You are on page 1of 1

PT .

ANTA RAKSA

SOIL AND ROCK INVESTIGATION

FIELD CBR TEST


Pekerjaan : Pembangunan Gate TPK Belawan Material : Timbunan Biasa
Kontraktor : PT. Anta Raksa Tanggal : 14 April 2017
Konsultan : PT. Adhimas Cipta Dwipantara STA : 0 + 380 L/S

Lokasi : Belawan

Wet Density and Dry Density Coef of Ring : 27.456 Piston Area : 5.06
Mold No. - gr
300
Wet Mold + Soil - gr 290
Wt of Mold - gr 280
270
Wt of Wet Soil - gr
260
Moisture Content - gr 250
Wt of Dry Density Soil - % 240

Volume of Mold 230


- gr/cc
220
Dry Density - gr/c
210
200
Moisture Content Before Soaked 190
180
Container No. - gr 170
Unit Load (lb/inc)

Container + Wet Soil - gr 160


Container + Dry Soil - gr 150
140
Wet of Container - gr
130
Wet of Water - gr 120
Wet of Dry Soil - gr 110
100
Moisture Content - %
90
80
Moisture Content Before Soaked 70

Container No. 60
- gr
50
Container + Wet Soil - gr 40
Container + Dry Soil - gr 30
Wet of Container 20
- gr
10
Wet of Water - gr
0
Wet of Dry Soil - gr Penetration ( inches)
Moisture Content - %

CBR TEST
TIMES 30'' 01'' 1.30'' 2'' 2.30" 3.0'' 3.30'' 4.0'' 5.0'' 6.0'' 8.0"
Penetration in 0,025 0,050 0,075 0,100 0,125 0,150 0,175 0,200 0,250 0,300 0,400
Reading 4.0 7.0 10.0 14.0 16.0 19.0 21.0 24.0
Loads, lb 109.8 192.2 274.6 384.4 439.3 521.7 576.6 658.9
Unit Load, lb/in2 0 21.7 38.0 54.3 76.0 86.8 103.1 113.9 130.2
Standar Loads 3000 4500 5700 6900
CBR Unit 12.81 14.64

CBR AVRAGE : 13.73 %

Pengawas Proyek Konsultan Kontraktor

() (..) (..)

You might also like