You are on page 1of 2

1

CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: SEP 3, 2017 Time: 20:48
Job: Pipe Support Dipo Lok Malang

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP


CASE 5 (SUS) W+P1
CASE 6 (SUS) W+P2

Piping Code: B31.3

CODE STRESS CHECK PASSED : LOADCASE 1 (HYD) WW+HP

Highest Stresses: (N./sq.mm. ) LOADCASE 1 (HYD) WW+HP


Ratio (%): 63.5 @Node 20
Code Stress: 153.3 Allowable Stress: 241.3
Axial Stress: 4.7 @Node 20
Bending Stress: 148.6 @Node 20
Torsion Stress: 0.0 @Node 20
Hoop Stress: 10.1 @Node 20
Max Stress Intensity: 153.3 @Node 20

CODE STRESS CHECK FAILED : LOADCASE 5 (SUS) W+P1

Highest Stresses: (N./sq.mm. ) LOADCASE 5 (SUS) W+P1


Ratio (%): 108.8 @Node 20
Code Stress: 150.0 Allowable Stress: 137.9
Axial Stress: 3.1 @Node 20
Bending Stress: 146.9 @Node 20
Torsion Stress: 0.0 @Node 20
Hoop Stress: 6.7 @Node 20
Max Stress Intensity: 150.0 @Node 20

CODE STRESS CHECK FAILED : LOADCASE 6 (SUS) W+P2

Highest Stresses: (N./sq.mm. ) LOADCASE 6 (SUS) W+P2


Ratio (%): 107.7 @Node 20
Code Stress: 148.5 Allowable Stress: 137.9
Axial Stress: 1.6 @Node 20
Bending Stress: 146.9 @Node 20
Torsion Stress: 0.0 @Node 20
Hoop Stress: 3.4 @Node 20
Max Stress Intensity: 148.5 @Node 20
2
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: SEP 3, 2017 Time: 20:48
Job: Pipe Support Dipo Lok Malang

You might also like