a4
HRI WORK
Seah Sm with et 10 em pla)
Alajwsal of eeivated cath Kad upto 300 and Nope
te levelled and eats dese
1 Sm disposed ea
AM baa of si
Swpplying chrcal emulsion i sae containers inelaing
Aeivery& specified
(Chirp sith Linda ems eoncennrate 2
iting and injecting chemical
POSTCONSTRUCTIONAL —antiermite
{excluding the cost of chemical emulsion)
Treinen of soil under existing Doors using. chemical
emulsion tone lire pe hol. 300 mm apart including
{alling 12 sn ameter holes and plugging sith cement
ore 1-211 coment 2 Coase sand) 9 ma the esi
Wath Chinwpsrinhos Landane B.C. 20% ith Ie
comeeriratin approved Bnd wth spsificion.
Note: 1) The work must he exceted by approved
easel ens ho is the member of PCA. The
Contactor sll pve a 10 sear guaante as per instruction
ance Pusat Manager
reas pla & side il be mies
susrorat a)
CONCRETE WORK,
‘Providing & lying in postion cement concrete of specified
rade excluding the cost of centring shunering» Al work
‘pt pith vel ie orig.
1.08 (1 coment t coarse sand = 8 praded stone ageregate
Ag minal sie)
Providing ant laying damp proof course 40m thick with
‘cement concrete 1:2:4 (1 eement = 2 couse sand: 4 graded
Stone agree 200m wominal size)
Ear pros iin and ising of wate rooting compound
in omc concrete work @ The per 0 kg of cement
Appling a cmt of residual petroleum itamen of
penn 001) of approved ais using 17h per
Sava to post cous ater
vith shes! inal wih piece of ck lps soaked
Jn kerosene oi
ig the sure
SUBTOTAL @)
Ae
bi ou
Sam aor
cy coon
sqm, 17.00
perso 500
he
Sam 1700
Oust
sot}. h205i-34{
vars 7875-04}
azesf = STST-66
ABBY
ani2-a6f. 26377-4e}
Frame so. 394
sue ies:
lopueh este