N
1J1ES0- 075
MAKKAH
B B
Electronic drawings once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision.
C C
D D
0 1H2P77 1H2P78 1 1J1PES01 2 1J1PES02 3 1J1PES03 4 1J1PES04 5 1J1PES05 6 1J1PES06 7 1J1PES07 8 1J1P01 9
E E
34980 12000 17000 21000 21000 21000 21000 17000 12000
DIESEL TANK
ACCESS HATCH
A
COOLER DUCK BANK GENERATOR VENTILATION SHAFT B02-N078 B02-A112_1 TRAFO B02-N211 B02-N212 B02-A181_1 DUCT BANK DUCT BANK DUCT BANK FWT
2800
B02-N210 B02-A113_2 SHAFT B02-A112_2
ON GRADE LEVEL CLR STAIR ACCESS HATCH ACCESS HATCH B02-A111-2 B02-N097 B02-N213 B01-N098 ACCESS
F SHAFT SHAFT SST (33KV SWGR) F
4 m 10 m
SHAFT
2 m
CORR
295 m
STAIR
11 m 6 m 6 m 22 m SEP VEST SHAFT VEST HATCH B
11030 80860
N 2720377840.100 13 m 5 m 7 m 5 m
B02-N009 E 678358277.000
7500
580.490 TFF 579.992 TFF B02-A105
2835
2820
2485
2485
FIRE FIRE FIRE
3225
3225
E-ROOM HOSE REL HOSE REL HOSE REL
5175
27 m
8715
2500 3300 3300 2100 108 m
CLR
2540
C
10115
8250
2480
8715
1135 1090 2370 3300 530
B02-A181_6
1085 B02-N016 B02-A181_5 2 m
6040
INV B02-A106
5650
5650
5650
7195 1810 B02-A182 176980 B02-N007
LPS DC
3740
3350
3350
3350
29 m
3020
3020
3020
LPS FWT
7500
41 m
TRAFO TRAFO TRAFO TRAFO
59 m DWS
27 m 104 m
34 m
19140 24304
14360 9445 2055 3340 7240 4200 4200 4200 4360 12260 7670 5200 2225 9005 5650
B02-N008
G B02-A109 B02-A104 D G
GEN B02-A100 B02-A181_4 B02-A181_3 B02-N003
2800
B02-N002 B02-N001 B02-A181_2 B02-A111-1 B02-A134_2
TIMESTAMP 01/07/2016 11:29:48
H H
J J
C:\Users\rosac\Documents\M-BD4-1J1ES0-CA00-BIM-001001_rosac.rvt
1 OVERALL SERVICE LEVEL * SH NOTE 2: FOR ABBREVIATIONS LEGEND CHECK SHEET M-BD4-1J1-ES0-CA00-EDR-100051 A' A B C
SCALE: 1 : 300
* SH NOTE 1: FOR GENERAL COMMENTS CHECK SHEET M-BD4-1J1ES0 -CA00-EDR-100015
REVISIONS PROJECT BACS CONSORTIUM DATE SCALE PAPER DRAWING TITLE
SIZE
No Date Description
First Issue SUPERSEDES drawing no M-BD4-1J1ES0-CASF-EDR-000101
Originator Checked Approved
JULY 2016 A1 BD4 - ELEVATED STATION
L 00A 07/07/2016 90% DESIGN. ARCHITECTURE CR MF CJ L
DRAWING STATUS
LINE 1 - STATION 1J1
90% DESIGN. ARCHITECTURE
ARCHITECTURE
NOT FOR CONSTRUCTION CONSULTANT / SUB-CONTRACTOR
OVERALL SERVICE FLOOR PLAN
FOR INFORMATION ONLY
www.bacsrmp.com 2015 High Commission for the Development of ArRiyadh SERVICE LEVEL
WORK IN PROGRESS LEAD DESIGN ENTITY (LDE) APPROVED BY ORIGINATOR CHECKED BY APPROVED BY DRAWING NUMBER REVISION
NAME NAME NAME NAME
M-BD4-1J1ES0-CA00-EDR-120101 00A
BIM MODEL