You are on page 1of 7
a4 HRI WORK Seah Sm with et 10 em pla) Alajwsal of eeivated cath Kad upto 300 and Nope te levelled and eats dese 1 Sm disposed ea AM baa of si Swpplying chrcal emulsion i sae containers inelaing Aeivery& specified (Chirp sith Linda ems eoncennrate 2 iting and injecting chemical POSTCONSTRUCTIONAL —antiermite {excluding the cost of chemical emulsion) Treinen of soil under existing Doors using. chemical emulsion tone lire pe hol. 300 mm apart including {alling 12 sn ameter holes and plugging sith cement ore 1-211 coment 2 Coase sand) 9 ma the esi Wath Chinwpsrinhos Landane B.C. 20% ith Ie comeeriratin approved Bnd wth spsificion. Note: 1) The work must he exceted by approved easel ens ho is the member of PCA. The Contactor sll pve a 10 sear guaante as per instruction ance Pusat Manager reas pla & side il be mies susrorat a) CONCRETE WORK, ‘Providing & lying in postion cement concrete of specified rade excluding the cost of centring shunering» Al work ‘pt pith vel ie orig. 1.08 (1 coment t coarse sand = 8 praded stone ageregate Ag minal sie) Providing ant laying damp proof course 40m thick with ‘cement concrete 1:2:4 (1 eement = 2 couse sand: 4 graded Stone agree 200m wominal size) Ear pros iin and ising of wate rooting compound in omc concrete work @ The per 0 kg of cement Appling a cmt of residual petroleum itamen of penn 001) of approved ais using 17h per Sava to post cous ater vith shes! inal wih piece of ck lps soaked Jn kerosene oi ig the sure SUBTOTAL @) Ae bi ou Sam aor cy coon sqm, 17.00 perso 500 he Sam 1700 Oust sot}. h205i-34{ vars 7875-04} azesf = STST-66 ABBY ani2-a6f. 26377-4e} Frame so. 394 sue ies: lopueh este

You might also like