DAFTAR HARGA SATUAN BAHAN,

Harga
No. Uraian Satuan
( Rp. )
1 2 3 4
DAFTAR BAHAN BANGUNAN.

1 Gedek Bambu ( 2 m x 3 m ) Lbr 50,000.00


2 Kawat Pengikat ( Kawat Tali ) Kg 21,000.00
3 Tanah Urug ( tanah pilihan ) M3 90,000.00
4 Tanah Urug M3 75,000.00
5 Batu Kali / Gunung / Belah M3 165,000.00
6 Pasir Pasang/Cor M3 153,000.00
7 PC ( Portland Semen ) 50 Kg. Zak 74,300.00
8 Mini Pile ( 200 mm x 200 mm x 3 m ) Btg 393,750.00
9 CCSP uk. 100 x 40 cm M' 1,208,700.00
10 Dolken Gelam ( 2.5 m ) Dia. 12 cm Bh 156,600.00
11 Batu Pecah Mesin ( beton ) M3 312,000.00
12 Pipa PVC 2" M' 56,900.00
13 Ijuk Kg 3,500.00
12 Geotextile t=2mm M2 27,500.00
13 Rubber Joint Filter ( t = 1 cm ) M2 38,500.00
14 Besi Beton ( deform ) Kg 16,800.00
15 Besi Beton Kg 16,000.00
16 Kayu Bekisting M3 3,615,000.00
17 Paku Kg 26,400.00
18 Bambu Bongkotan ( l = 2.5 m ) Btg 27,000.00
19 Pasir Urug M3 116,300.00
20 Tusuk Bambu Bh 350.00
21 Gebalan Rumput M2 12,500.00
22 Bronjong ( 2 m x 1 m x 0,5 m ) Set 283,800.00
23 Bronjong ( 3 m x 1 m x 0,5 m ) Set 467,500.00
24 Kawat Beton/Bendrat Kg 21,600.00
23 Cat Meni Kg 30,000.00
24 Paku Payung Kg 30,000.00
25 Minyak Bakar Ltr 10,500.00
26 Pertamina Dex Ltr 11,500.00
27 Pelumas/Olie Ltr 30,000.00
28 Copy Buku MC Lbr 225.00
29 Bambu 6-8 cm, L = 6 m Bh 14,500.00
30 Sand Bag Bj 5,000.00
31 Water Stop B=200, t=5 mm M' 90,000.00
32 Sirtu M3 99,000.00
DAFTAR HARGA SATUAN TENAGA DAN ALAT
Harga
No. Uraian Satuan
( Rp. )
1 2 3 4

I. HARGA SATUAN TENAGA


1 Mandor Hari 89,000.00
2 Kepala Tukang Hari 80,000.00
3 Tukang Kayu/Tukang Cat Hari 72,500.00
4 Tukang Batu/Tukang Aspal Hari 70,000.00
5 Tukang Besi/Penganyam Besi Hari 72,500.00
6 Tukang Hari 70,000.00
7 Operator Hari 65,400.00
8 Asisten Operator Hari 62,000.00
9 Pekerja Hari 52,000.00
10 Mekanik Hari 66,600.00
11 Driver ( Sopir ) Hari 63,600.00
12 Juru Ukur Hari 94,800.00

II. HARGA SATUAN ALAT.


1 Treefoot & Trinsbris Hari 58,000.00
2 Molen Unit/Hr 32,400.00
3 Ember Bh 9,600.00
4 Kotak Adukan Bh 43,200.00
5 Cetok Bh 51,500.00
6 Kuas Bh 16,400.00
7 Kayu Kasut Bh 9,000.00
8 Concrete Vibrator Jam 66,600.00
9 Gergaji Bh 80,000.00
10 Pompa Dia. 4" Jam 16,350.00
11 Pompa Dia. 3" Jam 16,350.00
12 Kereta Dorong Hari 400,000.00
13 Bodem Bh 43,200.00
14 Tang Pemotong Kawat Bh 24,000.00
15 Keranjang Bh 24,800.00
16 Gunting Pemotong Baja Bh 51,600.00
17 Kunci Pembengkok Tulangan Bh 16,800.00
18 Stamper Jam 38,300.00
19 Excavator Jam 260,000.00
20 Palu Biasa Bh 19,250.00
21 Meteran 5 m. Bh 15,000.00
22 Meteran 50 m Bh 90,000.00
23 Pesawat Ukur ( Theodolite ) Hari 77,400.00
24 Ganco Unit 85,400.00
25 Chainsaw Unit 43,200.00
26 Truck Treller Jam 247,500.00
27 Dump Truck unit/jam 161,000.00
28 Alat Pelancip ( Pisau Besar ) Bh 26,000.00
29 Linggis Bh 57,000.00
30 Pick Hummer (15 kg) hari 81,000.00
31 Air Compressor port 5 m3/mm hari 249,700.00
32 Steel sheet pile 6 m hari 70,000.00
33 Vibro Hummer jam 400,000.00
34 Crawler crane 35 T jam 409,400.00
35 Crane jam 409,400.00
36 Alat bantu ls 6,000.00
37 Baby Roller Jam 55,000.00
R HARGA SATUAN BAHAN,

Ket.
5
RGA SATUAN TENAGA DAN ALAT

Ket.
5
45,600.00 50500
22,800.00 21000
81,600.00 99000
42,000.00 75000
165,000.00 240000
130,000.00 180000
71,000.00 89500
324,000.00 356400

16,000.00 157900
312,000.00 312000
47,400.00 55000
3,300.00 3630
25,000.00 27500
35,000.00 38500
15,600.00 22000
14,000.00 16000
3,208,800.00 3700000
26,400.00 27200
19,250.00 29700
86,400.00 125000
250.00 275
2,160.00 12500
258,000.00 283800
425,000.00 467500
21,600.00 26000
24,000.00 30000
25,200.00 30000
8,500.00 11000
10,800.00 10800
24,350.00 26785
200.00 250
13,200.00 31000
3,500.00 5000
90,000.00 99000
99,000.00 205000
Harga
( Rp. )
4

73000 95000
68400 90000
64200 80000
64200 80000
64200 80000
64200 80000
65400 85000
62000 78000
52000 62500
66600 87500
63600 80000
94800 90000

57960 63750
27000 29700
9600 10500
36000 39500
12000 13000
15000 16500
9000 11000
66600 73250
42600 46800
14,850.00 16350
14,850.00 16350
27000 29700
43200 47500
16800 18450
13680 15000
51600 56500
16800 18000
26100 28500
243600 267500
17,500.00 19250
9600 10500
90000 99000
64440 70850
44400 48850
43200 47500
225,000.00 247500
142560 #N/A
21600 23750
57000 #N/A
81,000.00 #N/A
227,000.00 249700
70,000.00 #N/A
400,000.00 #N/A

6,000.00 #N/A
55,000.00
#N/A 55000
ANALISA HARGA SATUAN
Kabupaten : Tulungagung
No. Jenis Pek. : 1.1.
Jenis Pek. : Pengukuran Lokasi pekerjaan untuk MC
Satuan Pek. : Km

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Patok Kayu uk.4 x 6 x 50 cm M3 0.0240 3,615,000.00
2 Cat Meni Kg 0.2400 30,000.00
3 Paku Payung Kg 0.1000 30,000.00

II. Tenaga.
1 Juru Ukur OH 4.0000 94,800.00
2 Pekerja OH 12.0000 52,000.00

III. Peralatan.
1 Pesawat Ukur Hari 4.0000 77,400.00
2 Meteran 50 m. Bh 0.0900 90,000.00
3 Palu/Bodem Bh 0.1800 43,200.00

IV. Reproduksi.
1 Copy Buku MC (A4) Lbr 120.0000 200.00
Sub Total I + II + III + IV
V. Biaya Umum dan Keuntungan % 10.0000
Jumlah : I+II+III+IV+V
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 1.2
Jenis Pek. : Pembongkaran Rumpun Bambu
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.

II. Tenaga.
1 Mandor OH 0.0450 89,000.00
2 Pekerja OH 1.3270 52,000.00

III. Peralatan.
1 Ganco Bh 0.0500 85,400.00
2 Keranjang Bh 0.2250 24,800.00
Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 2.1.
Jenis Pek. : Mobilisasi dan Demobilisasi
Satuan Pek. : Ls

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Mobilisasi
1 Excavator Unit 2.0000 4,529,000.00
2 Baby Roller Unit 1.0000 442,000.00
3 Vibro Hammer Unit 1.0000 4,529,000.00

II. Demobilisasi
1 Excavator Unit 2.0000 4,529,000.00
2 Baby Roller Unit 1.0000 442,000.00
3 Vibro Hammer Unit 1.0000 4,529,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 3.1
Jenis Pek. : Pembuatan Caffering dan Pengeringan dengan steel sheet pile
Satuan Pek. : M'

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Steel sheet pile 6 m ( sewa ) M'/Hari 180.0000 70,000.00
( On site )

II. Tenaga.
1 Tukang OH 0.0617 70,000.00
2 Pekerja OH 0.1233 52,000.00

III. Peralatan.
1 Vibro Hammer jam 0.0617 400,000.00
2 Alat Bantu ls 1.0000 6,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 3.1
Jenis Pek. : Pembuatan Caffering dan Pengeringan
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Gedek Bambu ( 2 m x 3 m ) Lbr 0.4000 50,000.00
2 Bambu 6-8 cm, L = 6 m Bh 1.6000 14,500.00
3 Kawat Pengikat ( Kawat Tali ) Kg 0.3700 21,000.00

II. Tenaga.
1 Mandor OH 0.0250 89,000.00
2 Kepala tukang OH 0.0050 80,000.00
2 Tukang OH 0.0460 70,000.00
3 Pekerja OH 0.6950 52,000.00

III. Peralatan.
1 Alat Pelancip ( Pisau Besar ) Bh 0.0800 26,000.00
2 Bodem Bh 0.0200 43,200.00
3 Keranjang Bh 0.0400 24,800.00
4 Pompa Air 3"-4" Jam 3.0000 16,350.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000


Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN


Kabupaten : Tulungagung
No. Jenis Pek. : 3.2.
Jenis Pek. : Pembongkaran Caffering Steel sheet pile
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Steel sheet pile 6 m ( sewa ) M'/Hari 70,000.00
( On site )
II. Tenaga.
1 Tukang OH 0.1420 70,000.00
2 Pekerja OH 0.2850 52,000.00

III. Peralatan.
1 Vibro Hammer jam 0.0583 400,000.00
2 Alat Bantu ls 1.0000 6,000.00

Sub Total I + II + III


IV. Biaya Umum dan Keuntungan % 10.0000
Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 3.2.
Jenis Pek. : Pembongkaran Caffering
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.

II. Tenaga.
1 Mandor OH 0.0016 89,000.00
2 Operator OH 0.0045 65,400.00
3 Pekerja OH 0.0160 52,000.00

III. Peralatan.
1 Excavator jam 0.0362 260,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 4.1. CCSP
Jenis Pek. : Galian Tanah Type A 5 ( tanah biasa ) Dengan Excavator
Satuan Pek. : M3

NO. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan

II Tenaga.
1 Mandor OH 0.0010 89,000.00
III Peralatan
1 Excavator Jam 0.0402 260,000.00

Sub Total I + II + III


IV. Biaya Umum dan Keuntungan % 10.0000
Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 4.2.
Jenis Pek. : Timbunan tanah Type C.2 dari luar ( Mekanis )
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Tanah Urug ( tanah pilihan ) M3 1.2000 90,000.00

II. Tenaga.
1 Mandor OH 0.0010 89,000.00

III. Peralatan.
1 Baby Roller / Stamper Jam 0.0519 55,000.00
2 Excavator Jam 0.0201 260,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 4.4.
Jenis Pek. : Timbunan Pasir Urug Type A ( Manual )
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Pasir Urug M3 1.2000 116,300.00

II. Tenaga
1 Mandor OH 0.0180 89,000.00
2 Pekerja OH 0.4990 52,000.00

III. Peralatan.
1 Keranjang Bh 0.1250 24,800.00
2 Kereta Dorong Hari 0.0560 400,000.00

Sub Total I + II + III

IV. OH dan Profit ( 10 % dari Total I + II )

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.3.
Jenis Pek. : Drain Hole pipa PVC 2"
Satuan Pek. : Bh.

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Pipa PVC 2" M' 1.0000 56,900.00
2 Ijuk Kg 0.5000 3,500.00

II. Tenaga.
1 Mandor OH 0.0040 89,000.00
2 Pekerja OH 0.0900 52,000.00

Sub Total I + II
III. Biaya Umum dan Keuntungan % 10.0000
Jumlah : I + II + III
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.6.
Jenis Pek. : Rubber Joint Filler ( t = 1 cm )
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Rubber Joint Filler ( t = 1 Cm ) M' 1.0000 38,500.00

II. Tenaga.
1 Mandor OH 0.0500 89,000.00
2 Pekerja OH 0.0500 52,000.00

Jumlah I + II
III. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II + III.
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.7.
Jenis Pek. : Water Stop Type B = 200, t = 5 mm
Satuan Pek. : M'

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Water Stop B=200, t=5 mm M' 1.1000 90,000.00

II. Tenaga.
1 Mandor OH 0.0500 89,000.00
2 Tukang OH 0.1000 70,000.00

Jumlah I + II

III. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II + III.
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.8.
Jenis Pek. : Pemasangan Bronjong Pabrikan Uk 0,5 x 1 x 2 M Diisi Batu Kali / Gunung
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Bronjong ( 2 m x 1 m x 0,5 m ) Set 1.0000 283,800.00
2 Batu Kali / Gunung / Belah M3 1.0000 165,000.00

II. Tenaga Kerja


1 Mandor Pengisian Batu OH 0.0240 89,000.00
2 Pekerja Batu/Pengisi OH 1.3820 52,000.00

III. Peralatan
1 Paku / Bodem Bh 0.0100 43,200.00
2 Tang Pemotong Kawat Bh 0.0200 24,000.00

Harga Untuk Volume 2.25 M3 Sub Total I + II + III


Harga Untuk Volume 1 M3

IV. OH dan Profit ( 10 % dari Total I + II + III ) 0.1000 523,712.00

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 6.1.
Jenis Pek. : Beton mutu K. 225
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Batu Koral Beton 1/2 - 2/3 M3 0.7750 312,000.00
2 Pasir Pasang/Cor M3 0.4990 153,000.00
3 PC 50 Kg Zak 7.4200 74,300.00

II. Tenaga.
1 Mandor OH 0.2400 89,000.00
2 Kepala Tukang OH 0.0400 80,000.00
2 Tukang Batu/Cor OH 0.4000 70,000.00
3 Pekerja OH 4.8000 52,000.00

III. Perlengkapan.
1 Molen Unit/Hr 0.2000 32,400.00
2 Concrete Vibrator Jam 0.2000 66,600.00
3 Ember Bh 0.0100 9,600.00
4 Kotak Adukan Bh 0.0120 43,200.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 6.2.
Jenis Pek. : Pembesian dengan tulangan besi ulir
Satuan Pek. : Kg

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Besi Beton Kg 105.0000 16,000.00
2 Kawat Beton/Bendrat Kg 1.5000 21,600.00

II. Tenaga.
1 Mandor OH 0.0400 89,000.00
2 Kepala Tukang OH 0.0700 80,000.00
3 Tukang Besi OH 0.7000 72,500.00
4 Pekerja OH 0.7000 52,000.00

III. Perlengkapan.
1 Gunting Pemotong Baja Ls 0.0200 51,600.00
2 Kunci Pembengkok Tulangan Ls 0.0100 16,800.00

Jumlah satuan Pekerjaan per 100 kg


Sub Total I + II + III
Harga Satuan Pekerjaan Per 1 kg --> =

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 6.3.
Jenis Pek. : Bekesting kayu termasuk pembongkaran
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.
I. Bahan.
1 Kayu Begisting M3 0.0400 3,615,000.00
2 Paku Kg 0.4000 26,400.00

II. Tenaga.
1 Mandor OH 0.0100 89,000.00
2 Kepl. Tukang OH 0.0480 80,000.00
3 Tukang Kayu OH 0.4800 72,500.00
4 Tenaga Pekerja OH 0.5760 52,000.00

III. Perlengkapan
1 Palu Biasa Bh 0.0100 19,250.00
2 Gergaji Bh 0.0100 80,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 6.4.
Jenis Pek. : Beton mutu K. 125
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Batu Koral Beton M3 0.7500 312,000.00
2 Pasir Pasang/Cor M3 0.5910 153,000.00
3 PC 50 Kg Zak 5.5200 74,300.00

II. Tenaga.
1 Mandor OH 0.2400 89,000.00
2 Kepala Tukang Batu OH 0.0400 80,000.00
2 Tukang Batu OH 0.4000 70,000.00
3 Pekerja OH 4.8000 52,000.00

III. Perlengkapan.
1 Molen Unit/Hr 0.2000 32,400.00
2 Concrete Vibrator Jam 0.2000 66,600.00
3 Ember Bh 0.0100 9,600.00
4 Kotak Adukan Bh 0.0120 43,200.00
Jumlah : I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 7.1.
Jenis Pek. : Pengadaan / Pengedropan Tiang Pancang Beton ke Lokasi.
Satuan Pek. : Btg

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Mini Pile (200 mm x 200 mm x 3 m) Btg 1.0000 393,750.00

Sub Total I

II. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. 7.2.
Jenis Pek. Pemancangan Tiang Beton (20 cm x 20 cm x 3 m)
Satuan Pek. M'

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Tenaga.
1 Mandor OH 0.0440 89,000.00
2 Kepl. Tukang OH 0.0160 80,000.00
3 Tukang Pancang OH 0.1590 70,000.00
4 Pekerja OH 1.7760 52,000.00

II. Perlengkapan
1 Trippot & Timbris Hari 0.0070 58,000.00
2 Bodem Bh 0.0070 43,200.00

Sub Total I + II

III. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II + III
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 8.2.
Jenis Pek. : Pemancangan Bongkotan Bambu
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Bambu Bongkotan Dia. 12 x 2,5 m M' 1.0000 27,000.00

II. Tenaga.
1 Mandor OH 0.0500 89,000.00
2 Pekerja OH 1.0430 52,000.00

III. Peralatan
1 Trippot & Timbris Hari 0.2000 58,000.00

Sub Total I + II + III

IV Biaya Umum dan Keuntungan % 10.0000


Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 8.1.
Jenis Pek. : Pengadaan dan Pemasangan Geotextile t=2mm
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Geotextile M2 1.0000 27,500.00

II. Tenaga.
1 Mandor OH 0.0800 89,000.00
2 Tukang OH 0.1040 70,000.00
3 Pekerja OH 0.5200 52,000.00

Sub Total I + II

III. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.12.
Jenis Pek. : Bongkaran Beton Bertulang
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.

II. Tenaga.
1 Mandor OH 0.5681 89,000.00
2 Tukang OH 1.1363 70,000.00
3 Pekerja OH 4.5450 52,000.00
III Alat
1 Pick Hummer 15 kg Hari 0.6670 81,000.00
2 Air Compressor port 5 m3/mm Hari 0.6670 249,700.00

Sub Total I + II

III. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III
Dibulatkan

ANALISA HARGA SATUAN


Kabupaten : Tulungagung
No. Jenis Pek. : 5.10.
Jenis Pek. : Pembongkaran Bronjong Lama
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan

II. Tenaga.
1 Mandor OH 0.2050 89,000.00
2 Tenaga Pekerja OH 2.0480 52,000.00

III. Peralatan.
1 Bodem Bh 0.0100 43,200.00
2 Keranjang Bh 0.0830 24,800.00
3 Tang Pemotong Kawat Bh 0.0150 24,000.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.11.
Jenis Pek. : Bongkaran Pas. Batu kali Lama
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.

II. Tenaga.
1 Mandor OH 0.2050 89,000.00
3 Pekerja OH 2.0480 52,000.00
III Alat
1 Bodem Bh 0.0100 43,200.00
2 keranjang Bh 0.0830 24,800.00

Sub Total I + II

III. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 5.1.
Jenis Pek. : Pasangan batu belah dengan spesi 1 Pc : 4 Ps
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Batu Kali M3 1.2000 165,000.00
2 Pasir M3 0.5200 153,000.00
3 PC 50 Kg Zak 3.2600 74,300.00

II. Tenaga.
1 Mandor OH 0.1440 89,000.00
2 Kepl. Tukang OH 0.0960 80,000.00
2 Tukang OH 0.9600 70,000.00
3 Pekerja OH 2.8800 52,000.00

III. Perlengkapan.
1 Molen Unit/Hr 0.1670 32,400.00
2 Ember Bh 0.1670 9,600.00
3 Kotak Adukan Bh 0.0110 43,200.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN


Kabupaten : Tulungagung
No. Jenis Pek. : 5.2.
Jenis Pek. : Pasangan batu belah dengan spesi 1 Pc : 4 Ps Bekas Bongkaran
Satuan Pek. : M3

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Batu Kali M3 - 165,000.00
2 Pasir M3 0.5200 153,000.00
3 PC 50 Kg Zak 3.2600 74,300.00

II. Tenaga.
1 Mandor OH 0.1440 89,000.00
2 Kepl. Tukang OH 0.0960 80,000.00
2 Tukang OH 0.9600 70,000.00
3 Pekerja OH 2.8800 52,000.00

III. Perlengkapan.
1 Molen Unit/Hr 0.1670 32,400.00
2 Ember Bh 0.1670 9,600.00
3 Kotak Adukan Bh 0.0110 43,200.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN


Kabupaten : Tulungagung
No. Jenis Pek. : 5.4.
Jenis Pek. : Siaran dengan speci 1 Pc : 2 Ps.
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Pasir M3 0.0120 153,000.00
2 PC 50 Kg Zak 0.1270 74,300.00

II. Bahan.
1 Mandor OH 0.0170 89,000.00
2 Kepl. Tukang OH 0.0120 80,000.00
3 Tukang OH 0.1150 70,000.00
4 Pekerja OH 0.3460 52,000.00

III. Perlengkapan.
1 Ember Bh 0.0100 9,600.00
2 Cetok Bh 0.0200 51,500.00
3 Kuas Bh 0.1670 16,400.00
Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN


Kabupaten : Tulungagung
No. Jenis Pek. : 5.5.
Jenis Pek. : Plesteran tebal 1.5 cm dengan speci 1 PC : 3 Ps
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Pasir M3 0.0230 153,000.00
2 PC Zak 0.1550 74,300.00

II. Tenaga.
1 Mandor OH 0.0190 89,000.00
2 Kepl. Tukang OH 0.0190 80,000.00
3 Tukang OH 0.1900 70,000.00
4 Pekerja OH 0.3840 52,000.00

III. Perlengkapan.
1 Kayu Kasut Bh 0.0330 9,000.00
2 Ember Bh 0.0100 9,600.00
3 Kotak Adukan Bh 0.0100 43,200.00

Sub Total I + II + III

IV. Biaya Umum dan Keuntungan % 10.0000

Jumlah I + II + III + IV
Dibulatkan

ANALISA HARGA SATUAN

Kabupaten : Tulungagung
No. Jenis Pek. : 8.2.
Jenis Pek. : Gebalan Rumput
Satuan Pek. : M2

N0. URAIAN SATUAN VOLUME HARGA SAT.


Rp.

I. Bahan.
1 Gabalan Rumput M' 1.0000 12,500.00
2 Tusuk Bambu Bh 0.0200 350.00

II. Tenaga.
1 Mandor OH 0.0100 89,000.00
2 Pekerja OH 0.1440 52,000.00
III. Peralatan.
1 Kereta Dorong Hari 0.0050 400,000.00

Sub Total I + II + III

IV Biaya Umum dan Keuntungan % 10.0000

Jumlah : I + II + III + IV
Dibulatkan
ALISA HARGA SATUAN

JML. HARGA
Rp.

86,760.00
7,200.00
3,000.00

379,200.00
624,000.00

309,600.00
8,100.00
7,776.00

24,000.00
1,449,636.00
144,963.60
1,594,599.60
1,594,590.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

4,005.00
69,004.00

4,270.00
5,580.00
82,859.00

8,285.90

91,144.90
91,140.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

9,058,000.00
442,000.00
4,529,000.00

9,058,000.00
442,000.00
4,529,000.00

28,058,000.00

2,805,800.00

30,863,800.00
30,863,000.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

12,600,000.00

4,316.67
6,413.33

24,666.67
6,000.00

12,641,396.67

1,264,139.67

13,905,536.33
13,905,530.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

15,200.00
21,120.00
6,660.00

1,625.00
285.00
2,461.00
28,495.00

1,440.00
720.00
456.00
44,550.00

123,012.00

12,301.20
135,313.20
135,310.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

9,940.00
14,820.00

23,333.33
6,000.00

54,093.33
5,409.33
59,502.67
59,500.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

142.40
295.80
832.00

9,406.80
-

10,677.00

1,067.70

11,744.70
11,740.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

89.00
10,441.60

10,530.60
1,053.06
11,583.66
11,580.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

108,000.00

89.00

2,852.99
5,226.00

116,167.99

11,616.80

127,784.79
127,780.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

139,560.00

1,602.00
25,948.00

3,100.00
22,400.00

192,610.00

19,261.00

211,871.00
211,870.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

56,900.00
1,750.00

356.00
4,680.00

63,686.00
6,368.60
70,054.60
70,050.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

38,500.00

4,450.00
2,600.00

45,550.00
4,555.00

50,105.00
50,100.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

99,000.00

4,450.00
7,000.00

110,450.00

11,045.00

121,495.00
121,490.00
ALISA HARGA SATUAN

TOTAL
Rp.

283,800.00
165,000.00

2,136.00
71,864.00

432.00
480.00

523,712.00
523,712.00

52,371.20

576,083.20
576,080.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

241,800.00
76,347.00
551,306.00

21,360.00
3,200.00
28,000.00
249,600.00

6,480.00
13,320.00
96.00
518.40

1,192,027.40

119,202.74

1,311,230.14
1,311,230.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

1,680,000.00
32,400.00

3,560.00
5,600.00
50,750.00
36,400.00

1,032.00
168.00

1,809,910.00
18,099.10

1,809.91

19,909.01
19,900.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

144,600.00
10,560.00

890.00
3,840.00
34,800.00
29,952.00

192.50
800.00

225,634.50

22,563.45

248,197.95
248,190.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

234,000.00
90,423.00
410,136.00

21,360.00
3,200.00
28,000.00
249,600.00

6,480.00
13,320.00
96.00
518.40
1,057,133.40

105,713.34

1,162,846.74
1,162,840.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

393,750.00

393,750.00

39,375.00

433,125.00
433,120.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

3,916.00
1,280.00
11,130.00
92,352.00

406.00
302.40

109,386.40

10,938.64

120,325.04
120,320.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

27,000.00

4,450.00
54,236.00

11,600.00

97,286.00

9,728.60
107,014.60
107,010.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

27,500.00

7,120.00
7,280.00
27,040.00

68,940.00

6,894.00

75,834.00
75,830.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

50,560.90
79,541.00
236,340.00

54,027.00
166,549.90

587,018.80

58,701.88

645,720.68
645,720.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

18,245.00
106,496.00

432.00
2,058.40
360.00

127,591.40

12,759.14

140,350.54
140,350.00
ALISA HARGA SATUAN

JML. HARGA
Rp.

18,245.00
106,496.00

432.00
2,058.40

127,231.40

12,723.14

139,954.54
139,950.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

198,000.00
79,560.00
242,218.00

12,816.00
7,680.00
67,200.00
149,760.00

5,410.80
1,603.20
475.20

764,723.20

76,472.32

841,195.52
841,190.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

-
79,560.00
242,218.00

12,816.00
7,680.00
67,200.00
149,760.00

5,410.80
1,603.20
475.20

566,723.20

56,672.32

623,395.52
623,390.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

1,836.00
9,436.10

1,513.00
960.00
8,050.00
17,992.00

96.00
1,030.00
2,738.80
43,651.90

4,365.19

48,017.09
48,010.00

ALISA HARGA SATUAN


JML. HARGA
Rp.

3,519.00
11,516.50

1,691.00
1,520.00
13,300.00
19,968.00

297.00
96.00
432.00

52,339.50

5,233.95

57,573.45
57,570.00

ALISA HARGA SATUAN

JML. HARGA
Rp.

12,500.00
7.00

890.00
7,488.00
2,000.00

22,885.00

2,288.50

25,173.50
25,170.00
LAMPIRAN ANALISA HARGA SATUAN MOBILISASI DEMOBILISASI EXCAVATOR

Kabupaten : Tulungagung
No. Jenis Pek. : 2.1.
Jenis Pek. : Mobilisasi dan Demobilisasi
Satuan Pek. : Unit

N0. URAIAN SATUAN VOLUME HARGA SAT. JML. HARGA


Rp Rp

I. Bahan
1 Pertamina Dex Lt 90.00 11,500.00 1,035,000.00

2 Pelumas/Olie Lt 9.00 30,000.00 270,000.00


-
II. Tenaga. -
1 Operator OH 2.00 65,400.00 130,800.00

2 Asisten Operator OH 2.00 62,000.00 124,000.00


-
III. Peralatan. -
1 Truck Treller Jam 12.00 247,500.00 2,970,000.00

Sub Total I + II + III 4,529,800.00


Dibulatkan 4,529,000.00
LAMPIRAN ANALISA HARGA SATUAN MOBILISASI DEMOBILISASI BABY ROLLER

Kabupaten : Tulungagung
No. Jenis Pek. : 2.1.
Jenis Pek. : Mobilisasi dan Demobilisasi
Satuan Pek. : Unit

N0. URAIAN SATUAN VOLUME HARGA SAT. JML. HARGA


Rp Rp

I. Bahan
1 Pertamina Dex Lt 10.00 11,500.00 115,000.00
2 Pelumas/Olie Lt 0.83 30,000.00 24,960.00
-
II. Tenaga. -
1 Sopir OH 0.50 63,600.00 31,800.00
2 Asisten Operator OH 0.50 62,000.00 31,000.00
-
III. Peralatan. -
1 Truck Engkel Jam 3.00 80,000.00 240,000.00

Sub Total I + II + III 442,760.00


Dibulatkan 442,000.00
LAMPIRAN ANALISA HARGA SATUAN MOBILISASI DEMOBILISASI VIBRO HAMMER

Kabupaten: Tulungagung
No. Jenis : 2.1.
Jenis Pek. : Mobilisasi dan Demobilisasi
Satuan Pek: Unit

N0.URAIAN SATUAN
VOLUME HARGA SAT. JML. HARGA
Rp Rp

I. Bahan
1 Pertamina Dex Lt 90.00 11,500.00 1,035,000.00

2 Pelumas/Olie Lt 9.00 30,000.00 270,000.00


-
II. Tenaga. -
1 Operator OH 2.00 65,400.00 130,800.00

2 Asisten Operator OH 2.00 62,000.00 124,000.00


-
III. Peralatan. -
1 Truck Treller Jam 12.00 247,500.00 2,970,000.00

Sub Total I + II + III 4,529,800.00


Dibulatkan 4,529,000.00
Kota : Tulungagung
No. Jenis Pekerjaan : 4.1
Jenis Pekerjaan : Pengadaan CCSP uk. W. 40 x A. 100 cm, L 12.00 m
Satuan Pembayaran : BH

NoUraian Pekerjaan Satuan Kuantitas Harga Satuan (Rp)


I TENAGA
1. Mandor Oh 0.150 89,000.00
2. Pekerja Oh 1.500 52,000.00

II BAHAN
m' 12.000 1,208,700.00

III ALAT
1. Truck Crane Unit/Jam 0.5000 409,400.00
2. Truck Treller Unit/Jam 3.0000 247,500.00

Sub Total
II Biaya Umum dan Keuntungan % 10.00
III Jumlah Harga
IV Harga Satuan Pekerjaan Per - BH

Kota / Kabupaten : Tulungagung


No. Jenis Pekerjaan : IV.2
Jenis Pekerjaan : Pemancangan CCSP
Satuan Pembayaran : m'

NoUraian Pekerjaan Satuan Kuantitas Harga Satuan (Rp)


I TENAGA
1. Mandor Org/hr 0.2000 89,000.00
2. Operator Org/hr 0.2800 65,400.00
2. Pekerja Org/hr 1.5000 52,000.00

II BAHAN

III ALAT
1. Vibrator Hammer Unit/Jam 0.1200 400,000.00
2. Crawler Crane Unit/Jam 0.2400 409,400.00
3. Pesawat Ukur Unit/Jam 0.1200 77,400.00

IV ALAT/BAHAN PEMBANTU
1. Karung plastik Bh 14.0000 6,000.00
2. Tanah urug M3 0.8000 90,000.00
3. Bambu Btg 0.2500 14,500.00
4. Bambu bongkotan Btg 0.5000 27,000.00

Sub Total
IV Biaya Umum dan Keuntungan % 10.000
V Jumlah
VI Harga Satuan Pekerjaan
Pengadaan CCSP uk. W. 40 x A. 100 cm, L 12.00 m

Jumlah Harga (Rp)

13,350.00
78,000.00

14,504,400.00

204,700.00
742,500.00

15,542,950.00
1,554,295.00
17,097,245.00
17,097,240.00

Jumlah Harga (Rp)

17,800.00
18,312.00
78,000.00

48,000.00
98,256.00
9,288.00

84,000.00
72,000.00
3,625.00
13,500.00

442,781.00
44,278.10
487,059.10
487,050.00
DAFTAR HARGA SATUAN
DINAS PEKERJAAN UM
TAHUN

koefisien
No. URAIAN PEKERJAAN satuan
perhari/m3
I PEKERJAAN PERSIAPAN
- Pengukuran Lokasi Pekerjaan untuk MC Km
1. Bahan
Patok Kayu uk.4 x 6 x 50 cm 0.0240 M3
Cat Meni 0.2400 Kg
Paku Payung 0.1000 Kg
2. Tenaga
Juru Ukur 4.0000 OH
Pekerja 12.0000 OH
3. Peralatan
Pesawat Ukur 4.0000 Hari
Meteran 50 m. 0.0900 Bh
Palu/Bodem 0.1800 Bh
4. Reproduksi
Copy Buku MC (A4) 120.00 Lbr

II MOBILISASI dan DEMOBILISASI


1. Mobilisasi Ls
Excavator 2.0000 Unit
Baby Roller 1.0000 Unit
Vibro Hammer 1.0000 Unit
2. Demobilisasi Ls
Excavator 2.0000 Unit
Baby Roller 2.0000 Unit
Vibro Hammer 1.0000 Unit

III PEKERJAAN DEWATERING


- Pembuatan Covering dan Pengeringan M3
1. Bahan.
Gedek Bambu ( 2 m x 3 m ) 0.4000 Lbr
Bambu 6-8 cm, L = 6 m 1.6000 Bh
Kawat Pengikat ( Kawat Tali ) 0.3700 Kg
2. Tenaga
Mandor 0.0250 OH
Kepala tukang 0.0050 OH
Tukang 0.0460 OH
Pekerja 0.6950 OH
3. Peralatan.
Alat Pelancip ( Pisau Besar ) 0.0800 Bh
Bodem 0.0200 Bh
Keranjang 0.0400 Bh
Pompa Air 3"-4" 3.0000 Jam

IV PEKERJAAN TANAH
- Galian Tanah Type A 5 ( tanah biasa ) Dengan Excavator M3
1. Bahan
-
2. Tenaga
Mandor 0.001 OH
3. Peralatan.
Excavator 0.0402 Jam
- Timbunan tanah Type C.2 dari luar ( Mekanis ) M3
1. Bahan
Tanah Urug ( tanah pilihan ) 1.2000 M3
2. Tenaga
Mandor 0.0010 OH
3. Peralatan.
Baby Roller / Stamper 0.0519 Jam
Excavator 0.0201 Jam
- Timbunan Pasir Urug Type A (Manual) M3
1. Bahan
Pasir Urug 1.2000 M3
2. Tenaga
Mandor 0.0180 OH
Pekerja 0.4990 OH
3. Peralatan.
Keranjang 0.1250 Bh
Kereta Dorong 0.0560 Hari

V PEKERJAAN PASANGAN
- Pasangan Batu Belah Dengan Spesi 1Pc : 4Ps M3
1. Bahan
Batu Kali 1.2000 M3
Pasir 0.5200 M3
PC 50 Kg 3.2600 Zak
2. Tenaga
Mandor 0.1440 OH
Kepl. Tukang 0.0960 OH
Tukang 0.9600 OH
Pekerja 2.8800 OH
3. Peralatan.
Molen 0.1670 Unit/Hr
Ember 0.1670 Bh
Kotak Adukan 0.0110 Bh
- Drain Hole PVC 2" Bh
1. Bahan
Pipa PVC 2" 1.0000 M'
Ijuk 0.5000 Kg
2. Tenaga
Mandor 0.0040 OH
Pekerja 0.0900 OH
3. Peralatan.
-
- Siaran Dengan Spesi 1Pc : 2Ps M2
1. Bahan
Pasir 0.0120 M3
PC 50 Kg 0.1270 Zak
2. Tenaga
Mandor 0.0170 OH
Kepl. Tukang 0.0120 OH
Tukang 0.1150 OH
Pekerja 0.3460 OH
3. Peralatan.
Ember 0.0100 Bh
Cetok 0.0200 Bh
Kuas 0.1670 Bh
- Plesteran tebal 1.5 cm M2
1. Bahan
Pasir 0.0230 M3
PC 0.1550 Zak
2. Tenaga
Mandor 0.0190 OH
Kepl. Tukang 0.0190 OH
Tukang 0.1900 OH
Pekerja 0.3840 OH
3. Peralatan.
Kayu Kasut 0.0330 Bh
Ember 0.0100 Bh
Kotak Adukan 0.0100 Bh
- Rubber Joint Filler ( t = 1 Cm ) M2
1. Bahan
Rubber Joint Filler ( t = 1 Cm ) 1.0000 M'
2. Tenaga
Mandor 0.0500 OH
Pekerja 0.0500 OH
- Water Stop (B = 200, t = 5 mm) M'
1. Bahan
Water Stop B=200, t=5 mm 1.1000 M'
2. Tenaga
Mandor 0.0500 OH
Tukang 0.1000 OH
3. Peralatan.
-
- Pemasangan Bronjong 0,5 x 1,00 x2,00 M M3
1. Bahan
Bronjong ( 2 m x 1 m x 0,5 m ) 1.0000 Set
Batu Kali / Gunung / Belah 1.0000 M3
2. Tenaga
Mandor Pengisian Batu 0.0240 OH
Pekerja Batu/Pengisi 1.3820 OH
3. Peralatan.
Paku / Bodem 0.0100 Bh
Tang Pemotong Kawat 0.0200 Bh

VI PEKERJAAN BETON
- Beton Mutu K-225 M3
1. Bahan
Batu Koral Beton 1/2 - 2/3 0.7750 M3
Pasir Pasang/Cor 0.4990 M3
PC 50 Kg 7.4200 Zak
2. Tenaga
Mandor 0.2400 OH
Kepala Tukang 0.0400 OH
Tukang Batu/Cor 0.4000 OH
Pekerja 4.8000 OH
3. Peralatan.
Molen 0.2000 Unit/Hr
Concrete Vibrator 0.2000 Jam
Ember 0.0100 Bh
Kotak Adukan 0.0120 Bh
- Pembesian Kg
1. Bahan
Besi Beton 105.000 Kg
Kawat Beton/Bendrat 1.500 Kg
2. Tenaga
Mandor 0.0400 OH
Kepala Tukang 0.0700 OH
Tukang Besi 0.7000 OH
Pekerja 0.7000 OH
3. Peralatan.
Gunting Pemotong Baja 0.0200 Ls
Kunci Pembengkok Tulangan 0.0100 Ls
- Bekisting Kayu Termasuk pembongkaran M2
1. Bahan
Kayu Begisting 0.0400 M3
Paku 0.4000 Kg
2. Tenaga
Mandor 0.0100 OH
Kepl. Tukang 0.0480 OH
Tukang Kayu 0.4800 OH
Tenaga Pekerja 0.5760 OH
3. Peralatan.
Palu Biasa 0.0100 Bh
Gergaji 0.0100 Bh
- Beton Mutu K-125 M3
1. Bahan
Batu Koral Beton 0.7500 M3
Pasir Pasang/Cor 0.5910 M3
PC 50 Kg 5.5200 Zak
2. Tenaga
Mandor 0.2400 OH
Kepala Tukang Batu 0.0400 OH
Tukang Batu 0.4000 OH
Pekerja 4.8000 OH
3. Peralatan.
Molen 0.2000 Unit/Hr
Concrete Vibrator 0.2000 Jam
Ember 0.0100 Bh
Kotak Adukan 0.0120 Bh

VII PEKERJAAN PEMANCANGAN


- Pengadaan / Pengedropan Tiang Beton Ke Lokasi Btg
1. Bahan
Mini Pile (200 mm x 200 mm x 3 m) 1.0000 Btg
2. Tenaga
-
3. Peralatan.
-
- Pemancangan Tiang Beton 20cmx20cmx3m M'
1. Bahan
-
2. Tenaga
Mandor 0.0440 OH
Kepl. Tukang 0.0160 OH
Tukang Pancang 0.1590 OH
Pekerja 1.7760 OH
3. Peralatan.
Trippot & Timbris 0.0070 Hari
Bodem 0.0070 Bh

Btg
- Pengadaan Corrugated Sheet Pile CCSP-W400x1000x12000
1. Bahan
CCSP 12.000 m'
2. Tenaga
Mandor 0.150 Oh
Pekerja 1.500 Oh
3. Peralatan.
Truck Crane 0.5000 Unit/Jam
Truck Treller 3.0000 Unit/Jam
- Pemancangan CCSP W400x1000x12000 M'
1. Bahan
-
2. Tenaga
Mandor 0.2000 Org/hr
Operator 0.2800 Org/hr
Pekerja 1.5000 Org/hr
3. Peralatan.
Vibrator Hammer 0.1200 Unit/Jam
Crawler Crane 0.2400 Unit/Jam
Pesawat Ukur 0.1200 Unit/Jam
Karung plastik 14.0000 Bh
Tanah urug 0.8000 M3
Bambu 0.2500 Btg
Bambu bongkotan 0.5000 Btg

VIII PEKERJAAN LAIN-LAIN


- Pengadaan dan Pemasangan Geotextile t = 2mm M2
1. Bahan
Geotextile 1.0000 M2
2. Tenaga
Mandor 0.0800 OH
Tukang 0.1040 OH
Pekerja 0.5200 OH
3. Peralatan.
-
R HARGA SATUAN PEKERJAAN KONSTRUKSI (HSPK)
S PEKERJAAN UMUM KABUPATEN TULUNGAGUNG
TAHUN ANGGARAN 2013

produktivitas Kapasitas sumber daya yang dibutuhkan


Jumlah Harga
volume Harga Satuan Rp. per orang produksi
Rp.
m3 m3/hari orang

0.08

3,615,000.00 86,760.00
30,000.00 7,200.00
30,000.00 3,000.00

94,800.00 379,200.00 0.083 0.083 0.333


52,000.00 624,000.00 1.000

77,400.00 309,600.00
90,000.00 8,100.00
43,200.00 7,776.00

200.00 24,000.00
Jumlah 1,449,636.00
HSPK

0.50
4,529,000.00 9,058,000.00 0.50 0.50 1.000
442,000.00 442,000.00 0.500
4,529,000.00 4,529,000.00 0.500
0.50
4,529,000.00 9,058,000.00 0.50 0.50 1.000
442,000.00 442,000.00 1.000
4,529,000.00 4,529,000.00 0.500
Jumlah 28,058,000.00
HSPK

136.000

50,000.00 15,200.00
14,500.00 21,120.00
21,000.00 6,660.00

89,000.00 1,625.00 1.439 5.755 0.144


80,000.00 285.00 0.029
70,000.00 2,461.00 0.265
52,000.00 28,495.00 4.000

26,000.00 1,440.00
43,200.00 720.00
24,800.00 456.00
16,350.00 44,550.00
Jumlah 123,012.00
HSPK

2643.602

89,000.00 89.00 24.900 74.701 0.075

260,000.00 10,441.60 3.000


322.577

90,000.00 108,000.00

89,000.00 89.00 19.278 19.278 0.019

55,000.00 2,852.99 1.000


260,000.00 5,226.00 0.387
21.680

116,300.00 139,560.00

89,000.00 1,602.00 0.833 1.667 0.072


52,000.00 25,948.00 2.000

24,800.00 3,100.00 0.501


400,000.00 22,400.00 0.224
Jumlah 200,777.99
HSPK

283.288

165,000.00 198,000.00
153,000.00 79,560.00
74,300.00 242,218.00
89,000.00 12,816.00 0.347 6.944 1.0000
80,000.00 7,680.00 0.6667
70,000.00 67,200.00 6.6667
52,000.00 149,760.00 20.0000

32,400.00 5,410.80 1.1597


9,600.00 1,603.20 1.1597
43,200.00 475.20 0.0764
60.500

56,900.00 56,900.00
3,500.00 1,750.00

89,000.00 356.00 11.111 11.111 0.0444


52,000.00 4,680.00 1.0000

270.670

153,000.00 1,836.00
74,300.00 9,436.10

89,000.00 1,513.00
80,000.00 960.00
70,000.00 8,050.00 2.890 8.671 0.9971
52,000.00 17,992.00 3.0000

9,600.00 96.00
51,500.00 1,030.00
16,400.00 2,738.80
7.525

153,000.00 3,519.00
74,300.00 11,516.50

89,000.00 1,691.00 2.604 2.604 0.0495


80,000.00 1,520.00 0.0495
70,000.00 13,300.00 0.4948
52,000.00 19,968.00 1.0000

9,000.00 297.00
9,600.00 96.00
43,200.00 432.00
24.780
38,500.00 38,500.00

89,000.00 4,450.00 20.000 20.000 1.0000


52,000.00 2,600.00 1.0000
30.800

90,000.00 99,000.00

89,000.00 4,450.00 10.000 10.000 0.5000


70,000.00 7,000.00 1.0000

37.500

283,800.00 283,800.00
165,000.00 165,000.00

89,000.00 2,136.00 0.724 2.171 0.0521


52,000.00 71,864.00 3.0000

43,200.00 432.00
24,000.00 480.00
Jumlah 1,604,112.60
HSPK

134.180

312,000.00 241,800.00
153,000.00 76,347.00
74,300.00 551,306.00

89,000.00 21,360.00 0.208 4.167 1.0000


80,000.00 3,200.00 0.1667
70,000.00 28,000.00 1.6667
52,000.00 249,600.00 20.0000

32,400.00 6,480.00
66,600.00 13,320.00
9,600.00 96.00
43,200.00 518.40
6709.000

16,000.00 1,680,000.00
21,600.00 32,400.00

89,000.00 3,560.00 1.429 142.857 5.7143


80,000.00 5,600.00 10.0000
72,500.00 50,750.00 100.0000
52,000.00 36,400.00 100.0000

51,600.00 1,032.00
16,800.00 168.00
197.800

3,615,000.00 144,600.00
26,400.00 10,560.00

89,000.00 890.00 1.736 6.944 0.0694


80,000.00 3,840.00 0.3333
72,500.00 34,800.00 3.3333
52,000.00 29,952.00 4.0000

19,250.00 192.50
80,000.00 800.00
21.680

312000.000 234000.000
153000.000 90423.000
74300.000 410136.000

89000.000 21360.000 0.208 0.833 0.2000


80000.000 3200.000 0.0333
70000.000 28000.000 0.3333
52000.000 249600.000 4.0000

32400.000 6480.000
66600.000 13320.000
9600.000 96.000
43200.000 518.400
Jumlah 4,284,705.30
HSPK

393,750.00 393,750.00
322.920

89,000.00 3,916.00 0.563 8.446 0.3716


80,000.00 1,280.00 0.1351
70,000.00 11,130.00 1.3429
52,000.00 92,352.00 15.0000

58000.000 406.000
43200.000 302.400

1,208,700.00 14,504,400.00

89,000.00 13,350.00
52,000.00 78,000.00

409,400.00 204,700.00
247,500.00 742,500.00
95.000

89,000.00 17,800.00 0.667 3.333 0.6667


65,400.00 18,312.00 0.9333
52,000.00 78,000.00 5.0000

400,000.00 48,000.00
409,400.00 98,256.00
77,400.00 9,288.00
6,000.00 84,000.00
90,000.00 72,000.00
14,500.00 3,625.00
27,000.00 13,500.00
Jumlah 16,488,867.40
HSPK

35.150

27,500.00 27,500.00
89,000.00 7,120.00 1.923 3.846 0.3077
70,000.00 7,280.00 0.4000
52,000.00 27,040.00 2.0000

Jumlah 68,940.00
HSPK
mber daya yang dibutuhkan waktu
asumsi dibulatkan
group hari hari

1 0.900 1
1

1 1.000 1
1
1

1 1.000 1
1
1

4 23.630 24
3 35.389 36

1 16.73 17

2 13.008 13.000
20 40.793 3

1 5.445 6

3 31.217 32

1 2.890 3
1 1.239 2

1 3.080 3

3 17.275 18

20 32.203 33
100 46.963 33

4 28.483 29

4 26.016 27
15 38.234 39

5 28.500 29
2 9.139 10
RENCANA ANGGARAN BIAYA
Pek. : Perbaikan Proteksi Tebing dan Groundsill

No. Item
Pekerjaan
1 2

I. PEKERJAAN PERSIAPAN
1.1. Pengukuran Lokasi Pekerjaan untuk MC
Jumlah Harga Pekerjaan
II. MOBILISASI
2.1. Mobilisasi dan Demobilisasi
Jumlah Harga Pekerjaan
III. PEKERJAAN DEWATERING
3.2. Pembuatan Covering dan Pengeringan
3.4. Pembongkaran Caffering
Jumlah Harga Pekerjaan
IV. PEKERJAAN TANAH
4.1. Galian Tanah Type A 5 ( tanah biasa ) Dengan Excavator
4.2. Timbunan tanah Type C.2 dari luar ( Mekanis )
4.4. Timbunan Pasir Urug Type A ( Manual )
Jumlah Harga Pekerjaan
V. PEKERJAAN PASANGAN
5.1. Pasangan Batu Belah Dengan Spesi 1Pc : 4Ps
5.3. Drain Hole PVC 2"
5.4. Siaran Dengan Spesi 1Pc : 2Ps
5.5. Plesteran tebal 1.5 cm
5.6. Rubber Joint Filler ( t = 1 Cm )
5.7. Water Stop (B = 200, t = 5 mm)
5.8. Pemasangan Bronjong 0,5 x 1,00 x2,00 M
Jumlah Harga Pekerjaan
VI. PEKERJAAN BETON
6.1. Beton Mutu K-225
6.2. Pembesian
6.3. Bekisting Kayu Termasuk pembongkaran
6.4. Beton Mutu K-125
Jumlah Harga Pekerjaan
VII. PEKERJAAN PEMANCANGAN.
7.1. Pengadaan / Pengedropan Tiang Beton Ke Lokasi
7.2. Pemancangan Tiang Beton ( 20cmx20cmx3m)
7.3. Pengadaan Corrugated Sheet Pile CCSP-W400x1000x12000
7.4. Pemancangan CCSP W400x1000x12000
Jumlah Harga Pekerjaan
VIII. PEKERJAAN LAIN-LAIN
8.1. Pengadaan dan Pemasangan Geotextile t = 2mm
8.2. Gebalan Rumput
Jumlah Harga Pekerjaan

Terbilang :
#NAME?
REKAPITULASI RENCANA ANGGARAN BIAY

Pekerjaan R
: ehabilitasi Perkuatan Tebing Dan Groundsill Sungai Parit Raya
Volume 1 Paket ( L = 300 M' )
Lokasi Desa Bendo Kecamatan Pogalan Kabupaten Trenggalek

No. Item
Pekerjaan
1 2

I. PEKERJAAN PERSIAPAN

II. PEKERJAAN MOBILISASI

III. PEKERJAAN DEWATERING

IV. PEKERJAAN TANAH

V. PEKERJAAN PASANGAN

VI. PEKERJAAN BETON

VII. PEKERJAAN PEMANCANGAN.

VIII. PEKERJAAN LAIN-LAIN

Terbilang :
#NAME?
ENCANA ANGGARAN BIAYA

Sat. Volume Harga Satuan Harga


( Rp ) ( Rp )
3 4 5 6

Km 0.15 1,594,590.00 239,188.50


239,188.50

Ls 1.00 30,863,000.00 30,863,000.00


30,863,000.00

M3 272.00 135,310.00 36,804,320.00


M3 272.00 11,740.00 3,193,280.00
39,997,600.00

M3 2,643.60 11,580.00 30,612,907.26


M3 645.15 127,780.00 82,437,856.89
M3 43.36 211,870.00 9,186,683.20
122,237,447.35

M3 566.58 841,190.00 476,597,675.13


Bh 121.00 70,050.00 8,476,050.00
M2 541.34 48,010.00 25,989,733.40
M2 15.05 57,570.00 866,428.50
M2 49.56 50,100.00 2,482,956.00
M' 61.60 121,490.00 7,483,784.00
M3 75.00 576,080.00 43,206,000.00
565,102,627.03

M3 268.36 1,311,230.00 351,881,682.80


Kg 13,418.00 19,900.00 267,018,200.00
M2 395.60 248,190.00 98,183,964.00
M3 43.36 1,162,840.00 50,420,742.40
767,504,589.20

Btg 239.20 433,120.00 103,602,304.00


M' 645.84 120,320.00 77,707,468.80
btg 19.00 17,097,240.00 324,847,560.00
m' 190.00 487,050.00 92,539,500.00
598,696,832.80

M2 70.30 75,830.00 5,330,849.00


M2 136.00 25,170.00 3,423,120.00
8,753,969.00

JUMLAH 2,133,395,253.88
PPN 10% 213,339,525.39
TOTAL 2,346,734,779.27
DIBULATKAN 2,346,734,000.00
ULASI RENCANA ANGGARAN BIAYA

Jumlah Harga ( Rp )

239,188.50

30,863,000.00

39,997,600.00

122,237,447.35

565,102,627.03

767,504,589.20

598,696,832.80

8,753,969.00

JUMLAH 2,133,395,253.88
PPN 10% 213,339,525.39
TOTAL 2,346,734,779.27
DIBULATKAN 2,346,734,000.00
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill 4.000
PAS. BATU KALI
LOKASI 1 : 4Kedungwaru, Kabupaten Tulungagung
: Desa Boro, Kecamatan

PERHITUNGAN dan GAMBAR SAT

BETON K.225
DRAIN HOLE DIA 2" TIMBUNAN TANAH
BETON K.125
LAPISAN PASIR
MINI PILE 3.000 GEDEG/SESEK
20X20X3.00M 2.000
BAMBU L = 2,5 M

BETON K.225
2.000
BETON K.125
LAPISAN PASIR
MINI PILE A
20X20X3.00M

Pasangan Batu Kali


3.00

COFFERING
14.20

4.00
SKALA 1 : 100
1.00 3.50

Pasangan Bronjong 0.50


1.40 1.50
0.60
1.00
0.60 BETON K. 225 0.50
1.50 1.00
0.30 0.50
6.00
0.60 6.00 2.00 5.00 0.60

PANCANG MINI PILE


20X20X3.00M
A

POTONGAN MEMANJANG
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT

I PEK. PERSIAPAN
Pengukuran Bangunan untuk MC
= 0.150 Bh

II MOBILISASI
1 Mobilisasi dan Demobilisasi Ls

III PEK. DEWATERING


1 Pembuatan Covering dan Pengeringan dengan Steel Sheet
Covering
Cov + = - M'
- M'

2 Pembuatan Covering dan Pengeringan dengan sesek yang diperkuat bongkotan bambu
Covering
Cov 68.000 x 2.000 x 2.000 = 272.000 M3
272.000 M3

3 Pembongkaran Caffering steel sheet


Covering
Cov - + - = - M'
- M'
4 Pembongkaran Caffering
Covering
Cov 68.000 x 2.000 x 2.000 = 272.000 M3
272.000 M3
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


IV PEKERJAAN TANAH

A Galian Tanah Type A-5 dengan Excavator 525.097 M3

B Timbunan Tanah dari luar dipadatkan dirapikan (Type C-2) 309.495 M3

C Urugan Pasir
>> Bawah Apron 1 ( slab + sloof )
Kanan 5.600 x 9.500 x 0.100 = 5.320 M3
Kiri 5.600 x 9.500 x 0.100 = 5.320 M3
Bawah Pasangan Batu Kali (atas)
Kanan 0.600 x 63.000 x 0.100 = 3.780 M3
Kiri 0.600 x 63.000 x 0.100 = 3.780 M3
Bawah Pasangan Batu Kali (bawah)
Kanan 0.700 x 63.000 x 0.100 = 4.410 M3
Kiri 0.700 x 63.000 x 0.100 = 4.410 M3

>> Bawah Apron 2 ( Tubuh bendung + Abutment )


Tubuh Bendung 8.600 x 19.000 x 0.100 = 16.340 M3
Total Urugan pasir----------> 43.360 M3

tampak atas
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


V PEKERJAAN PASANGAN
1 Pasangan Batu Kali 1 : 4
kanan = kiri
Atas 0.680 x 0.300 x 0.500 = 0.102 M2
( 0.800 + 0.400 )x 0.500 x 0.400 = 0.240 M2
( 0.680 + 0.500 )x 0.500 x 3.670 = 2.165 M2
2.507 M2
2.507 x 62.600 = 156.957 M3

Bawah 0.690 x 0.300 x 0.500 = 0.104 M2


( 0.800 + 0.400 )x 0.500 x 0.400 = 0.240 M2
( 0.690 + 0.500 )x 0.500 x 4.384 = 2.608 M2
Persegi Trap. 2.952 M2
( 0.40 x 3.900 x 42.000 ) +( 2.952 x 20.600 )= 126.331 M3

Sisi Kiri = sisi kanan 283 = 283.288


Total Pas. Batu kali 566.576 M3

2 Pasangan Drain Hole PVC "2


Pasangan Batu Kali 1 : 4
Panjang Pasangan ( kiri-kanan) = 62.600 m'
Jumlah Beton Frame = 12.000 bh
60.200 : 2 x 4.000 = 120.400 Bh
Total Drain Hole------------------------> = 120.400 Bh

3 Siaran
Pasangan Batu Kali 1 : 4
60.200 x 8.992 = 541.336 M2
Total Siaran------------------------> = 541.336 M2

4 Plesteran
Pas. Batu Kali
60.200 x 0.500 x 0.500 = 15.050 M2
Total Plesteran------------------------> = 15.050 M2

2.600

0.624
0.700

2.300
Rubber joint filler
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT

2.600

0.624
0.700

2.300
Rubber joint filler
T = 1 mm

5 Rubber Joint Filler T = 1 mm


a. Pemisah antar span pasangan batu kali
Pasangan 4.000 x 5.459 = 5.459 M2
pondasi 4.000 x 11.025 = 44.100 M2
49.559 M2
Total Rubber Joint Filler------------------------> 49.559 m2

6 Water Stop
>> Apron 1
Pembagi kanan dan kiri 3.000 x 14.200 = 42.600 M'
Pembatas apron 1.000 x 19.000 = 19.000 M'
Total Water Stop------------------------> = 61.600 M'

0.4000 3.00 0.4000

0.4000 DRAIN HOLE 2" DRAIN HOLE 2" 0.4000


0.3000 0.3000
2.62
2.62

0.2000
0.4000

0.6000 0.6000
0.3000 0.3000
BETON K.225 BETON K.225
BETON K.125 0.6000 0.6000 BETON K.125
URUKAN PASIR 19.00 URUKAN PASIR
PANCANG MINI PILE PANCANG MINI PILE
20X20X3.00M BETON K.225 20X20X3.00M
1.50
2.50

POTONGAN A - A
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT

0.4000 3.00 0.4000

0.4000 DRAIN HOLE 2" DRAIN HOLE 2" 0.4000


0.3000 0.3000
2.62
2.62

0.2000
0.4000

0.6000 0.6000
0.3000 0.3000
BETON K.225 BETON K.225
BETON K.125 0.6000 0.6000 BETON K.125
URUKAN PASIR 19.00 URUKAN PASIR
PANCANG MINI PILE PANCANG MINI PILE
20X20X3.00M BETON K.225 20X20X3.00M
1.50
2.50

POTONGAN A - A
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT

7 Pengadaan dan Pemasangan Bronjong


Bronjong Downstream 2.000 x 0.500 x 5 = 5.000
5.000 x 15.000 = 75.000 M3
= 75.000 M3
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


VI PEKERJAAN BETON
1 Pekerjaan Beton K-225
>> Apron groundsill
0.600 x 1.000 = 0.600 m2
5.000 x 0.500 = 2.500 m2
1.000 + 2.500 / 2.000 x 2.000 = 3.500 m2
6.000 x 0.600 = 3.600 m2
0.500 + 0.600 / 2.000 x 1.500 = 0.825 m2
Luas Penampang apron 11.025 m2
18.120 x 11.025 = 199.773
199.773 M3
- Vol. Beton vertikal groundsill
0.700 + 1.000 / 2.000 x 0.600 = 0.510 m2
0.300 x 3.520 = 1.056 m2
1.566 m2
1.566 x 14.200 x 2 44.474 M3

- Pondasi atas pasangan


0.600 x 0.500 x( 0.300 + 0.600 )= 0.270
0.270 m2
62.600 x 0.270 = 16.902 M3

- Pondasi bawah pasangan


0.700 x 0.500 x( 0.300 + 0.700 )= 0.350
0.350 m2
20.600 x 0.350 = 7.210 M3

Vol. Total 268.359 M3

Total Beton K-225-----------> 268.359 M3


PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT

3 Pembesian
Asumsi Pembesian per m3 adalah 60.000 kg/m3
Volume beton 268.360 x 50.000 = 13,418.000 kg/m3
Total Pembesian ----------> 13,418.000 Kg

3 Pekerjaan Bekisting

>> Groundsill

Kiri ( 1.487 + 1.400 )x 5.250 = 15.155 m2


1.050 x 2.000 = 2.100 m2
Kanan ( 1.487 + 1.400 )x 16.658 = 48.084 m2
1.050 x 2.000 = 2.100 m2

Kiri ( 0.700 + 0.700 )x 5.250 = 7.350 m2


0.350 x 2.000 = 0.700 m2
Kanan ( 0.700 + 0.700 )x 16.658 = 23.321 m2
0.350 x 2.000 = 0.700 m2

Kiri ( 0.700 + 0.700 )x 5.250 = 7.350 m2


0.350 x 2.000 = 0.700 m2
Kanan ( 0.700 + 0.700 )x 16.658 = 23.321 m2
0.350 x 2.000 = 0.700 m2

Kiri ( 0.700 + 0.700 )x 5.250 = 7.350 m2


0.350 x 2.000 = 0.700 m2
Kanan ( 0.700 + 0.700 )x 16.658 = 23.321 m2
0.350 x 2.000 = 0.700 m2
Plat
32.500 x 1.000 = 32.500 m2
44.203 x 1.000 = 44.203 m2

( 0.900 + 0.600 )x 8.000 = 12.000 m2


0.480 x 2.000 = 0.960 m2

( 4.472 + 4.341 )x 0.500 x 0.300 = 1.322


( 0.400 + 0.200 )x 0.500 x 0.300 = 0.090
1.412
1.412 x 10.000 = 14.120 M2
10.000 x 0.200 = 2.000 M2
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


Pondasi pasangan batu kali
Pondasi ( 0.700 + 0.700 )x 8.000 = 11.200 m2
Wall Miring 6.169 + 6.039 = 12.208
Tegak 5.782 + 5.768 = 11.550
( 12.208 + 11.550 ): 2.000 x 8.000 = 95.032 m2

Pondasi 3.000 x 0.700 = 2.100


Wall 5.768 x 0.500 x( 0.300 + 0.700 )= 2.884
4.984
4.984 x 4.000 = 19.936 m2
Total Bekisting 395.600 m2
PEKERJAAN : Perbaikan Proteksi Tebing dan Groundsill
LOKASI : Desa Boro, Kecamatan Kedungwaru, Kabupaten Tulungagung

PERHITUNGAN dan GAMBAR SAT


Total Bekisting----------> = 395.600 M2

4 Beton K-125 (t=10 cm)


>> Sama dengan urugan pasir 43.360 M3
Total Beton K-125----------> = 43.360 M3

VII PEK.PENGADAAN DAN PEMANCANGAN


1 Pengadaan Pengedropan Tiang Pancang Mini Pile (20x20x300 cm)
>> Pas. Batu kali kanan kiri 62.600 : 1.000 x 2.000 = 125.200
>> Groundsill
19.000 : 1.000 x 6.000 = 114.000
114.000
Round 239.200 btg
Total Tiang Pancang -----------> = 239.200 Btg
2 Pemancangan Tiang Pancang Mini Pile 20x20x300 cm
239.20 x 2.700 = 645.840 M'
645.840 M'
3 Pengadaan Corrugated Sheet Pile CCSP-W400x1000x12000
Panjang melintang groundsill 19.000 M
Vol CCSP 1.000 x 19.000 = 19.000 btg

4 Pemancangan CCSP W400x1000x12000 ( 10 M) 10.000 x 19.000 = 190.000 M

VIII.Pekerjaan Lain - Lain


a. Pasangan Geotextile t = 2 mm Bronjong Bawah
bwh bronjong 3.000 x 19.000 = 57.000 M2
samping 19.000 x 0.700 = 13.300 M2
= - M2
Total Pas. Geotextile---------------> = 70.300 M2
c. Gebalan Rumput
2.00 x 68.000 = 136.000 M2
dan Groundsill 4.000
KALI

VOLUME

AIN HOLE DIA 2" TIMBUNAN TANAH

3.000 GEDEG/SESEK
2.000
BAMBU L = 2,5 M

2.000

Pasangan Batu Kali


3.00

ERING
14.20
1 : 100
1.00 3.50

1.40 1.50

0.60 BETON K. 225 0.50


1.00
0.50
6.00 2.00 5.00 0.60

PANCANG MINI PILE


20X20X3.00M
A

POTONGAN MEMANJANG
dan Groundsill

VOLUME

0.15

1.00

272.00

272.00
dan Groundsill

VOLUME
dan Groundsill

VOLUME

525.10

309.49

43.36

tampak atas
dan Groundsill

VOLUME
dan Groundsill

VOLUME

121.00

541.34

15.05
dan Groundsill

VOLUME

49.56

61.60

0.4000
DRAIN HOLE 2" 0.4000
0.3000
2.62

0.6000
0.3000
BETON K.225
0.6000 BETON K.125
19.00 URUKAN PASIR
PANCANG MINI PILE
BETON K.225 20X20X3.00M

.50

POTONGAN A - A
dan Groundsill

VOLUME

0.4000
DRAIN HOLE 2" 0.4000
0.3000
2.62

0.6000
0.3000
BETON K.225
0.6000 BETON K.125
19.00 URUKAN PASIR
PANCANG MINI PILE
BETON K.225 20X20X3.00M

.50

POTONGAN A - A
dan Groundsill

VOLUME

75.00
dan Groundsill

VOLUME

268.36
dan Groundsill

VOLUME

13,418.00
dan Groundsill

VOLUME
dan Groundsill

VOLUME
395.60

43.36
43.36

239.20

645.84

19.00

190.00

70.30

136.00
Galian Kiri Timbunan Kiri
PC PC
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 82.459 493.105 1 0.000 82.459 493.105
2 5.980 78.500 0.000 657.830 2 5.980 78.500 0.000 657.830
3 8.380 78.942 472.073 701.005 3 8.380 78.942 472.073 701.005
4 8.880 78.212 655.417 757.092 4 8.880 78.212 655.417 757.092
5 9.680 77.836 691.184 642.925 5 9.680 77.836 691.184 642.925
6 8.260 76.500 740.520 478.814 6 8.260 76.500 740.520 632.349
7 6.259 76.500 631.890 478.814 7 8.266 77.000 636.020 466.620
8 6.259 75.800 474.432 428.952 8 6.060 77.000 636.482 197.120
9 5.659 75.800 474.432 428.952 9 2.560 80.500 487.830 157.780
10 5.659 76.700 434.045 188.605 10 1.960 80.500 206.080 0.000
11 2.459 80.100 453.286 172.936 11 0.000 82.459 161.620 0.000
12 2.159 80.100 196.966 172.936 12
13 2.159 79.700 172.072 124.252 13
14 1.559 79.700 172.072 124.252 14
15 1.559 80.200 125.032 241.402 15
16 3.010 82.930 129.288 51.168 16
17 0.617 82.863 249.418 0.000 17
18 0.000 82.459 50.877 0.000 18
19 19
20 20
Total 6123.004 6143.040 Total 4687.225 4705.826
b-a 20.036 b-a 18.601
Area ( b - a ) / 2 10.0181035 Area ( b - a ) / 2 9.30063
Galian Kiri Timbunan Kiri
PB1 PB
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 81.304 184.723 1 0.000 82.950 53.088
2 2.272 80.928 0.000 289.156 2 0.640 83.500 0.000 303.940
3 3.573 80.100 181.987 85.867 3 3.640 83.500 53.440 303.940
4 1.072 80.100 286.197 85.867 4 3.640 83.100 302.484 334.062
5 1.072 79.900 85.653 37.713 5 4.020 83.100 302.484 435.444
6 0.472 79.900 85.653 37.713 6 5.240 81.687 328.382 199.316
7 0.472 80.200 37.854 420.248 7 2.440 82.830 434.029 0.000
8 5.240 81.687 38.556 0.000 8 0.000 82.950 202.398 0.000
9 0.000 81.304 426.033 0.000 9
10
Total 1141.934 1141.286 11
b-a 0.647 12
Area ( b - a ) / 2 0.323646 13
14
Galian Kiri 15
PB2 16
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b 17
1 0.000 79.625 55.738 18
2 0.700 79.439 0.000 215.280 19
3 2.710 78.000 54.600 709.956 20
4 9.102 78.000 211.380 1138.410 Total 1623.217 1629.790
5 14.595 78.000 709.956 1255.956 b-a 6.573
6 16.102 78.521 1146.014 1319.310 Area ( b - a ) / 2 3.28667
7 16.802 79.080 1273.346 1440.047
8 18.210 79.545 1336.515 1479.696
9 18.602 79.722 1451.738 1482.989
10 18.602 75.500 1404.451 687.201
11 9.102 75.500 1404.451 30.049
12 0.398 75.500 687.201 30.049
13 0.398 79.730 31.733 0.000
14 0.000 79.625 31.691 0.000
15
Total 9743.075 9844.680
b-a 101.604
Area ( b - a ) / 2 50.8022055

Galian Kiri Timbunan Kiri


PA1 PA.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 81.850 214.529 1 0.000 83.023 45.663
2 2.621 80.500 0.000 278.611 2 0.550 83.500 0.000 296.425
3 3.461 80.100 209.942 99.244 3 3.550 83.500 45.925 296.425
4 1.239 80.100 277.226 99.244 4 3.550 83.100 295.005 327.248
5 1.239 79.900 98.996 51.056 5 3.938 83.100 295.005 417.910
6 0.639 79.900 98.996 51.056 6 5.029 81.890 322.483 348.114
7 0.639 80.200 51.248 70.817 7 4.251 82.198 413.374 250.786
8 0.883 81.390 52.008 0.000 8 3.051 82.920 352.493 0.000
9 0.000 81.850 72.274 0.000 9 0.000 82.032 250.280 0.000
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 860.690 864.556 Total 1974.564 1982.571
b-a 3.866 b-a 8.007
Area ( b - a ) / 2 1.932995 Area ( b - a ) / 2 4.003362
Galian Kiri Timbunan Kiri
PA2 PA.2
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 78.986 144.702 1 0.000 80.100 134.488
2 1.832 78.000 0.000 1182.012 2 1.679 80.409 0.000 135.007
3 15.154 78.000 142.896 1303.692 3 1.679 79.166 132.920 85.420
4 16.714 79.012 1197.348 1434.147 4 1.079 79.079 132.774 0.000
5 18.151 79.794 1333.677 1477.306 5 0.000 80.100 86.428 0.000
6 18.514 80.100 1453.895 1482.971 6
7 18.514 75.500 1397.807 36.693 7
8 0.486 75.500 1397.807 36.693 8
9 0.486 79.166 38.475 0.000 9
10 0.000 78.986 38.387 0.000 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 7000.292 7098.217 Total 352.121 354.915
b-a 97.925 b-a 2.793
Area ( b - a ) / 2 48.962472 Area ( b - a ) / 2 1.396735
Galian Kiri Timbunan Kiri
P01 P0.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 81.650 214.576 1 0.000 83.057 42.525
2 2.628 80.529 0.000 235.547 2 0.512 83.500 0.000 293.252
3 2.925 80.100 210.503 106.373 3 3.512 83.500 42.752 293.252
4 1.328 80.100 234.293 106.373 4 3.512 83.100 291.847 324.007
5 1.328 79.900 106.107 58.167 5 3.899 83.100 291.847 395.722
6 0.728 79.900 106.107 58.167 6 4.762 82.142 320.272 263.840
7 0.728 80.200 58.386 81.964 7 3.212 82.931 394.917 0.000
8 1.022 82.142 59.799 0.000 8 0.000 83.057 266.779 0.000
9 0.000 81.650 83.446 0.000 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 858.641 861.168 Total 1608.415 1612.598
b-a 2.527 b-a 4.184
Area ( b - a ) / 2 1.2634745 Area ( b - a ) / 2 2.091912
Galian Kiri Timbunan Kiri
P02 P0.2
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 78.419 79.125 1 0.000 80.100 183.429
2 1.009 78.000 0.000 1263.756 2 2.290 80.100 0.000 184.470
3 16.202 78.000 78.702 1402.986 3 2.303 78.629 180.060 39.550
4 17.987 78.343 1269.313 1448.327 4 0.503 79.375 182.801 0.000
5 18.487 78.726 1416.045 1455.408 5 0.000 80.100 40.290 0.000
6 18.487 75.500 1395.769 38.732 6
7 0.513 75.500 1395.769 38.732 7
8 0.513 78.629 40.337 0.000 8
9 0.000 78.419 40.229 0.000 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 5636.162 5727.064 Total 403.151 407.450
b-a 90.902 b-a 4.298
Area ( b - a ) / 2 45.450951 Area ( b - a ) / 2 2.149176
Galian Kiri Timbunan Kiri
P1.1 P1.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 82.116 149.123 1 0.000 83.106 37.813
2 1.816 80.975 0.000 182.518 2 0.455 83.500 0.000 288.493
3 2.254 80.500 146.188 182.172 3 3.455 83.500 37.993 288.493
4 2.263 80.100 180.545 113.422 4 3.455 83.100 287.111 319.270
5 1.416 80.100 181.266 113.422 5 3.842 83.100 287.111 396.304
6 1.416 79.900 113.138 65.198 6 4.769 82.472 316.857 71.751
7 0.816 79.900 113.138 65.198 7 0.870 82.472 393.309 202.469
8 0.816 80.200 65.443 69.774 8 2.455 83.416 72.572 0.000
9 0.870 82.472 67.297 0.000 9 0.000 83.106 204.025 0.000
10 0.000 82.116 71.441 0.000 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 938.458 940.826 Total 1598.977 1604.592
b-a 2.368 b-a 5.615
Area ( b - a ) / 2 1.184017 Area ( b - a ) / 2 2.807344
Galian Kiri Timbunan Kiri
P1.2 P1.2
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 78.684 163.977 1 0.000 80.100 217.071
2 2.084 78.000 0.000 1361.100 2 2.710 80.100 0.000 1.362
3 17.450 78.000 162.552 1443.000 3 0.017 78.684 213.234 38.791
4 18.500 78.478 1369.441 1489.512 4 0.493 79.565 1.353 0.000
5 18.980 78.701 1455.969 1493.745 5 0.000 80.100 39.489 0.000
6 18.980 75.500 1432.990 0.000 6
7 0.000 75.500 1432.990 0.000 7
8 0.000 78.684 0.000 0.000 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 5853.942 5951.335 Total 254.076 257.224
b-a 97.393 b-a 3.148
Area ( b - a ) / 2 48.696638 Area ( b - a ) / 2 1.5741835

Galian Kiri Timbunan Kiri


P2.1 P2.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 82.560 120.785 1 0.000 83.104 37.979
2 1.463 81.649 0.000 274.586 2 0.457 83.500 0.000 288.660
3 3.363 80.725 118.101 307.804 3 3.457 83.500 38.160 288.660
4 3.813 80.100 269.376 181.266 4 3.457 83.100 287.277 319.436
5 2.263 80.100 305.421 181.266 5 3.844 83.100 287.277 337.802
6 2.263 79.900 180.814 132.874 6 4.065 82.854 318.491 0.000
7 1.663 79.900 180.814 132.874 7 0.000 83.104 337.818 0.000
8 1.663 80.200 133.373 58.466 8
9 0.729 82.854 137.786 0.000 9
10 0.000 82.560 60.186 0.000 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 1385.871 1389.921 Total 1269.021 1272.535
b-a 4.050 b-a 3.514
Area ( b - a ) / 2 2.0251875 Area ( b - a ) / 2 1.756996

Galian Kiri Timbunan Kiri


P2.2 P2.2
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 78.540 84.823 1 0.000 80.100 187.434
2 1.080 78.000 0.000 1262.586 2 2.340 80.100 0.000 188.235
3 16.187 78.000 84.240 1341.600 3 2.350 78.731 184.231 35.429
4 17.200 78.357 1268.365 1418.653 4 0.450 80.725 189.704 0.000
5 18.105 79.477 1367.004 1470.325 5 0.000 80.100 36.045 0.000
6 18.500 79.854 1445.757 1477.299 6
7 18.500 75.500 1396.750 37.750 7
8 0.500 75.500 1396.750 36.467 8
9 0.483 78.731 39.366 0.000 9
10 0.000 78.540 37.935 0.000 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 7036.166 7129.503 Total 409.979 411.098
b-a 93.337 b-a 1.119
Area ( b - a ) / 2 46.668268 Area ( b - a ) / 2 0.55933

Galian Kiri Timbunan Kiri


P3 P3
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 82.577 107.350 1 0.000 83.318 94.483
2 1.300 82.577 0.000 289.020 2 1.134 83.500 0.000 273.880
3 3.500 81.344 105.747 593.811 3 3.280 83.500 94.689 273.880
4 7.300 79.984 279.944 631.874 4 3.280 83.100 272.568 297.498
5 7.900 78.491 572.984 755.476 5 3.580 83.100 272.568 337.968
6 9.625 77.733 614.091 651.092 6 4.067 82.577 295.626 0.000
7 8.376 76.500 736.313 487.764 7 0.000 83.318 338.854 0.000
8 6.376 76.500 640.764 487.764 8
9 6.376 75.800 483.301 437.821 9
10 5.776 75.800 483.301 437.821 10
11 5.776 76.700 443.019 197.579 11
12 2.576 80.100 462.658 182.308 12
13 2.276 80.100 206.338 182.308 13
14 2.276 79.900 181.852 133.912 14
15 1.676 79.900 181.852 133.912 15
16 1.676 80.200 134.415 43.067 16
17 0.537 82.557 138.366 0.000 17
18 0.000 82.577 44.344 0.000 18
19 19
20 20
Total 5709.288 5752.878 Total 1274.305 1277.708
b-a 43.590 b-a 3.403
Area ( b - a ) / 2 21.795001 Area ( b - a ) / 2 1.701673

Galian Kanan Timbunan Kanan


PB PB
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 80.500 255.990 1 0.000 83.500 250.500
2 3.180 82.408 0.000 364.243 2 3.000 83.500 0.000 271.375
3 4.420 82.765 263.193 419.039 3 3.250 83.280 249.840 141.576
4 5.063 82.952 366.648 238.819 4 1.700 83.320 270.790 68.322
5 2.879 80.200 406.053 230.896 5 0.820 82.952 141.018 32.351
6 2.879 79.450 228.737 181.067 6 0.390 83.100 68.142 0.000
7 2.279 79.450 228.737 181.067 7 0.000 83.100 32.409 0.000
8 2.279 80.100 182.548 64.481 8 0.000 83.500 0.000 0.000
9 0.805 80.100 182.548 0.000 9
10 0.000 80.500 64.803 0.000 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 1923.265 1935.601 Total 762.199 764.125
b-a 12.336 b-a 1.925
Area ( b - a ) / 2 6.1681115 Area ( b - a ) / 2 0.96264

Galian Kanan Timbunan Kanan


PA PA
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 80.500 3.864 1 0.000 83.500 250.500
2 0.048 80.544 0.000 463.128 2 3.000 83.500 0.000 262.858
3 5.750 82.881 3.978 503.916 3 3.148 83.341 250.023 141.680
4 6.080 82.930 476.848 544.850 4 1.700 83.146 261.744 15.798
5 6.570 82.830 503.606 335.296 5 0.190 82.923 140.969 38.974
6 4.048 80.200 526.914 324.650 6 0.470 82.826 15.737 32.054
7 4.048 79.900 323.435 275.495 7 0.387 83.100 39.057 0.000
8 3.448 79.900 323.435 275.495 8 0.000 83.100 32.160 0.000
9 3.448 80.100 276.185 36.205 9 0.000 83.500 0.000 0.000
10 0.452 80.100 276.185 0.000 10
11 0.000 80.500 36.386 0.000 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
Total 2746.972 2762.900 Total 739.689 741.863
b-a 15.927 b-a 2.174
Area ( b - a ) / 2 7.963716 Area ( b - a ) / 2 1.086782

Galian Kanan Timbunan Kanan


P0 P0.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 80.500 117.933 1 0.000 78.726 0.000
2 1.465 81.882 0.000 381.980 2 0.000 80.081 0.000 116.117
3 4.665 83.392 122.169 472.416 3 1.450 80.081 0.000 0.000
4 5.665 83.494 389.500 440.681 4 0.000 78.726 114.153 0.000
5 5.278 83.440 472.688 222.368 5
6 2.665 80.200 423.296 213.733 Total 114.153 116.117
7 2.665 79.900 212.934 164.994 b-a 1.965
8 2.065 79.900 212.934 164.994 Area ( b - a ) / 2 0.982375
9 2.065 80.100 165.407 33.482
10 0.418 80.081 165.367 0.000 Timbunan Kanan
11 0.000 80.500 33.649 0.000 P0.2
12 No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
13 1 0.000 83.500 250.500
14 2 3.000 83.500 0.000 260.771
15 3 3.123 82.893 248.679 0.000
16 4 0.000 83.100 259.521 0.000
17 5 0.000 83.500 0.000 0.000
18 6
19 Total 508.200 511.271
20 b-a 3.070
Total 2197.942 2212.578 Area ( b - a ) / 2 1.5351
b-a 14.637
Area ( b - a ) / 2 7.3183435

Galian Kanan Timbunan Kanan


P1 P1.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 80.500 100.625 1 0.000 80.100 147.384
2 1.250 80.816 0.000 157.591 2 1.840 80.100 0.000 80.741
3 1.950 81.847 102.309 225.079 3 1.008 80.100 147.384 24.030
4 2.750 82.615 161.099 296.588 4 0.300 78.838 79.469 0.000
5 3.590 82.842 227.816 342.966 5 0.000 78.701 23.610 0.000
6 4.140 82.964 297.841 136.808 6 0.000 80.100 24.030 0.000
7 1.649 80.200 332.028 132.250
8 1.649 79.900 131.755 83.815 Total 274.493 252.155
9 1.049 79.900 131.755 83.815 b-a 22.338
10 1.049 80.100 84.025 80.741 Area ( b - a ) / 2 11.169102
11 1.008 80.100 84.025 60.155
12 0.751 80.310 80.952 0.000 Timbunan Kanan
13 0.000 80.500 60.456 0.000 P1.2
14 No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
15 1 0.000 83.500 250.500
16 2 3.000 83.500 0.000 258.850
17 3 3.100 83.414 250.242 150.979
18 4 1.810 83.292 258.205 42.479
19 5 0.510 82.964 150.165 31.526
20 6 0.380 80.100 40.851 0.000
Total 1694.060 1700.433 7 0.000 80.100 30.438 0.000
b-a 6.372 8 0.000 83.500 31.730 0.000
Area ( b - a ) / 2 3.186238
Total 761.631 734.335
b-a 27.296
Area ( b - a ) / 2 13.64823

Galian Kanan Timbunan Kanan


P2 P2.1
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 80.100 197.847 1 0.000 80.100 170.613
2 2.470 80.382 0.000 218.639 2 2.130 80.100 0.000 0.000
3 2.720 80.500 198.835 190.624 3 0.000 79.854 170.089 0.000
4 2.368 80.200 218.144 189.914 4 0.000 80.100 0.000 0.000
5 2.368 79.900 189.203 141.423 5
6 1.770 79.900 189.203 141.423 6
7 1.770 80.100 141.777 0.000 7
8 0.000 80.100 141.777 0.000 8
9
10 Total 170.089 170.613
11 b-a 0.524
12 Area ( b - a ) / 2 0.26199
13
14 Timbunan Kanan
15 P2.2
16 No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
17 1 0.000 83.500 250.500
18 2 3.000 83.500 0.000 268.119
19 3 3.211 83.318 249.954 0.000
20 4 0.000 82.298 264.259 223.851
Total 1078.939 1079.870 5 2.720 80.500 0.000 31.395
b-a 0.930 6 0.390 80.100 217.872 0.000
Area ( b - a ) / 2 0.46512 7 0.000 80.100 31.239 0.000
8 0.000 83.500 32.565 0.000

Total 795.889 773.864


b-a 22.025
Area ( b - a ) / 2 11.012409

Galian Kanan
P3
No Jarak Elevasi Perkalian X1 a Perkalian Y1 b
1 0.000 77.681 380.482
2 4.898 79.080 0.000 501.446
3 6.341 79.943 391.561 551.447
4 6.898 79.610 504.807 557.270
5 7.000 80.600 555.979 596.279
6 7.398 81.334 569.338 666.776
7 8.198 81.420 602.345 753.949
8 9.260 82.262 674.384 838.908
9 10.198 83.353 771.849 908.381
10 10.898 83.353 850.034 908.381
11 10.898 83.100 905.624 880.694
12 10.598 83.100 905.624 656.324
13 7.898 80.200 849.960 633.420
14 7.898 79.900 631.050 583.110
15 7.298 79.900 631.050 583.110
16 7.298 80.100 584.570 560.540
17 6.998 80.100 584.570 304.220
18 3.798 76.700 536.747 291.307
19 3.798 75.800 287.888 242.408
20 3.198 75.800 287.888 242.408
21 3.198 76.500 244.647 91.647
22 1.198 76.500 244.647 0.000
23 0.000 77.681 93.062 0.000

Total 11707.623 11732.506


b-a 24.883
Area ( b - a ) / 2 12.441728
Pekerjaan Galian
Section Area Jarak Volume
Patok
m2 m m3(per 1m) m3
PC 20.81 15 7.50 312.15
PB 8.40 5.6 8.40 47.04
PA 8.76 6 8.76 52.55
P0 5.85 6 5.85 35.08
P1 2.53 15 2.53 37.92
P2 2.69 15 2.69 40.37
P3 24.22 24.22 0.00
TOTAL 59.94 525.10

Pekerjaan Timbunan
Section Area Jarak Volume
Patok
m2 m m3(per 1m) m3
PC 1.70 15 7.50 25.47
PB 4.10 5.6 4.10 22.96
PA 4.50 6 4.50 26.97
P0 5.65 6 5.65 33.90
P1 6.70 15 6.70 100.46
P2 6.65 15 6.65 99.73
P3 2.96 6.30 0.00
TOTAL 41.39 309.49
63
RESUM MC.0 %
PERHITUNGAN KALI WUDU

Galian kanan Timbunan kanan

No. Sta/P Area Area/2 Rata-rata Jarak Volume No. Sta/P Area Area/2 Rata-rata Jarak Volume

PD 0.000 PD 0.000
0.000 0.000 15.000 0.000 0.000 0.000 15.000 0.000
PC 0.000 PC 0.000
6.168 3.084 15.000 46.261 0.963 0.481 15.000 7.220
PB 6.168 PB 0.963
14.132 7.066 5.600 39.569 2.049 1.025 5.600 5.738
PA 7.964 PA 1.087
15.282 7.641 6.000 45.846 3.604 1.802 6.000 10.813
P0 7.318 P0 2.517
10.505 5.252 6.000 31.514 27.335 13.667 6.000 82.004
P1 3.186 P1 24.817
3.651 1.826 15.000 27.385 36.092 18.046 15.000 270.688
P2 0.465 P2 11.274
12.907 6.453 15.000 96.801 11.274 5.637 15.000 84.558
P3 12.442 P3 0.000
JUMLAH 77.600 287.376 JUMLAH 77.600 461.021

Galian Kiri Timbunan kiri

No. Sta/P Area Area/2 Rata-rata Jarak Volume No. Sta/P Area Area/2 Rata-rata Jarak Volume

PD 0.000 PD 0.000
0.000 0.000 15.000 0.000 0.000 0.000 15.000 0.000
PC 0.000 PC 0.000
51.126 25.563 15.000 383.444 3.287 1.643 15.000 24.650
PB 51.126 PB 3.287
102.021 51.011 5.600 285.660 8.687 4.343 5.600 24.323
PA 50.895 PA 5.400
97.610 48.805 6.000 292.830 9.641 4.821 6.000 28.924
P0 46.714 P0 4.241
96.595 48.298 6.000 289.785 8.623 4.311 6.000 25.868
P1 49.881 P1 4.382
98.574 49.287 15.000 739.306 6.698 3.349 15.000 50.234
P2 48.693 P2 2.316
48.693 24.347 15.000 365.201 4.018 2.009 15.000 30.135
P3 0.000 P3 1.702
JUMLAH 77.600 2356.23 JUMLAH 77.600 184.133

Total Galian = 2643.602 Total Timbunan = 645.155


Pekerjaan : Rehab dan Pembangunan Proteksi Tebing, Groundsill Kali Ngrow
Lokasi : Lokasi-3 ( Ds. Sukowiyono / Ds. Gendingan )

No. Jenis Pekerjaan Satuan

I PEKERJAAN PERSIAPAN
1 Pengukuran untuk MC Km

II MOBILISASI / DEMOBILISASI
1 Mobilisasi dan Demobilisasi Ls

III PEKERJAAN DEWATERING / PENGERINGAN


1 Pembuatan covering dan Pengeringan m3

IV PEKERJAAN TANAH
1 Galian tanah Type A5 (tanah biasa) Dengan Excavator m3
2 Timbunan tanah type C.2 dari luar ( Mekanis ) m3
3 Timbunan pasir urug type A ( Manual ) m3

V PEKERJAAN PASANGAN
1 Pasangan batu kali ( 1 : 4 ) m3
2 Drain hole PVC 2" bh
3 Siaran dg spesi 1 : 2 m2
4 Plesteran tbl = 1,5 cm m2
5 Rubber Joint Filler ( t = 1 cm ) m'
6 Water Stop ( B = 200, t = 5 mm ) m'
7 Pasangan Bronjong ( 2 x 1 x 0.5 m ) m3
VI PEKERJAAN BETON
1 Beton mutu K.225 m3
2 Pembesian kg
3 Bekesting kayu termasuk pembongkaran m2
4 Lantai Kerja beton K.125 m3

VII PEKERJAAN PEMANCANGAN


1 Pengadaan / pengedropan tiang beton 20x20x300 cm btg
2 Pemancangan tiang beton 20x20x300 cm m'
3 Pengadaan CCSP-W400x1000x12000 btg
4 Pemancangan CCSP W400x1000x12000 m'

VIII PEKERJAAN LAIN - LAIN


1 Pengadaan dan pemasangan Geotextile t = 2 mm m
2 Gebalan Rumput m

Jumlah Nilai Pekerjaan


Rencana Pekerjaan
Komulatif Rencana Pekerjaan
Realisasi Pekerjaan
Komulatif Realisasai Pekerjaan
-
ng, Groundsill Kali Ngrowo Kec. Kedungwaru Dan Kecamatan Karangrejo, Kab. Tulungagung

1 2

Bobot
Volume
(%) 1 2 3 4 5 6 7

0.08 0.010 0.01 0.01

0.50 1.315 0.09 0.09 0.09 0.09 0.09 0.09 0.09

136.00 1.568 0.0653 0.0653 0.0653 0.0653 0.0653

1,321.80 1.304 0.04 0.04 0.04 0.04 0.04


322.58 3.513
21.68 0.391

283.29 20.309
60.50 0.361
270.67 1.107
7.53 0.037
24.78 0.106
30.80 0.319
37.50 1.841
134.18 14.995
6,709.00 11.378
197.80 4.184
21.68 2.149

119.60 4.415
322.92 3.311
9.50 13.843
95.00 3.943

35.15 0.227
68.00 0.146

90.77
0.10 0.10 0.20 0.20 0.20 0.20 0.20
0.10 0.20 0.39 0.59 0.78 0.98 1.18

24 feb
31 mar
30 apr
31 mei
30 jun
31 jul
3 agus
sep
180
Juli
8 9 10 11 12 13 14 15 16 17 18

0.09 0.09

0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

0.51 0.51 0.51 0.51

0.03 0.03 0.03 0.03


0.20 0.20 0.34 0.34 0.34 0.34 0.34 0.88 0.88 0.88 0.88
1.37 1.57 1.91 2.24 2.58 2.92 3.26 4.14 5.02 5.90 6.78
JADWAL P

19 20 21 22 23 24 25 26 27 28 29

0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
0.03 0.03 0.03 0.03

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
0.06 0.06 0.06 0.06 0.06 0.06
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.01 0.01 0.01
0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.21 0.21 0.21

0.40 0.40 0.40

0.88 0.88 0.88 0.95 1.00 1.00 0.99 0.99 1.32 1.26 1.26
7.66 8.54 9.42 10.38 11.38 12.38 13.37 14.36 15.69 16.95 18.21
DWAL PELAKSANAAN PEKER

Jangka Waktu Pelaksanaan

30 31 32 33 34 35 36 37 38 39 40

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

1.35 1.35 1.48 1.48 1.48 1.48 1.48 1.48 1.48 1.45 1.45
19.56 20.91 22.40 23.88 25.37 26.85 28.34 29.82 31.30 32.75 34.20
PEKERJAAN

Pelaksanaan Pekerjaan 85 Hari ( 3 Bulan )


Agustus
41 42 43 44 45 46 47 48 49 50 51

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51

0.03 0.03 0.03 0.03 0.03 0.03


0.41 0.41
0.15 0.15
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08

0.21 0.21 0.21 0.21 0.21 0.21 0.21


0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

1.45 1.45 1.45 1.45 1.45 1.45 1.41 1.20 1.20 1.68 1.68
35.65 37.10 38.55 40.00 41.44 42.89 44.31 45.51 46.71 48.39 50.07
n)

52 53 54 55 56 57 58 59 60 61 62

0.51 0.51 0.51

0.05 0.05
0.11 0.11 0.11
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438
0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15

0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

1.68 2.13 2.13 1.89 1.89 1.84 1.73 1.73 1.73 1.59 1.20
51.75 53.89 56.02 57.91 59.80 61.63 63.36 65.09 66.82 68.41 69.61
September
63 64 65 66 67 68 69 70 71 72 73

0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438
0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15

0.08 0.08 0.08 0.08 0.08 0.08

0.02 0.02 0.02 0.02 0.02

0.02

1.20 1.20 1.20 1.20 1.20 1.20 1.14 1.14 1.14 1.14 1.05
70.81 72.01 73.20 74.40 75.60 76.79 77.93 79.06 80.20 81.34 82.39
3 4 5 6

September
74 75 76 77 78 79 80 81 82 83 84
0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438
0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15

0.02 0.02 0.02 0.02 0.02

0.02 0.02 0.02 0.02 0.02 0.02

1.05 1.05 1.05 1.05 0.50 0.48 0.45 0.45 0.45 0.45 0.45
83.44 84.50 85.55 86.60 87.10 87.58 88.03 88.49 88.94 89.39 89.85

105
Ket.

85

100%

0.0102 -
- -
- -
0.8455 (0.4697)

- -
1.5683 -
75%

- -
- -
1.3045 -
3.5129 -
0.3915 -
- -
50% - -
20.3090 -
0.3612 -

0.0369 -
0.1058 -
0.3189 -
1.8411 -
- -
- -
0.45438 14.9945 -
25% 11.3783 -
4.1839 -

4.4147 -
3.3113 -

- (0.1459)

0.45
90.30
Pekerjaan : Rehab dan Pembangunan Proteksi Tebing, Groundsil
Lokasi : Lokasi-3 ( Ds. Sukowiyono / Ds. Gendingan )

No. Jenis Pekerjaan Satuan Volume

I PEKERJAAN PERSIAPAN
1 Pengukuran untuk MC Km 0.08

II MOBILISASI / DEMOBILISASI
1 Mobilisasi dan Demobilisasi Ls 0.50

III PEKERJAAN DEWATERING / PENGERINGAN


1 Pembuatan covering dan Pengeringan m3 136.00

IV PEKERJAAN TANAH
1 Galian tanah Type A5 (tanah biasa) Dengan Excavator m3 1,321.80
2 Timbunan tanah type C.2 dari luar ( Mekanis ) m3 322.58
3 Timbunan pasir urug type A ( Manual ) m3 21.68

V PEKERJAAN PASANGAN
1 Pasangan batu kali ( 1 : 4 ) m3 283.29
2 Drain hole PVC 2" bh 60.50
3 Siaran dg spesi 1 : 2 m2 270.67
4 Plesteran tbl = 1,5 cm m2 7.53
5 Rubber Joint Filler ( t = 1 cm ) m' 24.78
6 Water Stop ( B = 200, t = 5 mm ) m' 30.80
7 Pasangan Bronjong ( 2 x 1 x 0.5 m ) m3 37.50

VI PEKERJAAN BETON
1 Beton mutu K.225 m3 134.18
2 Pembesian kg 6,709.00
3 Bekesting kayu termasuk pembongkaran m2 197.80
4 Lantai Kerja beton K.125 m3 21.68

VII PEKERJAAN PEMANCANGAN


1 Pengadaan / pengedropan tiang beton 20x20x300 cm btg 119.60
2 Pemancangan tiang beton 20x20x300 cm m' 322.92
3 Pengadaan CCSP-W400x1000x12000 btg 9.50
4 Pemancangan CCSP W400x1000x12000 m' 95.00

VIII PEKERJAAN LAIN - LAIN


1 Pengadaan dan pemasangan Geotextile t = 2 mm m 35.15
2 Gebalan Rumput m 68.00

Jumlah Nilai Pekerjaan


Rencana Pekerjaan
Komulatif Rencana Pekerjaan
Realisasi Pekerjaan
Komulatif Realisasai Pekerjaan

24
31
30
31
30
31
3

180

-
Proteksi Tebing, Groundsill Kali Ngrowo Kec. Kedungwaru Dan Kecamatan Karangrejo, Kab. Tulungagung
/ Ds. Gendingan )
1 2
Bobot

(%) 1 2 3 4 5 6 7 8 9 10

0.010 0.01

1.315 1.32

1.568 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653

1.304 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04


3.513 0.21
0.391 0.03

20.309
0.361
1.107
0.037
0.106
0.319
1.841

14.995
11.378
4.184
2.149
4.415
3.311
13.843
3.943

0.227
0.146

90.77
0.01 1.32 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.34
0.00000 0.01 1.33 1.43 1.53 1.63 1.73 1.83 1.93 2.04 2.37

feb
mar
apr
mei
jun
jul
agus
sep
b. Tulungagung

Oktober
11 12 13 14 15 16 17 18 19 20 21

0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653 0.0653

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

0.51 0.51 0.51 0.51 0.51 0.51 0.51

0.03 0.03 0.03 0.03 0.03 0.03 0.03


0.34 0.34 0.34 0.34 0.88 0.88 0.88 0.88 0.88 0.88 0.88
2.71 3.05 3.39 3.73 4.61 5.49 6.37 7.25 8.13 9.01 9.89
JA

22 23 24 25 26 27 28 29 30 31 32

0.0653 0.0653 0.0653 0.0653 0.0653

0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04
0.21 0.21 0.21 0.21 0.21
0.03

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51
0.06 0.06 0.06 0.06 0.06 0.06
0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
0.01 0.01 0.01

0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.21 0.21 0.21 0.21 0.21 0.21
0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40
0.14

0.95 1.00 1.00 0.99 0.99 1.32 1.26 1.26 1.35 1.35 1.48
10.85 11.85 12.85 13.84 14.83 16.16 17.42 18.68 20.03 21.38 22.87
JADWAL PELAKSANAAN PEKERJAAN

Jangka Waktu Pelaksanaan Pekerjaan ( 3 Bulan

33 34 35 36 37 38 39 40 41 42 43

0.04 0.04 0.04 0.04 0.04 0.04

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51

0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03

0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21 0.21
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

1.48 1.48 1.48 1.48 1.48 1.48 1.45 1.45 1.45 1.45 1.45
24.35 25.84 27.32 28.81 30.29 31.77 33.22 34.67 36.12 37.57 39.02
N

aksanaan Pekerjaan ( 3 Bulan )


November
44 45 46 47 48 49 50 51 52 53 54

0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51 0.51

0.03 0.03 0.03

0.45438 0.45438
0.41 0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15 0.15
0.08 0.08 0.08 0.08 0.08 0.08
0.21 0.21 0.21 0.21
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14

1.45 1.45 1.45 1.41 1.20 1.20 1.68 1.68 1.68 2.13 2.13
40.47 41.91 43.36 44.78 45.98 47.18 48.86 50.54 52.22 54.36 56.49
1 2 3

55 56 57 58 59 60 61 62 63 64 65

0.05 0.05
0.11 0.11 0.11
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438
0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
0.40 0.40 0.40 0.40 0.40 0.40 0.40
0.14 0.14 0.14 0.14 0.14 0.14

1.89 1.89 1.84 1.73 1.73 1.73 1.59 1.20 1.20 1.20 1.20
58.38 60.27 62.10 63.83 65.56 67.29 68.88 70.08 71.28 72.47 73.67
4 5 6 7 8 9 10 11 12 13 14
3

Desember
66 67 68 69 70 71 72 73 74 75 76

0.10 0.10 0.10 0.10 0.10 0.10 0.10

0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438
0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41
0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
0.08 0.08 0.08

0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.20 1.20 1.20 1.14 1.14 1.14 1.14 1.03 1.03 1.03 1.03
74.87 76.07 77.26 78.40 79.53 80.67 81.80 82.84 83.87 84.90 85.94

105
15 16 17 18 19 20 21 22 23
4 5 6

Ket.
77 78 79 80 81 82 83 84 85

100%

75%

50%

0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438 0.45438


0.41 25%
0.15
0.02 0.02

0.02 0.02 0.02 0.02 0.02 0.02 0.02

1.03 0.50 0.48 0.48 0.48 0.48 0.48 0.48 0.45


86.97 87.47 87.94 88.42 88.89 89.37 89.84 90.32 90.77
0.0102 -
- -
- -
1.3151 -

- -
1.5683 -

- -
- -
1.3045 -
3.5129 -
0.3915 -
- -
- -
20.3090 -
0.3612 -

0.0369 -
0.1058 -
0.3189 -
1.8411 -
- -
- -
14.9945 -
11.3783 -
4.1839 -
4.4147 -
3.3113 -

- (0.1459)
K E M E N T E R I A N P E K E R J A A N U M
D I R E KTO RAT J E N D E RAL S U M B E R DAYA
B A LA I B E S A R W I LAYA H S U N G A I B R A N T
S N V T P E LJln.AJayengkusuma
KSAN AAN JARINGAN SUMBER AIR
123 Telp. 0355 - 321013 Fax. 321014 Tulungagung 66224, Email : pbps_2@yahoo

ESTIMATE ENGINEERING (EE)

UNTUK
PEKERJAAN : REHABILITASI PERKUATAN TEBING DAN GROUNDSILL
PARIT RAYA - KAB. TRENGGALEK
BALAI BESAR WILAYAH SUNGAI BRANTAS
SUNGAI DAN PANTAI I
2012
K E M E N T E R I A N P E K E R J A A N U M
D I R E KTO RAT J E N D E RAL S U M B E R DAYA
B A LA I B E S A R W I LAYA H S U N G A I B R A N T
S N V T P E LJln.AJayengkusuma
KSAN AAN JARINGAN SUMBER AIR
123 Telp. 0355 - 321013 Fax. 321014 Tulungagung 66224, Email : pbps_2@yahoo

HARGA PERKIRAAN SENDIRI (HPS)

UNTUK
PEKERJAAN : REHABILITASI PERKUATAN TEBING DAN GROUNDSILL
PARIT RAYA - KAB. TRENGGALEK
BALAI BESAR WILAYAH SUNGAI BRANTAS
SUNGAI DAN PANTAI I
2012
J A A N U M U M
B E R DAYA AI R
GAI B RAN TAS
U224,
MEmail
B E: pbps_2@yahoo.co.id
R AIR BRANTAS

ROUNDSILL
J A A N U M U M
B E R DAYA AI R
GAI B RAN TAS
U224,
MEmail
B E: pbps_2@yahoo.co.id
R AIR BRANTAS

PS)

ROUNDSILL

You might also like