You are on page 1of 13
III ITT LA fi WW .- JOY sjeudd Yy>IMpuns DNUJSUOD JOYIWO|eDI7 wunib6jeg Uo} Table of contents Wall cladding panels tL HL Handling of mineral wool panels Gude lae TVERMOWALL *160LL/AK. THERMOWALLVE-1000 LLL PROwsTYL FEU 30038/48 PROMUSTYL FEU 3506 8/8 THeRMOROOF 10007, Vertical: horizontal walling panels with hidden fixings fx plces with low or mda ygrometry Fes see ude nora Sond pe a some el oe = . —a ira oo —— faster : = : a oe e = = Make 180 rm 1 ' oo 2) ass home a SS a eo a = a {i = ae 4 ry Hl = nm stoch —— 3 sop cee oncom eee ‘ aoe (SEE Pastas EE . Boe ES fete . SSeS —— eee = ee RE sei tetas . er ee ee Eom ictes tasted rancntia fis plein Ts fir shold ba erat te tact fing. 3 wets Sitecting tou be aveed as far as possble by ersuring sacs are ctt rth nthe factory. Honever te cating has oe cated then 20k slr ol shoul be vse Abrasive wheal eters mut ot be eed beac the het they {eres all denage ne cos, hen etn, the scroundng ze sro be protected ato cages on he can. C) | Riera Inne mene rib are Isr Pleas comet us forron sans oats, ect or hart wall dng pads wi iden fing fr laces wth low armadle ygronety 5 ry 8 eatwantoigon OP rete a vets io oe cor eralmarenn is reo uz oue ole | en aa? | az eee area | MO 1005 1500 Bath sis ore protected by ronal nn poyetyene. This fils shoul be removed atthe tee of fing, nd’ wes Ste et shou be aries ossbleby ensuring sheets at ca to nat nthe factey Homer te iting ae sob carted nt nailer o trata shu be eed Aree wel tere must mtb vad bec the het they {shu sh costings scoring to or Blgan Coben Scrfaces sano nmr, tba Vln Roof sandwich faels for places with ow or idle hyromet'y Pensioner tone 63 -0S6r) = = 9 * ee foo set Bee ft ee -— Bea oo a : a 7 @ OB Fo: - fe a so Boe ee ae = ae poco ST swans Beh Zé. ieee Soe oo aay a \ seem SS wea “ Baths re petecte by removal mn poetlene. Tiss shouldbe removed the tine offing 23 wee ‘CURETmIne rn own iene OF HE CORE oul Oe ice sa as ossbleby ering sheets are cat orth nthe fectory. Homever if ste cating has ese 2 Roi CSN Frederator ecg 165 coxa mine fain chro Ra x a ssa ne tne of fing, and 3 wesks Handling of mineral wool panels HANDLING WALL CLADDING PANELS Vertical laying Description and use of different materials Tength max ength ax kngth depending rescauce tg seed Pewee asp ace cuce Recommendations for the lifting: ithe nce pressure pad at 2 ng epeation tance 1/3 from the geo the panel itr: do ot shake the peel during the HANDLING WALL CLADDING PANELS Horizontal laying eng Use of 2 camp tools sing avant Hoisting beam ar keg ‘According to te maximum length ofthe panel, ake 37 srg 400m Recess touse a Preparation ofthe panel feu he plan owes fora ete cffestivenae of the vacur cp and on nous Ferro the ovr (Pre-ctin the fact) lating (Getto well a2 aly a ard ats Seal Serthebean wth sll cacerraton to ge small rarer soe tothe panel (Sto 10°. etre th beam on te rh of he patel st safety omothinwhtecend a0 Worksite safety rules utting 9 so Delivery panelto be respected entngs nc tothe length! the pane Position ofthe men Necesity to pce men onthe bearas Dinan on te exraleso the pana Delicate operation: necessary smallrotation of the panel oston the pana paral slop decetraon th tne vecucm ban) Sethe nero pone fed analy pstng ied panel with smal Push the footie Lat cow she pane it ‘en the feng y concollng the armen ofthe itera coat (tee of re pac frre ban ost, hefhing bad) tow of the pret 2efees Fixing types Rectang otheknd af fane (teal wood, diferent types of rg canbe used sel dling scene threading serena srews muna caus tr to oid the anal tobe crushed, Soe the referers techie docrrarts (esti Ale, andorde, stembly appropriate process.) Sa Mounting methods rig onthe ta of te teckng ib wh a starple Adore nny Stews f acessty Useafa ditwer coupling toate tava hush of ne zee desing rd eoas ie; Noo Noo ArcelorMittal Construction Belgium NV wwn-arcelormittalcom/arval +324 2406711 +32 14563915 43214592710 Arval Site Geel Industrieterrein Geel West ~ 4 Lammerdries 8 B-2440 Geel Avval Site Fleurus Z.l.de Martinrou Rue de Berlaimont 21 8-6220 Fleurus, Arval Site Malmedy Z.L Avenue de Norvége 16 8-4960 Malmedy ArcelorMittal Construction applies a policy of continuous development. ArcelorMittal Construction reserves the right to make changes and improvernents to any ofthe products and information inthis document without prior notice, Atnough care has been taken during the development ofthis catalogue, we regret that we cannot accept lability in respect of ary incorrectness It may contain nor any darmage which ‘may aise trough misinterpretation of is contents. Alrghts reserved! No part ofthis publication may be reproduced in any forms and any means without permission in writing from ArcelorMittal Construction,

You might also like