 Track bevel Cosi nd! Od. | Reinfoscement ~ np Represonaie Namo: Rejarelva Al. Desanason SAE. Dote Tine: (H.0F: B04 - BS val 28.2 Grrcley TR) 33, 21.09. 2019 Famicel PMA Ral rs61- Date atime’) @.94-d0r4 . BANGALORE METRO RAIL PROJECT, PHASE-2 Name of work ‘Consrction of int td stations et :BMRCL conescor NCC Lined Asjaompura.Read Goss Rest Tension, Giver s APBCNTRM a2 2 ARR RON. _Bnscs\anl Rul Teelsurloot Ghovo,os) ‘FORMWORK CHECKLIST FOR PRESTRESSED GIRDER Resale Ye [Fe No.:097 Description FORMWORK ‘Check fr botiom, side & top shuttering fied propery wih Team sheets to the fine, level and plumb / angles as perth drawing. ‘Check forte ros Hed properly with side shuter at he appropriais location a pr approved drawing. ‘Check for bottom and sie top sues cleaned propery and akin coat of shustering ol applied evenly. Check for conrete area cleared off mls, bnding wie, wooden wastes, te. ‘Check fo staging & snting works done propel as pete CMC approved dawing. ‘Check fr suicient o. of vibrating ad hing Hs ae vail ‘Cesk for ay protetion Tie barnes pao Hing _erangemens completed. [Name of contgctor’s representa wndve 0 Spare Be Date & time)g.94- 2014 BANGALORE METRO RAIL PROJECT, PHASE-2 1. Name of wok {Constrtion of vind! nd tations 2 Chen MCL 3. Contactor ‘NCC Limited Nob 4. Name of tbe son Arijsanpira. Baad Coss S Giner ype + Pasi Teaaien.T. Grinder 6. Girder identification no. APRENIRE)Z3, 7. Date of inspection MBAR 4 Drawing Noe Revision No Fmagcr|enalais| 74) surloo: Chor of os) ou IRDERS CONC! = Rell ism riptoa ee | tem ‘Check for required grade of concrete M30. | ~~ Check forthe girders location identification as per the drawing no. | 2 Jomecalenalantnesclsurleo: Gh.et of os) ‘Check for concrete placed in approved sequence with boom placer! ie ied proper Check for concrete placed in approved sequence of concrete stages inte girs pert proved doings 3 | Ck ruc. feo ae ka lng abe | alr crlog xg fr aren penn ‘Check for botiom and side shutters loosened after a minimum 6 | period 24 osm and exposed concrete surices moist ering fr || — in. period of 4 days. 7 | ek fr conse sure good spre aque = Cie fe go, fan depresios unl, bangs: THE rod le, vod et, found in conta be mad good with | approved mateial which shall be not less than the grade of a covert | Cask rs P= se lng vin | bolt oles pipesleeves et, poston & alignments. Nane ofeongrsrepesenatveRofendtra NI Name ot BMRCLrepesentve: Me sient: BSP Sion — Date & tine: 4@:03-201% Date & time: . jshaheoe BANGALORE METRO RAIL PROJECT, PHASE-2 Name of work -Consevton af vad in tons Cleat wre. Conte NOC Limited No Name ofthe tion Arianapuia. Road Coss Ginger ype Post. Tension T.Grdex Girderideatieation no. APRETRE\z3, Date ofinsecton 07:2 Drawing No& Revision No agen enolas|7s&) surleo: Ghor o} 6s) Description ia or oul gate oT conse NT. ‘Check for the girders location identification as per the drawing no, lannerlenalaultats|surle, hot of os) Geforce pled in approved ogee Wi aS rt an ished rope, ‘Cesk fr ena las n approval equanee of Sere Ra inthe ink po the approved ving ‘Check for sulin na of oer cae taken nclaing be eu for ate caring sting fr srsing operations her ot did sto Tsad ar nam pevod 24 tous nd expose concrete sure ot cing fr min period of 14 dys ‘Check cones are god pore auc ‘Chea oles, any depressions, uniniatons,elage: The roles, vos, fond in concrete sal be mad god with ‘prove mail whic shal bent es than he rad of ‘Cesk Fr Bias Pos = canara cig i Us ee, pa toltoles pipe sleet, psto alignment Naneateogors pein Rajendya N- —Name of BMRCL eerie sient: YP- Siena Date & time: \@-09-2014 . BANGALORE METRO RAIL PROJECT, PHASE-2 1. Name of work ‘Consretion vad and stations 2 Chen BMRCL 3. Conte NCC Limited nol 48 4, Name ofthe sation Asisanpins.Bead Coss 5. Girdertype Past. Tansee I, Givcber ‘6. Ginder identification no, CNR 23, 1. Date of inpston 1 S809: 2019, ae, :BMRGLAPHOI REI TSE) suploor Ghor o| 05) - ‘CHECKLIST FOR PRE-STRESS GIRDERS CONCRETE. WORK Real Sno Description xe —| Remar 1] Cie Trou ae of nea Cesk forte gs ocaton enfin pe te dawg no 2 famgcienolunratlsunler hol of ony ‘Cesk fer oneree lst in aprovd sequence wit oom pace esos fished propery, Check cons ined i pprove ace oT Cones ages inthe girder pe th approved eavings. 5 | Check osteo. of cone cabe tke nlading cube ‘equ for site coring & esting for sesing operation, Check oon and sid shes oon aera ian 46 | pre 0f24 hours and exposed concrete surfaces moist ung for in. period of 4 days. 7 | Gs fr conse uric good a pre FoR ‘Cesk fo ge, any depressions, datos, Welage.The rod holes, vise, funda cope sal be made god with spproved mate! which shal be ot es than the ede of Check or irs Post conreccng i Tee lamb, bolo, spe sleeves te, positon & alignments via el Sas A \ \ Namne of 1's representative: Rejerdva AI. Name of BMRCL represenusive: Signature: YY2- Signanre: Dat & time: \2. 09-2019 te & time: shakes BANGALORE METRO RAIL PROJECT, PHASE 2 1, Name of wrk -Conseetion of ade and stations 2. Clan BMRCL 3. Contactor ANC Limited Wo. 247 ‘e Name ote stonsiaroeation : Aisha Road Cross S. Date & time 2 ASE: 6 Drawing No & Rev No trenlgnp ex) Ts4\ sun} ont Gb 010608) 1. Ginder ype 1 PoukTenalen Z Giver 18, Girder identification no 2 APREVIRKI 23 9, Grad of eons MES (CONCRETE POUR DETAIL & SLUMP REPORT GIRDER c ‘Cone | Comets & | ve | ecm | mem | sacs | Pe mma 430 | auonm | s.apaml eso | su0mm | axaoan| ty | 6 — i const sonst: “Theoretical concrete quantity = 4-952 Cue) Concrete starting time 0AM ‘Acta consumption aut @ & 50 Cum Conte compeontine 9°20 4° see onsumption: Approve guy as perB3S = ‘eta quit provided = IGT mec conpg'srepreatnive: Rojendten NI - Name of BMRCL pment Madd) ‘Signature: ‘Signanure: — Date & tne: 18.05-29 ate & tine: “3/7 Be BANGALORE METRO RAIL PROJECT, PHASE -2 a, Name of work “constrain of viaduct nd stations 2) 3 No: 4 Road Cross . > 6 iphav e4\Ts61 Supl ov! Gorges) 7. Cinder type Tension, I Greeter ier idntieaton na. CN TREN 33, * s Ne 52. Cus) Coneeesttingtime 104 Covert sompletin ime 3°30.8™) NicCL_ READE MIX. WP? scx 10 conta Sytem Var — naw Docket /Batch Report /Antnraphic Record smainte season Pint Sl Se: 8 arerstarerime |: Diese teh End Tone - 014026 aM Belch Norber/Dect Nrber = 1104S (Ordered Oustity = -€50 ‘Cutarer nec Production Ountty > 450 Ste APRCITRE/23 AgVMsl Quantity 000 dace se “nsvcomem wert aD Ree Nae 14.0 SEGMENT: 1- GIEDER, Mixer Cepecty 1.00 ‘Truck Rumer RAGSAPION Buich Se 0 ‘Tackirie ae RaWiFomW rite 0 Order aber 1 Batch are Seaue Asereegte. Comat. Waa MSR Admit 2M SAND vg. CSAND MME 9 CEM CEM GOBS warm, ADD ges hors htc Sl Gln OOO tae we vl 0 0 on weo 9 8 lM 00 as i 0 ole rr) we o ow 0 0 9 0 om} oo wo ot, ye yom vow ym ey yo nw font SSBsSUMPAT PLANT USIE® SoRaTURE.. fs Mana. UME AT SITE 44. Gang. ST OF FOURNG 2, counrrn- ashe moore ea eb. NE SRE CdD na Ae [Bru 13/3 /oo i YPC. READY MIX. F MCT 100 Control System Ver 1.0 scrWING ‘Sue Docket /Batch Report / Autographic Record atchnite ada Plat Seria umber: 185, “tarsearctime EDA RL Baird Tine —— 0537 A Bch uber Docket Number = 1246 Ordered Qumtity 850 ‘Customer Prodictin Ovantity = 400 Site ‘AgiMtanoal Quantity : 000 Feeewet se WitrTragLons = 30 Recipe ime Mize Cenacty 100 “Truck Nunber HAG AP ION Bch Size 100 “nek aura, NaWeom Weide der Number 1 Batch are ‘sits Sempre. Creare, Wats MSUICK Admin 2M SiO vg. CSAND MM 9 CEM CEMZ GOES warm. pM Tigi rn or 7m Oa POST-TENSION I. GIRDER CONCRETE QUATITY TRACK LEVEL = TOOK AND STRESSING END 1d PORTION “TAPERED PORTION = aes _|m TT ma] t i LT 7 (eet) zg canon rexnao reton- eres eee ose = eons 209 WOLiME VE 2aamc0see-aercim | sora youmeevivevewue as] | cromemoaest so Cid oso vous Soto acum Fee REQUEST FOR INSPECTION (RFI) ‘Spas See aman yar iae Sone tans Sebo nel Se teense Mo /stbeNon | Gbirmsaaucr star tieeniedaegs ae earaimerr™ om | PRgwamentNo | BURGUPHASEDRC EXTNa& Salat seda7 016 Cn anak Mato Ral Copan Lind (CT) coacix we NWECLniog RrINo: Nasu ual oul Rel 646, Date: 01-08-2013 _We hereby request for inspection of the following activity falling in the next 24 hes. eee eee Descipon ot Work ‘ection vans ‘Aaty Post Tension I Givder Casting | a1 Stressing ee | UNO Apre|re«| a3 yer ea no Gud 9 te 10 yaar Track Level —o NO mere tome Fegernteas eM Serie Re Date &Time 1-08: 2anyy | 10:00 AMD pip ear . {The rca rn sty trod ct sh et) ‘Kt — 0:2 “The Werks stated above have boon inspected and apfioved ot approved Comments by BMRCI's Raptosentave which ar olows, aod NO Archos Heol 8240 2oeabyes - £901, Hen -3558 aan b&, Nese ee Designation; A ahs ey, Designation: § U~ Date & Tine: 03.08 2019 Oate 8 Tene: J 2—F— 17 essing ale tending he remarks Aoprove Comments Noct' Representative BMRCL's Representative Nave Name Dasgion Designation ae & Tim: Date & Tine « orosrnte wane: K 1 Guna dt. Ke patoatine yfe(t7 DANGALORE METRO RAIL PROJECT, PHASE 1 Nae of work Contin of vind and stations. 2 Chet BMRCL. 3. Contactor Neel. 4. Name of he sationitecr locaton « Aracrpatie. Road Cross £ PerNovepn de ‘AAPRel Tak) 33 € Daan ‘ona. cnrext, Date 3-08: 2014 ana ausem, Fini time 315, 22. Loenion Casting. Yord.. Grid,.24..10,.40 Span No = Batch No No 3,| vate aly rae. m Remarks: Name of eongje'sepreseutve:Rajendhsa. NI is excesse sheath [Tare the high & low points of the Tendons, atthe correct el BANGALORE METRO RAL PROJECT ame ofthe Work constnction fade and tations chest conor Su Name ofthe station/Viaduct location Anjanepune Road Cross Per No, Span detalls Goie.9.40.10. ata ine 03:08:20. ARTO PECTON OF Pos TNE ERAT FON AONOID AEN ‘A. ATWMATERIAL MANUFACTURING STAGE ncorage; seating evenly and edequately on the ‘ce the Gis of Dead End A ‘Anchor ate? _ 1 sp & immed at Dead End Fa Anchora te? is the slate sheathing of sutfiient and unform thickness? 1s the quay & texture ofthe fling greases onsstnt? rents appled evenly al over snd enh sta pero ee ad ae fom corn whe esti cave are removed? ire the. ArchorsproBiymadhinedwthamoot Teper Holes To Gi? are_the Grips of uniform length and eration of consistent quolty? ‘ve the Grips Fee from Corrosion? ie the Back ralef provided uniformy? ‘re al Test Reports and Certifste avalable for the Presresting Steel | nd all the components of Anchorage, as requeed bythe specficaton TENDON HSTALLATION STAGE: ‘he the tendon profiles smooth end earecthy shaped (parabote, Greuiar or | Sraign betwee reference pons? [Do the tendons have excess Baronial woBbi? YEINoINA Wiivajn Yes NolN | Yei/Noi =e Yes)NoIND. Wivoinn YeaINoINA vesflona re Ware ay fale Ih Whe erie feng of the sheng, od 50, | ave they beeps? | ‘Does the chavs oF Support-bar sym ave adequate and confirm tothe esi requrement? are the Siesting Anchors secived and fastened with the appropriate | posket former? [is bursting reinforcement inaled behind the anchorages are adequate and satisfying the design requlrement? ies the method of candle placarent been reviewed as to | Ieeffeet on duct stabaty during placement? | Hat the conventional sees placement been reviewed? —G_ATTENOON STRESSING STAGE ps, fee from rust dit snd foreign Has 2 consistent dimension Been used, asthe elongation datum mark on the sand? ie the overcome at much rton a posible rior olocking? ‘re Grips seated evenly, propery under pressure? In approvals te tendon tals propery cleaned and MCL Representatives vesinSina v&inoja ‘YESINo/NA YEININA YES/NO/NA Yes/No[NA YeuMo/Na VEIN NA auprents wel maintained, and are al the calbration | yuyu charts & reports aaleble? “* 7 tree tendo sresed ony veh is sow the sods © | Euan ENON | vy Rojendea o 1M: Si ve: (\ 03-08:a014. Blipa Name of work {Construction of viaduct nd stations lint ‘BMRCL ' 2 3. Contractor NCC Limited wod 41 4 Name ofthe station angpuna, Baad Coss ‘5. Date of inspection BS.08: as a, &: Dawnete ‘ricer PLEA 3% svoloo1 Ge ozopos) cere ee rate ect a CoN PYqaaCe Date of cating, te 07F-2017 | Gieder No Avec] Tek |e, | Actual Ar 145-09 Dasofsiesing [o3.0n-2013 | Cle wre (ais |Teoicalees | 140 ack ype usi¥iole [Chie RE. 15146 | Actual MOE 19686 an ogg a. C5940 | No | per drawing. ie .| ieee. Pump type Hydra Pack, cathe : © | peat i a 199-50] @ | Wr 94 nn 3 abieNe 67 1 Aid ctitramal Meme Renan :0))800 1536 somtetieas - mariana iapusxieae 2 Haim 2) oe ins Ain Mid enn Eo Ca hag sl Cita cotentatees Ghaaese meet oneee na sme 7 Sa » catia om 0 Repti oa _ Tustin Otc 10 1250 W144 ire mere Taser raiee 2) Mose engio fr Adin stl engin a ning. 1G hase as (ting gt eigenen nino Ata ME nia) ‘chee a Seek. - ce ome ©) CableNo: 1) vsti at _ Ch kotsetaas Ree 2 td ein it san na ag a se Ci achanetens ee See ae Se ee ta aneosonger someone: Rajendva N amearpungL oa Mr Spe Ke Signeure: Diteatin’O=08:.20\9 Dated time: Sate Trace | Devotestne ta. grt pit [ Greene khan [asia | wsiog | a of ring 2013 | EO leis | Rewwsares | fle Ick ope Iroutipie. [SReMTEN ——eohoasive [Ammer | Jazag i] Dag tunes [esa uo |e" Ree Tet | 1.209 500 7201 si sr rin aes Ama Moe arm) "etal se OD. 1) emp eae _honia Aras Tt MO Dec 014500 TH, 2-62 ron. 2) Modi snp ation Sepia arte ‘Tenens ast shee em em oe om ‘een a 0) Re einen Name of work Chere MCL Contractor .o2 of 8) Post. Tensten.d Greder ApRCLIRK | 33 Saleth:g0o Ulbatech, aa Sage pene ee Pm KLIST FOR: tem Description Yer Remarks T | Check or grouting stared min hoor of sen completed and all he Bright meal sheathing doce ae cleaned a wth Ai, water sper he requirement throwgh vents. ‘Check forcement rout prepared to WIC of Ot wit lpyroved OPC-53 grade Cement and amine ((NTRAPLAST N200/ CEBEX 200) inthe aptating mixer ‘machin and cleaned the Bright metal HDPE docs with pout the quired conisteney coming ou from al the vent and then locked. (Check for all Bright metal” HDPE dct are ied with coment rout and built up a pressure of Skea fra mininum period oF minut using grout gauge. -F | Check for vent pipes cut air mia oF 24 Roar and sealed them toa depth of 25mm with approved materia. Signature: Date & time: 09-08-2017. en Rajendva Name of BMRCL represent: Vj. Sinivot Red = BANGALORE METRO RAIL PROJECT, PHASE-2 A Nie owe Contraction of vad an sans 2 Chest MR el 2. Const, NCC Limi 4 eae acta Asianapme.Read Cress 5. Date of inspection 12208208... 6 Drawing Nod Rev No, specs mal esl Tas) svolov) Goa ob os) 7. Ginder type Rosi. Tensiend Gixdee 3. Gideridemtication No 2 APG 33 9. Gro adie rad EOSIN Ake BOD 10. Batch No ANIME 39.2962 1, Cement rand OPC 53 Grade 12, Cement ath 19, TRerete cement consumption 14, Aco Conteption 15. Gro statin 16, Got as me Ee ‘Mem Deseription Ye No ‘Remarks ‘Check for groning Operation stared min 2 hours of sing ‘completed an all the Bright metal sheathing dots are cleaned ‘vA, water as per the egulement hough ves. | Check forcement grow repered to» WIC of 0.4 with Approved OPC: grade coment and admixtare LONTRAPLAST N30/ CEBEX 200) in the aang mixer Imachine and cleaned the Bright metaVHDPE ducts with grout Ullheroquied consistency coming out rom all the Vents and then ocked. 3] Chek or Bg aa HDPE aac ee wih comet {rat ond tlt ps presi of Safe ora minimum period |__| oF mine sing ut gage “FJ Check for vet pipes cut afer in oF 24 ous ad sealed hem twa depth of 25mm with approved material. Wa Signature Naneotconrtors esate Reendya N~ Name of BMRCL ji foiniwet Fe Sloman) paren 08 9019. Dov ind Te ale BANGALORE METRO RAIL PROJECT, PHASE- Name of work {Consrction of viaduct nd stations tint 1. Contactor ‘Name ofthe station : ate of inspection 1Q9:28.201, 1 2 wo. 240 2 4 5 6. Drawing No& Rev No. acu pun Rul-Tasloveloey @hoaeb es) 1 * 8. Bead Ove Girdertype Girder identification No, Grout admire brand 10 Batch No ‘Cement rand OPC! 53 Grade 12, Cement bach n. 13, Theoretical cement consumption 14, Actual Coisumption 15, Grout stat time 16, Grou nish ime tem Deserition ve No | Remar Ce or grouting operation Saied min 24 Bours of HEINE ‘completed und all he Bright metal heating ducts are cleaned | + ‘oh Ait wafer so he requirement rough ven | Check forcement rou prepared toa WIC of 04 wih [PC-33 grade coment and admire (GNTRAPLAST N200/CEBEX 200) inthe agian miner ee (tachine and cleaned the Bright meta HDPE ducts with grout ihe required consistency coming out fom all the vents and then locked. 3 | Gieck forall Bright metal” HDPE docks are ile with cement {gout and built pa pressure ofS kgf’ fora minimum period | —— ‘1 minute using grou gouge. | Chick for vent pipes cut afer nn 0773 ours and esd hem: i to. depth of 25mm oth approved materia \ s ne ctcomgrsremeeivejesdh= NN of BMRCL pete! Siena: Siar: | ; Date tine: 09:0 20° ate tines! >) [BANGALORE METRO RAIL PROJECT, PHASE-2 1 Name of ws conan fade od tos, 2 Glen ‘oer. 3. Contator Neste & Nacottetoinin enn agicns, Road Cross 'S. Pir Nodapan details APRELTRI) 33 6 Ducane 091:08;,2012. oo Gnovrine nuvonr.cuve : aa Toa toi [ctlena ot 7 ce TE | o306-2017. | Puvofeowine —_ os-08. 2019 pew paieoToeneat [ore Ss Gracke [One Na eager oz WiC ore an Tune end monroe 500- Aininuewalitay | g369 per bag of Cement. Tena oeag oP . Sw wa IE water we Deve ie ea Usenciap Expt oe 1a PIV sang pe WS STR Maw a DY war OH Foiied 5:16 Pm. ‘Grout is sieved through 1060 micron sieve. Grout pumping pressure (Wo be keptlow) | - (C3ddpntto cured ty Ia be toning ot fe oto ame veivania deny wna) : ‘fe clon ulead a en, pong EE SE renene Mains 03 Mp orate Vat YEINONA Groaing oberon YERGNA sg of ging ag ven es Yes aie of proving Bogh one Yea “Ay equipment failure = “YesNoNA | rot twin Tonia oT = LE | ¥eeNONA if cable duct blocked, remedial measures | YesNaNA | Cable duct dameter 104 men 1D Length V3-20mby, Yobneof retin eee Seer cocmptn ig Tera 282 Bags [s.acta | 5 ays cai Aors1 : 19936 Uy Nombre fea E Nan ofcongaprs preemie: Raj endo N ame otbunct poet). C, Smeg <4 Nese Ml ive Duet tne-Bq.09 DIY. a 7 Paldty oe ee BANGALORE METRO RAIL PROJECT, PHASE? Conseton of vad dso 2 3 [Nee 4 Fisanapiay Road Coots 5 Alene ATS ‘ 702.2014 = GROUTING REPORT-cuex List gens (09.4010 [CaleNo, Biiotterwaiale 19.05.2019 |oweateoane | 090009 ‘ype wnd pac oTement | OPCS Grade | GageNe [KPa 3TH Wi i Noreen Nae wn amaatol [Cater =a50 7. sinitrewelitey [aos pes Gap of Cement. Teper of go : Gea NT wae ice poe ue et aise Gf i ‘Pay Be pag pe WI SIRS Naa ty way a a Tae Ons Pm —[Fhisbel te Bro “ious evel rough 1060 ron ee, Gro pumping presse (oe keplow) (05Mpa ott exceed by IM il te pst ong ou of at some YEON Senay nl) ‘Mr ling ean en Bou EE : Yeinana ‘Mainuned 5 Mp for oes inte YeaNonia ‘Gretng oberon = VERNA asses of eating ough ven aici YesNoweR sag of rating dough ales YEENGIA ‘ay eit lire estan ‘Grote whine oF ming = Tea ctl dit bocked rod moar : Yeaonn Gate dit inet Wine Tb. Tag 13:20 AT "olane frat Te a3. Ue. Regrexing | NO. Cem cme GB) Fra Ac! Wears a w—" anaes Aca 1348 Lae Nubian Frm iF aReing 5 ae oon resent: Ray endea a ss ey Say fly BANGALORE METRO RAIL PROJECT, PHASE? 1. Name oa Const f vinta sation. 2 Clim 3 Conse 44 Nae ofthe trond ootion Road Cro £ Fohsieesdettn ae & Dat atine 99:082012. cnourinG REPORT Ba 99.583073_] Greater =D Nike ahead Spon Kodi lo] [reat Pomp_ MMS 100 ‘ine Cenex = 20D Darel Gian, | WE moo ference sect 0208 2017 cane Temp of Fishing No tere | pouting sc ime ke ee z sae be Bare zap | Shalem Name of co eee nae Memronnce ive: Sine 408.2013, Diets Wwe wr

You might also like