You are on page 1of 263

-------------------------------------------------------------------------------

ROBOCOPY :: Robust File Copy for Windows


-------------------------------------------------------------------------------

Started : Sat Nov 11 22:51:53 2017

Source : D:\PoyryNeoh\
Dest : C:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:51:53 ERROR 2 (0x00000002) Accessing Source Directory D:\PoyryNeoh\


The system cannot find the file specified.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:04 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:04 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:21 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:21 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:56 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:56 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:53:20 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:53:20 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:28 2017

Source : C:\AdvisianActive" D:\AdvisianActive"\


Dest -

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

ERROR : No Destination Directory Specified.

Simple Usage :: ROBOCOPY source destination /MIR

source :: Source Directory (drive:\path or \\server\share\path).


destination :: Destination Dir (drive:\path or \\server\share\path).
/MIR :: Mirror a complete directory tree.
For more usage information run ROBOCOPY /?

**** /MIR can DELETE files as well as copy them !

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:44 2017

Source : C:\AdvisianActive" D:\AdvisianActive"\


Dest -

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

ERROR : No Destination Directory Specified.

Simple Usage :: ROBOCOPY source destination /MIR

source :: Source Directory (drive:\path or \\server\share\path).


destination :: Destination Dir (drive:\path or \\server\share\path).
/MIR :: Mirror a complete directory tree.

For more usage information run ROBOCOPY /?

**** /MIR can DELETE files as well as copy them !

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:55 2017

Source : D:\PoyryNeoh\
Dest : C:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:54:55 ERROR 2 (0x00000002) Accessing Source Directory D:\PoyryNeoh\


The system cannot find the file specified.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:56:44 2017

Source : D:\AdvisianActive\
Dest : C:\PoyryFiles\
Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

*EXTRA Dir -1 C:\PoyryFiles\01 Projects\


*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\
*EXTRA File 63193 5YX312462 Energy Commission Technical
Advisory Services_Project Charter.docx
*EXTRA File 283935 5YX312462 Energy Commission Technical
Advisory Services_Project Charter.pdf
*EXTRA File 1494 Alor Gajah 2100 MW CCGT - Shortcut.lnk
*EXTRA File 3.1 m Draft EC Inv5Y160033 Dec15-Apr16.pdf
*EXTRA File 3.1 m EC Inv5Y160033 Dec15-Apr16.pdf
*EXTRA File 49036 Expense Claim_Sean.xlsx
*EXTRA File 9.4 m Framework Agreement_signed.pdf
*EXTRA File 16847 Invoice EC.xlsx
*EXTRA File 1793 Kagayaki 30 MW - Shortcut (3).lnk
*EXTRA File 93839 Letter of Intent (Poyry Energy Sdn
Bhd).pdf
*EXTRA File 60334 PESB-MD-T16-0013_Framework
Agreement_signed.docx
*EXTRA File 60380 PESB-MD-T16-0018_Framework
Agreement_stamped.docx
*EXTRA File 1778 Sandakan 60MW - Shortcut.lnk
*EXTRA File 100306 Technical Advisory Agreement-poyry
energy_execution version.docx
*EXTRA File 144896 Thumbs.db
*EXTRA File 55610 Timesheets_Energy Commission_sbd.xlsx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\
*EXTRA File 1.3 m 2.4 Operational Flexibility of the Power
Plant_neoh.pdf
*EXTRA File 165153 2.4.1.1.5 Electrical System and Equipment
Description_neoh.pdf
*EXTRA File 120638 2.4.1.1.7 Instrumentation and Control
System_neoh.pdf
*EXTRA File 116974 Alor Gajah evaluation.docx
*EXTRA File 16414 Alor Gajah evaluation_general elec.docx
*EXTRA File 16355 Clarification question for CCGT Alor
Gajah.xlsx
*EXTRA File 8136 Edra proposal index.pdf
*EXTRA File 5.1 m Melaka - Feasibility Study Report 25-Mar-
15.pdf
*EXTRA File 95232 Thumbs.db
*EXTRA File 891356 Track 4A_SIPP offer review_7 Jan
2015_draft.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\
*EXTRA File 8.8 m Tender Addendum No. 3.pdf
*EXTRA File 201236 Tender Addendum No. 4.pdf
*EXTRA File 5.7 m Tender Addendum No. 5.pdf
*EXTRA File 24064 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\MSWord\
*EXTRA File 74117 Addendum No 1 - Attachment 6 - Part C -
Appendix C - EPC Contractor's Experience (20151023).docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\PDF\
*EXTRA File 561580 Addendum No 1 (20151023).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part A\
*EXTRA File 690452 Tender Document - Part A - Section A -
Instruction To Tenderers [Final Draft].pdf
*EXTRA File 404747 Tender Document - Part A - Section B -
Form of Tender [Final Draft].pdf
*EXTRA File 383069 Tender Document - Part A - Section D -
Schedule of Key Dates [Final Draft].pdf
*EXTRA File 868224 Tender Document - Part A - Section E -
Schedule of Prices [Final Draft].pdf
*EXTRA File 663000 Tender Document - Part A - Section F -
Schedule of Options_ [Attachment A].pdf
*EXTRA File 470051 Tender Document - Part A - Section G -
Schedule of Milestone Payment [Final Draft].pdf
*EXTRA File 457323 Tender Document - Part A - Section H -
Schedule of Unit Rates [Final Draft].pdf
*EXTRA File 612513 Tender Document - Part A - Section I -
Schedule of Performance Guarantees [Final Draft].pdf
*EXTRA File 710044 Tender Document - Part A - Section I -
Schedule of Performance Guarantees Annex A [Final Draft].pdf
*EXTRA File 9242 Tender Document - Part A - Section L -
Insurance Requirements [Cover].pdf
*EXTRA File 9209 Tender Document - Part A - Section M -
Form of LNTP Bond [Cover].pdf
*EXTRA File 12008 Tender Document - Part A - Section M -
Form of LNTP Bond.pdf
*EXTRA File 9234 Tender Document - Part A - Section N -
Form of Performance Bond [Cover].pdf
*EXTRA File 11237 Tender Document - Part A - Section N -
Form of Performance Bond.pdf
*EXTRA File 9237 Tender Document - Part A - Section O -
Form of Warranty Bond [Cover].pdf
*EXTRA File 11364 Tender Document - Part A - Section O -
Form of Warranty Bond.pdf
*EXTRA File 9250 Tender Document - Part A - Section P -
Form of Availability Warranty Bond [Cover].pdf
*EXTRA File 354525 Tender Document - Part A - Section Q -
Schedule of DeviationQualification [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part B\
*EXTRA File 2.6 m Tender Document - Part B - Functional
Specification [Final Draft].pdf
*EXTRA File 10240 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part
B\Appendices\
*EXTRA File 3.0 m Appendix A - Drawings.pdf
*EXTRA File 4872 Appendix B - Gas Fuel Specification.pdf
*EXTRA File 719039 Appendix C - Distillate Oil Analysis.pdf
*EXTRA File 489006 Appendix D - PPA Technical
Requirements.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part C\
*EXTRA File 910551 Tender Document - Part C - Information to
be Provided by Tenderers [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\
*EXTRA File 9222 Tender Document - Part D - Attachment A -
Form of Bid Bond [Cover].pdf
*EXTRA File 9864 Tender Document - Part D - Attachment A -
Form of Bid Bond.pdf
*EXTRA File 9240 Tender Document - Part D - Attachment B -
Form of Substitute Bond [Cover].pdf
*EXTRA File 12012 Tender Document - Part D - Attachment B -
Form of Substitute Bond.pdf
*EXTRA File 9235 Tender Document - Part D - Attachment C -
Geotechnical Investigation [Cover].pdf
*EXTRA File 9233 Tender Document - Part D - Attachment D -
Topographic Survey [Cover].pdf
*EXTRA File 9241 Tender Document - Part D - Attachment E -
Bathymetric Survey [Cover].pdf
*EXTRA File 259310 Tender Document - Part D - Attachment E -
Bathymetric Survey.pdf
*EXTRA File 9233 Tender Document - Part D - Attachment F -
Seawater Analysis [Cover].pdf
*EXTRA File 72256 Tender Document - Part D - Attachment F -
Seawater Analysis.pdf
*EXTRA File 9245 Tender Document - Part D - Attachment G -
Raw Water Analysis [Cover].pdf
*EXTRA File 83254 Tender Document - Part D - Attachment G -
Raw Water Analysis.pdf
*EXTRA File 9273 Tender Document - Part D - Attachment H -
Exitsing Seawater Intake and Outfall Drawings [Cover].pdf
*EXTRA File 21.1 m Tender Document - Part D - Attachment H -
Exitsing Seawater Intake and Outfall Drawings.pdf
*EXTRA File 21364 Tender Document - Part D - Attachment I -
Form of Tender Enquiries [Final Draft].pdf
*EXTRA File 876424 Tender Document - Part D - Attachment J -
Request for LTSA Proposal [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\Tender
Document - Part D - Attachment C - Geotechnical Investigation\
*EXTRA File 1.0 m 3018-150422-GIR-SD-R0.pdf
*EXTRA File 60.2 m SI report.pdf
*EXTRA File 2.2 m SSE 1168.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\Tender
Document - Part D - Attachment D - Topographic Survey\
*EXTRA File 523015 MHHMEL1510TOPO_DRAFT04.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 10\
*EXTRA File 189000 Tender Addendum No.10.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 2\
*EXTRA File 4.3 m Attachment 2.pdf
*EXTRA File 737606 Attachment 3.pdf
*EXTRA File 268336 Tender Addendum No. 2 (20151109).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\
*EXTRA File 624657 Attachment 1_Cover Page.pdf
*EXTRA File 1.5 m Pre-Approved List for Substation.pdf
*EXTRA File 3.9 m Transmission Substation.pdf
*EXTRA File 425976 Transmission Technical Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\500KV\
*EXTRA File 161296 500kV_Design_Specification.pdf
*EXTRA File 139035 500kV_General_Specification.pdf
*EXTRA File 538349 500kV_Line_Construction.pdf
*EXTRA File 389752 500kV_Material_Specificaton.pdf
*EXTRA File 43452 TOC.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\CIVIL (GREEN BUILDING)\
*EXTRA File 397299 10-Plumbing_GB_rev1.pdf
*EXTRA File 71194 11-Roof_GB_rev0.pdf
*EXTRA File 902175 13-Mech_GB_rev0.pdf
*EXTRA File 279852 14-ElectSpecs_GB_rev0.pdf
*EXTRA File 316997 8-BldgTrdr_GB_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\CIVIL (LUMP SUM)\
*EXTRA File 98849 15-
Lift_Installaltion_(AC_Variable_Frequncy_Geared_Lifts).pdf
*EXTRA File 66802 16-Landscaping_Works.pdf
*EXTRA File 123380 18-Soft_Ground_Treatment.pdf
*EXTRA File 53387 19-Dynamic_Compaction.pdf
*EXTRA File 366186 2-Earthworks.pdf
*EXTRA File 118434 3-Drainage_and_Kerbing_works.pdf
*EXTRA File 194297 4-Roadworks.pdf
*EXTRA File 304300 5-Concrete_Works.pdf
*EXTRA File 41216 7-Fencing_.pdf
*EXTRA File 57637 9-Steelwork.pdf
*EXTRA File 122340 Lattice_Steel_Structures.pdf
*EXTRA File 72583 Table_of_Contents.pdf
*EXTRA File 298108 TTS-CV-FDN-LS_rev0.pdf
*EXTRA File 246869 TTS-CV-FIRE_PROT-LS_rev0.pdf
*EXTRA File 112341 TTS-CV-FLRWALL-LS_rev0.pdf
*EXTRA File 413272 TTS-CV-PART1_PRELIM-LS_rev0.pdf
*EXTRA File 49529 TTS-CV-STECLR-LS_rev0.pdf
*EXTRA File 137069 Tubular_Steel_Structures.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\EARTHING & LOCAL TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 861994 Section_2_-
_Earthing_and_Local_Transformer_33_22_11_rev2_.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\LINES\
*EXTRA File 71924
275_132kV__Cap_&_Pin_Insulators_(Porcelain_&_Glass).pdf
*EXTRA File 144380
500_275_132kVTransmission_Line_Conductors__(TACSR(SA)__TW).pdf
*EXTRA File 176018 Fittings_and_Accessories_(ACSR)_rev1.pdf
*EXTRA File 247361
Fittings_and_Accessories_(High_Temperature_Conductors)_rev1.pdf
*EXTRA File 404560
General_Specification_for_Transmission_Line.pdf
*EXTRA File 151001 Insulator_(Composite).pdf
*EXTRA File 282592
Monopole_&_Lattice_Tower_Earthing_System.pdf
*EXTRA File 99032
Optical_Fibre_Approach_Cable_&_Accessories.pdf
*EXTRA File 220887
Optical_Fibre_Composite_Groundwire_(OPGW)_Accessories.pdf
*EXTRA File 151763
Optical_Fibre_Groundwire_(48_Fibres_OPGW)_of_Lightning_Class_3.pdf
*EXTRA File 121038 Transmission_Line_Arrester_(Gap_Type).pdf
*EXTRA File 79026 Transmission_Line_Conductors_(ACSR).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\POWER TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 449252
High_Voltage_Bushing_for_Transformer_and_Reactor_ver.2.pdf
*EXTRA File 91129 Section_1_-
_Transformer_Reactor_Specification_rev1.pdf
*EXTRA File 378820 Section_2A_-
_Transformer_Insulating_Mineral_Oil_Technical_Requirement.pdf
*EXTRA File 752090 Section_3-
Transformer_Painting_&_Corrosion_Prevention.pdf
*EXTRA File 624543 Section_5-
Transformer_Quality_Assurance_&_Design_Review.pdf
*EXTRA File 270504 Section_6-
Transformer_SCADA_Interface_Requirements.pdf
*EXTRA File 4.8 m Secttion_2_-
_Transformer_Technical_Requirement_500KV_rev2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\PROTECTION\
*EXTRA File 144098 415V_LVAC_Switchborad.pdf
*EXTRA File 309744
Auxiliary_Power,_Control_and_Instrumentation_Cables.pdf
*EXTRA File 803988 Protection_Control_&_Instrumentation.pdf
*EXTRA File 187084 Station_DC_System.pdf
*EXTRA File 261787 Three_Phase_Energy_Meters.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\SUBSTATION\
*EXTRA File 422442 33kV_&_11kV_Transformer_Tail_Cable.pdf
*EXTRA File 146058 500kV,_275kV_&_132kV_Circuit_Breaker.pdf
*EXTRA File 117617 Busbar_and_Fitting.pdf
*EXTRA File 47504 Capacitor_Voltage_Transformer.pdf
*EXTRA File 48330 Current_Transformer.pdf
*EXTRA File 95125 Earthing_Systems.pdf
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 50087 Inductive_Voltage_Transformer.pdf
*EXTRA File 77730 Lightning_Prot_System.pdf
*EXTRA File 93066 Neutral_Earthing_Equipment.pdf
*EXTRA File 224912
Outdoor_Disconnectors_&_Earthing_Switches.pdf
*EXTRA File 311906 Standby_Diesel_Generator.pdf
*EXTRA File 352371
Substation_Product_Testing_&_Inspection.pdf
*EXTRA File 58319 Surge_Arrester.pdf
*EXTRA File 81103 TX_Explosion_Prevention.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\TELECONTROL\
*EXTRA File 408645
Network_Control_Center_SCADA_Requirements.pdf
*EXTRA File 553162 Remote_Terminal_Unit.pdf
*EXTRA File 95101 Supervisory_Interface_Panel.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 9\
*EXTRA File 544553 Tender Addendum No. 9.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct 2015\
*EXTRA File 69014 Cover Letter dated 9 Oct 2015.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document (Tracked Change)\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\pdf\
*EXTRA File 369995 Tender Document - Part A - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part B\
*EXTRA File 370304 Tender Document - Part B - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\MS word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\pdf\
*EXTRA File 370097 Tender Document - Part C - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\pdf\
*EXTRA File 370096 Tender Document - Part D - Vol 1 -
Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\pdf\
*EXTRA File 370073 Tender Document - Part D - Vol 2 -
Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 1\
*EXTRA File 3.7 m Cover Letter.pdf
*EXTRA File 88291 Extract of Board Resolution.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 14\
*EXTRA File 340754 0_Table of Content (Vol 14).pdf
*EXTRA File 2.1 m 1_Commercial Proposal (Main Body).pdf
*EXTRA File 25.3 m Annex 3.2.1-A Copy of draft PPA.pdf
*EXTRA File 9.9 m Annex 3.2.1-B Copy of draft GSA (Part 1
of 2).pdf
*EXTRA File 980917 Annex 3.2.1-B Copy of draft GSA (Part 2
of 2).pdf
*EXTRA File 2.5 m Annex 3.2.1-C Copy of Letter of Support
from Financial Institution.pdf
*EXTRA File 5.6 m Annex 3.2.1-D Copy of Land SPA with
1MDB.pdf
*EXTRA File 496065 Annex 3.2.1-E Copy of Letter of Intent
and follow up letter from Edra Energy to TNB.pdf
*EXTRA File 245759 Annex 3.2.1-F Copy of Letter of intent
from Powertek Berhad to Edra Energy.pdf
*EXTRA File 2.9 m Annex 3.2.1-G Copy of Land SPA with
Yayasan Melaka.pdf
*EXTRA File 305227 Annex 3.2.1-H Copy of Letter of Intent
from Panglima Power Sdn Bhd to Edra Energy.pdf
*EXTRA File 1.6 m Annex 3.3.8-A Copy of Letter from
Insurance Adviser.pdf
*EXTRA File 179712 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 15\
*EXTRA File 287596 0_Table of Content (Vol 15).pdf
*EXTRA File 5.3 m Annex 3.4.1 & 3.4.2 Financial Forms, Data
Book and Model.xlsm
*EXTRA File 2.0 m Annex 3.4.2-A Financial Model Data Book
and User Manual.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.1\
*EXTRA File 196123 2.1 Plant Net Capacity.pdf
*EXTRA File 19456 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.10\
*EXTRA File 41657 2.10 Project Implementation Schedule.pdf
*EXTRA File 145847 Attachment A - Project Development
Schedule.pdf
*EXTRA File 313638 Attachment B - EPC Contractor
Schedule.pdf
*EXTRA File 42496 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.11\
*EXTRA File 192848 2.11 Maintenance Plan.pdf
*EXTRA File 45993 Attachment A - Maintenance Plan.pdf
*EXTRA File 130475 Attachment A1 - Maintenance Plan (AT
Table).pdf
*EXTRA File 3.3 m Attachment B - GER3620M Heavy-Duty GT
Operating and Maintenance Considerations.PDF
*EXTRA File 26624 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.12\
*EXTRA File 95342 2.12 Detailed Technical Information.pdf
*EXTRA File 17920 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.2\
*EXTRA File 112506 2 2 Certainty of Net Capacity over the
Term.pdf
*EXTRA File 15872 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.3\
*EXTRA File 1.5 m 2.3 Track Record of and Service Support
for the Power Plant Technology.pdf
*EXTRA File 3.1 m Attachment A - 01. 9HA.02 Overview (GE
Presentation).pdf
*EXTRA File 300154 Attachment A - 02. HA Gas Turbine
Validation from a Fleet Perspective Paper (GEA32109).pdf
*EXTRA File 56541 Attachment A - 03. GE H-Class Gas Turbine
Experience List (GEA31771).pdf
*EXTRA File 1.6 m Attachment B - 01. Letters of
Insurability for 9HA.02.pdf
*EXTRA File 2.4 m Attachment C - 01. Equipment Project
References (Table E.3.3).pdf
*EXTRA File 107520 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.4\
*EXTRA File 1.4 m 2.4 Operational Flexibility of the Power
Plant.pdf
*EXTRA File 4.5 m Attachment A - 01. Supporting Drawings
and Information (Part 1).pdf
*EXTRA File 1043742 Attachment A - 02. Supporting Drawings
and Information (Part 2).pdf
*EXTRA File 631906 Attachment B - Supporting Drawings and
Information (Supplement).pdf
*EXTRA File 77824 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.5\
*EXTRA File 455861 2.5 Environmental Compliance.pdf
*EXTRA File 98124 Attachment A - Acknowledgement from DOE
Melaka.pdf
*EXTRA File 38912 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.6\
*EXTRA File 220730 2.6 Capabality of and certainty of plant
delivery by the EPC contractor.pdf
*EXTRA File 82958 Attachment A - Particulars of EPC
Contractor.pdf
*EXTRA File 1.7 m Attachment B - EPC Contractor
Experience.pdf
*EXTRA File 99489 Attachment C - EPC Contractor Project
Organization Chart (Level 1 & 2).pdf
*EXTRA File 45949 Attachment D - EPC Contractor HSE
Statistics.pdf
*EXTRA File 10.3 m Attachment E - EPC Contractor Proposed
Approach, Project Execution Plan and Method Statements.pdf
*EXTRA File 48128 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.7\
*EXTRA File 753591 2.7 Capacity of and Certainty of Plant
Operation of the O&M Contractor.pdf
*EXTRA File 29184 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.8\
*EXTRA File 172022 2.8 Capabality of and certainty of plant
design review and construction management by the OE.pdf
*EXTRA File 539002 Attachment A - OE1 Project Reference.pdf
*EXTRA File 545101 Attachment B - OE2 Project Reference.pdf
*EXTRA File 67072 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.9\
*EXTRA File 408243 2.9 Information Required as per Appendix
G of the PPA.pdf
*EXTRA File 14848 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-A - EPC
Tender Process\
*EXTRA File 92983 00 EPC Tender Process.pdf
*EXTRA File 366724 01 EPC Tender Process (Tender Evaluation)
Feb2016.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-B -
RFEOI Evaluation Report\
*EXTRA File 726674 Request for Expression of Interest for
EPC Contractor Evaluation Report.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\
*EXTRA File 43920 Tender Document Covers.pdf
*EXTRA File 14336 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part A\
*EXTRA File 170812 Tender Document - Part A - Section A -
Instructions To Tenderers (20160224).pdf
*EXTRA File 400108 Tender Document - Part A - Section B -
Form of Tender (20160224).pdf
*EXTRA File 1.3 m Tender Document - Part A - Section C -
Form of Agreement and Conditions of Contract.pdf
*EXTRA File 21533 Tender Document - Part A - Section D -
Schedule of Key Dates (20160224).pdf
*EXTRA File 101976 Tender Document - Part A - Section E -
Schedule of Prices (20160224).pdf
*EXTRA File 361838 Tender Document - Part A - Section F -
Schedule of Options (20160224).pdf
*EXTRA File 473578 Tender Document - Part A - Section F -
Schedule of Options Annex A-1 (20151009).PDF
*EXTRA File 278145 Tender Document - Part A - Section F -
Schedule of Options Annex A-2 (20151009).PDF
*EXTRA File 423815 Tender Document - Part A - Section F -
Schedule of Options Annex D2-1 (20151009).pdf
*EXTRA File 92918 Tender Document - Part A - Section F -
Schedule of Options Annex D2-2 (20151009).pdf
*EXTRA File 453109 Tender Document - Part A - Section G -
Schedule of Milestone Payments (20160224).pdf
*EXTRA File 451403 Tender Document - Part A - Section H -
Schedule of Unit Rates (20160224).pdf
*EXTRA File 102449 Tender Document - Part A - Section L -
Insurance Requirements (20160224).pdf
*EXTRA File 367110 Tender Document - Part A - Section M -
Form of LNTP Bond (20160224).pdf
*EXTRA File 379629 Tender Document - Part A - Section N -
Form of Performance Bond (20160224).pdf
*EXTRA File 379831 Tender Document - Part A - Section O -
Form of Warranty Bond (20160224).pdf
*EXTRA File 293746 Tender Document - Part A - Section P -
Form of Advance Payment Bond (20160224).pdf
*EXTRA File 54784 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\
*EXTRA File 1.2 m Tender Document - Part B - Functional
Requirements (20160224).pdf
*EXTRA File 4.2 m Tender Document - Part B - Functional
Requirements - Annex A (20160224).pdf
*EXTRA File 214433 Tender Document - Part B - Functional
Requirements - Annex B (20160224).pdf
*EXTRA File 405989 Tender Document - Part B - Functional
Requirements - Annex C (20160224).pdf
*EXTRA File 234017 Tender Document - Part B - Functional
Requirements - Annex D (20160224).pdf
*EXTRA File 459754 Tender Document - Part B - Functional
Requirements - Annex E [Cover Only].pdf
*EXTRA File 46401 Tender Document - Part B - Functional
Requirements - Annex F (20160224).pdf
*EXTRA File 65024 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\
*EXTRA File 624657 Attachment 1_Cover Page.pdf
*EXTRA File 1.5 m Pre-Approved List for Substation.pdf
*EXTRA File 3.9 m Transmission Substation.pdf
*EXTRA File 425976 Transmission Technical Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\500KV\
*EXTRA File 161296 500kV_Design_Specification.pdf
*EXTRA File 139035 500kV_General_Specification.pdf
*EXTRA File 538349 500kV_Line_Construction.pdf
*EXTRA File 389752 500kV_Material_Specificaton.pdf
*EXTRA File 43452 TOC.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\CIVIL (GREEN BUILDING)\
*EXTRA File 397299 10-Plumbing_GB_rev1.pdf
*EXTRA File 71194 11-Roof_GB_rev0.pdf
*EXTRA File 902175 13-Mech_GB_rev0.pdf
*EXTRA File 279852 14-ElectSpecs_GB_rev0.pdf
*EXTRA File 316997 8-BldgTrdr_GB_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\CIVIL (LUMP SUM)\
*EXTRA File 98849 15-
Lift_Installaltion_(AC_Variable_Frequncy_Geared_Lifts).pdf
*EXTRA File 66802 16-Landscaping_Works.pdf
*EXTRA File 123380 18-Soft_Ground_Treatment.pdf
*EXTRA File 53387 19-Dynamic_Compaction.pdf
*EXTRA File 366186 2-Earthworks.pdf
*EXTRA File 118434 3-Drainage_and_Kerbing_works.pdf
*EXTRA File 194297 4-Roadworks.pdf
*EXTRA File 304300 5-Concrete_Works.pdf
*EXTRA File 41216 7-Fencing_.pdf
*EXTRA File 57637 9-Steelwork.pdf
*EXTRA File 122340 Lattice_Steel_Structures.pdf
*EXTRA File 72583 Table_of_Contents.pdf
*EXTRA File 298108 TTS-CV-FDN-LS_rev0.pdf
*EXTRA File 246869 TTS-CV-FIRE_PROT-LS_rev0.pdf
*EXTRA File 112341 TTS-CV-FLRWALL-LS_rev0.pdf
*EXTRA File 413272 TTS-CV-PART1_PRELIM-LS_rev0.pdf
*EXTRA File 49529 TTS-CV-STECLR-LS_rev0.pdf
*EXTRA File 137069 Tubular_Steel_Structures.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\EARTHING & LOCAL TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\LINES\
*EXTRA File 71924
275_132kV__Cap_&_Pin_Insulators_(Porcelain_&_Glass).pdf
*EXTRA File 144380
500_275_132kVTransmission_Line_Conductors__(TACSR(SA)__TW).pdf
*EXTRA File 176018 Fittings_and_Accessories_(ACSR)_rev1.pdf
*EXTRA File 247361
Fittings_and_Accessories_(High_Temperature_Conductors)_rev1.pdf
*EXTRA File 404560
General_Specification_for_Transmission_Line.pdf
*EXTRA File 151001 Insulator_(Composite).pdf
*EXTRA File 282592
Monopole_&_Lattice_Tower_Earthing_System.pdf
*EXTRA File 99032
Optical_Fibre_Approach_Cable_&_Accessories.pdf
*EXTRA File 220887
Optical_Fibre_Composite_Groundwire_(OPGW)_Accessories.pdf
*EXTRA File 151763
Optical_Fibre_Groundwire_(48_Fibres_OPGW)_of_Lightning_Class_3.pdf
*EXTRA File 121038 Transmission_Line_Arrester_(Gap_Type).pdf
*EXTRA File 79026 Transmission_Line_Conductors_(ACSR).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\POWER TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 449252
High_Voltage_Bushing_for_Transformer_and_Reactor_ver.2.pdf
*EXTRA File 91129 Section_1_-
_Transformer_Reactor_Specification_rev1.pdf
*EXTRA File 752090 Section_3-
Transformer_Painting_&_Corrosion_Prevention.pdf
*EXTRA File 2.7 m Section_4_-_Inspection_Erection.pdf
*EXTRA File 624543 Section_5-
Transformer_Quality_Assurance_&_Design_Review.pdf
*EXTRA File 270504 Section_6-
Transformer_SCADA_Interface_Requirements.pdf
*EXTRA File 4.8 m Secttion_2_-
_Transformer_Technical_Requirement_500KV_rev2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\PROTECTION\
*EXTRA File 144098 415V_LVAC_Switchborad.pdf
*EXTRA File 309744
Auxiliary_Power,_Control_and_Instrumentation_Cables.pdf
*EXTRA File 803988 Protection_Control_&_Instrumentation.pdf
*EXTRA File 187084 Station_DC_System.pdf
*EXTRA File 261787 Three_Phase_Energy_Meters.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\SUBSTATION\
*EXTRA File 422442 33kV_&_11kV_Transformer_Tail_Cable.pdf
*EXTRA File 146058 500kV,_275kV_&_132kV_Circuit_Breaker.pdf
*EXTRA File 117617 Busbar_and_Fitting.pdf
*EXTRA File 47504 Capacitor_Voltage_Transformer.pdf
*EXTRA File 48330 Current_Transformer.pdf
*EXTRA File 95125 Earthing_Systems.pdf
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 50087 Inductive_Voltage_Transformer.pdf
*EXTRA File 77730 Lightning_Prot_System.pdf
*EXTRA File 93066 Neutral_Earthing_Equipment.pdf
*EXTRA File 224912
Outdoor_Disconnectors_&_Earthing_Switches.pdf
*EXTRA File 311906 Standby_Diesel_Generator.pdf
*EXTRA File 352371
Substation_Product_Testing_&_Inspection.pdf
*EXTRA File 58319 Surge_Arrester.pdf
*EXTRA File 81103 TX_Explosion_Prevention.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\TELECONTROL\
*EXTRA File 408645
Network_Control_Center_SCADA_Requirements.pdf
*EXTRA File 553162 Remote_Terminal_Unit.pdf
*EXTRA File 95101 Supervisory_Interface_Panel.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part C\
*EXTRA File 77153 Tender Document - Part C - Appendix C -
EPC Contractor's Experience (20160224).pdf
*EXTRA File 131046 Tender Document - Part C - Appendix H -
Equipment References (20160224).pdf
*EXTRA File 154607 Tender Document - Part C - Appendix J -
PPA Technical Data (20160224).pdf
*EXTRA File 53360 Tender Document - Part C - Appendix K -
Technical Data (20160224).pdf
*EXTRA File 31760 Tender Document - Part C - Appendix L -
Consumable and Operation Spares (20160224).pdf
*EXTRA File 26458 Tender Document - Part C - Appendix M -
Special Tools (20160224).pdf
*EXTRA File 28678 Tender Document - Part C - Appendix N -
Implementation Schedule (20160224).pdf
*EXTRA File 40453 Tender Document - Part C - Appendix Q -
Drawings (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\Vol 1\
*EXTRA File 56.5 m Tender Document - Part D - Vol 1 -
Attachment C - Geotech_Part 1 (20160224).pdf
*EXTRA File 2.4 m Tender Document - Part D - Vol 1 -
Attachment C - Geotech_Part 2 (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\Vol 2\
*EXTRA File 17.0 m Attachment H - Existing Seawater Intake
and Outfall Drawings (20160224).pdf
*EXTRA File 4.3 m Tender Document - Part D - Vol 2 -
Attachment F - [P1] (20160224).pdf
*EXTRA File 744762 Tender Document - Part D - Vol 2 -
Attachment L - Climate Data (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\Administrative, Technical and Commercial Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\LTSA Proposal\
*EXTRA File 5.1 m LTSA Proposal.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\Assignment Bonds to Edra Energy\
*EXTRA File 48828 Notification_of_Nominee_BIB2.pdf
*EXTRA File 48842 Notification_of_Nominee_BIT2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160301\
*EXTRA File 131294 Tender_Clarification_T2_20160301 -
Attachment 1 Board Resolution.pdf
*EXTRA File 143673 Tender_Clarification_T2_20160301 -
Attachment 1 Form 49.pdf
*EXTRA File 268636 Tender_Clarification_T2_20160301 -
Attachment 2 Form of Bid.pdf
*EXTRA File 136463
Tender_Clarification_T2_20160301_Attachment 3 GEGPP-GEPSM Bid Bond.pdf
*EXTRA File 294366
Tender_Clarification_T2_20160301_Attachment 4 Confidentiality Undertaking.pdf
*EXTRA File 6.1 m
Tender_Clarification_T2_20160301_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160303\
*EXTRA File 1.4 m
Tender_Clarification_T2_20160303_Hyundai_.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160305\
*EXTRA File 2.5 m Attachment_Item#17_GER3620L GT Operating
and Maintenance Considerations.pdf
*EXTRA File 6.5 m
Tender_Clarification_T2_20160305_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160309\
*EXTRA File 1.4 m
Tender_Clarification_T2_20160309_1_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160310\
*EXTRA File 52506 (Confidential) Attachment_Item#61_Part
Load Heat Rate Table (Gas Fuel).pdf
*EXTRA File 47424 (Confidential) Attachment_Item#61_Part
Load Heat Rate Table (Liquid Fuel).pdf
*EXTRA File 119541 _Item#53_GEK-110392 Standard Noise
Assessment Procedure.pdf
*EXTRA File 47652 _Item#54_Section I Schedule of
Performance Guarantees.pdf
*EXTRA File 99489 Item#30_Revised Project Organization
Chart(Level1&2).pdf
*EXTRA File 2.0 m Item#51_GEK28172 Std Field Testing
Procedure for Emission Compliance.pdf
*EXTRA File 10.9 m
Tender_Clarification_T2_20160310_Hyundai.pdf
*EXTRA File 1.5 m
Tender_Clarification_T2_20160310_Hyundai_Additional.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160316\
*EXTRA File 1.5 m Item#3-1_Revised Section 5 Schedule of
Options.pdf
*EXTRA File 141362
Item#47_Section_L___Insurance_Requirements.pdf
*EXTRA File 285981
Item#48_Hyundai_Updated_Milestone_Payment.pdf
*EXTRA File 930817 Item#63_Codes and Standards for Gas
Turbine Generator.pdf
*EXTRA File 26035 Item#77_Part C - Appendix H - 1,2 Gas
Turbine Design Validation.pdf
*EXTRA File 10.3 m Item#78_Section 30 Plans, Manuals and
Method Statements.pdf
*EXTRA File 978441 Tender_Clarification_T2_20160316 -
Attachment_Item#77_GT Publication.pdf
*EXTRA File 1.0 m
Tender_Clarification_T2_20160316_Hyundai_Admin.pdf
*EXTRA File 1.9 m
Tender_Clarification_T2_20160316_Hyundai_Commercial.pdf
*EXTRA File 5.8 m
Tender_Clarification_T2_20160316_Hyundai_Tech.pdf
*EXTRA File 70177
Tender_Clarification_T2_20160328_EPC_Commercia_Item No. 47-Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160328\
*EXTRA File 247324 (Confidential) Tender
Clarification_T2_20160328-Cost Impact.pdf
*EXTRA File 7920 Item#4_Std Protection Instrumentation for
the Main Shaft Train.pdf
*EXTRA File 321283 Item#4_Vibration measurement and
protection HTCT604278.pdf
*EXTRA File 29767 Tender_Clarification_T2_20160328 -
Attachment_Item#54_Start-up Time.pdf
*EXTRA File 91434 Tender_Clarification_T2_20160328 -
Attachment_Item#94_Revised Option C&D&E.pdf
*EXTRA File 1.0 m
Tender_Clarification_T2_20160328_EPC_Commercial_Minutes.pdf
*EXTRA File 510713
Tender_Clarification_T2_20160328_EPC_Technical_Minutes.pdf
*EXTRA File 2.7 m
Tender_Clarification_T2_20160330_EPC_Commercial.pdf
*EXTRA File 1.6 m
Tender_Clarification_T2_20160330_Soft_Submission.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160329\
*EXTRA File 84996 Attachment 2 - Man-Hours, Rate and
Qualifications of labor for HGP & MI.pdf
*EXTRA File 3.1 m Tender_Clarification_T2_20160329 -
Attachment 9HA Overview (Presentation).pdf
*EXTRA File 1.3 m
Tender_Clarification_T2_20160329_EPC_Technical_Hyundai.pdf
*EXTRA File 88389 Tender_Clarification_T2_LTSA_20160324 -
Attachment 1 - PerformanceTesting.pdf
*EXTRA File 143664 Tender_Clarification_T2_LTSA_20160324.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160330\
*EXTRA File 1.5 m
Tender_Clarification_T2_20160330_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160331\
*EXTRA File 143627 (Confidential) Tuah Milestone
Payments_Rev D_Final_160406.pdf
*EXTRA File 1.3 m
Tender_Clarification_T2_20160331_Hyundai.pdf
*EXTRA File 1.2 m
Tender_Clarification_T2_20160331_Hyundai_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160406\
*EXTRA File 62635 (Confidential)
Tender_Clarification_T2_20160406_Item100_Cost Impact.pdf
*EXTRA File 217507
Tender_Clarification_T2_20160406_EPC_Technical_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160407\
*EXTRA File 81777 (Confidential)
Tender_Clarification_T2_20160407_Cost Impact.pdf
*EXTRA File 3.0 m
(Remaining)_Tender_Clarification_T2_20160406_20160407_Hyundai.pdf
*EXTRA File 4.2 m
Tender_Clarification_T2_20160407_Hyundai_r0.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160411\
*EXTRA File 687807 Tender_Clarification_T2_20160411 -
Attachment_Project HSE Plan.pdf
*EXTRA File 2.4 m
Tender_Clarification_T2_20160411_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160412\
*EXTRA File 494114 Tender_Clarification_T2_20160412 - Fuel
Gas Buffer review_160414.pdf
*EXTRA File 3.0 m
Tender_Clarification_T2_20160412_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160415\
*EXTRA File 412848 (Confidential)
Tender_Clarification_T2_20160415_Cost Impact.pdf
*EXTRA File 305952 Tender_Clarification_T2_20160415 -
Attachment_Item#84_FG Buffer System.pdf
*EXTRA File 216764 Tender_Clarification_T2_20160415 -
Attachment_Item#84_PFD_FG Supply System.pdf
*EXTRA File 337639 Tender_Clarification_T2_20160415 -
Attachment_Item#84_PID_FG Supply System.pdf
*EXTRA File 117395
Tender_Clarification_T2_20160415_Hyundai_Reply_Commercial.pdf
*EXTRA File 244569
Tender_Clarification_T2_20160415_Hyundai_Reply_Technical.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160420\
*EXTRA File 85713 (Confidential)
Tender_Clarification_T2_20160420_Cost Impact.pdf
*EXTRA File 61215 No.
124_Tender_Clarification_T2_20160420_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160421\
*EXTRA File 119123 Item#106 - 01. List of Hyundai HSE System
Document.pdf
*EXTRA File 53654 Item#126 Part Load Heat Rate Table (Gas
Fuel)_R1.pdf
*EXTRA File 385255 Tender_Clarification_T2_20160420 -
Technical (Meeting 20160421)_Hyundai_r2.pdf
*EXTRA File 92767 Tender_Clarification_T2_20160420 -
Technical_(Meeting_20160421)_Hyundai_r1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160425\
*EXTRA File 54493 (Confidential)
Tender_Clarification_T2_20160425_Cost Impact.pdf
*EXTRA File 3.5 m Tender_Clarification_T2_20160425_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160427\
*EXTRA File 5.4 m
Tender_Clarification_T2_20160427_1_Hyundai Reply (item# 76, 105 & 124).pdf
*EXTRA File 1.6 m Tender_Clarification_T2_20160427_Hyundai
Reply (item# 127).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160428\
*EXTRA File 649357 Tender_Clarification_T2_20160428 -
Attachment_Item#129_Revised Site Layout.pdf
*EXTRA File 1.4 m Tender_Clarification_T2_20160428_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160429\
*EXTRA File 128488 (Confidential)
Tender_Clarification_T2_20160429_Cost Impact.pdf
*EXTRA File 1.4 m Tender_Clarification_T2_20160429_Hyundai
Reply.pdf
*EXTRA File 1.6 m Tender_Clarification_T2_20160429_Hyundai
Reply_(updated 160504).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160503\
*EXTRA File 203011 Tender_Clarification_T2_20160512_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160309\
*EXTRA File 410424 Tender_Clarification_T2_20160309 - GE
Response.pdf
*EXTRA File 40267 Tender_Clarification_T2_20160309 - GE
Response_2270_001 GE Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160311\
*EXTRA File 170868 Attachment 1 - 9H.02 _Typical_CC Plant
Correction Curves.pdf
*EXTRA File 3.3 m Attachment 2 - GER3620M.PDF
*EXTRA File 39715 Tender_Clarification_T2_201603011 - GE
Response - 2349_001 Cover Letter.pdf
*EXTRA File 85268 Tender_Clarification_T2_201603011 - GE
Response - 2350_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160316\
*EXTRA File 37211 Tender_Clarification_T2_20160316 - GE
Response - 2373_001 Cover Letter.pdf
*EXTRA File 438694 Tender_Clarification_T2_20160316 - GE
Response - 2374_001.pdf
*EXTRA File 121614 Tender_Clarification_T2_20160316 - GE
Response - Attachment 2375_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160329\
*EXTRA File 81443 (Confidential)
Tender_Clarification_B2_20160329 (with Price).pdf
*EXTRA File 36825 Tender_Clarification_T2_20160329 - GE
Response_2543_001 - Cover Letter.pdf
*EXTRA File 298481 Tender_Clarification_T2_20160329 - GE
Response_2544_001.pdf
*EXTRA File 164525
Tender_Clarification_T2_20160329_LTSA_Commercial_Minutes.pdf
*EXTRA File 169808
Tender_Clarification_T2_20160329_LTSA_Technical_Minutes.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160330\
*EXTRA File 51072 Tender_Clarification_T2_20160330 - GE
Response.pdf
*EXTRA File 35476 Tender_Clarification_T2_20160330 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160406\
*EXTRA File 164454 Tender_Clarification_T2_20160406 - GE
Response.pdf
*EXTRA File 35631 Tender_Clarification_T2_20160406 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160408\
*EXTRA File 79450 Revised_Comfort_Letter_20160408.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160413\
*EXTRA File 36632 Tender_Clarification_T2_20160413 - GE
Response_2704_001_Cover Letter.pdf
*EXTRA File 175249 Tender_Clarification_T2_20160413 - GE
Response_2705_001.pdf
*EXTRA File 2.7 m Tender_Clarification_T2_20160413 - GE
Response_Attachment - 9HA CC update.pdf
*EXTRA File 99000 Tender_Clarification_T2_20160413_1 - GE
Response.pdf
*EXTRA File 31975 Tender_Clarification_T2_20160413_1 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160417\
*EXTRA File 35800 Tender_Clarification_T2_20160417- GE
Response - 2702_001 Cover Letter.pdf
*EXTRA File 53186 Tender_Clarification_T2_20160417- GE
Response - 2703_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160418\
*EXTRA File 38087 Tender_Clarification_T2_20160418 - GE
Response - 2812_001 Cover Letter.pdf
*EXTRA File 79919 Tender_Clarification_T2_20160418 - GE
Response - 2813_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160421\
*EXTRA File 200582 20160422 - GE Comfort_Letter.pdf
*EXTRA File 39528 Tender_Clarification - GE Response
V2_T2_20160421 - 2786_001 Cover Letter.pdf
*EXTRA File 192293 Tender_Clarification - GE Response
V2_T2_20160421 - 2787_001.pdf
*EXTRA File 198665 Tender_Clarification_T2_20160421 - GE
Response.pdf
*EXTRA File 39207 Tender_Clarification_T2_20160421 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160422\
*EXTRA File 37518 Tender_Clarification - GE Response
T2_20160422 - 2814_001 Cover Letter.pdf
*EXTRA File 63563 Tender_Clarification - GE Response
T2_20160422 - 2815_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160424\
*EXTRA File 36623 Tender_Clarification - GE Response
T2_20160424 - 2790_001 GE Cover Letter.pdf
*EXTRA File 71788 Tender_Clarification - GE Response
T2_20160424.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-F -
Tender Evaluation\
*EXTRA File 2.7 m Melaka CCGT Project - Tender Evaluation
Report.pdf
*EXTRA File 25088 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\
*EXTRA File 165 ~$Track4A Model Submission Model (GE
Option 1440MW) .xlsm
*EXTRA File 165 ~$Working Paper - Comparison
Notebook_SIPP_28102015.xlsb
*EXTRA File 17365 Comparison TNB - SIPP Submission.docx
*EXTRA File 5.1 m Track4A Model Submission Model (GE Option
1440MW) .xlsm
*EXTRA File 5.2 m Track4A Model Submission Model (GE Option
1440MW)_neoh .xlsm
*EXTRA File 291558 Working Paper - Comparison
Notebook_SIPP_28102015.xlsb
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\FOLDER 5 - FINANCIAL MODELLING (FM)\
*EXTRA File 13897 Refer to Financial Model CD.pdf
*EXTRA File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
*EXTRA File 3.7 m Track 4A - TNB FM - EC.xlsm
*EXTRA File 90370 Track 4A - TNB FM User Manual - EC.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\
*EXTRA File 257449 Track 4A - Commercial Proposal 13 March
2015 clean.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 1 - TOC AND
SUMMARY TABLE\
*EXTRA File 4096 ._9HA 02 LTSA - Comfort Package.pdf
*EXTRA File 4096 ._GE Letter.pdf
*EXTRA File 4096 ._SUMMARY TABLE TRACK-4A.pdf
*EXTRA File 4096 ._Track 4A Evaluation Report-ST Version-
R2.pdf
*EXTRA File 519007 9HA 02 LTSA - Comfort Package.pdf
*EXTRA File 1.8 m 9HA.02 Insurability Evidence.PDF
*EXTRA File 212095 GE Letter.pdf
*EXTRA File 98164 ST-to-TNB - dated 8 Sept 2014.pdf
*EXTRA File 71206 ST-to-TNB - SIPP (EoT) dated 6 Feb
2015.pdf
*EXTRA File 44221 SUMMARY TABLE TRACK-4A.pdf
*EXTRA File 43852 Table of Contents.pdf
*EXTRA File 108434 Track 4A Evaluation Report-ST Version-
R2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab A - PPA, LLA and OMA\
*EXTRA File 4096 ._CCGT PPA -20141017.pdf
*EXTRA File 4096 ._TRACK 4A DRAFT OMA - Submission to ST
March 2015.pdf
*EXTRA File 314688 14-TSC-85-01 (PRECOMP)-Model.pdf
*EXTRA File 4.4 m CCGT PPA -20141017.pdf
*EXTRA File 170309 LLA Lease Agreement (given to IPP on 9
March 2015).pdf
*EXTRA File 590066 TRACK 4A DRAFT OMA - Submission to ST
March 2015.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab B - Project Advisors (TA, LA, TA, IA, EIA Consultant)\
*EXTRA File 35505 EIA Consultant - R-SYNC.pdf
*EXTRA File 27627 Insurance Advisor - Marsh.pdf
*EXTRA File 9233 Legal Advisors - ZICO.pdf
*EXTRA File 11237 Tax Advisor - PWC.pdf
*EXTRA File 67413 Technical Advisor - Poyry.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab C - Project Document Deviations (PPA)\
*EXTRA File 743374 Letter to Single Buyer - PPA
Deviations.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab D - Letter of Support (Financial Institution)\
*EXTRA File 938316 Letter of Support - AmInvestment Bank
20150312.pdf
*EXTRA File 105629 LETTER OF SUPPORT CIMB.PDF
*EXTRA File 119543 LETTER OF SUPPORT MAYBANK.PDF
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab E - Tax Advisor Letter\
*EXTRA File 645415 Tax Advisor Report.pdf
*EXTRA File 58992 Tax Write-up_Commercial Report.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab F - Insurance Opinion Letter\
*EXTRA File 4096 ._Comfort Letter110315.pdf
*EXTRA File 4096 ._Insurance Premium Assumptions.pdf
*EXTRA File 4096 ._Insurance Term Sheet Track 4A Schedule
(Marsh).pdf
*EXTRA File 29109 Comfort Letter110315.pdf
*EXTRA File 25627 Insurance Premium Assumptions.pdf
*EXTRA File 57022 Insurance Term Sheet Track 4A Schedule
(Marsh).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab G - Form 49\
*EXTRA File 219294 FORM49 REMACO.PDF
*EXTRA File 328314 FORM49 TNB.PDF
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab H - Malaysian Content\
*EXTRA File 30378 Malaysian Content.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 3 - TECHNICAL
PROPOSAL\
*EXTRA File 4096 ._Track 4A - Appendix E Technical
Form.pdf
*EXTRA File 460383 Track 4A - Appendix E Technical Form.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\
*EXTRA File 4096 ._Design Concept for Interconnection
Facilities.pdf
*EXTRA File 100484 Design Concept for Interconnection
Facilities.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\POSCO\
*EXTRA File 4096 ._16 Technical reply_Attachment 1. Heat
Balance Diagram.pdf
*EXTRA File 4096 ._17 Technical reply_Attachment 2. Level
1 Project Schedule.pdf
*EXTRA File 4096 ._18 Technical reply_Attachment 3. Plant
Layout.pdf
*EXTRA File 4096 ._3A Attachment (Appendix 1-A5) Plant
Design Advantage & Special Feature.pdf
*EXTRA File 4096 ._9 Attachment (Appendix 1-B4) EPC
Strategy(Price, Performance and Time)_S1.pdf
*EXTRA File 619477 1 Cover Letter.pdf
*EXTRA File 1.9 m 10 Attachment (Appendix 1-B5)
Proposal_Recommendation to Minimize PF cost_S1.pdf
*EXTRA File 1.8 m 11 Attachment (Appendix 1-B6) Gas Turbine
Insurability Evidence_S1.PDF
*EXTRA File 50813 12 Attachment (Appendix 1-B7) List of
Deviation on Key Technical Specification_S1.pdf
*EXTRA File 57469 13A Attachment (Appendix 1-B8) List of
deviation(s) on key commercial terms_S1.pdf
*EXTRA File 62797 13B Technical reply_Attachment 6
Commercial Deviation List.pdf
*EXTRA File 48887 14 Attachment (Appendix 1-B9) Expectation
from Developer_S1.pdf
*EXTRA File 183012 15 Submission Requirements_Reply Form
Technical and Commercial.pdf
*EXTRA File 3.3 m 16 Technical reply_Attachment 1. Heat
Balance Diagram.pdf
*EXTRA File 195882 17 Technical reply_Attachment 2. Level 1
Project Schedule.pdf
*EXTRA File 1.6 m 18 Technical reply_Attachment 3. Plant
Layout.pdf
*EXTRA File 4.8 m 19 Technical reply_Attachment 4.
Construction Method for Intake and Discharge.pdf
*EXTRA File 552025 2 Attachment (Appendix 1-A1) Plant
Configuration & Description.pdf
*EXTRA File 126624 20 Technical reply_Attachment 5.
Auxiliary Steam System.pdf
*EXTRA File 358125 21 T4A PG - EOI Clarification Form
POSCO_Clarification #1.pdf
*EXTRA File 86502 22 T4A PG - EOI Clarification Form
POSCO_Clarification #2.pdf
*EXTRA File 5.5 m 23 Attachment (Appendix 1-B10) Audited
Financial Information_S1.pdf
*EXTRA File 5.6 m 3A Attachment (Appendix 1-A5) Plant
Design Advantage & Special Feature.pdf
*EXTRA File 42718 3B Attachment (Appendix 1-A8)
Degradation.pdf
*EXTRA File 979627 4 Attachment (Appendix 1-A11) Operating
and Performance Record_S1.pdf
*EXTRA File 12.2 m 5 Attachment (Appendix 1-A13) (2)
P&ID_S1.pdf
*EXTRA File 569596 6 Attachment (Appendix 1-A13) (3)
SLD_S1.pdf
*EXTRA File 275818 7 Attachment (Appendix 1-A13) (4) System
Configuration Diagram_S1.pdf
*EXTRA File 20600 8a Attachment (Appendix 1-B2) List of
CCGT Power Plant Experience_S1.pdf
*EXTRA File 24428 8b Attachment (Appendix 1-B3) List of
Participation Experience_S1.pdf
*EXTRA File 1.4 m 9 Attachment (Appendix 1-B4) EPC
Strategy(Price, Performance and Time)_S1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\POSCO\24 EPC Proposal for IF\
*EXTRA File 4096 ._06. Switchyard Layout.pdf
*EXTRA File 4096 ._07. Plan & Section View A-A.pdf
*EXTRA File 4096 ._15. Building Layout - Ground Floor
(Cable Cellar).pdf
*EXTRA File 4096 ._19. Building Layout - Perspective
View.pdf
*EXTRA File 171276 00. Cover.pdf
*EXTRA File 237201 01. Content List.pdf
*EXTRA File 1.2 m 02. 275_132_33kV Single Line Diagram.pdf
*EXTRA File 389018 03. 275kV Single Line Diagram.pdf
*EXTRA File 329843 04. 132kV Single Line Diagram.pdf
*EXTRA File 169376 05. 33kV Single Line Diagram.pdf
*EXTRA File 414307 06. Switchyard Layout.pdf
*EXTRA File 141304 07. Plan & Section View A-A.pdf
*EXTRA File 159158 08. Plan & Section View B-B.pdf
*EXTRA File 179615 09. Plan & Section View C-C.pdf
*EXTRA File 112668 10. Plan & Section View D-D.pdf
*EXTRA File 196613 11. Plan & Section View E-E.pdf
*EXTRA File 104447 12. Plan & Section View F-F.pdf
*EXTRA File 78828 13. Plan & Section View G-G.pdf
*EXTRA File 140615 14. Building Layout - 1st Floor.pdf
*EXTRA File 131166 15. Building Layout - Ground Floor (Cable
Cellar).pdf
*EXTRA File 185211 16. Switchyard Layout - Substation
Location.pdf
*EXTRA File 407191 17. Switchyard Layout - Substation
Location.pdf
*EXTRA File 1.3 m 18. Switchyard Layout - Substation
Location.pdf
*EXTRA File 172229 19. Building Layout - Perspective
View.pdf
*EXTRA File 174501 20. Building Layout - Perspective
View.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 5 - FINANCIAL
MODELLING (FM)\
*EXTRA File 13897 Refer to Financial Model CD.pdf
*EXTRA File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
*EXTRA File 3.7 m Track 4A - TNB FM - EC.xlsm
*EXTRA File 90370 Track 4A - TNB FM User Manual - EC.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\
*EXTRA File 2.0 m 30MW Diesel Power Plant Project Proposal
- Kagayaki Energy Sdn Bhd (DRAFT)_rev4.pdf
*EXTRA File 217544 A. Site Plan - Electrical layout.pdf
*EXTRA File 142373 B. 30MW IPP- SLD Rev 1.pdf
*EXTRA File 14920 EC ddiesel.xlsx
*EXTRA File 7.2 m
Environmental_Quality_Industrial_Effluent_Regulations_2009_-_P.U.A_434-
2009.pdf
*EXTRA File 23237 High Speed Engine Sabah 1st April
2016.docx
*EXTRA File 336092 Kagayaki Addendum+poyry.docx
*EXTRA File 341862 Kagayaki Addendumv2+poyry.docx
*EXTRA File 6.0 m Lahad Datu 30MW Draft PPA.zip
*EXTRA File 151397 Sabah PART 4 technical+poyry.docx
*EXTRA File 183810 Sabah PART 4 technicalpoyry_r1v2 may 9
2016.docx
*EXTRA File 35254 Salient points of Kagayaki
CLoA+poyry.docx
*EXTRA File 2.5 m sample diesel report 20 MW Diesel engines
plant options report__draft.doc
*EXTRA File 9.7 m sample diesel report SP2 Final Technical
DDR_10 Feb 2012.docx
*EXTRA File 41472 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Lahad Datu 30MW Draft PPA\
*EXTRA File 1028549 [0] Lahad Datu PPA (Main Body).pdf
*EXTRA File 271380 [1] Lahad Datu PPA (App A).pdf
*EXTRA File 366863 [10] Lahad Datu PPA (App J).pdf
*EXTRA File 332179 [11] Lahad Datu PPA (App K).pdf
*EXTRA File 122744 [12] Lahad Datu PPA (App L).pdf
*EXTRA File 167367 [13] Lahad Datu PPA (App M).pdf
*EXTRA File 168075 [14] Lahad Datu PPA (App N).pdf
*EXTRA File 194976 [15] Lahad Datu PPA (App O).pdf
*EXTRA File 179402 [16] Lahad Datu PPA (App P).pdf
*EXTRA File 23135 [17] Exhibit 1 Form of Bank guarantee.pdf
*EXTRA File 23648 [18] Exhibit 2 Form of Annual Scheduled
Available Capacity.pdf
*EXTRA File 40497 [19] Exhibit 3 Form of Daily Actual
Availability.pdf
*EXTRA File 543869 [2] Lahad Datu PPA (App B).pdf
*EXTRA File 261880 [20] Exhibit 4 Form of Daily
Operation.pdf
*EXTRA File 1.1 m [21] Exhibit 5 Generator Testing
Guidelines Prior to Commercial O.pdf
*EXTRA File 259152 [22] Exhibit 6 Requirements for Outage
and Commissioning Works fo.pdf
*EXTRA File 199222 [23] Exhibit 7 Safety Requirement.pdf
*EXTRA File 158785 [3] Lahad Datu PPA (App C).pdf
*EXTRA File 339359 [4] Lahad Datu PPA (App D).pdf
*EXTRA File 496288 [5] Lahad Datu PPA (App E).pdf
*EXTRA File 131020 [6] Lahad Datu PAA (App F).pdf
*EXTRA File 482289 [7] Lahad Datu PPA (App G).pdf
*EXTRA File 137813 [8] Lahad Datu PPA (App H).pdf
*EXTRA File 134321 [9] Lahad Datu PPA (App I).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\Site next to SESB office (alternative)\
*EXTRA File 3.0 m 20160418_104544.jpg
*EXTRA File 2.5 m 20160418_104546.jpg
*EXTRA File 1.6 m 20160418_104551.jpg
*EXTRA File 1.7 m 20160418_104553.jpg
*EXTRA File 1.6 m 20160418_104556.jpg
*EXTRA File 2.0 m 20160418_104558.jpg
*EXTRA File 2.5 m 20160418_104615.jpg
*EXTRA File 2.5 m 20160418_104623.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\Site where SESB have old engines
(base)\
*EXTRA File 2.7 m 20160418_105913.jpg
*EXTRA File 2.7 m 20160418_105916.jpg
*EXTRA File 2.8 m 20160418_110251.jpg
*EXTRA File 2.6 m 20160418_110253.jpg
*EXTRA File 2.1 m 20160418_110418.jpg
*EXTRA File 2.4 m 20160418_110420.jpg
*EXTRA File 2.4 m 20160418_110422.jpg
*EXTRA File 2.7 m 20160418_110425.jpg
*EXTRA File 1.9 m 20160418_110427.jpg
*EXTRA File 1.1 m 20160418_114936.jpg
*EXTRA File 1.1 m 20160418_114943.jpg
*EXTRA File 1.2 m 20160418_115005.jpg
*EXTRA File 1028915 20160418_115017.jpg
*EXTRA File 3.0 m 20160418_115128.jpg
*EXTRA File 2.8 m 20160418_115133.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Reference reports\
*EXTRA File 9.7 m Intergen FS Draft_final.doc
*EXTRA File 35.0 m ORIX - TDD Final Report for Diesel Power
Plants - 15May13.doc
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Sandakan 60MW\
*EXTRA File 1.8 m New 60MW POIC Sandakan.pptx
*EXTRA File 1.6 m planning and connection codes for sabah
16th june 2014.pdf
*EXTRA File 27403 Reply Letter SESB Appealv2
(redacted)_Neoh.docx
*EXTRA File 358948 sabah gen dev plan.jpg
*EXTRA File 30897 Sandakan CLOA to SESB (redacted)
+poyry.docx
*EXTRA File 199079 Technical and Commercial
Requirement+poyry.docx
*EXTRA File 7168 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Sandakan 60MW\Site visit photos\
*EXTRA File 1.5 m 20160418_164950.jpg
*EXTRA File 1.6 m 20160418_164952.jpg
*EXTRA File 2.1 m 20160418_164955.jpg
*EXTRA File 2.5 m 20160418_165002.jpg
*EXTRA File 3.2 m 20160418_165003.jpg
*EXTRA File 2.1 m 20160418_165005.jpg
*EXTRA File 2.3 m 20160418_165043.jpg
*EXTRA File 2.0 m 20160418_165044.jpg
*EXTRA File 2.3 m 20160418_165046.jpg
*EXTRA File 2.6 m 20160418_165048.jpg
*EXTRA File 2.9 m 20160418_165050.jpg
*EXTRA File 2.3 m 20160418_165052.jpg
*EXTRA File 1.5 m 20160418_165053.jpg
*EXTRA File 1.2 m 20160418_165055.jpg
*EXTRA File 2.2 m 20160418_165057.jpg
*EXTRA File 2.1 m 20160418_165058.jpg
*EXTRA File 3.2 m 20160418_165326.jpg
*EXTRA File 1.5 m 20160418_165327.jpg
*EXTRA File 1.7 m 20160418_165329.jpg
*EXTRA File 1.4 m 20160418_165331.jpg
*EXTRA File 2.2 m 20160418_165332.jpg
*EXTRA File 2.7 m 20160418_165424.jpg
*EXTRA File 1.8 m 20160418_165425.jpg
*EXTRA File 1.1 m 20160418_165526.jpg
*EXTRA File 1.7 m 20160418_165605.jpg
*EXTRA File 2.1 m 20160418_165608.jpg
*EXTRA File 2.0 m 20160418_170004.jpg
*EXTRA File 1.5 m 20160418_170008.jpg
*EXTRA File 1.1 m 20160418_170019.jpg
*EXTRA File 1.3 m 20160418_170021.jpg
*EXTRA File 1.3 m 20160418_170027.jpg
*EXTRA File 1.4 m 20160418_170028(0).jpg
*EXTRA File 1.3 m 20160418_170028.jpg
*EXTRA File 1.4 m 20160418_170102.jpg
*EXTRA File 1.8 m 20160418_170109.jpg
*EXTRA File 1.6 m 20160418_170132.jpg
*EXTRA File 1.2 m 20160418_170211.jpg
*EXTRA File 1.6 m 20160418_170249.jpg
*EXTRA File 1.2 m 20160418_170251.jpg
*EXTRA File 3.3 m 20160418_170254.jpg
*EXTRA File 3.3 m 20160418_170256.jpg
*EXTRA File 1.3 m 20160418_170507.jpg
*EXTRA File 1.6 m 20160418_170821.jpg
*EXTRA File 1.9 m 20160418_170822.jpg
*EXTRA File 2.0 m 20160418_170825.jpg
*EXTRA File 2.2 m 20160418_171016.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Track 4A_SIPP offer review\
*EXTRA File 885114 Track 4A_SIPP offer review_8 Jan
2015_final.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\
*EXTRA File 58800 Cable Sizing.docx
*EXTRA File 838747 Simplified Plant SLD for new Paka 1,400MW
Power.pptx
*EXTRA File 838155 Simplified Plant SLD for new Paka 1,400MW
Power_r1.pptx
*EXTRA File 3.3 m Switchyard.pptx
*EXTRA File 3.3 m Switchyard_28Aug.pptx
*EXTRA File 3.3 m Switchyard_31Aug.pptx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\
*EXTRA File 48755 Proposal to Transgrid for DCR +PH
+rk.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\110 Agreements\
*EXTRA File 170340 PESB LOA - Rev 2.pdf
*EXTRA File 23040 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\120 Budget\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\400 Report\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\400 Report\410 Poyry Report Deliverables\
*EXTRA File 162 ~$ka DCR_draft 25 Oct.doc
*EXTRA File 195479 Brief overview of the Malaysian Energy
market.docx
*EXTRA File 21588 Indicative ProjectTimetable.xlsx
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout1.pdf
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout1+rk.pdf
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout2.pdf
*EXTRA File 1.4 m LAYOUT PLANT DRAWING - (POWER PLANT).pdf
*EXTRA File 6.2 m Paka DCR_draft 1Nov clean.doc
*EXTRA File 2.0 m Paka DCR_draft 1Nov clean.pdf
*EXTRA File 8.1 m Paka DCR_draft 25 Oct.doc
*EXTRA File 3.3 m Paka DCR_draft 29Oct clean_sbd r1.doc
*EXTRA File 6.4 m
-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:57:10 2017

Source : C:\AdvisianActive\
Dest : D:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

New Dir 2 C:\AdvisianActive\


New File 342443 Malaysia_IPP.pdf100%
New File 283259 Waiver for Conflict of Interest.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\


New File 34942 LTA Risks.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\
New File 2.0 m 2. MOU.pdf100%
New File 153287 ArbitrationCaseIntroduction.pdf100%
New File 119086 Schedule of Defects.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\
New File 212.3 m 12. Defects Bundle in Chronological
Order.zip 0%
-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:57:45 2017

Source : C:\AdvisianActive\
Dest : D:\AdvisianFiles\
Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

New Dir 2 C:\AdvisianActive\


New File 342443 Malaysia_IPP.pdf100%
New File 283259 Waiver for Conflict of Interest.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\


New File 34942 LTA Risks.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\
New File 2.0 m 2. MOU.pdf100%
New File 153287 ArbitrationCaseIntroduction.pdf100%
New File 119086 Schedule of Defects.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\
New File 212.3 m 12. Defects Bundle in Chronological
Order.zip100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\
New File 18709 Documents forming EPC Contract.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\1.onshore\
New File 162 ~$ Section 2b Conditions of Contract CHEC
Initialed 2009-12-04.doc100%
New File 162 ~$ Section 2c Schedules to CoC_Initialed
2009-12-04.doc100%
New File 14158 Contract Agmt Onshore cover.docm100%
New File 50688 ON Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 950637 ON Section 2b Conditions of Contract CHEC
Initialed 2009-12-04.doc100%
New File 597587 ON Section 2c Schedules to CoC_Initialed
2009-12-04.doc100%
New Dir 7 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\2.offshore\
New File 162 ~$F Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 162 ~$F Section 2b Conditions of Contract
CHEC Initialed 2009-12-04.doc100%
New File 162 ~$F Section 2c Schedules to COC_Initialed
2009-12-04.doc100%
New File 14112 Contract Agmt Offshore cover.docm100%
New File 47616 OFF Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 482304 OFF Section 2b Conditions of Contract
CHEC Initialed 2009-12-04.doc100%
New File 431104 OFF Section 2c Schedules to COC_Initialed
2009-12-04.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\3.Employer's Requirments\
New File 1.9 m Employer's Requirments-Initialed 2009-12-
04.doc100%
New Dir 21 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\4.Contractor's Proposal\
New File 923136 T1 11.30.doc100%
New File 50176 T-10 11.30.doc100%
New File 35840 T-11 11.30.doc100%
New File 39424 T-12 11.30.doc100%
New File 35840 T-13 11.30.doc100%
New File 41984 T-14 11.30.doc100%
New File 37376 T-15 11.30.doc100%
New File 50176 T-16 11.30.doc100%
New File 47616 T-17 11.30.doc100%
New File 125440 T-18 11.30.doc100%
New File 440320 T-19 11.30.doc100%
New File 46033 T-2 11.30.pdf100%
New File 344696 T-20 11.30.pdf100%
New File 100864 T-21 11.30.doc100%
New File 1.2 m T-3 11.30.pdf100%
New File 1.8 m T-4 11.30.doc100%
New File 51200 T-5 11.30.doc100%
New File 70144 T-6 11.30.doc100%
New File 230151 T-7 11.30.pdf100%
New File 2.9 m T8 11.30.doc100%
New File 148992 T-9 11.30.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\10. Response to Notice of Arbitration\
New File 371307 Response to Notice of Arbitration.pdf100%

New Dir 8 C:\AdvisianActive\01 Projects\100037 - DLA Piper -


Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\11. Valuation Reports\
New File 83303 Index - Disclosure documents relating to
procedural order number no.1 bundle index.pdf100%
New File 2.6 m Tab B.pdf100%
New File 303032 Tab C.pdf100%
New File 1.6 m Tab D.pdf100%
New File 3.8 m Tab E.pdf100%
New File 820317 Tab F.pdf100%
New File 639925 Tab G.pdf100%
New File 671475 Tab H.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\11. Valuation Reports\Tab A - Cambodian Energy Limited Pricing
Support with attachments and annexes\
New File 28.5 m Tab A Vol 1.pdf100%
New File 51.0 m Tab A Vol 2.pdf100%
New File 76.6 m Tab A Vol 3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\2. Coordination Agreement\
New File 813538 Coordination Agreement.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\3. Amendment to Agreements\
New File 239049 A - First Amendment Agreements.pdf100%
New File 792900 B - Amendment I Onshore.pdf100%
New File 790112 C - Amendment I Offshore.pdf100%
New File 230585 D - Second Amendment Agreements.pdf100%
New File 2.6 m E - Amendment II Onshore.pdf100%
New File 4.3 m F - Amendment II Offshore.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\4. Minutes of Meeting\
New File 2.0 m MOM.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\5. Summary of Defects List\
New File 59521 Summary of Defects List.XLSX100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\6. Preliminary Report\
New File 258560 Preliminary Analysis of Case (19.01.2015)
- Final Clean.DOC100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\7. May 2016 Report\
New File 1.2 m CHEC Report - May 2016 (FINAL).PDF100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\8. Chronology\
New File 194560 CHEC - CEL - Chronology (draft 2).DOC100%

New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -


Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\9. Notice of Arbitration\
New File 28811 Notice of Arbitration (04.10.2016).PDF
100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 2\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\
New Dir 14 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 1 - 2010\
New File 686430 1 - Date 25 August 2010 LIMITED NOTICE
TO PROCEED UNDER THE CONTRACT AGREEMENTDATED AS OF 7DECEMBER 2009, AS AMENDED
(SUPPLY CONTRACT) .pdf100%
New File 443889 10 - Date 16 November 2010.pdf100%
New File 73394 11 - CEL-FX-OFF-003_Advance Payment
Application.pdf100%
New File 645728 12 - CEL-CHEC-L -2010-0031 NOTICE TO
PROCEED AND COMMENCEMENT DATE, OFFSHORE ENGINEEDING ,PROCUREMENT AND
CONSTRUCTION.pdf100%
New File 671540 13 - CEL-CHEC-L-2010=0030 NOTICE TO
PROCEED AND COMMENCEMENT DATE, ONSHORE ENGINEERING PROCUREMENT AND CONSTRUCTION.pdf
100%
New File 138752 14 - CEL-FX-OFF-004_Project Schedule
Clarification_[??????].doc100%
New File 612213 2 - CEL-CHEC-L-2010-0022.pdf100%
New File 676048 3 - CEL-CHEC-L-2010-0025.pdf100%
New File 670666 4 - CEL-CHEC-L-2010-0026.pdf100%
New File 509500 5 - CEL-CHEC-L-2010-0036 RIGHT OF ACCESS
TO TO THE SITE.pdf100%
New File 73234 6 - CEL-FX-OFF-001_CHEC Bank Account.pdf
100%
New File 73206 7 - CEL-FX-OFF-002_Work Report.pdf100%
New File 45721 8 - 20101111-Schedule of LNTP work_Rev.C-
Eng.pdf100%
New File 66255 9 - CEL-FX-OFF-
003_Attachment_Invoice(Updated).pdf100%
New Dir 181 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 2 - 2011\
New File 78087 1 - CEL-FX-OFF-
005_Information_Subcontractors of Turbines and Generators.pdf100%
New File 413738 10 - CEL-CHC-L-11-0039 LOCATION AND CO-
ORDINATES OF STEUNG HAV SUBSTATION.pdf100%
New File 615339 100 - CEL-CHC-L-11-0179 Permanent Work
for Electrica Grounding and lighning Prorection.pdf100%
New File 735161 101 - CEL-FX-OFF-054_Milestone Payment
Application_Onshore_August.pdf100%
New File 118716 102 - CEL-FX-OFF-053_site moblization-
2011831.pdf100%
New File 34816 103 - CEL-FX-OFF-050 ??????.xls100%
New File 408782 104 - CEL-CHC-L-11-0183 Batching Plant
Area during Construction (2).pdf100%
New File 467198 105 - CEL-CHC-L-11-0183 Batching Plant
Area during Construction.pdf100%
New File 623778 106 - CEL-CHC-L-11-0184 Design Approvals
and Quality of Work.pdf100%
New File 208103 107 - CEL-FX-OFF-055 shipping agent.pdf
100%
New File 258532 108 - CEL-FX-OFF-056 offshore milestone
payment application.pdf100%
New File 203515 109 - CEL-FX-OFF-057 Extra cost for the
location change of temporary facilities.pdf100%
New File 617505 11 - CEL-CHC-L-11-0042 APPLICATION FOR
MASTER LIST APPROVAL FOR TAX EXEMPTION.pdf100%
New File 524895 110 - CEL-CHC-L-11-0191 Electrical Short-
Circuit Calculation.pdf100%
New File 500415 111 - CEL-CHC-L-11-0196 Site Visit by
Ministry of Environment to Inspect Implementation of Environmental Mamagement
Plan.pdf100%
New File 216344 112 - CEL-FX-OFF-058 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 216344 113 - CEL-FX-OFF-058 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 36132 114 - 004C-S.D.10.01.01.03-0013.pdf100%
New File 36145 115 - 004C-S.D.10.01.01.03-0018.pdf100%
New File 36052 116 - 004C-S.D.10.01.01.03-0019.pdf100%
New File 36073 117 - 004C-S.D.10.01.01.03-0020.pdf100%
New File 36103 118 - 004C-S.D.10.01.01.03-0021.pdf100%
New File 36097 119 - 004C-S.D.10.01.01.03-0022.pdf100%
New File 542374 12 - CEL-CHC-L-11-0053 MILESTONE PAYMENT
APPLICATION-BASECAMAP (CEL-FX-OFF-014).pdf100%
New File 36117 120 - 004C-S.D.10.01.01.03-0023.pdf100%
New File 36032 121 - 004C-S.D.10.01.01.03-0024.pdf100%
New File 564787 122 - CEL-FX-OFF-059_Milestone Payment
Application_Onshore_September.pdf100%
New File 179811 123 - CEL-FX-OFF-060_Milestone Payment
Application_Offshore_Spetember.pdf100%
New File 663565 124 - CEL-CHC-L-11-0200 Milesrone Payment
Application Offshore Julyy (CEL-FX-OFF-050).pdf100%
New File 120832 125 - CEL-FX-OFF-061 shipping agent.doc
100%
New File 673383 126 - CEL-CHC-L-11-0209 Overdue Design
Documents and Document Submission.pdf100%
New File 179552 127 - CEL-FX-OFF-062_Variation Proposal
for Batching Plant.pdf100%
New File 629983 128 - CEL-CHC-L-11-0212 Variation
Proposal for Batching Plant (Ref. CEL-FX-OFF-062).pdf100%
New File 619680 129 - CEL-CHC-L-11-0217 Milestone Payment
Application Onshore September (CEL-FX-059).pdf100%
New File 620646 13 - CEL-CHC-L-11-0054 CHEC, MARCH,
MONTHLY REPORT (CHEC-XB-CEL-00MR-055).pdf100%
New File 485624 130 - CEL-CHC-L-11-0218 Milestone Payment
Application offshore September (CEL-FX-OFF-060).pdf100%
New File 601490 131 - CEL-CHC-L-11-0222 EDC Contract
Options for Supply of (i) Quadruple Circuit Transmission Towers, and (ii) Black
Start Diesel Generators .pdf100%
New File 284950 132 - CEL-FX-OFF-
064_shipping_agent_contact_info.pdf100%
New File 35122 133 - contact_info..pdf100%
New File 119712 134 - CEL-FX-OFF-
065Cost_Quotation_for_0.7km_Transmission_Lines_and_Black_Start-.pdf100%
New File 6935 135 - 1---20111017-
Quotation_of_0.7km_lines.pdf100%
New File 8567 136 - 2--Quotation_for_black_start-up.pdf
100%
New File 105533 137 - Appendix_1_(SUMEC).pdf100%
New File 8105 138 - Appendix_2_Civil_Work.pdf100%
New File 762407 139 -
Appendix_3_Power_house_layout_for_3x2000KW.pdf100%
New File 42983 14 - CEL-FX-OFF-016_COAL
SPECIFICATION.pdf100%
New File 50510 140 - Additional Cost of temporary
facilities location changed.pdf100%
New File 12164 141 - 004C.D.10.01.01.03-0027.pdf100%
New File 12020 142 - 004C.D.10.01.01.03-0030.pdf100%
New File 12013 143 - 004C.D.10.01.01.03-0031.pdf100%
New File 161917 144 - CEL-FX-OFF-
066_Milestone_Payment_Application_Offshore_October.pdf100%
New File 347442 145 - CEL-FX-OFF-
067_Milestone_Payment_Application_Onshore_October.pdf100%
New File 2.5 m 146 - CEL-FX-OFF-
066_Milestone_Payment_Application_Offshore_October.pdf100%
New File 513997 147 - CEL-FX-OFF-
067_Milestone_Payment_Application_Onshore_October.pdf100%
New File 683694 148 - CEL-CHC-L-11-0244 Issues from Wuxi
Site Viist, 25 October 2011.pdf100%
New File 498846 149 - CEL-FX-OFF-068 Confirm the Color of
Boiler Top Roof.pdf100%
New File 338641 15 - CEL-FX-OFF-017 Shipping Notice for
Core Drills & Accessories, invoice no. 004C-TEMP-001.pdf100%
New File 517905 150 - CEL-CHC-L-11-0248 EDC Meeting on
Subatation Technical Issues.pdf100%
New File 145014 151 - CEL-FX-OFF-069_Re Issues of Wuxi
Visit (your ref CEL-CHC-L-11-0244).doc100%
New File 722392 152 - Attachment 1 Original clarified
letter from Wuxi and the report of UT and RT.PDF100%
New File 399731 153 - Attachment 2 Original heat
treatment record.PDF100%
New File 3.1 m 154 - Attachment 3 Original manufacturing
process record.pdf100%
New File 590012 155 - CEL-CHC-L-11-0281 Quotation for
Black Start-Up DGs (CEL-OFF-065_.pdf100%
New File 513213 156 - CEL-CHC-L-11-0282 Quotation Of
0.7km Lines (CEL-FX-OFF-065).pdf100%
New File 636452 157 - CEL-CHC-L-11-0256 Milestone Payment
Application Onshore October (CEL-FX-OFF-067).pdf100%
New File 591619 158 - CEL-CHC-L-11-0257 Milestone Payment
Application Offshore October (CEL-FX-OFF-066).pdf100%
New File 95338 159 - CEL-FX-OFF-070 exemption procedure
explaination.pdf100%
New File 666926 16 - CEL-CHC-L-11-0060 Coal Specifcation
(ref. CEL-FX-OFF-016).pdf100%
New File 1.4 m 160 - CEL-FX-OFF-
071_Regarding_the_site_access_road_issue.pdf100%
New File 399184 161 - CEL-FX-OFF-
072_blocked_access_road.pdf100%
New File 633536 162 - CEL-CHC-L-11-0283 Site Access
Road.pdf100%
New File 638890 163 - CEL-CHC-L-11-0285 Load for Bridges
along Access to Site.pdf100%
New File 311202 164 - CEL-FX-OFF-073_site_access_road.pdf
100%
New File 128502 165 - CEL-FX-OFF-
074_Steel_Bar_Exemption.pdf100%
New File 118272 166 - CEL-FX-OFF-075-Interconnection
Issues with EDC.doc100%
New File 104420 167 - CEL-FX-OFF-076-
Please_supply_the_accurate_coordinate_of_the_access_road_to_the_bridge_in_front_of_
the_plant.pdf100%
New File 314232 168 - CEL-FX-OFF-
079_Impacts_of_ENDOROS'_Intake_Pipeline_Project_to_CHEC's_Site.pdf100%
New File 576631 169 - CEL-CHC-L-11-0314 Site Access Road
(CEL-FX-OFF-073) and Impact of ERDOSs Intake Pipeline to CHECs Construction Site
(CEL-FX-OFF-079) .pdf100%
New File 595845 17 - CEL-CHC-L-11-0061 Shipping Notice
for Core Drills Accessories, Invoice No.004C-TEMP-001(ref. CEL-FX-OFF-17).pdf100%
New File 134992 170 - CEL-FX-OFF-080-Reply for
transmission line.pdf100%
New File 208327 171 - CEL-FX-OFF-081-Reply for black
start-up DG.pdf100%
New File 139947 172 - CEL-FX-OFF-082_Re Site access road
and Impact of ERDOS's Intake pipelineto CHEC's Construction Site1.pdf100%
New File 563216 173 - CEL-CHC-L-11-0324 Milestone Payment
Application Onshore Noveber (CEL-FX-OFF-078).pdf100%
New File 459103 174 - CEL-CHC-L-11-0329 Boiler House
Elevator for Goods and personnel.pdf100%
New File 439857 175 - CEL-FX-OFF-083-items need to be
confirmed by CEL.pdf100%
New File 960335 176 - CEL-FX-OFF-085-
Please_confirm_the_coordinate_and_dimension_of_the_raw_water_pond.pdf100%
New File 220280 177 - CEL-FX-OFF-
084_Lift_or_Elevator_for_boilers.pdf100%
New File 546600 178 - CEL-CHC-L-11-0339 Corridor for
Transmssion Line to EDC Subststion and Access Road to Main Public Road.pdf100%
New File 208718 179 - CEL-FX-OFF-
086_Notification_of_Subcontractor_for_jetty_and_intake_pipeline.pdf100%
New File 434220 18 - CEL-CHC-L-11-0064 Black Start Diesel
Generator Specification & Scope of Supply.pdf100%
New File 610802 180 - CEL-CHC-L-11-0349 Additional
Information as Part of Generator Data.pdf100%
New File 592991 181 - CEL-CHC-L-11-0352 Change of
Coordinates for Available Corridor For Transmission Line to EDC Substation and
Access Road to Main Public Road .pdf100%
New File 194763 19 - CEL-FX-OFF-
018_CHEC_Amendment_of_Master_list.pdf100%
New File 150958 2 - CEL-FX-OFF-006_Information_Chinese
New Year Schedule.pdf100%
New File 699192 20 - CEL-FX-OFF-020_Milestone Payment
Application_Offshore_April(1).pdf100%
New File 2.9 m 21 - CEL-FX-OFF-019_Milestone Payment
Application_Onehore_April.pdf100%
New File 117417 22 - Offshore Payment Invoice-April.pdf
100%
New File 647941 23 - CEL-CHC-L-11-0073 Endorsement of
Master List and Application to Ministry of Industry, Mines and Energy.pdf100%
New File 295296 24 - CEL-FX-OFF-
021_Coal_specification.pdf100%
New File 1027584 25 - CEL-FX-OFF-019_Milestone Payment
Application_Onehore_April.doc100%
New File 123155 26 - tax invoice10001.pdf100%
New File 934400 27 - CEL-FX-OFF-
022_Coal_specification2.doc100%
New File 121691 28 - CEL-FX-OFF-022_invoice.pdf100%
New File 371892 29 - CEL-FX-OFF-022_Tax_invoice and
Payment_Invoice.pdf100%
New File 143360 3 - CEL-FX-OFF-007_Milestone Payment
Application_Signing of TG_[?????????].doc100%
New File 371892 30 - CEL-FX-OFF-022.pdf100%
New File 602609 31 - CEL-CHC-L-11-0082 Milestone payment
Application Onshore Alril (CEL-FX-OFF-019).pdf100%
New File 593657 32 - CEL-CHC-L-11-0083 Milestone Payment
Application Offshore April (CEL-FX-OFF-020).pdf100%
New File 220211 33 - CEL-FX-OFF-023_Black Start Diesel
Generator (Your ref CEL-CHC-L-11-0064).pdf100%
New File 598021 34 - CEL-CHC-L-11-0090 BLACK START DIESEL
GENRERATOR.pdf100%
New File 588912 35 - CEL-CHC-L-11-0092 POWER SYSTEM GRID
DATA.pdf100%
New File 465496 36 - CEL-CHC-L-11-0094 DEEP WELL DEILLING
PERMIT AND LICENSE.pdf100%
New File 119457 37 - CEL-FX-OFF-024_The Reply of Deep
Well Drilling Permit and License.pdf100%
New File 321550 38 - CEL-FX-OFF-025 Training Issues.pdf
100%
New File 202003 39 - CEL-FX-OFF-026 Subcontractor of
Concret.pdf100%
New File 137216 4 - CEL-FX-OFF-011_Daily Minimum Water
Consumption for Construction_[????].doc100%
New File 309427 40 - CEL-FX-OFF-027 Recommended Coal
Specification.pdf100%
New File 236809 41 - CEL-FX-OFF-028 Questions to be
clarified about communication.pdf100%
New File 636363 42 - CEL-CHC-L-11-0106 Delays with
Project Schedule and Basic Design.pdf100%
New File 196963 43 - CEL-FX-OFF-029_Barge Size for
approval.pdf100%
New File 210764 44 - CEL-FX-OFF-030 Training Issues
Clarification.pdf100%
New File 221466 45 - CEL-FX-OFF-031 Notification of 1st
Batch Auxiliary Equipments[???????](1).pdf100%
New File 34815 46 - 004C.D.10.01.01.03-0011.pdf100%
New File 34839 47 - 004C.D.10.01.01.03-0012.pdf100%
New File 35441 48 - 004C.D.10.01.01.03-0013.pdf100%
New File 34982 49 - 004C.D.10.01.01.03-0014.pdf100%
New File 137728 5 - CEL-FX-OFF-012_The Approval of
Environmental Impact Assessment Report_[????].doc100%
New File 35112 50 - 004C.D.10.01.01.03-0015.pdf100%
New File 35268 51 - 004C.D.10.01.01.03-0016.pdf100%
New File 136751 52 - CEL-FX-OFF-032_Black Start Diesel
Generator (Your ref CEL-CHC-L-11-0090).pdf100%
New File 62026 53 - 004C.D.10.01.01.03-0017.pdf100%
New File 778490 54 - CEL-FX-OFF-033_Milestone Payment
Application_Offshore_June.pdf100%
New File 210070 55 - CEL-FX-OFF-035 Additional Cost for
quadruple circuit.pdf100%
New File 368021 56 - CEL-FX-OFF-035-Additional Cost for
quadruple circuit????????.pdf100%
New File 616793 57 - CEL-FX-OFF-039 Re Sihanoukville
Project Design Issues(Your ref CEL-CHEC-L-11-0108).pdf100%
New File 349832 58 - CEL-FX-OFF-033_attachement-
Contract.pdf100%
New File 38971 59 - subcontract for Electrical Feed
Pump-covering page.jpg100%
New File 137728 6 - CEL-FX-OFF-013_CHEC Clarification to
ER on Basic Design Stage_[??????].doc100%
New File 29785 60 - subcontract for Electrical Feed
Pump-signing page.jpg100%
New File 22714 61 - subcontract for Fans-covering
page.jpg100%
New File 40737 62 - subcontract for Fans-signing
page.jpg100%
New File 39348 63 - subcontract for High Pressure
Heater(HP) and Deaerator-covering page.jpg100%
New File 29224 64 - subcontract for High Pressure
Heater(HP) and Deaerator-signing page.jpg100%
New File 33911 65 - subcontract for Main Transformer-
covering page.jpg100%
New File 25846 66 - subcontract for Main Transformer-
signing page.jpg100%
New File 25045 67 - subcontract for Turbine Bridage
Cranes-covering page.jpg100%
New File 30237 68 - subcontract for Turbine Bridage
Cranes-signing page.jpg100%
New File 420773 69 - CEL-FX-OFF-037_CHEC shipping notice
004C-PI-002.pdf100%
New File 29718 7 - CEL-FX-OFF-013_CHEC Clarification to
ER on Basic Design Stage.pdf100%
New File 252882 70 - CEL-FX-OFF-
038_The_Proposal_of_Bed_Material_Silos.pdf100%
New File 211505 71 - CEL-FX-OFF-040 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 210600 72 - CEL-FX-OFF-041 Notice to Proceed of
Mainbuilding Foundation Excavation.pdf100%
New File 420820 73 - CEL-FX-OFF-042_CHEC shipping notice
004C-PI-002.pdf100%
New File 235735 74 - CEL-FX-OFF-045_CHEC shipping notice
004C-PI-003.pdf100%
New File 119952 75 - CEL-FX-OFF-043_Island mode
operation.pdf100%
New File 238048 76 - CEL-FX-OFF-044_CHEC shipping notice
004C-PI-002(updated).pdf100%
New File 554481 77 - CEL-CHC-L-11-0138 Black Start Diesel
Generator.pdf100%
New File 133424 78 - CEL-FX-OFF-046 1st Batch Auxiliary
Equipments Specification.pdf100%
New File 264618 79 - CEL-FX-OFF-047 Condensate Pump
Suction Strainers.pdf100%
New File 544261 8 - CEL-CHC-L-11-0023 MILESTONE
APPLICATION PAYMENT (CEL-FX-OFF-010).pdf100%
New File 119465 80 - CEL-FX-OFF-034_Milestone Payment
Application_Onshore_July.pdf100%
New File 384550 81 - CEL-FX-OFF-034_Milestone Payment
Application_Onshore_June.pdf100%
New File 131822 82 - CEL-FX-OFF-034-Milestone
Payment_onshore_july final.pdf100%
New File 17167 83 - 004C-TEMP-003-clearance.pdf100%
New File 16752 84 - 004C-TEMP-003-clearance1.pdf100%
New File 36409 85 - 004C-S.D.10.01.01.03-0007.pdf100%
New File 36260 86 - 004C-S.D.10.01.01.03-0008.pdf100%
New File 36348 87 - 004C-S.D.10.01.01.03-0009.pdf100%
New File 36266 88 - 004C-S.D.10.01.01.03-0010.pdf100%
New File 36311 89 - 004C-S.D.10.01.01.03-0011.pdf100%
New File 494613 9 - CEL-CHC-L-11-0025 THE APPROVAL OF
ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIA) (CEL-FX-OFF-012).pdf100%
New File 36312 90 - 004C-S.D.10.01.01.03-0012.pdf100%
New File 119577 91 - CEL-FX-OFF-051_Milestone Payment
Application_Onshore_July.pdf100%
New File 236425 92 - CEL-FX-OFF-048 Specification of
Limestone and Bed Material.pdf100%
New File 4.2 m 93 - CEL-FX-OFF-050_Milestone Payment
Application_Offshore_July.pdf100%
New File 294752 94 - CEL-FX-OFF-049-Island Operation
Conditions Reports (Your ref Transmittal 9H000139-000474).pdf100%
New File 233388 95 - CEL-FX-OFF-052-shipping notice 004C-
TEMP-003.pdf100%
New File 586846 96 - CEL-CHC-L-11-0159 Basic Design
Review Meeting.pdf100%
New File 656347 97 - CEL-CHC-11-0169 Milestone Payment
Application Onshore July (CEL-FX-OFF-034).pdf100%
New File 607863 98 - CEL-CHC-L-11-0173 Milestine Payment
Application Off-shore July (CEL-FX-050, Dated 8 August 2011.pdf100%
New File 543021 99 - CEL-CHC-L-11-0147 Marine Project
Cargo Insurance.pdf100%
New Dir 241 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\
New File 492227 1 - CEL-CHC-L-12-0005 Coordinate of Tower
of Transmission Line to EDC Substation.pdf100%
New File 557113 10 - CEL-FX-OFF-12-004-Access road for
heavy equipment transportation.pdf100%
New File 117760 100 - CEL-FX-OFF-12-057-DCS FAT.doc100%
New File 296640 101 - CEL-FX-OFF-12-057-DCS FAT.pdf100%
New File 157184 102 - Cambodia Sihanoukville DCS FAT
file.doc100%
New File 5.9 m 103 - DCS-system.pdf100%
New File 21.0 m 104 - DCS-cabinet.pdf100%
New File 446105 105 - CEL-CHC-L-12-0227 Addition Cost for
Permanent Access Road.pdf100%
New File 429675 106 - CEL-CHC-L-12-0228 Sub-Suplier of
Refractory Material ,Zibo Hong Fei Special Refractory Co,Ltd..pdf100%
New File 204002 107 - CEL-FX-OFF-12-058-Matters for
permanent access road and transmission line.pdf100%
New File 184927 108 - CEL-FX-OFF-12-059 The required
information for the design of EDC substation interconnection.pdf100%
New File 3.5 m 109 - CEL-FX-OFF-12-060-Cooling water
heat dispersion number model study.pdf100%
New File 511906 11 - CEL-FX-OFF-12-005-Bridge location
over the stream.pdf100%
New File 81765 110 - CEL-FX-OFF-12-
061_Transportation_of_heavy_equipments_affected_by_access_road.pdf100%
New File 397797 111 - CEL-CHC-L-12-0241 Hydrostatic Test
for Boiler Unit#1.pdf100%
New File 379459 112 - CEL-CHC-L-12-0242 Milestone Payment
Application Offshore May 2012(CEL-FX-OFF-12-055).pdf100%
New File 424122 113 - CEL-CHC-L-12-0243 Transportation of
heavy Equipment planned for 15 June 2912.pdf100%
New File 448380 114 - CEL-FX-OFF-12-
062_Re_Transportation_of_heavy_equipments_affected_by_access_road.pdf100%
New File 184679 115 - CEL-FX-OFF-12-063 The co-ordinates
of last landing tower located within EDC terminal substation.pdf100%
New File 376060 116 - CEL-CHC-L-12-0252 Reduction in
Advance Payment Bond Offshore Enfinnerimg and procurement Contract.pdf100%
New File 431266 117 - CEL-CHC-L-12-0253 Reduction in
Advance Payment Bond Onshore Engineering ,Procurement and contruction Contract.pdf
100%
New File 122188 118 - CEL-FX-OFF-12-064-Site test for
Generator Rotor Unit 1.pdf100%
New File 454159 119 - CEL-CHC-L-12-0258 REQUIRED
Information from EDC.pdf100%
New File 198349 12 - CEL-FX-OFF-12-006-The coordinates of
substation and transmission line.pdf100%
New File 414942 120 - CEL-CHC-L-12-0259 Transmission line
Tower number N6 toN8.pdf100%
New File 203783 121 - CEL-FX-OFF-12-065-Re hydrostatic
test for boiler unit #1.pdf100%
New File 452028 122 - CEL-CHC-L-12-0266 Construction of
Permannent Access Road ,Trainmission line and Interconnection.pdf100%
New File 471329 123 - CEL-CHC-L-12-0267 Coordinates of
landing tower Within the EDC Terminal Substation.pdf100%
New File 408481 124 - CEL-CHC-L-12-0269 Cooling water
Heat Dispersion Study and location of Outfall pipe.pdf100%
New File 3.5 m 125 - CEL-FX-OFF-12-067 Inspection for
people from MOF and CHD.docx100%
New File 1.0 m 126 - CEL-FX-OFF-12-066-Certification of
Zibo Hongfei Refractory by WuXi Huaguang Boiler.pdf100%
New File 1.7 m 127 - CEL-FX-OFF-12-068 Confirmation of
Commissioning Subcontractor.pdf100%
New File 4.8 m 128 - CEL-FX-OFF-12-
069_Milestone_Payment_Application_Onshore_June_2012.pdf100%
New File 419167 129 - CEL-CHC-L-12-0286 Essential Design
Documents Requirimg Attention.pdf100%
New File 368452 13 - CEL-CHC-L-12-0041 Diameter of Main
Grounding Grid at Sihanoukville Terminal Substation.pdf100%
New File 120674 130 - CEL-FX-OFF-12-070 Maintenance for
the access road.pdf100%
New File 1003466 131 - CEL-FX-OFF-12-071 Water analysis
report for 1# boiler hydro test.pdf100%
New File 870290 132 - CEL-FX-OFF-12-072-Concrete the
pavement of the access road between the stream and gate.pdf100%
New File 1.6 m 133 - CEL-FX-OFF-12-
073_Milestone_Payment_Application_Offshore_June_2012.pdf100%
New File 494885 134 - Telecommunication System of nation
control centre.pdf100%
New File 398897 135 - CEL-CHC-L-12-0303 Detailed
Design_P&I Diagram for C&I.pdf100%
New File 374025 136 - CEL-CHC-L-12-0307 Limestone
specifications and quantity for reference coal.pdf100%
New File 300922 137 - CEL-FX-OFF-12-074-Workshop &
Laboratory facility list for O&M .pdf100%
New File 2.0 m 138 - CEL-FX-OFF-12-075-Application
request for the overhead bridge crane .pdf100%
New File 481058 139 - CEL-CHC-L-12-0314 Milestone Payment
Application Onshore June 2012 (CEL-FX-OFF-12-069).pdf100%
New File 831296 14 - CEL-CHC-M-12-0006 Weekly meeting
minutes of meeting.pdf100%
New File 126555 140 - CEL-FX-OFF-12-076_Limestone
specifications and quantity required for reference coal.pdf100%
New File 412235 141 - CEL-CHC-L-12-0326 Relocation of
landing tower (AN1)to a location Outside the EDC Substation.pdf100%
New File 184197 142 - CEL-FX-OFF-12-077-Request for Motor
Pass.pdf100%
New File 1.2 m 143 - CEL-FX-OFF-12-078 Milestone Payment
Application Onshore July 2012.docx100%
New File 768496 144 - CEL-FX-OFF-12-
078_Milestone_Payment_Application_Onshore_July_2012.pdf100%
New File 377868 145 - CEL-CHC-L-12-0334 Milestone Payment
Application Offshore june 2012 (CEL-FX-OFF-12-073).pdf100%
New File 4.9 m 146 - CEL-FX-OFF-12-079 Milestone Payment
Application Offshore July 2012.docx100%
New File 478966 147 - CEL-CHC-L-12-0342 Milestone Payment
Application Onshore july 2012 (CEL-FX-OFF-12-078).pdf100%
New File 181948 148 - CEL-FX-OFF-12-080-Approval for
refractory installation contractor.pdf100%
New File 477678 149 - CEL-CHC-L-12-0353 Approval for
Refractory Installation Contractor.pdf100%
New File 361879 15 - 2nd Batch Auxiliary Equipments
Specification.pdf100%
New File 471562 150 - CEL-CHC-L-12-0361 Milestone Payment
Application Offshore 2012(CEL-FX-OFF-12-079).pdf100%
New File 522018 151 - CEL-FX-OFF-12-081-Clarification for
approval of refractory installation contractor.pdf100%
New File 181544 152 - CEL-FX-OFF-12-082-Request for
variation of the master list.pdf100%
New File 449862 153 - cel-chc-l-12-0360 DCS Sofware FAT
Test -18 to 22 September 2012.pdf100%
New File 209715 154 - CEL-FX-OFF-12-083-Notification of
HV cable supplier.pdf100%
New File 180605 155 - CEL-FX-OFF-12-084-Request for
variation of the master list.pdf100%
New File 5.4 m 156 - CEL-FX-OFF-12-
085_Milestone_Payment_Application_Offshore_August_2012.pdf100%
New File 579648 157 - CEL-FX-OFF-12-
086_Milestone_Payment_Application_Onshore_August_2012.pdf100%
New File 181261 158 - CEL-FX-OFF-12-087 ERDOS vehicle
through our site area.pdf100%
New File 408688 159 - CEL-CHC-L-12-0389 Mileston Payment
Application Onshore August 2012 (CEL-FX-OFF-12-086).pdf100%
New File 119379 16 - CEL-FX-OFF-12-007-The meeting
proposal regarding substation and transmission line.pdf100%
New File 388751 160 - CEL-CHC-L-12-0404 Milestone payment
Application Offshore August2012(CEL-FX-OFF-12-085.pdf100%
New File 355411 161 - CEL-CHC-L-12-0409 Employer
Represeantatives of acting Deputy Project manager and Site Manager.pdf100%
New File 172006 162 - CEL-FX-OFF-12-088-Civil Access-EDC
Substation.pdf100%
New File 3.6 m 163 - CEL-FX-OFF-12-
090_Milestone_Payment_Application_Offshore_September_2012.pdf100%
New File 208588 164 - CEL-FX-OFF-12-091 Notification of
procurement for coal handling equipment.pdf100%
New File 412904 165 - CEL-CHC-L-12-0413 First Delivery
Date and Quantities for Coal.pdf100%
New File 392022 166 - CEL-CHC-L-12-0424 EDC Permission
for site access to Steung hav Terminal substation.pdf100%
New File 1.2 m 167 - CEL-FX-OFF-12-
089_Milestone_Payment_Application_Onshore_September_2012.pdf100%
New File 212083 168 - CEL-FX-OFF-12-092-Notification of
training program subcontractor.pdf100%
New File 480217 169 - CEL-CHC-L-12-0456 Milestone
payment application Onshore September 2012 (CEL-FX-OFF-12-089).pdf100%
New File 266819 17 - CEL-FX-OFF-12-008-RE Coordinates of
Towers of Transmission Line to EDC Substation.pdf100%
New File 376806 170 - CEL-CHC-L-12-0457 Leader Group
coporate structure.pdf100%
New File 462869 171 - CEL-CHC-L-12-0458 Training Program
Subcontractor.pdf100%
New File 401819 172 - CHC-12-0462 interconection
facilities at EDC Steung hav substation.pdf100%
New File 183979 173 - CEL-FX-OFF-12-093-Coordination with
ERDOS for the construction of tower N8 and N9 of transmission line.pdf100%
New File 306893 174 - CEL-FX-OFF-12-094-Request for
confirmation of EDC requirement of transmission line protection.pdf100%
New File 801083 175 - CEL-FX-OFF-12-095-Confirmation for
the name of interconnection bays in EDC's substation.pdf100%
New File 390024 176 - CEL-CHC-L-12-0455 Milestone
payment Application Offshore September 2012 (CEL-FX-OFF-12-090).pdf100%
New File 183026 177 - CEL-FX-OFF-12-096-Request for the
specification of RTU in EDC substation.pdf100%
New File 256505 178 - CEL-FX-OFF-12-097-Consumable of
electricity to be provided with diesel oil.pdf100%
New File 205781 179 - CEL-FX-OFF-12-098-Confirmation of
the first coal delivery for commissioning and testing.pdf100%
New File 527633 18 - CEL-FX-OFF-12-009 _Milestone Payment
Application_Onshore_February.pdf100%
New File 420584 180 - CEL -CHC-L-12-0483 jetty
completion and re3quired confirmation from CHEC for coal Deliveries.pdf100%
New File 486677 181 - cel-chc-l-12-0408submission of
documents for jeety operation permit.pdf100%
New File 1.5 m 182 - CEL-CHC-L-12-0485 Site Access to
Location of Transmission Towers AN8 and AN9.pdf100%
New File 1.1 m 183 - CEL-FX-OFF-12-099-ERDOS vehicle
route issue.pdf100%
New File 297993 184 - CEL-FX-OFF-12-100-Pipe connection
and raw water supply.pdf100%
New File 1.0 m 185 - CEL-FX-OFF-12-101-
Milestone_Payment_Application_Onshore_October_2012.pdf100%
New File 1.3 m 186 - CEL-CHC-L-12-0493 First Delivery
Date of Coal and Subdequent Coal Deliveries for February 2013.pdf100%
New File 719571 187 - CEL-CHC-L-12-0496 FAT of 23kV HV
Switchgears of Interconnection Facilies.pdf100%
New File 22.5 m 188 - CEL-CHC-L-12-0501 Project Site
Quality and Project Schedule, October 2012.pdf100%
New File 206434 189 - CEL-FX-OFF-12-103-Regarding to the
main cable tray and branch connection issues.pdf100%
New File 262360 19 - CEL-FX-OFF-12-010_Blasting
activities of ERDOS's intake piping line.pdf100%
New File 269823 190 - CEL-FX-OFF-12-104-Rejection for the
milestone application of chimney.pdf100%
New File 622974 191 - CEL-CHC-L-12-0506 Main Cable Tray
and Branch Connection Issues.pdf100%
New File 578312 192 - CEL-CHC-L-12-L-0509 Request for
Information for Coal Unloading Equipment.pdf100%
New File 169482 193 - CEL-FX-OFF-12-105-Confirmation of
Ceramic Tile Type in Office Building.pdf100%
New File 1.0 m 194 - CEL-FX-OFF-12-106-Confirmation of
Floor Tile Type in CCR Building.pdf100%
New File 640995 195 - CEL-CHC-L-12-0516 Milestone Payment
Application Onshore October 2012 (CEL-FX-OFF-12-101).pdf100%
New File 466430 196 - CEL-CHC-L-12-0517 Request for
Information by CHEC to EDC.pdf100%
New File 738082 198 - CEL-FX-OFF-12-108-Regarding to the
issue of stainless pipe cutting.pdf100%
New File 174790 199 - CEL-FX-OFF-12-109-Regarding to the
issue of lighting pull box protection class.pdf100%
New File 485743 2 - CEL-CHC-L-12-0014 MARINE Project
Cargo Insurance Survey Warranty.pdf100%
New File 197248 20 - CEL-FX-OFF-12-011_Coordination with
ERDOS to stop the blasting activity during our TG foundation concreting.pdf100%
New File 2.7 m 200 - CEL-CHC-L-12-0525.pdf100%
New File 1.5 m 201 - CEL-CHC-L-12-0526.pdf100%
New File 841247 202 - CEL-FX-OFF-12-110-The connections
of the grounding grid with metal structures.pdf100%
New File 449349 203 - CEL-FX-OFF-12-111-Regarding to the
issue of ERDOS's soil stacked at the west side of raw water pond.pdf100%
New File 211517 204 - CEL-FX-OFF-12-112-Regarding to the
issue of raw water supply valves protection.pdf100%
New File 792111 205 - CEL-CHC-L-12-0540.pdf100%
New File 773084 206 - CEL-FX-OFF-12-113-Final spare parts
and special tools list .pdf100%
New File 119485 207 - CEL-FX-OFF-12-114-Confirmation of
independent firm of engineers.pdf100%
New File 221878 208 - CEL-FX-OFF-12-115-Milestone
application for Black start diesel generator.pdf100%
New File 181382 209 - CEL-FX-OFF-12-116-Raw water supply
issue.pdf100%
New File 462500 21 - CEL-CHC-L-12-0053 Transmission Line
Route and Interconnection.pdf100%
New File 302362 210 - CEL-FX-OFF-12-118-safety warning
coordinates of the CW intake head caisson.pdf100%
New File 496496 211 - CEL-FX-OFF-12-117-blasting work for
transmission line at tower N8.pdf100%
New File 908988 212 - CEL-FX-OFF-12-
119_Milestone_Payment_Application_November_2012.pdf100%
New File 214794 213 - CEL-FX-OFF-12-121-Settings for
transmission line and busbar protection.pdf100%
New File 649424 214 - CEL-CHC-L-12-0562.pdf100%
New File 3.2 m 215 - CEL-CHC-L-12-0563.pdf100%
New File 764384 216 - CEL-CHC-L-12-0576.pdf100%
New File 1.5 m 218 - CEL-CHC-L-12-0558.pdf100%
New File 266541 219 - CEL-FX-OFF-12-122-
Reply_on_Letter_of_CEL_regarding_settings_for_transmission_line_and_busbar_protecti
on.pdf100%
New File 493928 22 - CEL-CHC-L-12-0054 Blasting Activties
of ERDOS Intake pipeline.pdf100%
New File 571490 220 - CEL-CHC-L-12-0571..pdf100%
New File 604209 221 - CEL-CHC-L-12-0571.pdf100%
New File 905448 222 - CEL-CHC-L-12-0573.pdf100%
New File 222464 223 - CEL-FX-OFF-12-
123_Resubmission_of_the_milestone_application_for_Black_start_diesel_generator.pdf
100%
New File 180942 224 - CEL-FX-OFF-12-124 Notification of
the account change for offshore milestone application November 2012.pdf100%
New File 187805 225 - CEL-FX-OFF-12-125-Coal unloader
crane testing and commissioning time.pdf100%
New File 490831 226 - CEL-CHC-L-12-0584.pdf100%
New File 247966 227 - CEL-FX-OFF-12-127-Operator plan for
BOP & unit 1 testing and commissioning.pdf100%
New File 315092 228 - CEL-FX-OFF-12-126-Expalnation for
some pipes without hydraulic test.pdf100%
New File 263934 229 - CEL-FX-OFF-12-
128_Issue_for_the_measure_of_the_raw_water_pond_corner.pdf100%
New File 182600 23 - CEL-FX-OFF-12-012-The proposal
agenda for the coordination with the EDC.pdf100%
New File 261228 230 - CEL-FX-OFF-12-129-Notification of
the power sockets for installation.pdf100%
New File 3.5 m 231 - CEL-CHC-L-12-0585.pdf100%
New File 288023 232 - CEL-FX-OFF-12-130-Torque value of
bus bar.pdf100%
New File 4.5 m 233 - CEL-CHC-L-13-0594.pdf100%
New File 206616 234 - CEL-FX-OFF-12-131-Enhance site
management to the O&M personnel.pdf100%
New File 3.8 m 235 - CEL-FX-OFF-12-
132_Milestone_application_for_Black_start_diesel_generator.pdf100%
New File 206440 236 - CEL-FX-OFF-12-133-RE FAT OF 230KV
HV SWITCHGEARS OF INTERCONNECTION FACILITIES.pdf100%
New File 204386 237 - CEL-FX-OFF-12-134-Seashore
protection.pdf100%
New File 204328 238 - CEL-FX-OFF-12-135-Installation of
the ceiling for the administration building.pdf100%
New File 207707 239 - CEL-FX-OFF-12-136-Request for
accelerating payment.pdf100%
New File 565580 24 - CEL-CHC-L-12-0061 Proposed Agenda
for Coordination meeting with EDC.pdf100%
New File 212955 240 - CEL-FX-OFF-12-137-Re Project Site
Quality and Project Schedule October 2012.pdf100%
New File 120180 241 - CEL-FX-OFF-12-138-Issue for the tax
exemption master list extension.pdf100%
New File 202862 242 - CEL-FX-OFF-12-139-Issue for the
achieved milestone of chimney.pdf100%
New File 245842 25 - CEL-FX-OFF-12-013 _Milestone Payment
Application_Offshore_January.pdf100%
New File 196936 26 - CEL-FX-OFF-12-014-Coordination for
the survey work in theTransmission Line and EDC Substation area.pdf100%
New File 596771 27 - CEL-FX-OFF-12-015 _Milestone Payment
Application_Offshore_January.pdf100%
New File 366104 28 - CEL-CHC-L-12-0064 Coordination for
Survey Work in the trainmission Line and EDC Substation Area.pdf100%
New File 434242 29 - CEL-FX-OFF-12-016-Regarding to the
explosive material storage of ERDOS.pdf100%
New File 416257 3 - CEL-CHC-L-12-0028 Material Installed
for Chimney Grounding for lighting Protection.pdf100%
New File 700838 30 - CEL-CHC-M-12-0009 WEEKLY MEETING
NINUTES OF MEETING.pdf100%
New File 406537 31 - CEL-CHC-L-12-0069 Milestone Payment
Application Offshore Janunary2012(CEL-FX-OFF-12-015).pdf100%
New File 383288 32 - CEL-CHC-L-12-0070 Milestone Payment
Application Onshore Janunary(CEL-FX-OFF-12-009).pdf100%
New File 364956 33 - CEL-CHC-L-12-0073 Phase 2,C.W.Pump-
house Area Blasting.pdf100%
New File 665699 34 - CEL-FX-OFF-12-017-Phase two CW pump
house area blasting 20120227.pdf100%
New File 196948 35 - CEL-FX-OFF-12-018-Raw water pond
area excavation.pdf100%
New File 241946 36 - CEL-FX-OFF-12-019-
Notification_of_Auxiliary_Equipments.pdf100%
New File 829781 37 - CEL-FX-OFF-12-
020_Milestone_Payment_Application_Onshore_February_2012.pdf100%
New File 166015 38 - CEL-FX-OFF-12-021-The Resume-O&M YUE
YUHUA.pdf100%
New File 180893 39 - CEL-FX-OFF-12-022-Changing the
internet route of ezecom .pdf100%
New File 424514 4 - CEL-CHC-L-12-0029 P&I Diagrams for
Design Review.pdf100%
New File 119489 40 - CEL-FX-OFF-12-023-Vehicles stopped
by Erdos .pdf100%
New File 449960 41 - CEL-CHC-L-12-0086 Milestone Payment
Application Offshore February 2012(CEL-FX-OFF-12-020).pdf100%
New File 307482 42 - CEL-FX-OFF-12-
024_Request_for_accelerating_the_payment_procedure.pdf100%
New File 316376 43 - CEL-FX-OFF-12-025-Reply to your
comments on spare parts and special tools list.pdf100%
New File 249845 44 - CEL-FX-OFF-12-
026_Transmission_line_and_permanent_access_road.pdf100%
New File 4.2 m 45 - CEL-FX-OFF-12-
027_Milestone_Payment_Application_Offshore_February_2012.pdf100%
New File 294589 46 - CEL-FX-OFF-12-028 Application for
import certificate of Goods Exemption.pdf100%
New File 1.7 m 47 - CEL-FX-OFF-12-
029_Clarification_of_Offshore_Application_February_2012.pdf100%
New File 244858 48 - CEL-FX-OFF-12-
30_Late_confirmation_of_transmission_line_and_permanent_access_road.pdf100%
New File 454237 49 - CEL-CHC-L-12-0117 Milestone Payment
Application Offshore February 2012 (CEL-CHC-L-12-0117 Milestone Payment Application
Offshore February 2012.pdf100%
New File 513191 5 - CEL-CHC-L-12-0030 Marine Project
Cargo insurance Survey Warranty for CEL-FX-SHPT-007.pdf100%
New File 388979 50 - CEL-CHC-L-12-0121 Good and Personnel
Lifts.Elevator for Boilers.pdf100%
New File 358171 51 - CEL-CHC-L-12-0122 Good and Personnel
Lifts(Elevators for Boiler.pdf100%
New File 354073 52 - CEL-CHC-L-12-0123 Training for
Employer's O&M Staff.(Ref;EPC Article 25).pdf100%
New File 1.1 m 53 - CEL-FX-OFF-12-
031_Issues_for_access_road_been_blocked.pdf100%
New File 340473 54 - CEL Scann12040821280.pdf100%
New File 906294 55 - CEL-CHC-L-12-0124.pdf100%
New File 3.1 m 56 - CEL-FX-OFF-12-
032_Milestone_Payment_Application_Onshore_March_2012.pdf100%
New File 486374 57 - CEL-CHC-L-12-0124 Route of
Transmission line,Pernement Access Road and Raw water pipeline.pdf100%
New File 414040 58 - CEL-CHC-L-12-0125 Damage to crate
Containing Rotor of Unit One.pdf100%
New File 1.5 m 59 - CEL-CHC-L-12-0125.pdf100%
New File 440611 6 - CEL-CHC-L-12-0027 Milestone Payment
Application Offshore December (CEL-FX-OFF-088).pdf100%
New File 1.7 m 60 - CEL-FX-OFF-12-
033_Damage_to_Crate_of_Generator_Rotor_of_Unit_One.pdf100%
New File 479752 61 - CEL-CHC-L-12-0135 Milestone Payment
Application Onshore march 2012 (CEL-FX-OFF-12-032).pdf100%
New File 396966 62 - CEL-CHC-L-12-0136 DAMANG TO
GENERATION ROTOR.pdf100%
New File 1.1 m 63 - CEL-FX-OFF-12-034-Outlet CW Pipe
Intercross With Erdos Jetty.pdf100%
New File 3.4 m 64 - CEL-FX-OFF-12-
035_Milestone_Payment_Application_Offshore_March_2012.pdf100%
New File 317184 65 - CEL-FX-OFF-12-
036_Additional_Cost_for_Permanent_Access_Road.pdf100%
New File 407924 66 - CEL-CHC-L-12-0147 Approved Extension
of Masterlist by CDC and MIME.pdf100%
New File 318806 67 - CEL-FX-OFF-12-
037_Additional_Cost_for_Permanent_Access_Road.pdf100%
New File 481744 68 - CEL-CHC-L-12-0152 Milestone Payment
Application Offshore March 2012(CEL-FX-OFF-12-035).pdf100%
New File 465303 69 - CEL-CHC-L-12-0153 Access Road for
Delivery.pdf100%
New File 747152 7 - CEL-FX-OFF-12-001-2nd Batch Auxiliary
Equipments Specification.pdf100%
New File 104918 70 - CEL-FX-OFF-12-
038_Access_road_to_be_finalized_for_delivering_transformer.pdf100%
New File 2.6 m 71 - CEL-FX-OFF-12-
039_Milestone_Payment_Application_Onshore_April_2012.pdf100%
New File 136365 72 - CEL-FX-OFF-12-040-CW pipe intercross
with ERDOS jetty approach.pdf100%
New File 109026 73 - CEL-FX-OFF-12-041-
1_Issues_for_Permanent_access_road.pdf100%
New File 499228 74 - CEL-CHC-L-12-0156 Milestone Payment
Application Onshore Apirl 2012(CEL-FX-OFF-12-039).pdf100%
New File 368356 75 - CEL-CHC-L-0163 CW Pipeline Route
Intersecting with jetty Route of Neighbouring Progect.pdf100%
New File 524374 76 - CEL-FX-OFF-12-041-Visa Extension
Procedure.pdf100%
New File 211861 77 - CEL-FX-OFF-12-042 Notification The
fabrication of CW FRP pipes have been completed.pdf100%
New File 320385 78 - CEL-FX-OFF-12-
043_Issue_for_rejection_of_onshore_milestone_application.pdf100%
New File 157307 79 - CEL-FX-OFF-12-
044_Deduction_for_Advance_Payment_Bond.pdf100%
New File 218997 8 - CEL-FX-OFF-12-
002_Marine_Project_Cargo_Insurance_Survey.pdf100%
New File 157120 80 - CEL-FX-OFF-12-
045_Deduction_for_Advance_Payment_Bond_(Utilization_as_at_31_Dec_2011).pdf100%
New File 4.3 m 81 - CEL-FX-OFF-12-
046_Milestone_Payment_Application_Offshore_April_2012.pdf100%
New File 464060 82 - CEL-CHC-L-12-0185 Achieved
Milestone of Chimney Stack.pdf100%
New File 1.1 m 83 - CEL-FX-OFF-12-
047_Tower_foundation_affected_by_Neighboring_Project.pdf100%
New File 311742 84 - CEL-FX-OFF-12-048 List of Required
Information From EDC.pdf100%
New File 171366 85 - CEL-FX-OFF-12-
049_Postponed_of_the_dredging_for_the_outlet_foundation_trench.pdf100%
New File 453954 86 - CEL-CHC-L-0186 Labour Inspection of
site by the ministry and Subsequent Report.pdf100%
New File 408830 87 - Postponement of Dredging of the
Outlet Foundation Trench.pdf100%
New File 221880 88 - CEL-FX-OFF-12-050 Respond to
postponed of the dredging for the outlet foundation trench.pdf100%
New File 118924 89 - CEL-FX-OFF-12-051 Delivery for heavy
equipments.pdf100%
New File 566573 9 - CEL-FX-OFF-12-
003_Excavation_of_CW_pump_house_for_project_second_phase.pdf100%
New File 461045 90 - CEL-CHC-L-0204 Stronge and
Insulation Test of Gernerater Rotor and Stator of Unit #1Site.pdf100%
New File 468796 91 - CEL-CHC-L-0206 Miloesstone Payment
Application Offshore Apirl 2012 (CEL-FX-OFF-12-046).pdf100%
New File 47616 92 - 041.doc100%
New File 4.9 m 93 - CEL-FX-OFF-12-052 Milestone Payment
Application Onshore May 2012.pdf100%
New File 245718 94 - CEL-FX-OFF-12-053- Notification The
Management Cost of Training for Employer's Staff in China .pdf100%
New File 130524 95 - CEL-FX-OFF-12----Notification of our
personnel and transportation blocked by Erdos Security.doc100%
New File 302883 96 - CEL-FX-OFF-12-054-Notification The
Management Cost of Training for Employer's Staff in China .pdf100%
New File 22016 97 - CEL-FX-OFF-12-054-??Management Cost
for the training.xls100%
New File 1.2 m 98 - CEL-FX-OFF-12-055 Milestone Payment
Application Offshore May 2012.pdf100%
New File 1.1 m 99 - CEL-FX-OFF-12-056-Offshore Milestone
Payment Application of Turbine and Generator Delivered .pdf100%
New File 3.0 m FILE IS BROKEN - LEAVE TAB EMPTY - 217 -
CEL-FX-OFF-12-120_Milestone_Payment_Application_Offshore_November_2012.part1.rar
100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\
New File 266858 CEL-FX-OFF-12-107-Submission of Documents
for Jetty Operations Permit .pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\
New File 5.6 m Attachment 1-Layout of jetty and port
facilities.pdf100%
New File 795078 Attachment 2-Layout of power plants.pdf
100%
New File 80342 Attachment 3-Location map and road
network.pdf100%
New File 1017497 Attachment 4-Layout of turning basin.pdf
100%
New File 4.2 m Attachment 5-Installation plan of buoys
and beacons.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 6-
Bathymetric survey report\
New File 355798 Appendix 1-Summary of Physical and
Mechanical Property Indexes for Soil.pdf100%
New File 187903 Appendix 2-The mean compression curves of
each foundation layer.pdf100%
New File 4.7 m Appendix 3-Plane position of boreholes
map.pdf100%
New File 2.6 m Appendix 4-Engineering Geologic
Profile.pdf100%
New File 476667 Appendix 5-List of boreholes
coordinate.pdf100%
New File 22.5 m CHECXB-CEL-01-087-Jetty Geotechnical
Engineering Investigation Report.pdf100%
New Dir 97 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 7-
Port Structure\
New File 482196 GJ-2010-0220D-JET-MS000-General
description of construction drawings.pdf100%
New File 261986 GJ-2010-0220D-JET-MS010-Layout of the
Jetty.pdf100%
New File 189599 GJ-2010-0220D-JET-MS011-Section(?)of the
Jetty.pdf100%
New File 189369 GJ-2010-0220D-JET-MS012-Section(?)of the
Jetty.pdf100%
New File 190468 GJ-2010-0220D-JET-MS013-Section(?)of the
Jetty.pdf100%
New File 216927 GJ-2010-0220D-JET-MS014-Front Elevation
Drawing of the Jetty.pdf100%
New File 516038 GJ-2010-0220D-JET-MS015-Beam and Slab
Installation Diagram of the Jetty.pdf100%
New File 269247 GJ-2010-0220D-JET-MS016-Rubber Fender
Installation Diagram.pdf100%
New File 237796 GJ-2010-0220D-JET-MS017-Precast Berthing
Parts Structure Diagram of the Jetty(I).pdf100%
New File 266672 GJ-2010-0220D-JET-MS018-Precast Berthing
Parts Structure Diagram of the Jetty(II).pdf100%
New File 253127 GJ-2010-0220D-JET-MS019-Prefabricated
Horizontal Bracing Structure Diagram of Jetty.pdf100%
New File 267138 GJ-2010-0220D-JET-MS020-Sewage Collection
Pool Structure of the Jetty.pdf100%
New File 479613 GJ-2010-0220D-JET-MS021-Cast-in-place
Beam Structure Diagram of the Jetty.pdf100%
New File 345906 GJ-2010-0220D-JET-MS022-Precasting Girder
Structure Diagram of the Jetty (I).pdf100%
New File 169802 GJ-2010-0220D-JET-MS023-Precasting Girder
Structure Diagram of the Jetty (II).pdf100%
New File 182306 GJ-2010-0220D-JET-MS024-Precasting Front
Girder Structure Diagram of the Jetty (I).pdf100%
New File 177881 GJ-2010-0220D-JET-MS025-Precasting Front
Girder Structure Diagram of the Jetty (II).pdf100%
New File 208228 GJ-2010-0220D-JET-MS026-Precasting Back
Girder Structure Diagram of the Jetty (I).pdf100%
New File 318372 GJ-2010-0220D-JET-MS027-Precasting Back
Girder Structure Diagram of the Jetty (II).pdf100%
New File 223736 GJ-2010-0220D-JET-MS028-Precasting Back
Girder Structure Diagram of the Jetty (III).pdf100%
New File 212812 GJ-2010-0220D-JET-MS029-Precasting Back
Girder Structure Diagram of the Jetty (IV).pdf100%
New File 320628 GJ-2010-0220D-JET-MS030-Precasting Pipe
Trench Girder Structure Diagram of the Jetty (I).pdf100%
New File 198673 GJ-2010-0220D-JET-MS031-Precasting Pipe
Trench Girder Structure Diagram of the Jetty (II).pdf100%
New File 226656 GJ-2010-0220D-JET-MS032-Precasting Slab
Structure Diagram (I).pdf100%
New File 247829 GJ-2010-0220D-JET-MS033-Precasting Slab
Structure Diagram (II).pdf100%
New File 198299 GJ-2010-0220D-JET-MS034-Precasting Slab
Structure Diagram (III).pdf100%
New File 176172 GJ-2010-0220D-JET-MS035-Precasting Slab
Structure Diagram (IV).pdf100%
New File 197292 GJ-2010-0220D-JET-MS036-Cast-in-place
Girder Structure Diagram of the Jetty (I).pdf100%
New File 215934 GJ-2010-0220D-JET-MS037-Cast-in-place
Girder Structure Diagram of the Jetty (II) .pdf100%
New File 213364 GJ-2010-0220D-JET-MS038-Cast-in-place
Front Girder Structure Diagram of the Jetty .pdf100%
New File 247480 GJ-2010-0220D-JET-MS039-Cast-in-place
Back Girder Structure Diagram of the Jetty .pdf100%
New File 225219 GJ-2010-0220D-JET-MS040-Cast-in-place
Pipe Trench Girder Structure Diagram of the Jetty .pdf100%
New File 194464 GJ-2010-0220D-JET-MS041-Cast-in-place
Fixed Crane Foundation Girder Structure Diagram.pdf100%
New File 170926 GJ-2010-0220D-JET-MS042-Cast-in-place
Connection Girder Structure Diagram of the Jetty.pdf100%
New File 307075 GJ-2010-0220D-JET-MS043-Cast-in-place
Surface Course Structure Diagram of the Jetty (I) .pdf100%
New File 262360 GJ-2010-0220D-JET-MS044-Cast-in-place
Surface Course Structure Diagram of the Jetty (II) .pdf100%
New File 337369 GJ-2010-0220D-JET-MS045-Cast-in-place
Surface Course Structure Diagram of the Jetty (III) .pdf100%
New File 232766 GJ-2010-0220D-JET-MS046-Mooring Dolphin
Superstructure Diagram(?) .pdf100%
New File 294186 GJ-2010-0220D-JET-MS047-Mooring Dolphin
Substructure Diagram (II) .pdf100%
New File 260064 GJ-2010-0220D-JET-MS048-Mooring Dolphin
Superstructure Diagram.pdf100%
New File 184547 GJ-2010-0220D-JET-MS049-Steel Ladder
Structure Diagram of the Jetty.pdf100%
New File 207531 GJ-2010-0220D-JET-MS050-Steel Chain
Ladder Structure Diagram .pdf100%
New File 334286 GJ-2010-0220D-JET-MS051-Details of 650kN
Bollard .pdf100%
New File 234832 GJ-2010-0220D-JET-MS052-Settlement and
Displacement Observation Point Layout of the Jetty .pdf100%
New File 327815 GJ-2010-0220D-JET-MS053-Layout of the
Approach Trestle.pdf100%
New File 219317 GJ-2010-0220D-JET-MS054-Section (?) of
the Approach Trestle .pdf100%
New File 239572 GJ-2010-0220D-JET-MS055-Section (?) of
the Approach Trestle .pdf100%
New File 227751 GJ-2010-0220D-JET-MS056-Section (?) of
the Approach Trestle .pdf100%
New File 227266 GJ-2010-0220D-JET-MS057-Section (IV) of
the Approach Trestle .pdf100%
New File 386502 GJ-2010-0220D-JET-MS058-Longitudinal
Section of the Approach Trestle .pdf100%
New File 427697 GJ-2010-0220D-JET-MS059-Structural member
layout of the trestle .pdf100%
New File 345822 GJ-2010-0220D-JET-MS060-Cast-in-place
beams structure diagram (I) .pdf100%
New File 311132 GJ-2010-0220D-JET-MS061-Cast-in-place
beams structure diagram (II) .pdf100%
New File 323797 GJ-2010-0220D-JET-MS062-Cast-in-place
beams structure diagram (?) .pdf100%
New File 304598 GJ-2010-0220D-JET-MS063-Cast-in-place
beams structure diagram (?) .pdf100%
New File 217888 GJ-2010-0220D-JET-MS064-Approach trestle
prestressed box girder structure(I).pdf100%
New File 230577 GJ-2010-0220D-JET-MS065-Approach trestle
prestressed box girder structure(II).pdf100%
New File 330344 GJ-2010-0220D-JET-MS066-Approach trestle
prestressed box girder structure(III).pdf100%
New File 207560 GJ-2010-0220D-JET-MS067-Approach trestle
prestressed box girder structure(IV).pdf100%
New File 227307 GJ-2010-0220D-JET-MS068-Approach trestle
prestressed box girder structure(?).pdf100%
New File 351693 GJ-2010-0220D-JET-MS069-Approach trestle
prestressed box girder structure(?).pdf100%
New File 209277 GJ-2010-0220D-JET-MS070-Approach trestle
prestressed box girder structure(?).pdf100%
New File 260606 GJ-2010-0220D-JET-MS071-Approach trestle
prestressed box girder structure(?).pdf100%
New File 209712 GJ-2010-0220D-JET-MS072-Approach trestle
prestressed box girder structure(?).pdf100%
New File 460985 GJ-2010-0220D-JET-MS073-Approach trestle
prestressed box girder structure(?).pdf100%
New File 270817 GJ-2010-0220D-JET-MS074-Approach trestle
precast slab structure (I).pdf100%
New File 240334 GJ-2010-0220D-JET-MS075-Approach trestle
precast slab structure (?).pdf100%
New File 239740 GJ-2010-0220D-JET-MS076-Approach trestle
precast slab structure (?).pdf100%
New File 232445 GJ-2010-0220D-JET-MS077-Approach trestle
precast slab structure (?).pdf100%
New File 232598 GJ-2010-0220D-JET-MS078-Approach trestle
precast slab structure (?).pdf100%
New File 287685 GJ-2010-0220D-JET-MS079-Structure diagram
of trestle pier DT.pdf100%
New File 300778 GJ-2010-0220D-JET-MS080-Substation
platform structure diagram (I) .pdf100%
New File 292562 GJ-2010-0220D-JET-MS081-Substation
platform structure diagram (?) .pdf100%
New File 361881 GJ-2010-0220D-JET-MS082-Cast-in-situ
surface course structure of approach trestle (I).pdf100%
New File 272284 GJ-2010-0220D-JET-MS083-Cast-in-situ
surface course structure of approach trestle (?).pdf100%
New File 238545 GJ-2010-0220D-JET-MS084-Approach
embankment earth retaining wall structure (I).pdf100%
New File 257643 GJ-2010-0220D-JET-MS085-Approach
embankment earth retaining wall structure (?).pdf100%
New File 271654 GJ-2010-0220D-JET-MS086-Cast-in-place
concrete road surface structure diagram.pdf100%
New File 292493 GJ-2010-0220D-JET-MS087-Layout for
settlement and displacement observation points trestle .pdf100%
New File 421592 GJ-2010-0220D-JET-MS088-Steel walkway
general view.pdf100%
New File 232922 GJ-2010-0220D-JET-MS089-Railing and chain
ring of the steel walkway.pdf100%
New File 234142 GJ-2010-0220D-JET-MS090-Lower lateral
bracing of the steel walkway.pdf100%
New File 258056 GJ-2010-0220D-JET-MS091-Main girder of
the steel walkway.pdf100%
New File 274351 GJ-2010-0220D-JET-MS092-Handrail
structure diagram.pdf100%
New File 381372 GJ-2010-0220D-JET-MS093-Embedded parts
structure (I).pdf100%
New File 325228 GJ-2010-0220D-JET-MS094-Embedded parts
structure (II).pdf100%
New File 241262 GJ-2010-0220D-JET-MS095-Embedded parts
structure (III).pdf100%
New File 257643 GJ-2010-0220D-JET-MS096-Embedded parts
structure (IV).pdf100%
New File 335531 GJ-2010-0220D-JET-MS097-Embedded parts
structure (V).pdf100%
New File 257707 GJ-2010-0220D-JET-MS098-Embedded parts
structure (VI).pdf100%
New File 312785 GJ-2010-0220D-JET-MS099-Embedded parts
structure (VII).pdf100%
New File 248840 GJ-2010-0220D-JET-MS100-Embedded parts
structure (VIII).pdf100%
New File 259203 GJ-2010-0220D-JET-MS101-Embedded parts
structure (IX).pdf100%
New File 414994 GJ-2010-0220D-JET-MS102-Embedded parts
structure (X).pdf100%
New File 349296 GJ-2010-0220D-JET-MS103-Embedded parts
structure (XI).pdf100%
New File 282186 GJ-2010-0220D-JET-MS104-Embedded parts
structure (XII).pdf100%
New File 1.8 m GJ-2010-0220D-JET-MS-Catalog of
Drawings.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 9-
Coal yard spray\
New File 162 ~$ECXB-CEL-01-DTS-
015_Documents_transfer_sheet__Basic_Design__Mech.doc100%
New File 39400 F428S-M0704-00-Catalogue.pdf100%
New File 502831 F428S-M0704-01 Coal field spray.pdf100%
New Dir 242 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\
New File 1041128 1 - CEL-CHC-L-13-0001.pdf100%
New File 1.9 m 10 - CEL-FX-OFF-13-002 Milestone Payment
Application Offshore Dece mber 2012.pdf100%
New File 537637 100 - CEL-FX-OFF-13-056-Reply on comments
for MS of individual test of IPB(CEL Switchyard).pdf100%
New File 785925 101 - CEL-FX-OFF-13-057-Reply on comments
for MS of individual test of Line protection(CEL Switchyard).pdf100%
New File 641319 102 - CEL-FX-OFF-13-058-Reply on comments
for MS of individual test of Steam turbine generator(CEL Switchyard).pdf100%
New File 116054 103 - CEL-FX-OFF-13-060-Submission of
Test procedure for earthing resistance.pdf100%
New File 1.4 m 104 - CEL-FX-OFF-13-061-Reply on comments
for MS of back feeding(CEL Switchyard).pdf100%
New File 118581 105 - CEL-FX-OFF-13-063-Notification of
commence #1 boiler blowpipe work.pdf100%
New File 851464 106 - CEL-CHC-L-13-0245 Milestone Payment
Application Onshore March 2012 [CEL-FX-OFF-12-032].pdf100%
New File 580905 107 - CEL-FX-OFF-13-062 Milestone Payment
Application Onshore April 2013.pdf100%
New File 932841 108 - CEL-FX-OFF-13-064-Submission for MS
of grouding resistance (CEL Switchyard).pdf100%
New File 115481 109- CEL-FX-OFF-13-065-The request for
the fuel oil.pdf100%
New File 308962 11 - CEL-CHC-L-13-0050 APPROVAL OF
MASTERLIST EXTENSION FOR 2013.pdf100%
New File 701237 110 - CEL-FX-OFF-13-066-Submission for MS
of grouding resistance (CEL Switchyard-revision) .pdf100%
New File 121494 111 - CEL-FX-OFF-13-067-Reply on comments
for MS of individual test of Steam turbine generator(CEL Switchyard).pdf100%
New File 628894 112 - CEL-FX-OFF-13-068-Replay on comment
of MS for grouding resistance (CEL Switchyard) .pdf100%
New File 204165 113 - CEL-FX-OFF-13-069-Submission of
Soil Resistance Test (CEL Switchyard) .pdf100%
New File 96755 114 - CEL-CHC-L-13-0301 Unit 1 Boiler
Steam Blowing.pdf100%
New File 685744 115 - CEL-FX-OFF-13-073-Confirmation of
the result of unit 1 steam blowing.pdf100%
New File 709692 116 - CEL-CHC-L-13-0298.pdf100%
New File 489992 117 - CEL-CHC-L-13-0309 Soil Resistivity
Measurements Done By CHEC and Retest on 21 May 2013 By CEL100%
New File 134846 118 - CEL-FX-OFF-13-070-Current status of
back energization activity.pdf100%
New File 124050 119 - CEL-FX-OFF-13-071-Re Re Soil
resistivity measurements done by CHEC and retest on 21 May 2013 by CEL.pdf100%
New File 795119 12 - CEL-CHC-L-13-0047 Training Program
of OEM.pdf100%
New File 66374 120 - CEL-CHC-L-13-0311 Regarding to the
Expiry of the Onshore and Offshore Performance Bonds and Advance Payment Bonds (3RD
REMINDER).pdf100%
New File 84324 121 - CEL-CHC-L-13-0313 Grounding
Impedance and Resistance Measurements Done by CHEC on 5 May 2013 and 7 May 2013 and
Retest On 21 May 2013 By CEL .pdf100%
New File 201882 122 - CEL-CHC-L-13-0314 CHEC'S PLANT
SWITCHYARD GROUNDING SYSTEM CALCULATIONS AND SITE TESTING.pdf100%
New File 315898 123 - CEL-FX-OFF-13-072-Electricity
consumption after back energization finished.pdf100%
New File 155431 124 - CEL-FX-OFF-13-074-Organization for
back energization from CHEC.pdf100%
New File 808306 125 - CEL-FX-OFF-13-075-Request to
confirmed information on SCADA system.pdf100%
New File 123681 127 - CEL-FX-OFF-13-076-Grounding
resistance retest activity of CEL 230KV switchyard.pdf100%
New File 1.5 m 128 - CEL-CHC-L-13-0319 Re Delay
Liquidated Damages.pdf100%
New File 1.6 m 129 - CEL-CHC-L-13-0320 Re Delay
Liquidated Damages.pdf100%
New File 318669 13 - CEL-FX-OFF-13-008-Document clip.pdf
100%
New File 1.7 m 130 - CEL-CHC-L-13-0321 Re Defects
Notification Period Bond.pdf100%
New File 1.6 m 131 - CEL-CHC-L-13-0322 Re Defects
Notification Period Bond.pdf100%
New File 921798 132 - CEL-CHC-L-13-0326 Re CEL-FX-OFF-13-
076 Grounding resistance retest activity of CEL 230KV switchyard.pdf100%
New File 727020 133 - CEL-FX-OFF-13-077-Regarding the
grounding resistance retest activity of CEL 230KV switchyard.pdf100%
New File 512665 134 - CEL-CHC-L-13-0328 Re Grounding
Resistance Retest Activity of C E L 230kV Switchyard.pdf100%
New File 1.0 m 135 - CEL-CHC-L-13-0330 Re Confirmation
of the Result of Unit 1 Steam Blowing.pdf100%
New File 1.8 m 136 - CEL-CHC-L-13-0331 Re Electrical
Equipment Function Test at CEL 230kV Switchyard.pdf100%
New File 489810 137 - CEL-CHC-L-13-0337 Request for
Limestone supply.pdf100%
New File 628690 138 - CEL-FX-OFF-13-0078-Unit 1 turbine
running by steam successfully.pdf100%
New File 4.2 m 14 - CEL-FX-OFF-13-007-Notification of
jetty light buoy protection.pdf100%
New File 630823 140 - CEL-FX-OFF-13-079-Re request for
limestone supply.pdf100%
New File 252666 141 - CEL-FX-OFF-13-081 Milestone Payment
Application Onshore May 2 013.pdf100%
New File 1.3 m 142 - CEL-FX-OFF-13-082-Delay Liquidated
Damages of Unit 1.pdf100%
New File 1024233 143 - CEL-FX-OFF-13-083-Regarding to the
issues of unit 1 reliability test.pdf100%
New File 1.9 m 144 - CEL-CHC-L-13-0359 Delay Liquidated
Damages.pdf100%
New File 1.0 m 145 - CEL-CHC-L-13-0360 CE-FX-OFF-13-083-
Regarding to the issues of Unit 1 Reliability TestCEL.pdf100%
New File 1.9 m 146 - CEL-FX-OFF-13-084-Regarding to the
issues of laptop handover .pdf100%
New File 1.8 m 147 - CEL-FX-OFF-13-085-Public safety
issue at CW pipe outfall.pdf100%
New File 1.2 m 148 - CEL-FX-OFF-13-086-Notification-
Commencement of the reliability test of Unit 1.pdf100%
New File 838787 149 - CEL-CHC-L-13-0368 Engineering Tools
- Laptop.pdf100%
New File 621473 15 - CEL-CHC-L-13-0062 Tools for
commissioning of Jetty and Coal unloading system.pdf100%
New File 1.6 m 150 - CEL-CHC-L-13-0369 Subject
Notification - Commencement of the Reliability Test of Unit 1.pdf100%
New File 1.2 m 151 - CEL-FX-OFF-13-087-Regarding to the
commencement of reliabiliaty test of Unit 1.pdf100%
New File 632784 152 - CEL-FX-OFF-13-088-Regarding to the
confirmation of third batch coal delivery.pdf100%
New File 717171 153 - CEL-FX-OFF-13-089-Request to cancel
the hydraulic test requirement of unit 2 main steam pipe.pdf100%
New File 2.9 m 154 - CEL-CHC-L-13-0385-Letter to CHEC
regarding Design List Debit-Credit List and Gen NCR List Phase 1 (14 June
2013).1.pdf100%
New File 9.3 m 155 - CEL-CHC-L-13-0386-Letter to CHEC
regarding Spare Parts (16 June 2013).pdf100%
New File 347313 156 - CEL-CHC-L-13-0390 Milestone Payment
Onshore May.pdf100%
New File 288005 157 - CEL-CHC-L-13-0404 Road For CEL
230kV Switchyard.pdf100%
New File 342306 158 - CEL-CHC-L-13-0405 Boiler Tube Leak
Repair.pdf100%
New File 986005 159 - CEL-CHC-L-13-0406 Subject
Reliability Test of Unit 1.pdf100%
New File 862165 16 - CEL-CHC-L-13-0064 Mechanical
Electrical C&I Workshop and Chemical Laboratory Facilities.pdf100%
New File 569376 160 - CEL-FX-OFF-13-090-Regarding to the
tube leakage repair of unit 1 boiler economizer.pdf100%
New File 1.4 m 161 - CEL-CHC-L-13-0411 Subject CEL-FX-
OFF-13-089-Request to Cancel the Hydraulic Test Requirement of Unit 2 Main Steam
Pipe.pdf100%
New File 1.4 m 162 - CEL-CHC-L-13-0416 CEL-FX-OFF-13-
091-Reliability test of the session 2 for unit 1.pdf100%
New File 581214 163 - CEL-FX-OFF-13-091-Reliability test
of the session 2 for unit 1.pdf100%
New File 2.2 m 164 - CEL-FX-OFF-13-092-Regarding to the
way of rectification of unit 1 economizer leakage.pdf100%
New File 1.9 m 165 - CEL-FX-OFF-13-093-Application for
the extention of master list balance.pdf100%
New File 5.3 m 166 - CEL-FX-OFF-13-094-Application for
the extention of re-export of master list.pdf100%
New File 334171 167 - CEL-CHC-L-13-0420 Proposed letter
to CHEC on DCS Workstations 20130622.pdf100%
New File 851989 168 - CEL-CHC-L-13-0426.pdf100%
New File 417647 169 - CEL-CHC-L-13-0426UAT Energy meters
to be used as Net Energy Meters.pdf100%
New File 897655 17 - CEL-CHC-L-13-0065 COAL SAMPLING
ANALYSIS REPORT.pdf100%
New File 608183 170 - CEL-FX-OFF-13-095-Schedule of Unit
1 performance test.pdf100%
New File 694113 171 -EL-FX-OFF-13-096-Clarification of
the capacity of Jetty coal unloader.pdf100%
New File 1.0 m 172 - CEL-FX-OFF-13-097-RE-Request to
cancel the hydraulic test requirement of unit 2 main steam pipe.pdf100%
New File 570726 173 - CEL-FX-OFF-13-098-RE-Road of CEL
230kv switchyard.pdf100%
New File 498688 174 - CEL-CHC-L-13-0430 CEL-FX-OFF-13-
097-RE-Request to cancel the hydraulic test requirement of unit 2 main steam
pipe.pdf100%
New File 962020 175 - CEL-CHC-L-13-0430.pdf100%
New File 1.0 m 176 - CEL-CHC-L-13-0442.pdf100%
New File 737867 177 - CEL-FX-OFF-13-099-Regarding to the
issue of limestone filling to silo.pdf100%
New File 747865 178 - CEL-FX-OFF-13-100-apply for back
feeding of No.2 MT.pdf100%
New File 529722 179 - CEL-CHC-L-13-0447.pdf100%
New File 373280 18 - CEL-CHC-L-13-0086 Milestone Payment
Application Offshore December 2012 rcvd.pdf100%
New File 612709 180 - CEL-CHC-L-13-0448.pdf100%
New File 621170 181 - CEL-CHC-L-13-0449.pdf100%
New File 6.5 m 182 - CEL-CHC-L-13-0450.pdf100%
New File 1.1 m 183 - CEL-CHC-L-13-0452.pdf100%
New File 1.3 m 184 - CEL-FX-OFF-13-101-Regarding to the
issue to bituminize the concrete road in CEL 230kv switchyard.pdf100%
New File 3.9 m 185 - 0202013-20130723.pdf100%
New File 991642 186 - CEL-CHC-L-13-0469 On-Defects
Notification Period Bond.pdf100%
New File 991647 187 - CEL-CHC-L-13-0470 OFF-Defects
Notification Period Bond - Copy.pdf100%
New File 450400 188 - CEL-CHC-L-13-0472 Subject
Clarification of the Capacity of Jetty Coal Unloader.pdf100%
New File 1040721 189 - CEL-CHC-L-13-0473 -Delay Liquidated
Damages.pdf100%
New File 761549 19 - CEL-CHC-L-13-0086 Milestone Payment
Application Offshore December 2012.pdf100%
New File 4.4 m 190 - 0212013.pdf100%
New File 686179 191 - CEL-CHC-L-13-0492 Re Reliability
Test Run of Unit 1.pdf100%
New File 723200 192 - CEL-CHC-L-13-0495 Regarding to
Unit-2 Turbine Emergency Trip Valve.pdf100%
New File 338873 193 - CEL-CHC-L-13-0496 Regarding Unit-2
Reliability Run Test.pdf100%
New File 497406 194 - CEL-CHC-L-13-0504 Project Matters
Discussed on 12 August 2013.pdf100%
New File 897821 195 - CEL-CHC-L-13-0506 Plastic Covered
equipments.pdf100%
New File 567649 196 - CEL-CHC-L-13-0500 BC1A and BC1B
Motor Protection.pdf100%
New File 282827 197 - CEL-CHC-L-13-0520 Spare Parts.pdf
100%
New File 1.8 m 198 - CEL-CHC-L-13-0523Re CEL-FX-OFF-13-
115-Regarding to the comment on MS by CEL.pdf100%
New File 1.8 m 199 - CEL-CHC-L-13-0525 CEL-FX-OFF-13-
125-RT and PT plan for Unit 2&1.pdf100%
New File 799154 2 - CEL-FX-OFF-13-
001_Milestone_Payment_Application_Onshore_December_2012.pdf100%
New File 201741 20 - CEL-FX-OFF-13-009-Hydraulic test for
the main steam pipe of Unit 2.pdf100%
New File 1.6 m 200 - CEL-CHC-L-13-0526 CEL-FX-OFF-13-
120-Resubmission of the performance test of unit 1.pdf100%
New File 306269 201 - CEL-CHC-L-13-0527 Regarding to the
witness of interlock test for boiler and turbine.pdf100%
New File 3.3 m 202 - CEL-CHC-L-13-0530 Steam and Water
Analysis Result for Boiler No. 2.pdf100%
New File 437550 203 - CEL-CHC-L-13-0533 Works to be
carried out during both units shutdown - r1.pdf100%
New File 306067 204 - CEL-CHC-L-13-0536 Maintenance
Tools.pdf100%
New File 1.3 m 205 - CEL-FX-OFF-13-132-Amendment
Proposal for Turbine trip by MFT trigger.pdf100%
New File 640315 206 - CEL-CHC-L-13-0538 Re CEL-FX-OFF-13-
133 Steam and Water Analysis Result for Boiler No. 2.pdf100%
New File 640310 207 - CEL-CHC-L-13-0539 Re CEL-FX-OFF-13-
134 Regarding To The Witness of Interlock Test for Boiler and Turbine.pdf100%
New File 424044 208 - CEL-CHC-L-13-0548 Re-CEL-FX-OFF-13-
137-Minutes of the meeting on 15 Aug 2013 Boiler No. 2.pdf100%
New File 421419 209 - CEL-CHC-L-13-0553 Subject Coal
unloading No.2 Crane and belt conveyor defects..pdf100%
New File 122416 21 - CEL-FX-OFF-13-010-Issues regarding
the late approval for the tax exemption master list extension.pdf100%
New File 298578 210 - CEL-CHC-L-13-0557 CEL-FX-OFF-13-132
Amendment Proposal for Turbine Trip by MFT trigger.pdf100%
New File 409258 211 - CEL-CHC-L-13-0564 List of Power
Plant System (Walkdown completed as 24-Aug-13).pdf100%
New File 977470 212 - CEL-CHC-L-13-0565 Method Statements
Approved For Construction.pdf100%
New File 248893 213 - CEL-CHC-L-13-0571 Subject Schedule
for Conducting Performance Tests of Unit 1.pdf100%
New File 271219 214 - CEL-CHC-L-13-0580 Configuration of
kWh Meters.pdf100%
New File 282837 215 - CEL-CHC-L-13-0586 Limestone Filling
to Silo.pdf100%
New File 257044 216 - CEL-CHC-L-13-0590 Additional Cost
for Limestone Handling and Filling.pdf100%
New File 252941 217 - CEL-CHC-L-13-0591 Re CEL-FX-OFF-
13-152-Regarding the operation arrangement of Unit 1&2.pdf100%
New File 499042 218 - CEL-CHC-L-13-0601 Delay Liquidated
Damages.pdf100%
New File 123652 22 - CEL-FX-OFF-13-011-Issue of the
observation windows of central control room..pdf100%
New File 2.8 m 220 - CEL-CHC-L-13-0602 Method Statements
.pdf100%
New File 630804 221 - CEL-CHC-L-13-0603 Regarding the
Coalyard low illumination.pdf100%
New File 726418 222 - CEL-CHC-L-13-0604 Regarding the
Coal unloading crane Defects.pdf100%
New File 311273 223 - CEL-CHC-L-13-0605 During Limestone
Filling (2).pdf100%
New File 521125 224 - CEL-CHC-L-13-0606 Spare Parts.pdf
100%
New File 480027 225 - CEL-CHC-L-13-0607 Ash Truck
Defects 13092013.pdf100%
New File 310119 226 - CEL-CHC-L-13-0608 Regarding the
supply of tools.pdf100%
New File 1.1 m 227 - CEL-CHC-L-13-0609 Regarding the
operation and inspection of equipment in the Laboratory.pdf100%
New File 1.0 m 228 - CEL-CHC-L-13-0610 Approval of
Master List Extension for 2013.1.pdf100%
New File 988910 229 - CEL-CHC-L-13-0613 Load rejection
test method statement.pdf100%
New File 283849 23 - CEL-CHC-L-13-0087 Regarding to the
Settings for Transmission Line&Bus Bar Protection.pdf100%
New File 499096 230 - CEL-CHC-L-13-0612 Window water
seepage at admin building.pdf100%
New File 696871 231 - CEL-CHC-L-13-0617 CEL Plant
Lighting system Illumination testing.pdf100%
New File 309952 232 - CEL-CHC-L-13-0625 MIlestone Payment
Application Onshore August 2013 (CEL-FX-OFF-13-156).pdf100%
New File 957627 233 - CEL-CHC-L-13-0630 CEL Subject
Schedule for performance test of Unit 1 & Unit 2.pdf100%
New File 706216 234 - CEL-CHC-L-13-0631 UNIT 1 MANUAL
TRIP TEST OF THE TURBINE(NO LOAD TEST).pdf100%
New File 3.6 m 235 - CEL-CHC-L-13-0632 Test records for
Unit 2 Net Sent Out Power and Net Heat Rate.pdf100%
New File 764022 236 - CEL-CHC-L-13-0633 Turbine digital
electro-hydraulic control system (DEH) test report.pdf100%
New File 2.8 m 237 - CEL-CHC-L-13-0634 Unit 2
commissioning test reports.pdf100%
New File 2.8 m 238 - CEL-CHC-L-13-0635 Unit 1
commissioning test reports.pdf100%
New File 401857 239 - CEL-CHC-L-13-0646 Unit 1&2 Net Heat
Rate And Net Sent Out Power Test Results.pdf100%
New File 310199 24 - CEL-CHC-L-13-0095 Regarding Damaged
230kv Current Transformers-2 Units.pdf100%
New File 401848 240 - CEL-CHEC-L-13-0699 RE CEL-FX-OFF-
13-169-For the witness for the interlock test of firefighting pumps - Copy.pdf100%

New File 755063 241 - CEL-CHC-L-13-0708 Expiration of


Onshore Advance Payment Bond and Performance Bond.pdf100%
New File 789254 242 - CEL-CHEC-L-13-0709 Capacity and
Performance testing of the Water Treatment System.pdf100%
New File 789249 243 - CEL-CHEC-L-13-0710 CEL-FX-OFF-13-
170-RE For the witness for the interlock test of fire-fighting pumps (CEL letter
CEL-CHC-L-13-0699_)CEL letter CEL-CHC-L-13-0699) .pdf100%
New File 1.7 m 244 - CEL-CHC-L-13-0722-Draft Addendum to
EPC Contract.pdf100%
New File 4.8 m 245 - 058B2013.pdf100%
New File 121648 25 - CEL-FX-OFF-13-012-Re Regarding the
damaged 230kv Current Transformers-2 Units.pdf100%
New File 932954 26 - CEL-FX-OFF-13-013 Milestone Payment
Application Onshore Janua ry 2013.pdf100%
New File 352984 27 - CEL-CHC-L-13-0129 Detailed Design
Review.pdf100%
New File 846398 28 - CEL-CHC-L-13-0132 Variation Order
No.1 Offshore.pdf100%
New File 841266 29 - CEL-CHC-L-13-0133 Variation Order
No.1 Onshore.pdf100%
New File 582171 3 - CEL-CHC-L-13-0003 (i) Confirmation of
Commissioning Coal Delivery Dates for February (ii) Confirmation of Commissioning
Coal Delivery for January .pdf100%
New File 549451 30 - CEL-CHC-L-13-0141 THE
SERVICED,REWOUND CONVEYOR MOTORS OF BC1A & BC1B.pdf100%
New File 273908 31 - CEL-CHC-L-13-0144 LOCAL CONTROL
PANEL IN DEMINERALISED WATER TREATMENT PLANT.pdf100%
New File 828703 32 - CEL-FX-OFF-13-014 Milestone Payment
Application Offshore Janu ary 2013.pdf100%
New File 567388 33 - CEL-FX-OFF-13-015-Regarding to the
issue of local control panel in demi water treatment plant CEL.pdf100%
New File 495682 34 - CEL-CHC-L-13-0157 INAUGURATION OF
UNIT 1 BY P.M. OF CAMBODIA to chec v.p..pdf100%
New File 612586 35 - CEL-CHC-L-13-0163.pdf100%
New File 620742 36 - CEL-CHC-L-13-0165.pdf100%
New File 789628 37 - CEL-FX-OFF-13-016-Regarding the
collision incident between the second delivery coal barge and the dolphin.pdf100%
New File 203189 38 - CEL-FX-OFF-13-017 Milestone Payment
Application Onshore Febru ary 2013.pdf100%
New File 861264 39 - CEL-CHC-L-13-0174 Site Progress & QA
Problems.pdf100%
New File 203842 4 - CEL-FX-OFF-13-003-Regarding to the
existing 22kv power supply for pre-commissioning issue.pdf100%
New File 121576 40 - CEL-FX-OFF-13-018-Coordinate to
solve the permission to work in Steng Hav substation.pdf100%
New File 1.0 m 41 - CEL-CHC-L-13-0181 Safety Precaution
of the Two Line Bays at EdC 230 kV Steung Hav Substation.pdf100%
New File 183109 42 - CEL-FX-OFF-13-019-Regarding the
permission to work in Steng Hav substationsubstation.pdf100%
New File 206486 43 - CEL-FX-OFF-13-020-Decision for 230kV
control cable channel in Steng Hav substation.pdf100%
New File 118835 44 - CEL-FX-OFF-13-021-Final edition for
location of panel at central control room in Steng Hav substation.pdf100%
New File 276728 45 - CEL-CHC-L-13-0191 RECEIVED.pdf100%
New File 121685 46 - CEL-FX-OFF-13-022-Re-Regarding the
permission to work in Steng Hav substationsubstation.pdf100%
New File 121318 47 - CEL-FX-OFF-13-023-Regarding the
request of O&M team to be 24h on duty.pdf100%
New File 121579 48 - CEL-FX-OFF-13-024-Re, Re-Regarding
the permission to work in Steng Hav substationsubstation.pdf100%
New File 848787 49 - CEL-FX-OFF-13-025-submission for
control cable list of Steng Hav substation.pdf100%
New File 279078 5 - CEL-FX-OFF-13-004 Regarding to the
pipes without hydraulic test.pdf100%
New File 181059 50 - CEL-FX-OFF-13-026-recalibration for
billing energy meter.pdf100%
New File 193231 51 - CEL-FX-OFF-13-027-Recommend location
for AC DC panel at Steng Hav substation.pdf100%
New File 179890 52 - CEL-FX-OFF-13-028-Request for
Temporary power at Steng Hav substation.pdf100%
New File 575935 53 - CEL-CHC-L-13-0196.pdf100%
New File 119349 54 - CEL-FX-OFF-13-029-Coordinate to free
the west area for the permanent fence of 230KV switchyard.pdf100%
New File 116864 55 - CEL-FX-OFF-13-030-Diesel oil
supplying for fuel oil tank.pdf100%
New File 119259 56 - CEL-FX-OFF-13-031-Diesel oil
supplying for fuel oil tank is not enough.pdf100%
New File 717979 57 - CEL-FX-OFF-13-032 Milestone Payment
Application Onshore March 2013.pdf100%
New File 717979 58 - CEL-FX-OFF-13-032 Milestone Payment
Application Onshore March 2013.pdf100%
New File 420237 59 - CEL-CHC-L-13-0224.pdf100%
New File 204209 6 - CEL-FX-OFF-13-005-Re Confirmation of
commissioning coal deliveries for Jan&Feb.pdf100%
New File 513402 60 - CEL-CHC-L-13-0226 Lab Equipment
Defects and Other Lab Equipment Needed for a Fully Functional Laboratory.pdf100%
New File 156387 61 - CEL-FX-OFF-13-033-Regarding the oil
firing for boiler acid cleaning.pdf100%
New File 925647 62 - CEL-FX-OFF-13-034-Request for the
O&M operators increase.pdf100%
New File 344152 63 - CEL-CHC-L-13-0227 CEL Energy Billing
Meters accuracy class verification.pdf100%
New File 1.8 m 64 - CEL-CHC-L-13-0228.pdf100%
New File 696776 65 - CEL-CHC-L-13-0231.pdf100%
New File 559330 66 - CEL-CHC-L-13-0234.pdf100%
New File 308763 67 - CEL-CHC-L-13-0235 Offshore Defect
Notification Period Bond.pdf100%
New File 229588 68 - CEL-CHC-L-13-0235 received.pdf100%
New File 441570 69 - CEL-FX-OFF-13-035-apply for shut off
power of busbar at DEC substation.pdf100%
New File 207112 7 - CEL-FX-OFF-13-006-Diesel oil supply
plan for BSDG.pdf100%
New File 332861 70 - CEL-CHC-L-13-0236 Regarding to the
Expiry of the Onshore and Offshore Performance Bonds.pdf100%
New File 436563 71 - CEL-CHC-L-13-0240 Request for CEL
coordination with EDC for shutdown of EDC 230KV busbar.pdf100%
New File 1.0 m 72 - CEL-CHC-L-13-0247.pdf100%
New File 814222 73 - CEL-FX-OFF-13-037
Deduction_for_Advance_Payment_Bond.pdf100%
New File 516653 74 - CEL-CHC-L-13-0248 Detailed Design
Status.pdf100%
New File 1.4 m 75 - CEL-CHC-L-13-0252 CEL-CHC-L-13-0252
Back Energization independent Engineer Certification Compliance Statement100%
New File 116103 76 - CEL-CHC-L-13-0253 CEL-FX-OFF-13-036-
Reply on comments for MS of individual test(Equipments at CEL Switchyard)100%
New File 125505 77 - CEL-CHC-L-13-0255 CEL-FX-OFF-13-037
Deduction_for_Advance_Payment_Bond100%
New File 580482 78 - CEL-CHC-L-13-0258 LETTER TO CHEC -
COMMUNICATION SYSTEMS INSTALLATION.pdf100%
New File 43212 79 - CEL-CHC-L-13-0261 Deduction for
Advance Payment Bond.pdf100%
New File 348302 8 - CEL-CHC-L-13-0020 Offshore Milestone
Application for black start diesel generator.pdf100%
New File 494672 80 - CEL-FX-OFF-13-038-Schedule for
practical implementation of back energization.pdf100%
New File 431334 82 - CEL-FX-OFF-13-059-The request for
the fuel oil.pdf100%
New File 663947 83 - CEL-FX-OFF-13-039-Reply on comments
for MS of individual test of 10.5kV CT(CEL Switchyard).pdf100%
New File 571263 84 - CEL-FX-OFF-13-040-Reply on comments
for MS of individual test of 10.5kV LA(CEL Switchyard).pdf100%
New File 656114 85 - CEL-FX-OFF-13-041-Reply on comments
for MS of individual test of 10.5kV PT(CEL Switchyard).pdf100%
New File 1.2 m 86 - CEL-FX-OFF-13-042-Reply on comments
for MS of individual test of 10.5kV-6.3kV APT(CEL Switchyard).pdf100%
New File 709016 87 - CEL-FX-OFF-13-043-Reply on comments
for MS of individual test of 230kV CB(CEL Switchyard).pdf100%
New File 741502 88 - CEL-FX-OFF-13-044-Reply on comments
for MS of individual test of 230kV CT(CEL Switchyard).pdf100%
New File 763545 89 - CEL-FX-OFF-13-045-Reply on comments
for MS of individual test of 230kV CVT(CEL Switchyard).pdf100%
New File 332687 9 - CEL-CHC-L-13-0034 Milestone Payment
Application Onshore December 2012 (CEL-FX-OFF-13-001).pdf100%
New File 592224 90 - CEL-FX-OFF-13-046-Reply on comments
for MS of individual test of 230kV DS(CEL Switchyard).pdf100%
New File 584760 91 - CEL-FX-OFF-13-047-Reply on comments
for MS of individual test of 230kV LA(CEL Switchyard).pdf100%
New File 1.2 m 92 - CEL-FX-OFF-13-048-Reply on comments
for MS of individual test of 230kV-10.5kV MT(CEL Switchyard).pdf100%
New File 731877 93 - CEL-FX-OFF-13-049-Reply on comments
for MS of back energization(CEL Switchyard).pdf100%
New File 544668 94 - CEL-FX-OFF-13-050-Reply on comments
for MS of individual test of busbar protection(CEL Switchyard).pdf100%
New File 1.1 m 95 - CEL-FX-OFF-13-051-Reply on comments
for MS of individual test of DC(CEL Switchyard).pdf100%
New File 664650 96 - CEL-FX-OFF-13-052-Reply on comments
for MS of individual test of Power Cable(CEL Switchyard).pdf100%
New File 363941 97 - CEL-FX-OFF-13-053-Reply on comments
for MS of individual test of Insulator(CEL Switchyard).pdf100%
New File 519612 98 - CEL-FX-OFF-13-054-Reply on comments
for MS of individual test of inter-lock(CEL Switchyard).pdf100%
New File 207476 99 - CEL-FX-OFF-13-055-Reply on comments
for MS of individual test of inter-trip(CEL Switchyard).pdf100%
New File 894069 DOCUMENT CORRUPTED - DO NOT PRINT - 139 -
CEL-CHC-L-13-0341 Achieved milestone in May 2013-DB Comments100%
New Dir 2 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\126 - CEL-FX-OFF-13-
072-Electricity consumption after back energization finished\
New File 111560 CEL-FX-OFF-13-072-Electricity consumption
after back energization finished.docx100%
New File 17568 Maximum requested capacity from EDC.docx
100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\154.2 - DOC attach with
CEL-CHC-L-13-0385\
New File 1.3 m Copy of Exhibit A_rev1.pdf100%
New File 1000824 Copy of Exhibit B.pdf100%
New File 853354 Copy of Exhibit C.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\157.2 - DOC attach with
CEL-CHC-L-13-0404\
New File 588068 F428S-Z010702-02_1 Section of Road for
Switch Yard PE.pdf100%
New File 50176 Re Road for CEL switchyard.msg100%
New Dir 19 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\81 - CEL-FX-OFF-13-036-
Reply on comments for MS of individual test(Equipments at CEL Switchyard)\
New File 11598 Attachment A comments reply for Cable.pdf
100%
New File 11052 Attachment B comments reply for 10.5kV
CT.pdf100%
New File 11089 Attachment C comments reply for 10.5kV
PT.pdf100%
New File 65495 Attachment D comments reply for
10.5kV_6.3kV APT.pdf100%
New File 65384 Attachment E comments reply for
230kV_10.5kV MT.pdf100%
New File 6437 Attachment F comments reply for 230kV
LA.pdf100%
New File 11952 Attachment G comments reply for 230kV
DS.pdf100%
New File 14915 Attachment H comments reply for DC.pdf
100%
New File 6437 Attachment I comments reply for 10.5kV
LA.pdf100%
New File 6717 Attachment J comments reply for
insulator.pdf100%
New File 16527 Attachment K comments reply for IPB.pdf
100%
New File 11236 Attachment L comments reply for 230kV
CVT.pdf100%
New File 11719 Attachment M comments reply for 230kV
CT.pdf100%
New File 16187 Attachment N comments reply for steam
turbine generator.pdf100%
New File 7775 Attachment O comments reply for busbar
protection.pdf100%
New File 6489 Attachment P comments reply for
interlock.pdf100%
New File 8207 Attachment Q comments reply for inter-
trip.pdf100%
New File 11403 Attachment R comments reply for line
protection.pdf100%
New File 11995 Attachment S comments reply for 230kV
CB.pdf100%
New Dir 206 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 5 - 2014\
New File 450301 1 - CEL-CHEC-L-13-0791 Discussion and
Identification of Items in the General NCR List,Testing and Commissioning NCR List,
Walkdown List and Punch List.pdf100%
New File 304361 10 - CEL-CHC-L-14-0106-Mile stone payment
application onshore January 2014.pdf100%
New File 1.3 m 100 - CEL-FX-OFF-14-041 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 561984 101 - CEL-CHEC-L-14-0369 CEL workshop
machinery.pdf100%
New File 562808 102 - CEL-FX-OFF-14-042 Reply of
rectification of defects.pdf100%
New File 4.4 m 103 - WD-23 CEL-CHC-L-14-0387 Warranty
Defect ( Unit-1 Once Through Cooling Water Piping Supply Leakage).pdf100%
New File 1.3 m 104 - CEL-CHC-L-14-0394 WARRANTY DEFECT
(WD-024 Water Seepage from Concrete Roof of Admin Bldg).pdf100%
New File 367942 105 - CEL-CHC-L-14-0395 WARRANTY DEFECT
(WD-025 PAINT PEELED OFF FROM JETTY FIRE WATER PIPING).pdf100%
New File 1.8 m 106 - CEL-CHC-L-14-0397 WARRANTY DEFECT
(WD-026 POWER PLANT REVETMENT COLLAPSED).pdf100%
New File 281708 107 - CEL-CHC-L-14-0396 Unit 2 Turbine
Excessive Overspeed on 2 Aug 2014.pdf100%
New File 541987 108 - CEL-FX-OFF-14-043 Reply warranty
defect (WD-019 Malfuntion of No.2 BSDG).pdf100%
New File 636301 109 - CEL-FX-OFF-14-044 Reply to the
common maintenance tools.pdf100%
New File 940147 11 - CEL-FX-OFF-14-008- Reminding for
Rotary machines maintenance.pdf100%
New File 652899 110 - CEL-FX-OFF-14-045 Application for
customs duty exemption of master list for spare parts.pdf100%
New File 490661 111 - CEL-FX-OFF-14-046 Main valve
dismantle and metal chip analysis test.pdf100%
New File 999913 112 - WD-22 CEL-CHC-L-14-0409????
WARRANTY DEFECT ( Pipe Clamp on the Electrical Conduit @ Chimney).pdf100%
New File 318498 113 - WD-22 CEL-CHC-L-14-0410????1
WARRANTY DEFECT ( Pipe Clamp on the Electrical Conduit @ Chimney).pdf100%
New File 541496 114 - CEL-FX-OFF-14-047 Reply to
Bulldozer Garage Hoist Crane.pdf100%
New File 1.0 m 115 - CEL-FX-OFF-14-048 Reply to water
seepage from concrete roof at admin building, BSDG and main building.pdf100%
New File 1.0 m 116 - CEL-FX-OFF-14-049 Reply civil work
plan to Water Seepage from Concrete Roof at Admin Building, BSDG, Cable Trenches
and Main Building .pdf100%
New File 748053 117 - CEL-FX-OFF-14-050 BSDG spare parts
and special tools.pdf100%
New File 1.0 m 118 - CEL-FX-OFF-14-051 Reply to Plant
Electrical Protection Setting Coordination-discrimination Study.pdf100%
New File 7.9 m 119 - WD-031 CEL-CHC-L-14-0442 Equipment
and Piping at Once through Cooling Water Intake.pdf100%
New File 3.7 m 12 - CEL-FX-OFF-14-009 Reminding of
maintenance of the sling of coal unloader bucket.pdf100%
New File 2.5 m 120 - WD-032 CEL-CHC-L-14-0443 WARRANTY
DEFECT ( Unit-2 CEMS) CEMS ??????.pdf100%
New File 3.1 m 121 - WD-033 CEL-CHC-L-14-0444 Guard
House CCTV Hard Disc HHD-05.pdf100%
New File 5.8 m 122 - WD-034 CEL-CHC-L-14-0445
Demineralized Water Tank.pdf100%
New File 4.5 m 123 - WD-035 CEL-CHC-L-14-0447 WD-035
Jetty Cable Tray.pdf100%
New File 4.3 m 124 - WD-036 CEL-CHC-L-14-0448 WD-036
Outdoor Cable Tray Cover.pdf100%
New File 1.2 m 125 - CEL-CHC-L-14-0455 WARRANTY DEFECT
(WD-38 Rubber Expansion Joint of Jetty Fire Fighting Piping).pdf100%
New File 724181 126 - CEL-CHC-L-14-0457 Extension of
Defects Notification Period Bonds-Onshore.pdf100%
New File 724195 127 - CEL-CHC-L-14-0458 Extension of
Defects Notification Period Bonds-Offshore.pdf100%
New File 1.1 m 128 - CEL-FX-OFF-14-052 Re Extension of
Defects Notification Period Bonds.pdf100%
New File 1.9 m 129 - CEL-FX-OFF-14-053-Replay for
warranty defects (WD-006 once through cooling water pump & etc.).pdf100%
New File 1.4 m 13 - CEL-CHC-L-14-0082 Raw water pond
leak from bottom of slab.pdf100%
New File 1026714 130 - CEL-CHC-L-14-0461 WARRANTY DEFECT
(WD-39 Induced Draft Fan Lighting Support).pdf100%
New File 1.4 m 131 - CEL-CHC-L-14-0462 WARRANTY DEFECT
(WD-40 Unit-1&2 Fire Fighting Piping at Main Transformer and Unit Auxiliary
Transformer).pdf100%
New File 1.1 m 132 - CEL-CHC-L-14-0463 WARRANTY DEFECT
(WD-41 CO2 Fire Fighting System).pdf100%
New File 415127 133 - CEL-CHC-L-14-0460 Extension of
Defects Notification Period Bonds.pdf100%
New File 1.8 m 134 - WD-042 CEL-CHC-L-14-0467 WARRANTY
DEFECT__ (WD-42 Chemical Storage and Unloading System at Water Treatment
Plant.).pdf100%
New File 3.6 m 135 - WD-43 CEL-CHC-L-14-0468 WARRANTY
DEFECT__ ( Cable Tray at Belt Conveyor #3).pdf100%
New File 1.3 m 136 - WD-044 CEL-CHC-L-14-0469 WARRANTY
DEFECT (WD-44 Water Treatment Plant)??????????????.pdf100%
New File 1.2 m 137 - WD-045 CEL-CHC-L-14-0470 WARRANTY
DEFECT__ (WD-45 Unit-2 Siphon Well of Once Through Cooling Water Return Pipe).pdf
100%
New File 1.0 m 138 - WD-046 CEL-CHC-L-14-0471 WARRANTY
DEFECT__ (WD-46 Unit-2 Turbine Bearing #2 Vibration Sensors).pdf100%
New File 1.5 m 139 - WD-006 CEL-CHC-L-14-0474 CHECs
Reply to Warranty Defect (WD-006 Once Through Cooling Water Pump & Etc.).pdf100%
New File 6.2 m 14 - CEL-FX-OFF-14-010 Balance payment of
the milestones of the project.pdf100%
New File 600805 140 - WD-047 CEL-CHC-L-14-0473 WARRANTY
DEFECT (WD-47 POWER PLANT CCTV).pdf100%
New File 918918 141 - WD-049 CEL-CHC-L-14-0480 WARRANTY
DEFECT__ (WD-49 Air Conditioning System in Admin Bldg.).pdf100%
New File 990355 142 - WD-050 CEL-CHC-L-14-0481 WARRANTY
DEFECT (WD-50 Fly Ash Silo no.2).pdf100%
New File 318624 143 - WD-032 CEL-CHC-L-14-0482 WARRANTY
DEFECT (Unit-2 CEMS).pdf100%
New File 315611 144 - WD-033 CEL-CHC-L-14-0483 WARRANTY
DEFECT__ ( Guard House CCTV Hard Disc HHD-05).pdf100%
New File 3.2 m 145 - WD-051 CHC-CEL-L-14-0498 WARRANTY
DEFECT__ (WD-51 Control Loops Change Over from Manual to Auto Mode).pdf100%
New File 1.0 m 146 - WD-052 CHC-CEL-L-14-0499 WARRANTY
DEFECT__ (WD-52 Turbine Main Stop Valve & Governor Control Valve).pdf100%
New File 860598 147 - WD-053 CHC-CEL-L-14-0500 WARRANTY
DEFECT__ (CPU of Gas Chromatograph in Water Treatment Plant.pdf100%
New File 1.9 m 148 - WD-054 CHC-CEL-L-14-0501 WARRANTY
DEFECT (WD-054 CCR Energy Meter).pdf100%
New File 845304 149 - WD-055 CHC-CEL-L-14-0502 WARRANTY
DEFECT (WD-055 Unit-2 Secondary Air Fan #2 - 6KV Motor Feeder).pdf100%
New File 4.2 m 15 - CEL-FX-OFF-14-011 Request for
certificates issuing.pdf100%
New File 1.7 m 150 - WD-056 CHC-CEL-L-14-0503 WARRANTY
DEFECT__ (WD-056 Transformer yard & Switchyard).pdf100%
New File 2.1 m 151 - CEL-CHC-L-14-0506 ???????Unit-1&2__
Pressure Reducer & Attemperator to Deaerator.pdf100%
New File 2.2 m 152 - WD-057 CEL-CHC-L-14-0505 ?????? ??
WARRANTY DEFECT (WD-057 Equipment_s Paint Defect).pdf100%
New File 1.3 m 153 - WD-058 CEL-CHC-L-14-0508 WARRANTY
DEFECT (WD-058 2UNIT-2 STEAM TURBINE NOZZLE).pdf100%
New File 1.3 m 154 - WD-059 CEL-CHC-L-14-0509 WARRANTY
DEFECT (WD-059 MAIN BUILDING ROOF VENTILATOR).pdf100%
New File 1.3 m 155 - WD-059 CEL-CHC-L-14-0509 WARRANTY
DEFECT__ (WD-059 MAIN BUILDING ROOF VENTILATOR).pdf100%
New File 1.0 m 156 - WD-060 CEL-CHC-L-14-0510 WARRANTY
DEFECT__ (WD-060 DIESEL OIL TANK LEVEL SENSOR & TRANSMITTER).pdf100%
New File 1.2 m 157 - WD-062 CEL-CHC-L-14-0512 WARRANTY
DEFECT (WD-062 Unit-1 Turbine Gland Sealing System).pdf100%
New File 1.1 m 158 - WD-063 CEL-CHC-L-14-0513 WARRANTY
DEFECT (WD-063 Water Treatment Plant - No.1 Acid Unloading Pump).pdf100%
New File 1.2 m 159 - WD-064 CEL-CHC-L-14-0514 WARRANTY
DEFECT (WD-064 Waste Water Treatment Plant - #1 & #2 Service Wastewater Drainage
Pumps).pdf100%
New File 107520 16 - CEL-FX-OFF-14-012- Exposed grounding
bars of the transmission line.doc100%
New File 1037235 160 - WD-061 CEL-CHC-L-14-0511 WARRANTY
DEFECT (WD-061 Unit-2 HP Bypass Valve No.1 Steam Passing).pdf100%
New File 1022318 161 - WD-065 CEL-CHC-L-14-0515 WARRANTY
DEFECT (WD-065 Ash & Coal Handling System).pdf100%
New File 861935 162 - WD-066 CEL-CHC-L-14-0516 WARRANTY
DEFECT (WD-066 Jetty Coal Unloading - BC-1B Motor).pdf100%
New File 759695 163 - WD-067 CEL-CHC-L-14-0517 WARRANTY
DEFECT (WD-067 Unit-1&2 Boiler Hoist Crane).pdf100%
New File 789458 164 - WD-068 CEL-CHC-L-14-0518 WARRANTY
DEFECT (WD-068 Coal Shed Lighting).pdf100%
New File 910264 165 - WD-069 CEL-CHC-L-14-0519 WARRANTY
DEFECT (WD-069 Fire Fighting System at General Water Pump House).pdf100%
New File 703517 166 - WD-070 CEL-CHC-L-14-0520 WARRANTY
DEFECT (WD-070 Workshop MCC).pdf100%
New File 885266 167 - WD-071 CEL-CHC-L-14-0521 WARRANTY
DEFECT (WD-071 Fire Fighting Outdoor Hydrant FW-06).pdf100%
New File 1.0 m 168 - WD-072 CEL-CHC-L-14-0522 WARRANTY
DEFECT (WD-072 Fire Alarm Annunciation).pdf100%
New File 807551 169 - WD-073 CEL-CHC-L-14-0523 WARRANTY
DEFECT (WD-073 Belt Conveyor #5 Coal Sampler).pdf100%
New File 3.5 m 17 - CEL-FX-OFF-14-013-Application for
the USD1 Million for Spare Parts and Special Tools.pdf100%
New File 801623 170 - WD-074 CEL-CHC-L-14-0524 WARRANTY
DEFECT (WD-074 Belt Conveyor #6 CCTV).pdf100%
New File 816516 171 - WD-075 CEL-CHC-L-14-0525 WARRANTY
DEFECT (WD-075 230KV SWITCHYARD).pdf100%
New File 821631 172 - WD-076 CEL-CHC-L-14-0526 WARRANTY
DEFECT (WD-076 UNIT-1 HP Bypass Valve & Feed Water Spray Valve Actuators).pdf100%
New File 834916 173 - WD-077 CEL-CHC-L-14-0527 WARRANTY
DEFECT (WD-077 Drain & Discharge Water Pumps).pdf100%
New File 940221 174 - WD-078 CEL-CHC-L-14-0528 WARRANTY
DEFECT (WD-078 Lighting Distribution Panel) (2).pdf100%
New File 940221 175 - WD-078 CEL-CHC-L-14-0528 WARRANTY
DEFECT (WD-078 Lighting Distribution Panel).pdf100%
New File 880086 176 - WD-079 CEL-CHC-L-14-0529 WARRANTY
DEFECT (WD-079 UNIT-2 Feed Water Spray Valve Actuators).pdf100%
New File 983433 177 - WD-080 CEL-CHC-L-14-0530 WARRANTY
DEFECT (WD-080 UNIT-2 BSDG #1 & #2 Turning Gear).pdf100%
New File 857126 178 - WD-081 CEL-CHC-L-14-0531 WARRANTY
DEFECT (WD-081 Water Treatment Plant Gas Chromatograph key board).pdf100%
New File 785636 179 - WD-082 CEL-CHC-L-14-0532 WARRANTY
DEFECT (WD-082 BSDG Maintenance Box).pdf100%
New File 1001114 18 - CEL-FX-OFF-14-014- Payment of
milestone of unit 2 taking over.pdf100%
New File 787911 180 - WD-083 CEL-CHC-L-14-0533 WARRANTY
DEFECT (WD-083 BSDG #1 & #2 AC & DC Fuel Oil Pump).pdf100%
New File 801329 181 - WD-084 CEL-CHC-L-14-0534 WARRANTY
DEFECT (WD-084 Unit-1 Replenishing Oil Tank Fire Fighting).pdf100%
New File 777947 182 - WD-085 CEL-CHC-L-14-0535 WARRANTY
DEFECT (WD-085 Fire Alarm Control Panel).pdf100%
New File 996837 183 - WD-086 CEL-CHC-L-14-0536 WARRANTY
DEFECT (WD-086 Boiler #1 & #2 Thermocouples).pdf100%
New File 1033334 184 - WD-087 CEL-CHC-L-14-0537 WARRANTY
DEFECT (WD-087 HMI Display in the Shift Supervisor Station).pdf100%
New File 984091 185 - WD-088 CEL-CHC-L-14-0538 WARRANTY
DEFECT (WD-088 Air Conditioning Units in the Electronic Equipment Room #1 & #2).pdf
100%
New File 793607 186 - WD-089 CEL-CHC-L-14-0539 WARRANTY
DEFECT (WD-089 Water & Steam Sampling).pdf100%
New File 836000 187 - WD-090 CEL-CHC-L-14-0540 WARRANTY
DEFECT (WD-090 6KV Switchgear).pdf100%
New File 790333 188 - WD-091 CEL-CHC-L-14-0541 ??3?????
WARRANTY DEFECT (WD-091 Aeration Fan #3 in the Waste Water Treatment plant).pdf100%

New File 1.1 m 189 - WD-092 CEL-CHC-L-14-0542 WARRANTY


DEFECT (WD-092 DCS Graphics of Coal Handling System).pdf100%
New File 1.6 m 19 - CEL-CHEC-L-14-0103-Warranty
deffects.pdf100%
New File 1.0 m 190 - WD-093 CEL-CHC-L-14-
0543 ??? ?? ????WARRANTY DEFECT (WD-093 Unit-1 Feed Water Pump-B).pdf100%
New File 767033 191 - WD-094 CEL-CHC-L-14-0544
11.25 ??? WARRANTY DEFECT (WD-094 Water Treatment Plant No.1 Acid Tank).pdf100%
New File 672913 192 - WD-095 CEL-CHC-L-14-0545 WARRANTY
DEFECT (WD-095 Main Building Roof Drainage Pipe).pdf100%
New File 848554 193 - WD-096 CEL-CHC-L-14-0546 WARRANTY
DEFECT (WD-096 Unit-1&2 LP Heater Drain Pumps).pdf100%
New File 653821 194 - WD-097 CEL-CHC-L-14-0547 WARRANTY
DEFECT (WD-097 Unit-1 Coal Feeder).pdf100%
New File 1.3 m 195 - CEL-FX-OFF-14-055-Differential
Expansion Variation Report For Turbine Shaft Seal Steam Supply System
Improvement.pdf100%
New File 2.8 m 196 - CEL-FX-OFF-14-056-Unit-1 Feed Water
Pump-#2 Motor Malfunction1??2#?????????.pdf100%
New File 756087 197 - CEL-FX-OFF-14-057-Extension of
SihanoukvilleVille Project Bonds Postponed.pdf100%
New File 1024127 198 - CEL-FX-OFF-14-058-SihanoukVille
Project Balance Payment.pdf100%
New File 1.5 m 199 - CEL-FX-OFF-14-059-Reply for #1#2 HP
Bypass Valve Actuators Malfunction Command in DCS.pdf100%
New File 852909 2 - CEL-FX-OFF-14-001-Accelerating the
Procedure of Milestone Payment.pdf100%
New File 372708 20 - CEL-CHEC-L-14-0094-Warranty-
deffects.pdf100%
New File 1.3 m 200 - CEL-FX-OFF-14-060 Reply Extension
of Defects Notification Period Bonds Reply for CEL-CHC-L-14-0564, 0582, 0587.pdf
100%
New File 79741 201 - Summary of Defect List (08-DEC-14)
- BY CHEC.xlsx100%
New File 2.4 m 202 - CEL-FX-OFF-14-061-Reply for CEL-
CHC-L-14-0588 CEL-CHC-L-14-589 and CEL-CHC-L-14-590.pdf100%
New File 2.1 m 203 - CEL-CHC-L-14-595Defects Liability
and Milestone #33.pdf100%
New File 611793 204 - CEL-CHC-L-14-0597 FIRE PROTECTION
SYSTEM.pdf100%
New File 1.4 m 205 - CEL-FX-OFF-14-062-Reply for CEL-
CHC-L-14-0595 Defects Liability and Milestone #33.pdf100%
New File 310204 206 - Statement CHEC(30.DEC.13)4.pdf100%

New File 801799 21 - O&M Manual Review 09apr2014.pdf100%

New File 522020 22 - CEL-CHC-L-14-0105 Taking Over


Certificate - Two Units.pdf100%
New File 576484 23 - CEL-CHEC-L-14-0117-Re.CEL-FX-14-013-
APPLICATIPN FOR THE USD 1 MILLION FOR SPARE PARTS AND SPECIAL TOOLS.pdf100%
New File 2.1 m 24 - CEL-CHC-L-14-0118-Warranty deffect
(WD-008 Raw water pond leakage).pdf100%
New File 676322 25 - CEL-FX-OFF-14-015-Re Warranty
Defects(001-004).pdf100%
New File 1.1 m 26 - CEL-FX-OFF-14-016 Re Warranty
defects (001-004).pdf100%
New File 785981 27 - O&M Manual Review 17apr2014.pdf100%

New File 534077 28 - O&M Manual Review 18apr2014.pdf100%

New File 524943 29 - O&M Manual Review 21apr2014.pdf100%

New File 621250 3 - CEL-FX-OFF-14-002-Discussion and


identification of NCR and Punch List.pdf100%
New File 512823 30 - O&M Manual Review 26apr2014.pdf100%

New File 500469 31 - O&M Manual Review


26apr2014(1)part2.pdf100%
New File 484676 32 - O&M Manual Review 02may2014.pdf100%

New File 1.3 m 33 - WD-009 CEL-CHC-L-14-0160 (WD-


009)Turbine Differential Expansion.pdf100%
New File 425965 34 - CEL-CHC-L-14-0167 Turbine
Differential Expansion.pdf100%
New File 293346 35 - CEL-CHC-L-14-0171 Rectification of
Defects.pdf100%
New File 626333 36 - CEL-CHC-L-14-0180 CEL SCADA signals
to EDC NCC.pdf100%
New File 1.0 m 37 - CEL-CHC-L-14-0186 (WARRANTY DEFECT
(WD-010 #2 ACID STORAGE TANK).pdf100%
New File 1.7 m 38 - CEL-CHC-L-14-0192 WARRANTY DEFECT
(WD-011 No.1 RE-USE WATER PUMP).pdf100%
New File 386954 39 - CEL-CHC-L-14-0188 CEL Plant
Electrical Protection setting coordination-discrimination study.pdf100%
New File 586338 4 - CEL-FX-OFF-14-003-Reply to CEL letter
CEL-CHC-L-14-0011.pdf100%
New File 3.2 m 40 - WD-012 CEL-CHEC-L-14-0198 Warranty
defect ( sewage pipe damaged).pdf100%
New File 2.1 m 41 - CEL-FX-OFF-14-017-Milestone Payment
Application Onshore June 2014.pdf100%
New File 794258 42 - CEL-FX-OFF-14-018 Reply of turbine
expanding difference.pdf100%
New File 231986 43 - CEL-FX-OFF-14-018- Reply of turbine
expanding difference.pdf100%
New File 2.3 m 44 - WD-013 CEL-CHEC-L-14-0206Warranty
defect ( Unit1 Work Oil Pump #2 Oil Leakage)??(20140611)??"#1???????"???.pdf100%
New File 573569 45 - WD-010 CEL-CHC-L-14-0215 Warranty
defect (2# Acid storage tank.pdf100%
New File 633834 46 - CEL-FX-OFF-14-019 Reply the Raw
water pond leakage.pdf100%
New File 341761 47 - CEL-CHC-L-14-0218 CEL Plant
Electrical Protection setting coordination-discrimination study.pdf100%
New File 587328 48 - CEL-CHC-L-14-0219 Re Application for
Payment - Milestone #33.pdf100%
New File 474136 49 - CEL-FX-OFF-14-020-Application for
customs duty exemption of master List for spare parts and special tools.pdf100%
New File 599659 5 - CEL-FX-OFF-14-004-Commissioning for
C&I laboratory devices.pdf100%
New File 477597 50 - CEL-CHC-L-14-0238 SPARE PARTS &
SPECIAL TOOLS FROM CHEC.pdf100%
New File 362482 51 - CEL-CHC-L-14-0256 WARRANTY DEFECT
(Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 330618 52 - CEL-CHC-L-14-0257 WARRANTY DEFECT
(Admin Bldg., Warehouse & Workshop Access Road Water Flooding).pdf100%
New File 323200 53 - CEL-CHC-L-14-0258 WARRANTY DEFECT
(Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 323499 54 - CEL-CHC-L-14-0260 WARRANTY DEFECT
(WD-014 Water Seepage in Cable Trenches).pdf100%
New File 319211 55 - CEL-CHC-L-14-0265 WARRANTY DEFECT
(WD-015 Unit-2 Main & Auxiliary Transformer).pdf100%
New File 585357 56 - CEL-CHC-L-14-0267 WARRANTY DEFECT
(Malfunction of No.2 BSDG).pdf100%
New File 328010 57 - CEL-CHC-L-14-0269 ENGINEERING TOOLS
(Software programs with License).pdf100%
New File 874849 58 - CEL-CHC-L-14-0270 WARRANTY DEFECT
(Water Leakage on the Unit-2 Open Circulating Water Pipe).pdf100%
New File 522856 59 - CEL-FX-OFF-14-021 Reply spare parts
and special tools from CHEC.pdf100%
New File 624720 6 - CEL-FX-OFF-14-005-Re discussion and
identification of NCR and Punch List.pdf100%
New File 281447 60 - CEL-CHC-L-14-0273 CHEC REPLY OF
TURBINE DIFFERENTIAL EXPANSION.pdf100%
New File 4.8 m 61 - CEL-FX-OFF-14-022-Reply for Warrenty
Deffect (WD-015 Unit-2 Main & Auxiliary Transformer).pdf100%
New File 1.5 m 62 - CEL-FX-OFF-14-023-Reply for Coal
Jammed.pdf100%
New File 712779 63 - CEL-FX-OFF-14-024-Reply for WARRANTY
DEFECT (Admin Bldg., Warehouse & Workshop Access Road Water Flooding).pdf100%
New File 615187 64 - CEL-FX-OFF-14-025 Reply for CEL-CHC-
L-14-0258 Warranty Defect (Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 646403 65 - CEL-FX-OFF-14-026 Reply for CEL-CHC-
L-14-0226 Urging the defects and NCR remain at 383 items.pdf100%
New File 583682 66 - CEL-FX-OFF-14-027 Reply for CEL-CHC-
L-14-0215 CEL-CHC-L-14-0186 (WD-010 Unit2 Acid storage).pdf100%
New File 583785 67 - CEL-FX-OFF-14-028 Reply for CEL-CHC-
L-14-0225 CEL-CHC-L-14-0260 (WD-014 Water seepage in cable trenches).pdf100%
New File 579332 68 - CEL-FX-OFF-14-029 Reply for CEL-CHC-
L-14-0192 (WD-011 Re-use water pump in waste water treatment plant).pdf100%
New File 318348 69 - CEL-CHC-L-14-0285 CHEC REPLY TO
RECTIFICATION OF DEFECTS.pdf100%
New File 502589 7 - CEL-FX-OFF-14-006- Master List for
spare parts and special tools.pdf100%
New File 1.1 m 70 - CEL-CHC-L-14-0286 WARRANTY DEFECT
(WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 317066 71 - CEL-CHC-L-14-0287 CEL Plant
Electrical Protection Setting Coordination-discrimination Study.pdf100%
New File 358713 72 - CEL-CHC-L-14-0288 WARRANTY DEFECT
(WD-015 Unit-2 Main & Auxiliary Transformer OLTC).pdf100%
New File 290135 73 - CEL-CHC-L-14-0289 CHEC Reply to
WARRANTY DEFECT (WD-010 #2 ACID STORAGE TANK).pdf100%
New File 272667 74 - CEL-CHC-L-14-0290 CHEC Reply to
WARRANTY DEFECT (WD-014 Water Seepage in Cable Trenches).pdf100%
New File 274766 75 - CEL-CHC-L-14-0291 CHEC Reply to
WARRANTY DEFECT (WD-018 Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 298347 76 - CEL-CHC-L-14-0292 CHEC Reply to
SPARE PARTS & SPECIAL TOOLS FROM CHEC.pdf100%
New File 306936 77 - CEL-CHC-L-14-0293 CHEC Reply to
WARRANTY DEFECT (WD-011 No.1 RE-USE WATER PUMP).pdf100%
New File 508403 78 - CEL-FX-OFF-14-030 Reply Warranty
Defect (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 522386 79 - CEL-FX-OFF-14-031 Reply of Spare
parts & special tools from CHEC.pdf100%
New File 548610 8 - CEL-FX-OFF-14-007-O&M manual
submission summary.pdf100%
New File 318962 80 - CEL-CHC-L-14-0295 WARRANTY DEFECT
(WD-019 Malfunction of No.2 BSDG).pdf100%
New File 333518 81 - CEL-CHC-L-14-0310 ENGINEERING TOOLS
(Software programs with License).pdf100%
New File 291342 82 - CHC-CEL-L-14-0313 CHEC Reply to
WARRANTY DEFECT (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 286133 83 - CHC-CEL-L-14-0314 CHEC Reply to
SPARE PARTS & SPECIAL TOOLS FROM CHEC.pdf100%
New File 296716 84 - CEL-FX-OFF-14-032-Replay for CEL-
CHC-L-14-0293 CHEC Reply to WARRANTY DEFECT (WD-011 No.1 RE-USE WATER PUMP).pdf100%

New File 870632 85 - CEL-CHC-L-14-0316 UNIT-2 TURBINE


EXCESSIVE OVERSPEED.pdf100%
New File 328493 86 - CEL-CHC-L-14-0317 DCS BAD AND FORCED
SIGNALS.pdf100%
New File 634898 87 - CEL-FX-OFF-14-033 Reply Warranty
Defect (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 631636 88 - CEL-FX-OFF-14-034 Reply of Spare
parts and special tools from CHEC.pdf100%
New File 2.7 m 89 - WD-21 CEL-CHC-L-14-0324 WARRANTY
DEFECT ( CONDENSATE SYSTEM BYPASS PIPELINE).pdf100%
New File 283776 9 - CEL-CHC-L-14-0109-Mile stone payment
application offshore January 2014.pdf100%
New File 615955 90 - CEL-FX-OFF-14-035 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 616782 91 - CEL-FX-OFF-14-036 CHEC Reply
Warranty Defect (WD-20 Water Leakage on the Unit-2 Open Circulating Water.pdf100%
New File 1.1 m 92 - CEL-CHC-L-14-0334 ??????Common
Maintenance Tools.pdf100%
New File 602048 93 - CEL-FX-OFF-14-037 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 301234 94 - CEL-CHC-L-14-0331 WARRANTY DEFECT
(WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 606203 95 - CEL-CHC-L-14-0337 TURBINE SPECIAL
TOOLS.pdf100%
New File 1.7 m 96 - Reply CEL-CHC-L-14-Turbine Special
Tools(Bolt Heater).pdf100%
New File 2.5 m 97 - CEL-FX-OFF-14-038 CHEC Reply of
Warranty Defect (WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 960358 98 - CEL-FX-OFF-14-039 Reply Warranty
Defect(WD-019 Malfunction of No.2 BSDG).pdf100%
New File 2.6 m 99 - CEL-FX-OFF-14-040 Reply Warranty
Defect(WD-019 Malfunction of No.2 BSDG).pdf100%
New Dir 88 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 6 - 2015\
New File 365617 1 - CEL-CHC-L-15-0007 Re-Defects
Notification Period Bonds.pdf100%
New File 484086 10 - CEL-FX-OFF-15-005-Notification for
repair the raw water pond.pdf100%
New File 1.0 m 11 - CEL-FX-OFF-15-006-With respect to
reply CEL for the Unit 2 main stop valve jammed issue.pdf100%
New File 644574 12 - CEL-CHC-L-15-0087 UNIT-2 TURBINE
MAIN STOP VALVE (MSV).pdf100%
New File 214953 13 - CEL-FX-OFF-15-007-With respect to
Unit 2 main stop valve jammed issue.pdf100%
New File 214953 14 - CEL-FX-OFF-15-007-With respect to
Unit 2 main stop valve jammed issue.pdf100%
New File 1.0 m 15 - CEL-CHC-L-15-0139 ?????100MW COAL
FIRED POWER PLANT, SIHANOUKVILLE UNIT-2 TURBINE MAIN STOP VALVE (MSV).pdf100%
New File 1.1 m 16 - CEL-FX-OFF-15-008-Reply for WD-008
Raw Water Pond Leakage.pdf100%
New File 782607 17 - CEL-CHC-L-15-0146 CHEC REPLY to WD-
008 Raw Water Pond Leakage.pdf100%
New File 109056 18 - CEL-FX-OFF-15-009-With respect to
reply CEL for the Unit 2 main stop valve jammed issue - ??.doc100%
New File 107520 19 - CEL-FX-OFF-15-
010 ????????????? ??.doc100%
New File 177749 2 - CEL-FX-OFF-14-064-Defects
Notification Period Bonds-Swift Message.pdf100%
New File 904121 20 - CEL-FX-OFF-15-011?2015-07-15?.pdf
100%
New File 1.8 m 21 - CEL-FX-OFF-15-012?2015-07-15?.pdf
100%
New File 565631 22 - CEL-FX-OFF-15-013?2015-07-15?.pdf
100%
New File 1.2 m 23 - CEL-CHC-L-15-0187 Ref-Exercise of
Rights to Correct O&M Manuals and Determination under Clause 3.5.pdf100%
New File 639160 24 - CEL-CHC-L-15-0205 Ref-Clarifications
of Rectification Dates for FPS and O&M Manuals.pdf100%
New File 4.1 m 25 - CEL-CHC-L-15-0203 Ref -First Notice
of Liquidation of Claims.pdf100%
New File 2.7 m 26 - Debit Noted 034-035.pdf100%
New File 1.2 m 27 - CEL-CHC-L-15-0213 Ref-Remaining
Defects and As-Built Drawings.pdf100%
New File 823250 28 - CEL-FX-OFF-15-014 Fire protection
test.pdf100%
New File 442011 29 - CEL-CHC-L-15-0217 Ref-Extension of
Rectification Date for Fire Protection Systems.pdf100%
New File 15.5 m 3 - CEL-CHC-L-15-0015 Review of Soft and
Hard Copies of As-Built Drawings Submitted by CHEC.pdf100%
New File 2.9 m 30 - CEL-CHC-L-15-0221 Ref -Notice of
Determination of Contract Price Reduction (WD-065).pdf100%
New File 530139 31 - Debit Note 045-046.pdf100%
New File 1.9 m 32 - CEL-CHC-L-15-0230 Ref-Notice of
Liquidation of Claims (Fire Protection Systems).pdf100%
New File 4.0 m 33 - CEL-CHC-L-15-0241 Ref -Notice of
Latent Defects...pdf100%
New File 430483 34 - CHEC-2 Letter of Statement of
Operation and Maitenance Manuals.pdf100%
New File 841948 35 - CEL-CHC-L-15-0244 Extension of
Defects Notification Period Bonds..pdf100%
New File 877785 36 - CEL-CHC-L-15-0245 Extension of
Defects Notification Period Bonds..pdf100%
New File 1.3 m 37 - CEL-FX-OFF-15-015?20151019? Inquiry
about Fire alarm system interlock test.pdf100%
New File 581694 38 - CEL-FX-OFF-15-016?20151021?Inquiry
about Fire alarm system interlock test1.pdf100%
New File 746955 39 - CEL-FX-OFF-15-017?20151021?Re_Notice
of Set Off Against Milestone .pdf100%
New File 334146 4 - CEL-CHC-L-15-0019 Fire Protection
System.pdf100%
New File 153885 40 - CEL-FX-OFF-15-017?20151021???.pdf
100%
New File 1.6 m 41 - CEL-CHC-L-15-0249 Ref -Notice of Set
Off Against Milestone #31.pdf100%
New File 1.5 m 42 - CEL-CHC-L-15-0253 Ref-Effect of Fire
Protection Systems Determination Letter.pdf100%
New File 771476 43 - CEL-CHC-L-15-0254 Ref-Notice of
Customs Assessment.pdf100%
New File 340153 44 - CEL-CHC-L-15-0255 Ref-Notice of
Determination of Contract Price Reduction (Category Alpha Defects).pdf100%
New File 3.0 m 45 - CEL-FX-OFF-15-019 [20151026]
Rectification Record of Fire Protection System Defects.pdf100%
New File 208045 46 - CHEC-1 Closing of NCR-ELECT-281
(Method Confirmation by CEL).pdf100%
New File 774975 47 - CEL-CHC-L-15-0260 Ref-Notice of
Practical Date for Rectifying Defects.pdf100%
New File 2.4 m 48 - CEL-CHC-L-15-0261 Ref-Notice of
Determinations and #33 Set Offs in re O&M Manuals, As-Builts, Etc..pdf100%
New File 3.3 m 49 - CEL-FX-OFF-15-020 [20151030] Re-
Notice of Customs Assessment.pdf100%
New File 702414 5 - CEL-FX-OFF-15-001-DCS Remote Cabinet
Installation.pdf100%
New File 2.8 m 50 - CEL-FX-OFF-15-021 [20151030]-
Extension of Defects Notification Period Bonds.pdf100%
New File 5.8 m 51 - CEL-FX-OFF-15-022 [20151031]-Notice
of Fire Protection System Witness.pdf100%
New File 1.6 m 52 - CEL-FX-OFF-15-023 [20151102]
Feedback of #33 Onshore and #31 Offshore Set Offs.pdf100%
New File 545574 53 - CEL-FX-OFF-15-024 [20151103] Urgent
Matter-Extension of Defects Notification Period Bonds.pdf100%
New File 254663 54 - CEL-CHC-L-15-0281 Ref-Your Request
to Withdraw Drawing on Defects Notification Period Bonds.pdf100%
New File 3.3 m 55 - CEL-CHC-L-15-0286 Ref Notice of
Determination of Contract Price Reduction (Category Beta Defects)..pdf100%
New File 287852 56 - CEL-CHC-L-15-0287 Ref Your New
Request to Withdraw Bond Drawing Request Documentation.pdf100%
New File 191161 57 - CEL-FX-OFF-15-026 [20151112] Notice
of Demobilization.pdf100%
New File 7.7 m 58 - CHECXB-CEL-05-172-SETTING LIST.pdf
100%
New File 4.4 m 59 - CEL-CHC-L-15-0294 Ref-Reply
regarding Contentions about Determinations and Set Offs and Other Matters.pdf100%
New File 2.5 m 6 - CEL-CHC-L-15-0038 Re Defects
Rectification Status.pdf100%
New File 2.2 m 60 - CEL-CHC-L-15-0295 Notice of
Determination of Contract Price Reduction and Set Off for Latent Defects;
Demobilization..pdf100%
New File 1.1 m 61 - PO747 (Ref. NCR-Mech-271).pdf100%
New File 994134 62 - PO1035 ABB Flow meter.pdf100%
New File 845625 63 - PO947 (Ref. WD-093).pdf100%
New File 1.7 m 64 - 3PO1129.pdf100%
New File 2.1 m 65 - CEL-CHC-L-15-0301Ref-
ReplytoClarification.pdf100%
New File 997081 66 - CEL-FX-OFF-15-027[20151216]Cost
Damage of Coal Jamming Issue.pdf100%
New File 548965 67 - CEL-FX-OFF-15-028[20151216] Claim
for the Late Payment.pdf100%
New File 1031433 68 - CEL-FX-OFF-15-029[20151217]Cost
Damage of DTS-168 Approval.pdf100%
New File 1005080 69 - CEL-FX-OFF-15-030[20151217]Cost
Damage of CCTV's Camera Wipers Malfunction Issues.pdf100%
New File 858965 7 - CEL-FX-OFF-15-002-CHEC DUTY SCHEDULE
FOR SPRING FESTIVAL.pdf100%
New File 982399 70 - CEL-FX-OFF-15-031[20151217]Cost
Damage of Calculations of Boiler Foundation.pdf100%
New File 966697 71 - CEL-FX-OFF-15-032[20151217]Cost
Damage of LabelKKS for motor local control box Issues.pdf100%
New File 991896 72 - CEL-FX-OFF-15-033[20151217]Cost
Damage of Unit 1 Boiler Feed Pump Motor Bearing Drive End.pdf100%
New File 964856 73 - CEL-FX-OFF-15-034 [20151217]Cost
Damage of Unit 2 Bearing Nos. 2X and 2Y.pdf100%
New File 975232 74 - CEL-FX-OFF-15-035[20151218]Cost
Damage of the On Load Tap Changer in the main and auxiliary transformer.pdf100%
New File 1.0 m 75 - CEL-FX-OFF-15-036[20151218] Cost
Damage of 400V Switchgear IP Protection Rating Issues.pdf100%
New File 885250 76 - CEL-FX-OFF-15-037 [20151219] Cost
Damage of Back Energization.pdf100%
New File 976925 77 - CEL-FX-OFF-15-038[20151219] Cost
Damage of Calculations of Temporary Gables Approval.pdf100%
New File 930619 78 - CEL-FX-OFF-15-039[20151221]Cost
Damage of TagLabel for control panel Issues.pdf100%
New File 1023259 79 - CEL-FX-OFF-15-040[20151221]Cost
Damage of As-Built Drawing Approval.pdf100%
New File 209683 8 - CEL-FX-OFF-15-003-Reply for Unit-2
Turbine Main Stop Valve (MSV).pdf100%
New File 951532 80 - CEL-FX-OFF-15-041[20151221]Cost
Damage of Additional Wiring Diagram and Wiring Pocket Providing.pdf100%
New File 574837 81 - CEL-FX-OFF-15-042-[20151222]Reply
Regarding Determinations and Set Off Matters.pdf100%
New File 1.4 m 82 - CEL-CHC-L-15-0324 Ref-Claim for
Reimbursement of Customs Assessment.pdf100%
New File 494839 83 - CEL-CHC-L-15-0325 Deadline for
Demolishing of Base Camp and Hauling out of Base Camp and Project Leftover
Materials from CEL Site.pdf100%
New File 1.0 m 84 - CEL-FX-OFF-15-043 [20151222] Cost
Damage of Commissioning Test for Unit Load Rejection issues.pdf100%
New File 580329 85 - CEL-FX-OFF-15-044 [20151222] Cost of
borrowed materials and consumables by CEL Issues.pdf100%
New File 1006325 86 - CEL-FX-OFF-15-045 [20151222] Cost
Damage for Acceptance Delay of NCR-Mech-106.pdf100%
New File 974509 87 - CEL-FX-OFF-15-046 [20151222] Cost
Damage of The Power Box of CCTV at BC6# Issue.pdf100%
New File 4.0 m 88 - CEL-CHC-L-15-0332 Ref-Response to
Various Purported Claims of CHEC - (027-038).pdf100%
New File 541565 9 - CEL-FX-OFF-15-004-Reply for CEL-CHC-
L-15-0019-Fire Protection System.pdf100%
New Dir 38 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 7 - 2016\
New File 1.0 m 1 - CEL-FX-OFF-16-001-[20160104]-Cost
Damage for Refusal of NCR-Mech-268 Closure.pdf100%
New File 956211 10 - CEL-FX-OFF-16-010-[20160106]-Cost
Damage for Refusal of NCR- ELECT-125 Closure.pdf100%
New File 917880 11 - CEL-FX-OFF-16-011-[20160106]-Cost
Damage for Refusal of Raw Water Pond Leakage Closure.pdf100%
New File 920783 12 - CEL-FX-OFF-16-012-[20160106]-Cost
Damage for Refusal of Electrical Protection Setting Closure.pdf100%
New File 934643 13 - CEL-FX-OFF-16-013-[20160106]-Cost
Damage for Refusal of NCR- ELECT-100 Closure.pdf100%
New File 3.2 m 14 - CEL-FX-OFF-16-014-[20160107]-Cost
Damage for Refusal of WD-060 Closure(Attachment).pdf100%
New File 951698 15 - CEL-FX-OFF-16-015-[20160107]-Cost
Damage for Refusal of WD-051 Closure.pdf100%
New File 1.2 m 16 - CEL-FX-OFF-16-015-[20160107]-
Attachment-Modulating Control System (MCS) Test Report.pdf100%
New File 948831 17 - CEL-FX-OFF-16-016-[20160107]-Cost
Damage for Refusal of NCR-MECH-135 Closure.pdf100%
New File 949904 18 - CEL-FX-OFF-16-017-[20160107]-Cost
Damage for Refusal of NCR- ELECT-350 Closure.pdf100%
New File 1.0 m 19 - CEL-FX-OFF-16-018-[20160108]-Cost
Damage for Refusal of WD-014 Closure.pdf100%
New File 1.9 m 2 - CEL-FX-OFF-16-002-[20160104]-Cost
Damage of O&M Manuals Approval.pdf100%
New File 990484 20 - CEL-FX-OFF-16-019-[20160108]-Cost
Damage for Refusal of NCR-C&I-157 Closure.pdf100%
New File 997640 21 - CEL-FX-OFF-16-020-[20160108]-
Clarification of the Claim of Punch List No 3431.pdf100%
New File 1.3 m 22 - CEL-FX-OFF-16-021-[20160108]-Cost
Damage for Refusal of NCR-C&I-155 Closure(The Respond for NCR 155&157).pdf100%
New File 938841 23 - CEL-FX-OFF-16-022-[20160108]-Cost
Damage for Refusal of NCR- ELECT-023 Closure.pdf100%
New File 937428 24 - CEL-FX-OFF-16-023-[20160111]-Cost
Damage for Refusal of NCR- ELECT-141 Closure.pdf100%
New File 1001595 25 - CEL-FX-OFF-16-024-[20160111]-Cost
Damage for Refusal of WD-037 Closure.pdf100%
New File 931767 26 - CEL-FX-OFF-16-025-[20160111]-
Clarification of the Claim of Punch List No 2839.pdf100%
New File 902666 27 - CEL-FX-OFF-16-026-[20160112]-
Clarification of the Claim of Punch List No 1826.pdf100%
New File 939793 28 - CEL-FX-OFF-16-027-[20160112]-
Clarification of the Claim of WD-006.pdf100%
New File 957898 29 - CEL-FX-OFF-16-028-[20160112]-
Clarification of the Claim of Various NCRs.pdf100%
New File 926537 3 - CEL-FX-OFF-16-003-[20160104]-Cost
Damage for NCR-Mech-271 Closure.pdf100%
New File 938599 30 - CEL-FX-OFF-16-029-[20160113]-Cost
Damage for Refusal of NCR- ELECT-154 Closure.pdf100%
New File 961376 31 - CEL-FX-OFF-16-030-[20160113]-Cost
Damage for Refusal of NCR- ELECT-164 and 148 Closure.pdf100%
New File 946717 32 - CEL-FX-OFF-16-031-[20160113]-Cost
Damage for Refusal of NCR- ELECT-285 Closure.pdf100%
New File 949456 33 - CEL-FX-OFF-16-032-[20160113]-Cost
Damage for Refusal of NCR- ELECT-292 Closure.pdf100%
New File 948663 34 - CEL-FX-OFF-16-033-[20160120]-Cost
Damage for Refusal of NCR- ELECT-096 Closure.pdf100%
New File 943818 35 - CEL-FX-OFF-16-034-[20160120]-
Clarification of the Claim of WD-065.pdf100%
New File 3.4 m 36 - CEL-CHC-L-16-0055 Response to
Letters Purporting to set out CHEC Claims - (15-039 - 16-008).pdf100%
New File 515723 37 - CEL-CHC-L-16-0061 Dongfang Turbine
Co Ltd.pdf100%
New File 2.3 m 38 - CEL-CHC-L-16-0064 Additions and
Adjustments to Claims, Contract Price Re....pdf100%
New File 947082 4 - CEL-FX-OFF-16-004-[20160104]-Cost
Damage for Refusal of NCR-ELECT-102 Closure.pdf100%
New File 958634 5 - CEL-FX-OFF-16-005-[20160104]-Cost
Damage for Refusal of WD-078 Closure.pdf100%
New File 940134 6 - CEL-FX-OFF-16-006-[20160104]-Cost
Damage for Refusal of NCR-C&I-077 Closure.pdf100%
New File 961497 7 - CEL-FX-OFF-16-007-[20160104]-Cost
Damage for Refusal of WD-070 Closure.pdf100%
New File 939897 8 - CEL-FX-OFF-16-008-[20160104]-Cost
Damage for Refusal of NCR-C&I-167 Closure.pdf100%
New File 542024 9 - CEL-FX-OFF-16-009-[20160104]-Reply
for CEL-CHC-15-0325 Regarding to Site Material Removal Work.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\2. Proposal\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\3. Contract\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\00 Emails\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\01 Proposal Drafts\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\02 Progress Reviews\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\03 Miscellaneous\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\5. Final\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\6. Peer Review\
New Dir 8 C:\AdvisianActive\01 Projects\Advisian Lump Sum
Guidelines\
New File 1.5 m Advisian Lump Sum Guidelines -
Preliminary Research Results.pdf100%
New File 208896 Competency Centered Management (CCM).ppt
100%
New File 36063 Competency Centered Management
(CCM)_Neoh.pdf100%
New File 290286 Competency Centered Management Brief
Writeup.docx100%
New File 260583 Competency Centered Management Brief
Writeup.pdf100%
New File 205569 Consultancy fee guidelines as approved by
the Council on february 6%2c 2012.pdf100%
New File 375808 Flowchart_Neoh.ppt100%
New File 4.2 m Preliminary Research Results.pptx100%
New Dir 15 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\
New File 15302 Advisian Q&A_batch 1_25Oct2017.xlsx100%
New File 17417 Advisian QA_31st October 2017_update.xlsx
100%
New File 14515 Attendees Details for Technaf Solar
Bangaladesh Site Visit.docx100%
New File 169531 Copy of Risk Register Template_Technaf
Solar_Rev1_Neoh.xlsx100%
New File 62007 Diagrams.pptx100%
New File 169860 OA0000000655234 (1).pdf100%
New File 121856 Re Technaf Solar - RFP Technical Advisor
- Call.msg100%
New File 7.2 m Report Template - revA_Neoh.docx100%
New File 8.2 m Technaf LTA Report - revA_Internal
Review_Neoh.docx100%
New File 8.2 m Technaf LTA Report - revB_First draft to
Client.docx100%
New File 1.5 m Technaf LTA Report - revB_First draft to
Client.pdf100%
New File 1.5 m Technaf LTA Report - revB_First draft to
Client_rev1.pdf100%
New File 8.5 m Technaf LTA Report -revA_Internal
Review_Draft 2_Neoh.docx100%
New File 8.5 m Technaf LTA Report -revA_Internal
Review_Draft 3.docx100%
New File 1.0 m VDR Access List.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Contracts\
New File 81374 GuarantCo and SCB Technical Advisor Rev01
Advisian WP 23Oct17 Rev01_Advisian 31Oct.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\
New File 11.9 m Environmental & Social.zip100%
New File 6.8 m Feasibility Report_TSEL_.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Construction\
New File 9.5 m Toma Group Profile.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Environmental & Social\
New File 1.5 m Environment Clearance Certificate.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf


28MW Solar Farm\Due Diligence Documents\Environmental & Social\Environment
Assessment Report\
New File 5.6 m IEE Report_TSEL_Final.pdf100%
New File 9.4 m New_EIA Report.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\LegalCorporate Documents\
New File 838269 TSEL Land Lease Agreement.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\PPA & IA\
New File 2.9 m IMPLEMENTATION AGREEMENT.pdf100%
New File 18.3 m PPA Signed Copy-TSEL with BPDB_090217.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Sgurr Energy\
New File 1.5 m 20MW(AC)Joules Solar PV Plant
_EYR_B2_25.05.2017.pdf100%
New File 3.9 m 6.17.10165_Joules Feasibility
Report_B1_10.08.17.pdf100%
New File 190482 Appendix A - PVsyst report.pdf100%
New File 1.0 m Appendix B- SolarGIS TMY report.pdf100%
New File 1.2 m Attachment-1 20MW(AC)Joules Solar PV
Plant _EYR_B4_26.10.2017.pdf100%
New File 121240 Attachment-2 PVsyst Report.pdf100%
New File 1.6 m Attachment-5 EE-SLD-DWG-01 R5 KEY AC SLD-
1.pdf100%
New File 14730 Major items list.xlsx100%
New File 3.6 m Sgurr Contract.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Supply\
New Dir 6 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Supply\Supplier Contract\
New File 1.8 m Contract - Proinso (Inverters).pdf100%
New File 2.2 m Contract - SUMEC (PV Panel).pdf100%
New File 8.0 m Contract - ZTT (Mounting System).pdf100%

New File 1.2 m Proinso_STP60_Technical Specification.pdf


100%
New File 9.4 m PV Module_JA Solar- Technical
Specification_Warranty_LD.pdf100%
New File 14.9 m Sterling Wilson Purchase Contract
TSEL .pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Technical\
New File 798718 30-Combinerbox.rar100%
New File 7.3 m 30-PV Module.rar100%
New File 2.0 m SL-1.pdf100%
New File 5.8 m SL-30 SCADA Technical Particulars.pdf100%

New File 261800 SL-30 Transformer.pdf100%


New File 23.1 m SL-31 .dwg100%
New File 785598 SL-33.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Project Management\
New File 80688 2229 - CSOC GuarantCo Rev01_SS (2).pdf
100%
New File 248322 2229 - CSOC GuarantCo_Neoh.docx100%
New File 22135 Guarantco Technaf Budget.xlsx100%
New File 344468 NPIS Form_Technaf Guarantco Solar.docx
100%
New File 190413 RCF Form_Guarantco.xlsx100%
New File 153600 RE Bangladesh Solar Technical Due
Diligence.msg100%
New File 1.2 m Technaf GuarantCo Internal Kick Off.pptx
100%
New File 1.1 m Technaf GuarantCo Internal Kick
Off_07Nov.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Proposal\
New File 3.7 m Guarantco LTA Proposal
Submission_Advisian.pdf100%
New Dir 15 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\
New File 1013229 CITIC Myanmar CCGT FM_05June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_06June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_07June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_08June2017_Master
DRAFT_answers.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_09June2017_Master
DRAFT.xlsm100%
New File 1.1 m CITIC Myanmar CCGT FM_12June2017_Master
DRAFT.xlsm100%
New File 1.1 m CITIC Myanmar CCGT FM_13June2017_Master
DRAFT.xlsm100%
New File 8 password.txt100%
New File 1.6 m Preliminary Technology Selection Report
Updated on Technical Data 24 May 2017-v3.pdf100%
New File 5.9 m Preliminary Technology Selection Report
Updated on Technical Data 24 May 2017-v3.pptx100%
New File 6.0 m Preliminary Technology Selection Report
Updated on Technical Data 31 May 2017.pptx100%
New File 1.0 m SIEMENS A.xlsm100%
New File 1023170 SIEMENS B.xlsm100%
New File 1.1 m SIEMENS TEST.xlsm100%
New File 1.0 m SIEMENS.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\ref\
New File 3.5 m Financial Modeling_Base_20150617_V2.xlsm
100%
New File 3.5 m IPP Financial Modeling_rev 00_for
Poyry_20150608.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\Retrofit Case\
New File 1023956 CITIC Myanmar CCGT FM_06June2017_Master
RETROFIT CASE Rev B-10p.xlsm100%
New File 1023795 CITIC Myanmar CCGT FM_06June2017_Master
RETROFIT CASE Rev B-15p.xlsm100%
New Dir 7 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\superceded\
New File 1.0 m CITIC Myanmar CCGT FM_01June2017.xlsm100%

New File 1.0 m CITIC Myanmar CCGT


FM_01June2017_DRAFT_rev2.xlsm100%
New File 1.0 m CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev3.xlsm100%
New File 1004844 CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev4.xlsm100%
New File 1014711 CITIC Myanmar CCGT
FM_04June2017_DRAFT.xlsm100%
New File 478339 CITIC Myanmar CCGT FM_DRAFT_rev2.xlsm100%
New File 1.0 m Copy of CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev2.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\
New File 51200 Confidentiality - WPS NDA.doc100%
New File 116913 NDA_DCM-HK_WP_131017_Signed.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Electricity Market\
New File 1.4 m

Carbon_Trust_Supporting_Vietnam_s_Renewable_Energy_Action_Plan_final_ENGLISH_.pdf
100%
New File 449942 Electricity Tariff Projections Review
final.pdf100%
New File 2.9 m EVN financial recovery WB.pdf100%
New File 1.3 m GIZ_PDP 7 rev_Mar 2016_Highlights_IS.pdf
100%
New File 1001953 Greening the Power Mix 31Mar2016 2.pdf
100%
New File 1.9 m
vietnam_power_and_renewable_markets_outlook_2017.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Land info\
New File 663452 CV 2186.signed.pdf100%
New File 1.1 m CV_2186.zip100%
New File 188905 UBND to DOIT_13.07.17.pdf100%
New File 302703 UBND_TB295_31.07.17_beginFS.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Project Management\
New File 21289 Dragon Capital PV FS budget.xlsx100%
New File 345253 NPIS Form_Project Mangosteen - 36MW Solar
PV Farm.docx100%
New File 405318 Project Mangosteen Internal Kick Off.pptx
100%
New File 190418 RCF Form_Project Mangosteen.xlsx100%
New File 10123 Travel Arrangement & Expenses.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Project Management\Agreement\
New File 1.4 m DC_Advisian Due Diligence
Contract_08Nov17.docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Proposal\
New File 5.9 m 1. DC_brochure.pdf100%
New File 1.1 m 2. Energy.briefing_DC.pdf100%
New File 7.0 m 20170912_Proposal for Project Mangosteen
FS_For Submission_with appendices.pdf100%
New File 628994 3. Project_Mangosteen_teaser.pdf100%
New File 122751 3.1 RFP_DC_Mangosteen.pdf100%
New File 613727 4. Project_Honeydew_teaser.pdf100%
New File 124616 4.1 RFP_DC_Honeydew.pdf100%
New File 2.6 m 5. VN_ADB_energy-road-map.pdf100%
New File 2.2 m 5.1 VN_ADB_Power-sector-reforms.pdf100%
New File 308368 6. Questionnaires.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Solar decision\
New File 117760 16-2017-TT-BCT Thong tu dien mat troi.doc
100%
New File 821489 Circular 16 TT-BCT solar PPA.pdf100%
New File 253881 Decision 11_2017_on Solar FIT_2017-04-
11_EN.PDF100%
New File 67072 Phu luc 1 ve quy hoach DMT tinh.doc100%
New File 187904 Phu luc 2-Du thao PPA mau dien mat troi
noi luoi.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Solar resources\
New File 16.4 m Maps of Solar Resource and Potential in
Vietnam REPORT FOR PUBLISHING.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\
New File 1.6 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template.docx100%
New File 689938 GIC Valuation Bridge_20170617.pdf100%
New File 3.7 m ISQ Asia Cube Energy Platform
Teaser_20170614.pdf100%
New File 3.4 m ISQ Asia Cube Solar Platform
Teaser_20170614.pdf100%
New File 2.6 m ISQ Asia Cube Water Platform
Teaser_20170614.pdf100%
New File 596627 Risk Register Template_14 July 2017.xlsx
100%
New File 67413 ??????2017?6????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\Chongqing\
New File 9.3 m TSQ-CA-S-001??????(??????).pdf100%
New File 1.4 m ????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\SiAn\
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Corporate Docs\
New File 4.5 m ????.pdf100%
New File 7.6 m ?????.pdf100%
New File 67584 ????????(??)20170508.docx100%
New File 1.2 m ???????????.pdf100%
New File 1.7 m ??????(???)20170531.pdf100%
New File 817709 ??????(???)20170531.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\
New Dir 12 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\????\
New File 140329 2017-05-23 (2) 0001.jpg100%
New File 299000 2017-05-23 (2) 0002.jpg100%
New File 352348 2017-05-23 (2) 0003.jpg100%
New File 279091 2017-05-23 (2) 0004.jpg100%
New File 326634 2017-05-23 (2) 0005.jpg100%
New File 393933 2017-05-23 (2) 0006.jpg100%
New File 405912 2017-05-23 (2) 0007.jpg100%
New File 384717 2017-05-23 (2) 0008.jpg100%
New File 373424 2017-05-23 (2) 0009.jpg100%
New File 374939 2017-05-23 (2) 0010.jpg100%
New File 376399 2017-05-23 (2) 0011.jpg100%
New File 197385 2017-05-23 (2) 0012.jpg100%
New Dir 15 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\????\
New File 1.9 m 0616_3.jpg100%
New File 150163 2017-05-23 (4) 0001.jpg100%
New File 256562 2017-05-23 (4) 0002.jpg100%
New File 222405 2017-05-23 (4) 0003.jpg100%
New File 324064 2017-05-23 (4) 0004.jpg100%
New File 352087 2017-05-23 (4) 0005.jpg100%
New File 352601 2017-05-23 (4) 0006.jpg100%
New File 393360 2017-05-23 (4) 0007.jpg100%
New File 345634 2017-05-23 (4) 0008.jpg100%
New File 150290 2017-05-23 (4) 0009.jpg100%
New File 321205 2017-05-23 (4) 0011.jpg100%
New File 287906 2017-05-23 (4) 0012.jpg100%
New File 289509 2017-05-23 (4) 0013.jpg100%
New File 280640 2017-05-23 (4) 0014.jpg100%
New File 219239 2017-05-23 (4) 0015.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\??????\
New File 267547 2017-05-23 (3) 0001.jpg100%
New File 142617 2017-05-23 (6) 0001.jpg100%
New File 256016 2017-05-23 (6) 0002.jpg100%
New File 232993 2017-05-23 (6) 0003.jpg100%
New File 338224 2017-05-23 (6) 0004.jpg100%
New File 379626 2017-05-23 (6) 0005.jpg100%
New File 348839 2017-05-23 (6) 0006.jpg100%
New File 370150 2017-05-23 (6) 0007.jpg100%
New File 360181 2017-05-23 (6) 0008.jpg100%
New File 228778 2017-05-23 (6) 0009.jpg100%
New File 324341 2017-05-23 (6) 0010.jpg100%
New Dir 10 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\??????\
New File 2.1 m 0616_1.jpg100%
New File 144205 2017-05-23 (5) 0001.jpg100%
New File 252870 2017-05-23 (5) 0002.jpg100%
New File 209487 2017-05-23 (5) 0003.jpg100%
New File 338679 2017-05-23 (5) 0004.jpg100%
New File 376432 2017-05-23 (5) 0005.jpg100%
New File 336730 2017-05-23 (5) 0006.jpg100%
New File 370614 2017-05-23 (5) 0007.jpg100%
New File 350634 2017-05-23 (5) 0008.jpg100%
New File 235626 2017-05-23 (5) 0009.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\
New File 1.0 m ??10MW????.jpg100%
New File 166706 ?????.jpg100%
New File 168895 ???????.jpg100%
New File 193111 ???? ???????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\??????\
New File 248724 01.jpg100%
New File 239129 02.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\?????\
New File 196588 002.jpg100%
New File 235356 003.jpg100%
New File 205865 ????10MW?????? 002.jpg100%
New File 240789 ????10MW?????? 003.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 205865 ????10MW?????? 1.jpg100%
New File 240789 ????10MW?????? 2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\????\
New File 274174 ????.jpg100%
New File 576059 ???.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\????\????\
New File 120583 IMG_1152.JPG100%
New File 87846 IMG_1153.JPG100%
New File 99396 IMG_1154.JPG100%
New File 110177 IMG_1155.JPG100%
New File 184068 ????????????.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\??\
New File 1.0 m ??10MW????.jpg100%
New File 167889 ??10MW???1.jpg100%
New File 244663 ??10MW???2.jpg100%
New File 232380 ??10MW???3.jpg100%
New File 247349 ??10MW???4.jpg100%
New File 216265 ??10MW????????.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 1.0 m ??10MW????.jpg100%
New File 167889 ??10MW???1.jpg100%
New File 244663 ??10MW???2.jpg100%
New File 232380 ??10MW???3.jpg100%
New File 247349 ??10MW???4.jpg100%
New File 216265 ??10MW????????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 258510 01 001.jpg100%
New File 211856 02.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\?????\
New File 289315 01 002.jpg100%
New File 253470 02.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????????\
New File 178338 01 001.jpg100%
New File 182411 01.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 286999 ??????? 001.jpg100%
New File 255107 ??????? 002.jpg100%
New File 273522 ??????? 003.jpg100%
New File 263066 ??????? 004.jpg100%
New File 178956 ??????? 005.jpg100%
New File 189002 ??????? 006.jpg100%
New File 182269 ???????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongying\
New File 166361 ???????????.JPG100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Guangda\
New File 483730 ??40MW???????.jpg100%
New File 99446 ???????-1.jpg100%
New File 102096 ???????-2.jpg100%
New File 75156 ??????????.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Sishui\
New File 1.7 m 05-????.jpg100%
New File 301956 ????.jpg100%
New File 224847 ????2.jpg100%
New File 244042 ??1 001.jpg100%
New File 114674 ??2 001.jpg100%
New File 109289 ???????????????.JPG100%
New File 366975 ??2.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Zaozhuang\
New File 1.5 m ???????????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Land Leasing Agreement\
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Land Leasing Agreement\Dongji\
New File 274174 ????.jpg100%
New File 576059 ???.jpg100%
New File 184068 ????????????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\PPA, Grid Connection Agreement and Report\
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\PPA, Grid Connection Agreement and Report\Dongji\
New File 1.7 m ?????????.JPG100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\
New File 469882 4-Business License(????????????).jpg100%

New File 448926 6-Business License (????????????).jpg100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I


Squared Capital\Asia Cube Water\Corporate Document\Gongping\
New File 396554 ????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Harbin\
New File 263107 11-Business License(???????????????).jpg
100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Xianyang\
New File 80743 19-Business License(????????????).jpg100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I


Squared Capital\Asia Cube Water\Corporate Document\Yichuan\
New File 46105 18-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 1\
New File 934179 ??????????????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 2\
New File 1029884 13-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 3\
New File 894162 17-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 4\
New File 924808 15-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 5\
New File 1.0 m 14-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\??\
New File 5.9 m ???????????.jpg100%
New Dir 13 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\??\??????\
New File 1.6 m 10-????-?????????????????????.jpg100%
New File 134020 11-????-??????.jpg100%
New File 1.5 m 12-????-??????????????????.jpg100%
New File 146298 13-????-????????????????.jpg100%
New File 61818 14-????-???????????????.tif100%
New File 4.5 m 1-??-???????????.jpg100%
New File 416607 2-??-????????????????.jpg100%
New File 4.7 m 3-??-???????????????.jpg100%
New File 495387 4-??-???????????????.jpg100%
New File 61692 5-??-???????????.tif100%
New File 591452 6-??-???????????.jpg100%
New File 157192 8-?????????????.jpg100%
New File 197818 9-????-????-???????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\????\
New File 112020 ????1.jpg100%
New File 56135 ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\?????????\
New File 112803 1.jpg100%
New File 94999 2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\??????\
New File 127382 11.jpg100%
New File 88432 12.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\
New File 4.5 m ???????.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????\
New File 1.0 m 001.jpg100%
New File 1.0 m 002.jpg100%
New File 1.0 m 003.jpg100%
New File 1.0 m 004.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????\
New File 2.0 m ????1.jpg100%
New File 2.4 m ????2.jpg100%
New File 1.8 m ????3.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????????\
New File 186678 ?????????1.PNG100%
New File 273239 ?????????2.PNG100%
New File 296583 ?????????3.PNG100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????????\
New File 2.7 m ????????? (1).jpg100%
New File 1.5 m ????????? (2).JPG100%
New File 1.3 m ????????? (3).jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Xianyang\
New File 1.0 m ?????????.jpg100%
New File 1009416 ?????????.jpg100%
New File 157740 ??1.5?????1.jpg100%
New File 115550 ??1.5?????2.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\
New File 427276 ??????????1.jpg100%
New File 1.5 m ??????????2.jpg100%
New File 541900 ??????.jpg100%
New File 237882 ?????.JPG100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\????\
New File 59733 ????1.jpg100%
New File 109599 ????2.jpg100%
New File 41897 ????3.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\??????\
New File 73945 ????????1.jpg100%
New File 82425 ????????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\??????\
New File 841625 ??????1.jpg100%
New File 1.1 m ??????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\????\
New File 908474 ????1.jpg100%
New File 740536 ????2.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\
New File 2.6 m ????????.jpg100%
New File 280477 ??????.jpg100%
New File 3.8 m ???????.jpg100%
New File 456165 ???????.jpg100%
New File 123122 ????????.jpg100%
New File 245679 ??????.jpg100%
New File 223456 ???.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\????????\
New File 342034 ????????1.jpg100%
New File 342967 ????????2.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\????????\
New File 247270 ??????1.jpg100%
New File 580045 ??????10.jpg100%
New File 281240 ??????2.jpg100%
New File 223881 ??????3.jpg100%
New File 191831 ??????4.jpg100%
New File 571827 ??????5.jpg100%
New File 310453 ??????6.jpg100%
New File 401279 ??????7.jpg100%
New File 261231 ??????8.jpg100%
New File 341026 ??????9.jpg100%
New File 218228 ??????11.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\
New File 1.4 m ????? ??.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 999246 ????1.jpg100%
New File 1.2 m ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\??????\
New File 189152 ?????????1.jpg100%
New File 230446 ?????????2.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 1.5 m ????.jpg100%
New File 155949 ???????1.jpg100%
New File 239313 ???????2.jpg100%
New File 233341 ???????3.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 220770 ???????1.jpg100%
New File 211287 ???????2.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 348618 ???????1.jpg100%
New File 264977 ???????2.jpg100%
New File 384993 ??????1.jpg100%
New File 375574 ??????2.jpg100%
New File 280306 ??????3.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\???\
New File 963632 ??????????.jpg100%
New File 1.1 m ????????1.jpg100%
New File 813108 ????????2.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\
New File 185004 ???????.jpg100%
New File 56137 ?????????1.jpg100%
New File 54280 ?????????2.jpg100%
New File 5.0 m ???3??.jpg100%
New File 1.5 m ?????.jpg100%
New File 320568 ????.jpg100%
New File 249425 ????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\????\
New File 270839 ??????1.jpg100%
New File 258741 ??????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\???????\
New File 470938 ?????????1.jpg100%
New File 411089 ?????????2.jpg100%
New Dir 8 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\
New File 176429 ???????.jpg100%
New File 195860 ????????????.jpg100%
New File 162488 ???????.jpg100%
New File 3.6 m ?????.jpg100%
New File 1.6 m ?????.jpg100%
New File 462160 ??????.jpg100%
New File 2.0 m ??????.jpg100%
New File 195860 ??????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????\
New File 836041 ????1.jpg100%
New File 1.2 m ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????????\
New File 301163 ????????1.jpg100%
New File 646755 ????????2.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????\
New File 247098 ????????1.jpg100%
New File 293329 ????????2.jpg100%
New File 114014 ?????????1.tif100%
New File 120018 ?????????2.tif100%
New File 525261 ????.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\??????\
New File 3.6 m ????? 001.jpg100%
New File 247098 ??????????1.jpg100%
New File 293329 ??????????2.jpg100%
New File 525261 ????????.jpg100%
New File 1.1 m ????????????1.jpg100%
New File 1.0 m ????????????2.jpg100%
New File 1017402 ????????????3.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\
New File 4.0 m ????????1.jpg100%
New File 705587 ????????2.jpg100%
New File 1.4 m ?????.jpg100%
New File 332325 ??????.jpg100%
New File 107504 ???????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 393452 ???????1.jpg100%
New File 341182 ???????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\????\
New File 371902 ???????1.jpg100%
New File 303722 ???????2.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 277481 ??????1.jpg100%
New File 347383 ??????2.jpg100%
New File 365947 ??????3.jpg100%
New File 342502 ??????4.jpg100%
New File 317838 ??????5.jpg100%
New File 172809 ??????6.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 369074 ??????1.jpg100%
New File 395134 ??????2.jpg100%
New File 443293 ??????3.jpg100%
New File 421445 ??????4.jpg100%
New File 208849 ??????5.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\????\
New File 113015 ???? 2.jpg100%
New File 150976 ????1.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 1.4 m ???????1.jpg100%
New File 960849 ???????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\?????\
New File 248831 ????????? 2.jpg100%
New File 219991 ?????????1.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Platform Org Chart\
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Platform Org Chart\Others\
New File 471768 2- Business Licenses (????????????).jpg
100%
New File 466274 3- Business Licenses (????????????).jpg
100%
New File 469882 4-Business License(????????????).jpg100%

New File 448926 6-Business License (????????????).jpg100%

New File 125119 8- Business License(????????????).JPG100%

New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\


New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\62
Basis of Design document, including site data and list of\
New File 162 ~$01 (draft)Project Application
Report.docx100%
New File 21.3 m 6201 (draft)Project Application
Report.docx100%
New File 3.3 m 6201 (draft)Project Application
Report.pdf100%
New File 204313 6202 (draft)PID.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\63
Major equipment and supplier list\
New File 52893 Major equipment and supplier list.pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\64


Project Design Manual (EPC Technical Specification)\
New File 263 6401 Heat Plant Exchanger
Specifications.log100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\65
Annual performance and operation records (Capacity, Outag\
New File 50969 2016?6??10?31???????.pdf100%
New File 51227 2016?6??12?20???????.pdf100%
New File 53203 2016?6??2017?2?24???????.pdf100%
New File 54239 ??????2017?6????????.pdf100%
New File 69643 ???????????????????????????.pdf100%
New File 75518 ???????????????????????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\66
Operation plan/procedure\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\69
Training program\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\70
O&M Monthly reports\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\71
Electricity, steam, chilled water (and other utilities) s\
New Dir 14 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Working\
New File 162 ~$170713 GIC TDD for CHP, WW and
Solar_Report Template_Neoh.docx100%
New File 73118 2015 -
commercial_boiler_efficiency.determine.test_2008.pdf100%
New File 1.6 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template.docx100%
New File 2.5 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template_Neoh_06Aug.docx100%
New File 549258
catalog_of_chp_technologies_appendix_a_expressing_chp_efficiency.pdf100%
New File 536012 CHP Plant.pdf100%
New File 65266 chpefficiencymetrics_epa.pdf100%
New File 24338 CogenerationOptions.pdf100%
New File 85653 Diagrams.pptx100%
New File 155789 IP-29 - CHP calculations.pdf100%
New File 47380 Master Spreadsheet.xlsx100%
New File 115916 news2.pdf100%
New File 596627 Risk Register Template_14 July 2017.xlsx
100%
New File 172124 Risk Register Template_Neoh.xlsx100%
New Dir 27 C:\AdvisianActive\01 Projects\GMR GKEL Arbitration\
New File 165 ~$SOC Analysis.pptx100%
New File 257651 19052017_ sepco Deviation from Contract
Technical Specification_v5.xlsx100%
New File 288201 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian_24Aug.xlsx100%
New File 264378 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian23 Aug.xlsx100%
New File 288220 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian24 Aug.xlsx100%
New File 260542 19052017_ sepco Deviation from Contract
Technical Specification_v5_Neoh.xlsx100%
New File 361392 2_6 Annexures A, B and C of RRT joint
protocol for Units 1, 2 and 3.zip100%
New File 4.3 m 20170822 Preliminary Technical Expert
Report - Template New r1_Neoh.docx100%
New File 4.1 m 20170822 Preliminary Technical Expert
Report - Template New.docx100%
New File 10.6 m 37-F4341C2-J-01 Design Basis Report
RevA.pdf100%
New File 693109 37-F4341C2-J-01 Design Instruction.pdf
100%
New File 15581 400kV Switchyard BOQ Estimation.docx100%

New File 45682 Ash Handling Settlement Tank.docx100%


New File 32948 Ash Handling Settlement Tank_Mukesh
comments.docx100%
New File 259895 Copy of 19052017_ sepco Deviation from
Contract Technical Specification_v5_Advisian.xlsx100%
New File 23447 Defects _SEPCO_20170822_Advisian 23
Aug.xlsx100%
New File 39628 Defects Identification Methodology.docx
100%
New File 432746 GKEL Defects Analysis.xlsx100%
New File 74264 NegotiationMeeting_21July2016.pptx100%
New File 122179
NegotiationMeeting_21July2016_Advisian21Aug.pptx100%
New File 45334 Settlement of Sulphuric Acid Tank.docx
100%
New File 394366 SOC Analysis.pptx100%
New File 3.6 m Study of Technical Issues faced in GKEL -
Steag April 2016.pdf100%
New File 70774 Sulphuric Acid.docx100%
New File 640040 T0327.pdf100%
New File 5.6 m Technical Specification for Erection Work
of BTG Area.pdf100%
New File 61583 TechnicalDeficiencies_Cost_21Aug.xlsx100%

New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Advisian Technical Report dated 13 Sep\
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 14Sep.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 15Sep.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 18Sep.docx100%
New File 790102 Mobile Crusher Location - annotated
Advisian.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Day 3 23 Aug\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Day 4 24 AUg\
New File 284522 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian to GKEL_24Aug.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\From Adam\
New File 428010 20170716 Preliminary Technical Expert
Report - Template.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-1\
New File 173056 Actual manufacturing status (component
wise) of GKEL Units 1 2 3 & 4 as on today (25th Jun 2012) .msg100%
New File 166400 GKEL Unitwise Manufacturing Tracking
Record as on 25th May 2012 .msg100%
New File 13411 High Value Items Inspection Latest - 15-
09-2015.xlsx100%
New File 3.5 m High Value Items.zip100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Generator Central retaining ring May & Dec-
11\
New File 87040 Inspection Call no. 573.doc100%
New File 86016 Inspection Call no. 872.doc100%
New File 77599 KTPP-Unit4-Generator-GMR-SEPCO-01-FIR-
001-573.pdf100%
New File 189788 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-001-
573.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Generator Stator- July-11 to Jan-12\
New File 87552 Inspection Call no. 737.doc100%
New File 86528 Inspection Call no. 866.doc100%
New File 86528 Inspection Call no. 870.doc100%
New File 86528 Inspection Call no. 886.doc100%
New File 228465 KTPP-Unit 4-Generator-GMR-SEPCO-01-IR-
007-866.pdf100%
New File 213364 KTPP-Unit 4-Generator-GMR-SEPCO-01-IR-
008-870.pdf100%
New File 147224 KTPP-Unit4-Generator-GMR-SEPCO-01-FIR-
003-886.pdf100%
New File 262981 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-004-
737.pdf100%
New File 230303 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-010-
879.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Intake Butterfly Valve-April-12\
New File 87552 Inspection Call no. 905 rev. 1.doc100%
New File 87040 Inspection Call no. 905.doc100%
New File 320434 KTPP-Intake valve-GMR-SEPCO-01-IR-001-
905.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Air cannon-Sep-11\
New File 86016 Inspection Call no. 803-20110910.doc100%

New File 654312 VR #008 IC-803 -14-16-Sept -2011.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Ash handling system-Nov-11\
New File 103617 KTPP-1-4 Unit Flash Ash handling System-
GMR-SEPCO-01-IR-001-864.pdf100%
New File 109844 KTPP-1-4 Unit Fly Ash handling System-
GMR-SEPCO-01-IR-002-865.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Drum- Jul-Aug-11\
New File 88064 Inspection Call no. 767.doc100%
New File 232674 KTPP-#4-Boiler Drum-GMR-SEPCO-01-IR-001-
724.pdf100%
New File 396962 KTPP-#4-Boiler Drum-GMR-SEPCO-01-IR-001-
R1-724.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Header-Aug-11\
New File 88576 Inspection Call no. 789.doc100%
New File 325946 KTPP-4-Boiler headers-GMR-SEPCO-01-IR-
001-789.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Heating surfaces-Jul-11\
New File 362758 IR-KTPP-4-Boiler Water Wall Panels &
Coils-01-IR-001-719.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Steel Structure-633,-Jun-11\
New File 71168 Inspection Call no. 633.doc100%
New File 368074 KTPP-Unit 4#-Boiler Steel Structure-GMR-
SEPCO-01-IR-001.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Butterfly Valve-Unit# 3 & 4-Aug-11\
New File 86016 Inspection Call no. 768 rev-01.doc100%
New File 86016 Inspection Call no. 768.doc100%
New File 416030 KTPP-Unit 3&4-Butterfly Valve-GMR-SEPCO-
01-IR-001-768.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Condenser Pump-Aug-Oct-11\
New File 92160 Inspection Call no. 769.doc100%
New File 89088 Inspection Call no. 835.doc100%
New File 151251 KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-001-769.pdf100%
New File 1.0 m KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-002-821.pdf100%
New File 183898 KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-003-835.pdf100%
New File 1.1 m KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-004-835 r1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Deaerator-Jun-Jul-2010\
New File 86016 Inspection Call no. 685.doc100%
New File 359133 KTPP-Unit 4#-Deaerator-GMR-SEPCO-01-IR-
001-685.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-2\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Silcon steel sheet-Jul-11\
New File 86528 Inspection Call no. 705 .doc100%
New File 236796 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-003-
705.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Transformer May-11 to Aug-11\
New File 86016 Inspection Call no. 535 .doc100%
New File 85504 Inspection Call no. 654.doc100%
New File 84480 Inspection Call no. 665 4# Generator
Transformer (663 call).doc100%
New File 47860 KTPP-Unit4#-Generator Transformer-GMR-
SEPCO-01-FIR-001-535.pdf100%
New File 222352 KTPP-Unit4#-Generator transformer-GMR-
SEPCO-01-IR-003-665.pdf100%
New File 437237 KTPP-Unit4#-Generator transformer-GMR-
SEPCO-01-IR-004-674.pdf100%
New File 489837 KTPP-Unit4-Generator transformer-GMR-
SEPCO-01-IR-005-720.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Whole Unit- May-Oct-11\
New File 87552 Inspection Call no. 577.doc100%
New File 90112 Inspection Call no. 807.doc100%
New File 295956 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-002-
577.pdf100%
New File 223703 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-005-
807.pdf100%
New File 243709 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-006-
838.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\HP Heater- Nov-10 to Jul-11\
New File 83968 Inspection Call no. 22.doc100%
New File 90112 Inspection Call no. 554.doc100%
New File 88064 Inspection Call no. 729 rev.1.doc100%
New File 88064 Inspection Call no. 729.doc100%
New File 1.4 m KTPP-Unit 4# HP Heater-GMR-SEPCO-01-IR-
003-729.pdf100%
New File 69078 KTPP-Unit4# HP Heater-GMR-SEPCO-01-FIR-
001-554.pdf100%
New File 70063 KTPP-Unit4# HP Heater-GMR-SEPCO-01-FIR-
002-562.pdf100%
New File 151677 KTPP-Unit4# HP Heater-GMR-SEPCO-01-IR-
001-554.pdf100%
New File 340248 KTPP-Unit4# HP Heater-GMR-SEPCO-01-IR-
002-562.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\LP Heater-Apr-Aug-11\
New File 91648 Inspection Call no. 447.doc100%
New File 93184 Inspection Call no. 448.doc100%
New File 91136 Inspection Call no. 765.doc100%
New File 93028 KTPP-Unit4#-LP Heater-GMR-SEPCO-01-FIR-
001-447 & 448.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Ring Hammer Crusher-Oct-11\
New File 93184 Inspection Call no. 832.doc100%
New File 316666 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-004-832.pdf100%
New File 161818 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-005-832.pdf100%
New File 287445 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-006-832 rev1.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Station Transformer-Jun-Jul-11\
New File 84992 Inspection Call no. 613 .doc100%
New File 30280 Inspection Call no. 655.docx100%
New File 318863 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-001-613.pdf100%
New File 150636 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-002-655.pdf100%
New File 261151 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-003-675.pdf100%
New File 50597 Punch List Summary for 4# station
transformer in Jinan -613.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Turbine feed water pump-Jun-Aug-11\
New File 86528 Inspection Call no. 660.doc100%
New File 86528 Inspection Call no. 707 .doc100%
New File 83456 Inspection Call no. 710 .doc100%
New File 83968 Inspection Call no. 710-rev.01 .doc100%
New File 87552 Inspection Call no. 711 .doc100%
New File 87552 Inspection Call no. 711-rev.02 .doc100%
New File 87552 Inspection Call no. 750.doc100%
New File 133279 KTPP-Unit4# FWP Turbine-GMR-SEPCO-01-IR-
004-710 r1.pdf100%
New File 247460 KTPP-Unit4#-Feed water Pump Turbine-GMR-
SEPCO-01-IR-002-707.pdf100%
New File 289975 KTPP-Unit4#-Feed water Pump Turbine-GMR-
SEPCO-01-IR-003-750.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Turbine LP Rotor-May-11\
New File 87040 Inspection Call no. 586.doc100%
New File 141918 KTPP-Unit4#-turbine-GMR-SEPCO-01-FIR-001-
586.pdf100%
New File 811232 KTPP-Unit4-Turbine-GMR-SEPCO-01-IR-001-
586.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\UAT-1-Jun-Jul-11\
New File 85504 Inspection Call no. 640.doc100%
New File 85504 Inspection Call no. 656.doc100%
New File 151555 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-003-656.pdf100%
New File 461684 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-006-677 & 723.pdf100%
New File 327901 KTPP-Unit4-UA Transformer-GMR-SEPCO-01-
IR-001-640.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\UAT-2-Jun-Jul-11\
New File 85504 Inspection Call no. 641.doc100%
New File 85504 Inspection Call no. 657.doc100%
New File 143227 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-004-657.pdf100%
New File 461684 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-006-723.pdf100%
New File 214932 KTPP-Unit4-UA Transformer-GMR-SEPCO-01-
IR-002-641.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Vaccum pump-Aug-Sep-11\
New File 88064 Inspection Call no. 751.doc100%
New File 86528 Inspection Call no. 763.doc100%
New File 686362 KTPP-Unit 4-vacuum pump-GMR-SEPCO-01-IR-
001-751.pdf100%
New File 339679 KTPP-Unit 4-vacuum pump-GMR-SEPCO-01-IR-
002-763.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\Unit#4-Mail-3\
New Dir 11 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\Unit#4-Mail-3\Boiler
feed water pump-Jun-Aug-11\
New File 86016 Inspection Call no. 684 -rev.01 .doc100%

New File 85504 Inspection Call no. 687 .doc100%


New File 89088 Inspection Call no. 712 .doc100%
New File 86528 Inspection Call no. 730.doc100%
New File 86016 Inspection Call no. 732.doc100%
New File 84992 Inspection Call no. 764(BFP motor).doc
100%
New File 882602 KTPP-Unit 4#-BFP Motor-GMR-SEPCO-01-IR-
001-Rev-684.pdf100%
New File 782001 KTPP-Unit 4#-Boiler Feed Water Pump-GMR-
SEPCO-01-IR-001-687.pdf100%
New File 4.6 m KTPP-Unit 4#-Boiler Feed Water Pump-GMR-
SEPCO-01-IR-004-732.pdf100%
New File 2.3 m KTPP-Unit 4#-Boiler Feed Water Pumpr-GMR-
SEPCO-01-IR-005-730.pdf100%
New File 6.9 m KTPP-Unit4#-BFP-GMR-SEPCO-01-IR-003-
712.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\
New File 94720 COAL ANALYSIS REPORT - IGI.xls100%
New File 459264 COAL ANALYSIS REPORT - Open market.xls
100%
New File 143728 Date wise receipt data.xlsx100%
New File 4.6 m IGI approved.pdf100%
New File 6.2 m IGI Reports.pdf100%
New File 520791 KRE source check.pdf100%
New File 1.3 m Utkal source check.pdf100%
New Dir 228 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Consumption Data of coal\
New File 44032 Coal receipt of dtd 26-07-13.msg100%
New File 88576 Coal report of dtd 01-12-13 GKEL.msg
100%
New File 88576 Coal report of dtd 02-12-13 GKEL.msg
100%
New File 87552 Coal report of dtd 17-11-13 GKEL.msg
100%
New File 87040 Coal report of dtd 18-11-13 GKEL.msg
100%
New File 91136 Coal report of dtd 19-11-13 GKEL.msg
100%
New File 91648 Coal report of dtd 21-11-13 GKEL.msg
100%
New File 88064 Coal report of dtd 22-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 24-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 25-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 26-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 27-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 28-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 29-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 30-11-13 GKEL.msg
100%
New File 73216 Coal Stock of GKEL as on dtd 31-03-13
.msg100%
New File 171520 Coal test report of GKEL .msg100%
New File 149504 DPR of CHP & AHP GKEL for dtd 01-03-13
.msg100%
New File 156160 DPR of CHP & AHP GKEL for dtd 01-04-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 01-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 01-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 01-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 01-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 01-09-13
.msg100%
New File 149504 DPR of CHP & AHP GKEL for dtd 02-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 02-04-13
.msg100%
New File 181248 DPR of CHP & AHP GKEL for dtd 02-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 02-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 02-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 02-09-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 02-10-13
.msg100%
New File 151040 DPR of CHP & AHP GKEL for dtd 03-03-13
.msg100%
New File 182784 DPR of CHP & AHP GKEL for dtd 03-04-13
.msg100%
New File 181248 DPR of CHP & AHP GKEL for dtd 03-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 03-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 03-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 03-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 03-10-13
.msg100%
New File 150528 DPR of CHP & AHP GKEL for dtd 04-03-13
.msg100%
New File 174080 DPR of CHP & AHP GKEL for dtd 04-04-13
(1).msg100%
New File 173056 DPR of CHP & AHP GKEL for dtd 04-04-13
.msg100%
New File 181760 DPR of CHP & AHP GKEL for dtd 04-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 04-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 04-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 04-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 04-09-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 04-10-13
.msg100%
New File 151040 DPR of CHP & AHP GKEL for dtd 05-03-13
.msg100%
New File 181760 DPR of CHP & AHP GKEL for dtd 05-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 05-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 05-07-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 05-09-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 06-03-13
.msg100%
New File 146432 DPR of CHP & AHP GKEL for dtd 06-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 06-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 06-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 06-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 06-10-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 07-03-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 07-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 07-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 07-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 07-08-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 08-03-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 08-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 08-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 08-07-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 08-09-13
.msg100%
New File 152576 DPR of CHP & AHP GKEL for dtd 09-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 09-04-13
.msg100%
New File 139776 DPR of CHP & AHP GKEL for dtd 09-05-13
.msg100%
New File 133632 DPR of CHP & AHP GKEL for dtd 09-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 09-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 09-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 09-10-13
.msg100%
New File 153600 DPR of CHP & AHP GKEL for dtd 10-03-13
.msg100%
New File 139264 DPR of CHP & AHP GKEL for dtd 10-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 10-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 10-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 10-09-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 10-10-13
.msg100%
New File 154112 DPR of CHP & AHP GKEL for dtd 11-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 11-04-13
.msg100%
New File 139264 DPR of CHP & AHP GKEL for dtd 11-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 11-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 11-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 11-08-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 11-09-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 12-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 12-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 12-06-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 12-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 12-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 12-09-13
.msg100%
New File 153088 DPR of CHP & AHP GKEL for dtd 13-03-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 13-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 13-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 13-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 13-09-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 13-10-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 14-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 14-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 14-06-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 14-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 14-09-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 15-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 15-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 15-06-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 15-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 15-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 15-09-13
.msg100%
New File 156160 DPR of CHP & AHP GKEL for dtd 16-03-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 16-04-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 16-05-13
.msg100%
New File 128000 DPR of CHP & AHP GKEL for dtd 16-06-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 16-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 16-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 16-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 16-10-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 17-04-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 17-05-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 17-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 17-09-13
.msg100%
New File 111616 DPR of CHP & AHP GKEL for dtd 18-01-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 18-04-13
.msg100%
New File 150528 DPR of CHP & AHP GKEL for dtd 18-05-13
.msg100%
New File 129024 DPR of CHP & AHP GKEL for dtd 18-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 18-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 18-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 18-09-13
.msg100%
New File 178688 DPR of CHP & AHP GKEL for dtd 19-04-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 19-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 19-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 19-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 19-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 19-09-13
.msg100%
New File 110592 DPR of CHP & AHP GKEL for dtd 20-01-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 20-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 20-06-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 20-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 20-09-13
.msg100%
New File 118272 DPR of CHP & AHP GKEL for dtd 21-01-13
.msg100%
New File 158208 DPR of CHP & AHP GKEL for dtd 21-03-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 21-04-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 21-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 21-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 21-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 21-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 21-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 21-10-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 22-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 22-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 22-06-13
.msg100%
New File 172032 DPR of CHP & AHP GKEL for dtd 22-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 22-08-13
.msg100%
New File 117760 DPR of CHP & AHP GKEL for dtd 23-01-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 23-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 23-05-13
.msg100%
New File 130560 DPR of CHP & AHP GKEL for dtd 23-06-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 23-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 23-09-13
.msg100%
New File 129536 DPR of CHP & AHP GKEL for dtd 24-01-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 24-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 24-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 24-06-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 24-09-13
.msg100%
New File 136192 DPR of CHP & AHP GKEL for dtd 25-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 25-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 25-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 25-06-13
.msg100%
New File 171520 DPR of CHP & AHP GKEL for dtd 25-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 25-08-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 25-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 25-10-13
.msg100%
New File 140800 DPR of CHP & AHP GKEL for dtd 26-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 26-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 26-05-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 26-06-13
.msg100%
New File 174080 DPR of CHP & AHP GKEL for dtd 26-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 26-08-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 26-09-13
.msg100%
New File 113152 DPR of CHP & AHP GKEL for dtd 27-01-13
.msg100%
New File 141312 DPR of CHP & AHP GKEL for dtd 27-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 27-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 27-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 27-06-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 27-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 27-09-13
.msg100%
New File 116224 DPR of CHP & AHP GKEL for dtd 28-01-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 28-02-13
.msg100%
New File 154112 DPR of CHP & AHP GKEL for dtd 28-03-13
.msg100%
New File 178688 DPR of CHP & AHP GKEL for dtd 28-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 28-05-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 28-06-13
.msg100%
New File 174592 DPR of CHP & AHP GKEL for dtd 28-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 28-08-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 29-01-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 29-04-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 29-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 29-06-13
.msg100%
New File 125440 DPR of CHP & AHP GKEL for dtd 29-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 29-08-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 29-09-13
.msg100%
New File 154624 DPR of CHP & AHP GKEL for dtd 30-03-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 30-04-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 30-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 30-06-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 30-07-13
(1).msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 30-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 30-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 30-09-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 31-05-13
.msg100%
New File 99328 FW regarding coal report of 09 06
2013.msg100%
New File 42496 FW Unburnt Carbon analysis of Fly Ash &
Bottom Ash sample submitted at GKEL plant Dhenkanal.msg100%
New File 1.6 m ORT of CHP & AHP-June-13.msg100%
New File 1.6 m ORT of CHP & AHP-Oct-13.msg100%
New File 1.6 m ORT-SEPT-13 of CHP & AHP.msg100%
New File 56320 RE Coal closing stock.msg100%
New File 62976 RE Coal receipt report 10 07 2013.msg
100%
New File 40448 RE Coal test report of GKEL .msg100%
New File 157184 RE DPR of CHP & AHP GKEL for dtd 01-03-
13 .msg100%
New File 139776 RE DPR of CHP & AHP GKEL for dtd 08-06-
13 .msg100%
New File 88576 RE DPR of CHP & AHP GKEL for dtd 14-06-
13 .msg100%
New File 133120 RE DPR of CHP & AHP GKEL for dtd 14-07-
13 (1).msg100%
New File 80384 RE DPR of CHP & AHP GKEL for dtd 14-07-
13 .msg100%
New File 132608 RE DPR of CHP & AHP GKEL for dtd 24-01-
13 .msg100%
New File 63488 Regarding receipt of poor quality of
coal at GKEL .msg100%
New File 33792 Requirement of Coal receipt detais as on
date .msg100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\
New File 162 ~$timate for Oil and Coal for
Commissioning and Startup.doc100%
New File 396417 Bent pipe.png100%
New File 290508 Coal Consumption_GKEL during
commisisoning period.xlsx100%
New File 166951 Coal Consumption_GKEL during
commisisoning period_2.xlsx100%
New File 39424 Estimate for Oil and Coal for
Commissioning and Startup.doc100%
New File 817664 Final analysis report.xls100%
New File 18450 Fuel consumption and estimates.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Ash Handling\
New File 21569 Ash Quantity Calculations.xlsx100%
New File 13.4 m C0101-01-0.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Backup files\
New File 467968 COAL ANALYSIS REPORT - GKEL-WO-3 July
Aug.xls100%
New File 104855 Coal Consumption.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Backup files\New
folder\
New File 464896 COAL ANALYSIS REPORT - GKEL.xls100%
New File 443392 COAL ANALYSIS REPORT - GKEL-WO-2.xls100%

New File 535552 COAL ANALYSIS REPORT - GKEL-WO-3.xls100%

New File 852480 COAL ANALYSIS REPORT - GKEL-WO-3-LINKAGE


COAL.XLS100%
New File 798208 COAL ANALYSIS REPORT - GKEL-WO-4-LINKAGE
COAL-41337.xls100%
New Dir 39 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Invoices\
New File 702889 MCL_Inv_56K_LKG_OFB_BOCP_9052-1111.pdf
100%
New File 630101 MCL_Inv_56K_LKG_OFB_BOCP_9052-1162.pdf
100%
New File 639597 MCL_Inv_56K_LKG_OFB_BOCP_9052-1216.pdf
100%
New File 628021 MCL_Inv_56K_LKG_OFB_BOCP_9052-1259.pdf
100%
New File 256617 MCL_Inv_56K_LKG_OFB_B'PUR_9041-243.pdf
100%
New File 253909 MCL_Inv_56K_LKG_OFB_B'PUR_9041-249.pdf
100%
New File 705969 MCL_Inv_56K_LKG_OFB_HOCP_9051-278.pdf100%

New File 370523 MCL_Inv_84K_LKG_OFB_HOCP_9051-360.pdf100%

New File 609549 MCL_Inv_84K_LKG_OFB_HOCP_9051-373.pdf100%

New File 730825 MCL_Inv_84K_LKG_OFB_HOCP_9051-375.pdf100%

New File 575385 MCL_Inv_84K_LKG_OFB_LOCP_5101-410.pdf100%

New File 584577 MCL_Inv_84K_LKG_OFB_LOCP_5101-430.pdf100%

New File 306501 MCL_Inv_Ant_01-07 Oct_1587.pdf100%


New File 296857 MCL_Inv_Ant_08-14 Oct_1612.pdf100%
New File 636097 MCL_Inv_Ant_15-21 Oct_1633.pdf100%
New File 272097 MCL_Inv_Ant_22-30 Sep_1568.pdf100%
New File 315433 MCL_Inv_Ant_22-31 Oct_1659.pdf100%
New File 484797 MCL_Inv_Bal_01-07 Oct_2104.pdf100%
New File 490173 MCL_Inv_Bal_07-14 Oct_2128.pdf100%
New File 567965 MCL_Inv_Bal_15-21 Oct_2201.pdf100%
New File 1.0 m MCL_Inv_Bal_22-30 Sep_2068.pdf100%
New File 591069 MCL_Inv_Bal_22-31 Oct_2275.pdf100%
New File 260197 MCL_Inv_Bhu_01-07 Oct_125.pdf100%
New File 1.0 m MGBK-01 & 02-FA-INV-BOCM.pdf100%
New File 763245 MGBK-01-FA-RR-BOCM RR-212000618.pdf100%
New File 494533 MGBK-01-INV..pdf100%
New File 551869 MGBK-01-inv.pdf100%
New File 758477 MGBK-02-FA-RR-BOCM RR-212000620.pdf100%
New File 476393 MGBK-02-INV..pdf100%
New File 370909 MGBK-03-FA-INV-LOCM.pdf100%
New File 682177 MGBK-03-FA-RR-LOCM_212002942.pdf100%
New File 402905 MGBK-03-INV..pdf100%
New File 488649 MGBK-03-inv.pdf100%
New File 362013 MGBK-04-FA-INV-LOCM.pdf100%
New File 661101 MGBK-04-FA-RR-LOCM-212002944.pdf100%
New File 559253 MGBK-05-inv.pdf100%
New File 483193 mgbk-06-inv.pdf100%
New File 317165 mgbk-08-inv.pdf100%
New File 629401 mgbk-13-inv.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\QC at source\
New File 874157 KC Shara Feb 14 Quality Report.pdf100%
New File 1.3 m KC Shara Nov 13 Quality Report.pdf100%
New File 1.3 m mcl gcv mar 14.pdf100%
New File 1.2 m Sample basis source check.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\
New File 478587 02- L2 Shedule update 20130731 - Pg 9,10
24.pdf100%
New File 15338 04 Ash Quantity Calculations.xlsx100%
New File 209758 23 Revised offer-HP Heater
-17.02.2017.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\03 Equipment Tech Spec\
New File 31.2 m Boiler.pdf100%
New File 34.5 m ESP + FF.pdf100%
New File 14.1 m Pneumatic Ash Handling System.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\
New File 154112 Comments on Technical Specification of
400kV Switchyard.msg100%
New File 1.3 m Deviation of the 400kV switchyard
equipment (transmittal 0446).msg100%
New File 332800 FW Engineering Progress - KTPP-OL-SEPS-
GKEL-0399-Regarding Progress of works at Site.msg100%
New File 15.6 m FW Requisition list for issues related
to 400 KV switchyard.msg100%
New File 411137 MOM.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\Contract\
New File 1.6 m 400KV amendment(1).pdf100%
New File 1.6 m 400KV amendment.pdf100%
New File 12.4 m 400KV??????????(20101015)(1).pdf100%
New File 27.5 m Civil works, erection-VOLUME I
(COMMERCIAL PART).pdf100%
New File 39.4 m TECHNICAL SPECIFICATION .pdf100%
New File 27.5 m VOLUME I (COMMERCIAL PART).pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\SOC ref\
New File 711123 C-101 20110204 GKELShifting of 400 KV
Switchyard coordinates towares GT.pdf100%
New File 181947 C-102 20110223 KTPP-OL-SEPS-GKEL-0208.pdf
100%
New File 1.7 m C-103 KTPP-OL-SEPS-GKEL-0216.pdf100%
New File 1.2 m C-104 20110329 GKEL Email re 400kv
switchyard.pdf100%
New File 832688 C-105 20110329 GKEL letter 807 re Change
in the design of 400kV Switchyard.pdf100%
New File 35115 C-107 SEPCO Monthly Progress Report June
2011 pages 1 and 19.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CCB\
New File 353792 excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 195584 FW Reply on the CCR scheme(transmittal
0160).msg100%
New File 142336 RE excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 144896 RE T0326-Foundation of CCB-0(transmittal
0540).msg100%
New File 182272 Reply comments on excavation drawing of
CCB fdn (transmittal 0484).msg100%
New File 821019 Resolutions & Content Sheet.pdf100%
New File 1.3 m T0326-Foundation of CCB-0(transmittal
0540).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CCB Erection\
New File 2.7 m T0327 comment.pdf100%
New File 5.7 m T0327-0 steel structure for CCB
(transmittal 0666).msg100%
New Dir 29 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\Chimney delay\
New File 591872 calculation for foundation of chimney
(transmittal 0372).msg100%
New File 3.5 m Chimney Drawing .msg100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 195072 confirming of chimney design issue(OL
0014).msg100%
New File 200192 Draft of Mechanical Resolutions.msg100%
New File 394752 excavation drawing of chimney & comments
(transmittal 0336).msg100%
New File 338944 excavation plan of chimneys' foundation
pit (transmittal 0329).msg100%
New File 696320 export mode of construction machinery of
chimney (OL-0041).msg100%
New File 850944 foundation drawing of chimney for
prepare discussion.msg100%
New File 423424 FW About the chimney report.msg100%
New File 428544 FW About the chimney report1.msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 209920 FW confirming of chimney design issue(OL
0014).msg100%
New File 252928 FW for chimney review .msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 73216 FW GEOE07234 GMR Kamalanga TPP
Information required from SEPCO for chimney drawings review .msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 1.0 m FW T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 146432 RE excavation drawing of chimney &
comments (transmittal 0336).msg100%
New File 143360 RE excavation plan of chimneys'
foundation pit (transmittal 0329).msg100%
New File 161792 RE revised drawings for 4 units
(transmittal 0335).msg100%
New File 95744 Response to chimney drawing.msg100%
New File 998400 T0331- B-CHIMNEY FOUNDATION
DRAWINFS(transmittal 0623).msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.0 m T0331-D chimney foundation (transmittal
0660).msg100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\Chimney delay\Useful\
New File 1.3 m C-76 20101029 Minutes of meeting Chimney
Design Discussions.pdf100%
New File 639921 C-77 20101218 Minutes of meeting
Finalisation of Chimney Foundation design.pdf100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 95744 Response to chimney drawing.msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 876940 T0331 chimney foundation REV-0.rar100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CW Pump house\
New File 147456 RE S5301Excavation drawings of CW pump
house (transmittal 0437).msg100%
New File 212205 Resolutions.pdf100%
New File 719529 S5301-01.PDF100%
New File 586752 S5301Excavation drawings of CW pump house
(transmittal 0437).msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\DM Water\
New File 163328 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 113664 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 145920 RE T0701-Foundation of DM plant house
and assay building (transmittal 0485).msg100%
New File 1.0 m Resolutions & Content Sheet.pdf100%
New File 1.8 m T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 1.1 m T0701-Foundation of DM plant house and
assay building (transmittal 0485).msg100%
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\08 Unit 1 commissioning report-pdf\
New File 114427 Annexure-3.1 LDO leak test Report.pdf100%

New File 72654 Annexure-3.2 Boiler Steam blowing data


Sheet.pdf100%
New File 32399 Annexure-3.3 Boiler hangers, support and
expansion readings.pdf100%
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 53681 Annexure-5.1 Holding time curve.pdf100%
New File 51848 Annexure-5.2 HP cylinder jacket heating
system.pdf100%
New File 20346 Annexure-5.3 TSI parameters during
rolling.pdf100%
New File 19268 Annexure-5.4 TSI parameters during
3000rpm.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 8.8 m Annexure-5.6 Unit #1 GCB failure
report.pdf100%
New File 9.4 m Annexure-5.7 Electrical tests after GCB
failure.pdf100%
New File 155198 Annexure-6.1 Main parameters at 350MW.pdf
100%
New File 20136 Annexure-7.1 Summary data Sheet.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_1.Purchase records of fuel oil\
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\
New File 78416 Copy of GKEL Coal Requirement.xlsx100%
New File 105578 HFO-RECE.XLS100%
New File 38289 LDO & HFO receipts.xlsx100%
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Apr 13\
New File 76022 Apr13 stock-oil.xlsx100%
New File 239769 Coal & Oil Stock Statement as on
30.04.2013.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Aug13\
New File 156156 [Untitled]_2013090215040800.pdf100%
New File 15.2 m MIS-AUG'13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\July13\
New File 165604 [Untitled]_2013080610560000.pdf100%
New File 176764 Corrected-July13.pdf100%
New File 10986 HFO-FINAL-JUL-13....xlsx100%
New File 237992 JUL-COAL purchases.xlsx100%
New File 14423 LDO HFO received in July-2013.xlsx100%
New File 13137 LDO-FINAL-JUL-13....xlsx100%
New File 23754 SAP-STOCK-COAL-31-7-13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\June\
New File 792867 Coal register may- jun'13 (2).xlsx100%
New File 16287 HFO as on 300613.xlsx100%
New File 17674 LDO as on 300613.xlsx100%
New File 60301 pivot coal.xlsx100%
New File 50096 SAP stock as on date for Coal-110713.txt
100%
New File 50552 SAP stock as on date for Coal-110713.xlsx
100%
New File 12063 stock jun'13-SAP.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Mar13\
New File 166623 GKEL Closing Stock 31st March 13.pdf100%

New File 130707 LDO &HFO status as on 31.03.13.xlsx.pdf


100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\May 13\
New File 44032 Coal statement as on 310513.xls100%
New File 14944 coal stock recon-310513.xlsx100%
New File 176879 Stock statement-31-05-13.pdf100%
New File 575975 Stock valuation as on 31-05-13.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Oct13\
New File 10.1 m MIS OCT'13...xlsx100%
New File 144067 stock-oct13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Sept 13\
New File 5.4 m MIS OF SEPTEMBER-2013.xlsx100%
New File 156758 mis-Sept13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\LDO HFO receipt -fom Sept\
New File 96887 HFO RECEIPT REGISTER (from Nov 12).xlsx
100%
New File 2.6 m LDO RECEIPT REGISTER (from Sept 12).xlsx
100%
New Dir 36 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Shift incharge reports from 10.07.2013 to
20.07.2013\
New File 121856 A- shift report for dated 10 7 13.msg100%

New File 121344 A shift report for dated 12 07 2013.msg


100%
New File 119296 A-shift report for date 19 07 2013.msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 120320 B-shift report for dated 17 07 2013.msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_3.Start up and Shut down activities of Units 1 and 2\
New File 2.7 m Daily Report FY13_14.xlsx100%
New File 3.3 m LDO procurement SAP data.xlsx100%
New File 55740 LDO Receipt details from 01.10.12 to
30.11.2013.xlsx100%
New File 203900 Oil stock -Apr 2013.pdf100%
New File 13897 Unit start stop details_ with oil
consumption.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_3.Start up and Shut down activities of Units 1 and 2\Unit 1
commissioning report-pdf\
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_4.Grid Clearance\
New File 261644 Synchronisation letter for unit #2.pdf
100%
New File 525862 Synchronisation letter for unit #3.pdf
100%
New File 273237 synchronisation permission ltr Unit
#1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_5. Fuel Requisition\
New File 148779 Fuel Estimate_Letter to SEPCO Site
2508.pdf100%
New File 655360 Fw For the Documents to be
Submitted.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\
New File 82722 Delay for Oil Calculation sheet.xlsx100%

New File 13902 Oil consumption calculation


sheet.xls.xlsx100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Invoices of fuel\
New File 3.1 m
fwemailingldo13004306_pdfldo13004307_pdfldo130043.zip100%
New File 2.0 m
fwemailingldo13004319_pdfldo13004320_pdfldo130043.zip100%
New File 3.5 m
fwemailingldo134_pdfldo135_pdfldo136_pdfldo152.zip100%
New File 2.0 m
fwemailingldo161_pdfldo162_pdfldo163_pdfldo165.zip100%
New File 2.1 m
fwemailingldo172_pdfldo214_pdfldo215_pdfldo216.zip100%
New File 2.6 m
fwemailingldo86_pdfldo90_pdfldo91_pdfldo92_pdf.zip100%
New File 5.3 m
fwemailingldo874_pdfldo875_pdfldo876_pdfldo877.zip100%
New File 2.0 m
fwemailingldo886_pdfldo887_pdfldo890_pdfldo153.zip100%
New File 4.1 m fwldoinvoices.zip100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Invoices of fuel\New folder\
New File 76022 Apr13 stock-oil.xlsx100%
New File 3.0 m Daily Report FY13_14.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Period 1\
New File 887856 GCB certification.pdf100%
New File 148779 Letter to SEPCO Site-2508 HFO guns.pdf
100%
New File 330577 Letter to SEPCO Site-2652.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Period 2\
New File 445965 Letter to SEPCO Site-2714.pdf100%
New File 224608 Letter to SEPCO Site-2835.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Fuel oil agreement\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\24 Isolating Damper\
New File 1.0 m FOURESS ENGINEERING (INDIA) LT PO-
4500062335.pdf100%
New File 1.1 m P.O 4500066822 fouress signed copy.pdf
100%
New File 2.8 m PO-TWIN SEAL FLAP ISOLATOR HOT AIR GATE-
FOURESS ENGINEERING.PDF100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\28 GCB Failure report\
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\28 GCB Failure report\Lindsey\
New File 162 ~$-ANALYSIS REPORT ON GCB FAILURE IN UNIT
1.docx100%
New File 162 ~$ECTION CLAIM FORM.doc100%
New File 126464 ~WRL0001.tmp100%
New File 19772 2.-ANALYSIS REPORT ON GCB FAILURE IN UNIT
1.docx100%
New File 5.0 m Annexures - GCB Failure report.zip100%
New File 1.3 m Damage analysis 4500197711.pdf100%
New File 12.2 m Damage_Inspection_HECS.pdf100%
New File 26.7 m Documents to Insurance Team-
Bangalore.zip100%
New File 612713 SINGLE_LINE_DIAGRAM.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\
New File 15073 11 HFO-LDO Estimate Jul'17.xlsx100%
New File 12.5 m 16 CEMS rectification.zip100%
New File 8.1 m 22. 400 KV Switchyard Design change.msg
100%
New File 1.1 m 26 Invictus Chimney analysis report.msg
100%
New File 248649 29_30 Sepco Deviation from Contract
Technical Specification_v5 (003).xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\27 News Article on Balco Chimney Mishap\
New File 585015 27 Bakshi Report on Korba disaster.pdf
100%
New File 10234 27 SEPCO Projects - Articles.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\
New Dir 59 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\Air Cargo Invoices\
New File 452119 A1.pdf100%
New File 467149 A10.pdf100%
New File 462466 A11.pdf100%
New File 373917 A13.pdf100%
New File 477995 A14.pdf100%
New File 450193 A15.pdf100%
New File 462345 A16.pdf100%
New File 451168 A17.pdf100%
New File 452370 A18.pdf100%
New File 455442 A19.pdf100%
New File 452587 A2.pdf100%
New File 3.9 m A20.pdf100%
New File 457995 A22.pdf100%
New File 450870 A23.pdf100%
New File 480848 A24.pdf100%
New File 452667 A25.pdf100%
New File 4.0 m A26.pdf100%
New File 132262 A28.pdf100%
New File 127116 A29.pdf100%
New File 1.5 m A3.pdf100%
New File 3.8 m A30.pdf100%
New File 162079 A31.pdf100%
New File 476464 A32.pdf100%
New File 170361 A33.pdf100%
New File 151613 A34.pdf100%
New File 136472 A36.pdf100%
New File 149122 A37.pdf100%
New File 167979 A38.pdf100%
New File 136662 A39.pdf100%
New File 5.8 m A4 A7.pdf100%
New File 135924 A40.pdf100%
New File 133674 A41.pdf100%
New File 3.7 m A42.pdf100%
New File 4.1 m A43.pdf100%
New File 3.9 m A45.pdf100%
New File 139761 A46.pdf100%
New File 137927 A47.pdf100%
New File 135851 A48.pdf100%
New File 148434 A49.pdf100%
New File 473784 A5.pdf100%
New File 140903 A50.pdf100%
New File 136252 A51.pdf100%
New File 142974 A52.pdf100%
New File 133343 A53.pdf100%
New File 300630 A55.pdf100%
New File 294034 A56.pdf100%
New File 301749 A58.pdf100%
New File 475661 A6.pdf100%
New File 315222 A61.pdf100%
New File 308865 A62.pdf100%
New File 305537 A63.pdf100%
New File 3.0 m A64 -A70.pdf100%
New File 480402 A8.pdf100%
New File 476919 A9.pdf100%
New File 10.1 m A95-A100,c20,c21 invoice.PDF100%
New File 4.1 m c11.pdf100%
New File 4.1 m C12.pdf100%
New File 153329 C13 inv.pdf100%
New File 138896 C15.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument cargoes\
New File 1.2 m A.1 C10A-custom duty-tools.xps100%
New File 122827 A.1 Letter to SEPCO Site-2869-custom
duty.pdf100%
New File 939772 A.2 Duty-40D.pdf100%
New File 1.0 m A.3 Duty-40B.pdf100%
New File 949306 A.4 Duty-40C.pdf100%
New File 385400 A.5 C17 BOE.pdf100%
New File 98990 A.6 A75 BOE.pdf100%
New File 329982 A.7 A32 DCS.pdf100%
New File 584395 A.8 TC20-BOE.pdf100%
New File 19503 Insurance details.xlsx100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\DCS cards\
New File 95744 FW C&I items.msg100%
New File 93184 FW Update for DCS Cards and UAT 3A low-
voltage bushing (1).msg100%
New File 84480 FW Update for DCS Cards and UAT 3A low-
voltage bushing (4).msg100%
New File 154624 Fw Update for DCS Cards and UAT 3A low-
voltage bushing (6).msg100%
New File 91648 Fw Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New File 68608 FW ?? DCS-Damaged cards- URGENT.msg100%

New File 1.5 m FW A32 shipment.msg100%


New File 38400 Fw Unit 3 Bushing and DCS cards.msg100%
New File 99840 RE FW Unit # 2 DCS-Damaged cards-
URGENT.msg100%
New File 122880 RE Update for DCS Cards and UAT 3A low-
voltage bushing (2).msg100%
New File 83456 RE Update for DCS Cards and UAT 3A low-
voltage bushing (3).msg100%
New File 131584 Re Update for DCS Cards and UAT 3A low-
voltage bushing (5).msg100%
New File 41472 Re Update for DCS Cards and UAT 3A low-
voltage bushing (8).msg100%
New File 38400 RE Update for DCS Cards and UAT 3A low-
voltage bushing (9).msg100%
New File 139776 RE Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New File 95232 Re ??:RE ??:RE ??:RE A29 A30
C13shipment.msg100%
New File 345088 Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\DCS cards\CD Related\
New File 75264 Customs duty approval A 32.msg100%
New File 125440 Re Update for DCS Cards and UAT 3A low-
voltage bushing (7).msg100%
New File 68608 Re FW Checklist of GMR A32 shipment.msg
100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\Inv-10 Custom duty PGT\
New File 100864 DOCUMENTS REQUIRED FOR PROCESSING OF
INSURANCE CLAIMS.msg100%
New File 271872 RE LV DRY Transformer claim under EAR
policy.msg100%
New File 101888 RE Settlement of marine claim- Damage
to CW pump - GKEL.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\36 Lender's Model\
New File 1.8 m GKEL Financial Model_Final for
PIM_09052015-Unlocked.xlsx100%
New File 2.0 m GKEL Lenders Model 20080709 IDFC
FINAL.xls100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\
New File 52728 Copy of Copy of Manpower Review (2)
(2).xlsx100%
New File 33238 Copy of Master Document List-17-07-
2017.xlsx100%
New File 13551 Manpower - RAXA comparison.xlsx100%
New File 36296 Master Document List.xlsx100%
New File 109476 scan 1.pdf100%
New File 412457 SEPCO-GKEL-Arbitration_Architectural-Doc-
Defence[28June17].DOCX100%
New File 47252 SOC analysis - Soumyata - v1.xlsx100%
New File 38581 SOC analysis_Divya - v1.xlsx100%
New File 69226 SOC analysis_Pg 10-74.xlsx100%
New File 10061 SOC Responsibilities.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\10. Jinan Meeting\
New File 74752 FW MOM Jinan 06112012.msg100%
New File 81920 MOM Jinan 06112012.msg100%
New File 118272 MOM Jinan 07112012.msg100%
New File 71680 MOM reference.msg100%
New File 91648 RE MOM Jinan 06112012-r1.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\11. Grid Synchronisation\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_1.Purchase records of fuel
oil\
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock balance\
New File 78416 Copy of GKEL Coal Requirement.xlsx100%
New File 105578 HFO-RECE.XLS100%
New File 38289 LDO & HFO receipts.xlsx100%
New File 1.0 m LDO procurement SAP data.xlsx100%
New File 13902 Oil consumption calculation
sheet.xls.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Apr 13\
New File 81918 Apr13 stock-oil.xlsx100%
New File 239769 Coal & Oil Stock Statement as on
30.04.2013.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Aug13\
New File 156156 [Untitled]_2013090215040800.pdf100%
New File 15.2 m MIS-AUG'13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\July13\
New File 165604 [Untitled]_2013080610560000.pdf100%
New File 176764 Corrected-July13.pdf100%
New File 10986 HFO-FINAL-JUL-13....xlsx100%
New File 237992 JUL-COAL purchases.xlsx100%
New File 14423 LDO HFO received in July-2013.xlsx100%
New File 13137 LDO-FINAL-JUL-13....xlsx100%
New File 23754 SAP-STOCK-COAL-31-7-13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\June\
New File 792867 Coal register may- jun'13 (2).xlsx100%
New File 16287 HFO as on 300613.xlsx100%
New File 17674 LDO as on 300613.xlsx100%
New File 60301 pivot coal.xlsx100%
New File 50096 SAP stock as on date for Coal-110713.txt
100%
New File 50552 SAP stock as on date for Coal-110713.xlsx
100%
New File 12063 stock jun'13-SAP.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Mar13\
New File 166623 GKEL Closing Stock 31st March 13.pdf100%

New File 130707 LDO &HFO status as on 31.03.13.xlsx.pdf


100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\May 13\
New File 44032 Coal statement as on 310513.xls100%
New File 14944 coal stock recon-310513.xlsx100%
New File 176879 Stock statement-31-05-13.pdf100%
New File 575975 Stock valuation as on 31-05-13.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Oct13\
New File 10.1 m MIS OCT'13...xlsx100%
New File 144067 stock-oct13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Sept 13\
New File 5.4 m MIS OF SEPTEMBER-2013.xlsx100%
New File 156758 mis-Sept13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock balance\LDO
HFO receipt -fom Sept\
New File 96887 HFO RECEIPT REGISTER (from Nov 12).xlsx
100%
New File 2.6 m LDO RECEIPT REGISTER (from Sept 12).xlsx
100%
New Dir 36 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Shift incharge reports from 10.07.2013 to 20.07.2013\
New File 121856 A- shift report for dated 10 7 13.msg100%

New File 121344 A shift report for dated 12 07 2013.msg


100%
New File 119296 A-shift report for date 19 07 2013.msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 120320 B-shift report for dated 17 07 2013.msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_3.Start up and Shut down
activities of Units 1 and 2\
New File 2.7 m Daily Report FY13_14.xlsx100%
New File 3.3 m LDO procurement SAP data.xlsx100%
New File 55740 LDO Receipt details from 01.10.12 to
30.11.2013.xlsx100%
New File 203900 Oil stock -Apr 2013.pdf100%
New File 13897 Unit start stop details_ with oil
consumption.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_3.Start up and Shut down
activities of Units 1 and 2\Unit 1 commissioning report-pdf\
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_4.Grid Clearance\
New File 261644 Synchronisation letter for unit #2.pdf
100%
New File 525862 Synchronisation letter for unit #3.pdf
100%
New File 273237 synchronisation permission ltr Unit
#1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_5. Fuel Requisition\
New File 148779 Fuel Estimate_Letter to SEPCO Site
2508.pdf100%
New File 655360 Fw For the Documents to be
Submitted.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Fuel Agreement\
New File 65536 FW Observations during Steam blowing of
Unit#1.msg100%
New File 61440 Requirement of LDO and HFO quantity .msg
100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge Reports\
New Dir 22 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge
Reports\01.01.13-15.01.2013\
New File 408576 A-shift report for dated 26 01 2013.msg
100%
New File 65024 Boiler Light up Information .msg100%
New File 406528 B-shift report for dated 25 01 2013.msg
100%
New File 402944 C-shift report for dated 25 01 2013.msg
100%
New File 386048 C-shift report for dated 26 01 2013.msg
100%
New File 414208 Day Shift Report -Date-31 12 2012.msg100%
New File 417280 Day shift report for dated 19 01 2013.msg
100%
New File 417280 Day shift report for dated 20 01 2013.msg
100%
New File 410624 Day shift report for dated 24 01 2013.msg
100%
New File 125952 FW Night shift report of 19 01 2013
.msg100%
New File 344064 Main Control Room Shift In-charge mobile
number is 7894471094.msg100%
New File 412160 Night shift report for dated 21 01
2013.msg100%
New File 411648 Night shift report for dated 22 01
2013.msg100%
New File 114688 Shift Report (1).msg100%
New File 124928 shift report .msg100%
New File 400896 Shift Report A shift.msg100%
New File 418304 Shift Report Date-19 1 2013 ( Night Shift
).msg100%
New File 411136 Shift report for 20 1 2013 Night
Shift ).msg100%
New File 408576 Shift Report for Date-23 01 2013.msg100%

New File 393216 SHIFT REPORT FOR THE DATE 01 01 2013.msg


100%
New File 388096 SHIFT REPORT FOR THE DATE 31-12-12 .msg
100%
New File 435200 Shift Report.msg100%
New Dir 42 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge
Reports\15.02.13-25.02.2013\
New File 118784 A shift activity reoprt-22 02 2013.msg
100%
New File 113664 A shift Report for date-21 02 2013.msg
100%
New File 50176 addition of shiftincharge gkel in all
groups.msg100%
New File 107008 A-shift report for dated 15 02 2013.msg
100%
New File 117760 A-shift report for dated 16 02 2013.msg
100%
New File 117248 A-shift report for dated 17 02 2013.msg
100%
New File 121856 A-shift report for dated 18 02 2013.msg
100%
New File 121856 A-shift report for dated 19 02 2013.msg
100%
New File 114688 A-shift report for dated 23 02 2013.msg
100%
New File 111104 A-shift report for dated 24 02 2013.msg
100%
New File 114176 A-shift report for dated 25 02 2013.msg
100%
New File 107520 B shift report -15 02 2013.msg100%
New File 125952 B shift report -24 02 2013.msg100%
New File 123392 B Shift Report -25 02 2013.msg100%
New File 115200 B-shift report for dated 16 02 2013.msg
100%
New File 119808 B-shift report for dated 17 02 2013
(1).msg100%
New File 176128 B-shift report for dated 17 02 2013.msg
100%
New File 123392 B-shift report for dated 18 02 2013.msg
100%
New File 121856 B-shift report for dated 19 02 2013.msg
100%
New File 113664 B-shift report for dated 21 02 2013.msg
100%
New File 116736 B-shift report for dated 22 02 2013.msg
100%
New File 113664 C-shift report for dated 14 02 2013.msg
100%
New File 113664 C-shift report for dated 15 02 2013.msg
100%
New File 118272 C-shift report for dated 16 02 2013.msg
100%
New File 122880 C-shift report for dated 17 02 2013.msg
100%
New File 120832 C-shift report for dated 19 02 2013.msg
100%
New File 113664 C-shift report for dated 21 02 2013.msg
100%
New File 115712 C-shift report for dated 22 02 2013.msg
100%
New File 113664 C-shift report for dated 23 02 2013.msg
100%
New File 117760 Day shift report for dated 20 02 2013.msg
100%
New File 52224 GKEL #1 tripping information.msg100%
New File 56832 GKEL Unit#1 Synchronisation
Information .msg100%
New File 52736 GKEL unit#1 tripping information.msg100%

New File 56832 GKEL Unit#1 Turbine rolling and


Synchronisation Information .msg100%
New File 114688 Night shift report for dated 20 02
2013.msg100%
New File 94720 Night shift report.msg100%
New File 87040 RE C-shift report for dated 24 02
2013.msg100%
New File 45568 regarding control room printer
cartridge.msg100%
New File 55808 Regarding GKEL Unit#1 Synchronisation
.msg100%
New File 64512 Regarding GMR Kamalanga energy unit-1
boiler lit up and synchronisation .msg100%
New File 64512 Regarding GMR Kamalanga energy unit-1
boiler lit up.msg100%
New File 119296 Untitled.msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\
New File 3.6 m Fwd Information Required GKEL.msg100%
New File 4.5 m Fwd Invoice copies of Mar 14.msg100%
New File 2.5 m Fwd Jan 14 Invocices.msg100%
New File 1.8 m Fwd Nov 14 Invoices.msg100%
New Dir 19 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\
New File 54784 Ash evacuation from ESP to silo.msg100%
New File 2.6 m Ash handling system modications.pdf100%
New File 957001 BOILER EFFICIENCY TEST REPORT OF
UNIT #1.pdf100%
New File 690176 Brief note on modification in the Ash
conveying system .msg100%
New File 67072 Compartive data of ash conveying system
after phasewise modification .msg100%
New File 46592 ESP pipe modification and BLU of Unit#1
for COD.msg100%
New File 301802 F4341C2-C-01-O Design instruction.pdf100%

New File 250459 Fly ash pond OSPCB Letter.pdf100%


New File 43520 FW Ash evacuation transportation from
ESP to ash silo of Unit-I.msg100%
New File 83968 FW Compartive data of ash conveying
system after phasewise modification .msg100%
New File 16.3 m FW Expert help for Unit 1 Ash
evacuation.msg100%
New File 2.9 m Fw Fwd Spillage of Ash at Hydrobin and
Geho Pump Area .msg100%
New File 24064 Fw Unit-1 shutdown due to tha ash
handling system un-working properly.msg100%
New File 75264 MoM of PG test review meeting 02-08-
14.xls100%
New File 2.2 m RE ash conveying issues.msg100%
New File 72704 Re Restarting of Unit-I for COD.msg100%

New File 28672 Re update of ash conveying system.msg


100%
New File 54272 Regarding Trial run of AHP equipments
.msg100%
New File 1.1 m UCT_Report_Unit-1 filled commented by
SEPCO.doc100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Coal
Specifications\
New File 2.8 m Comments regarding coal specs_KTPP-OL-
SEPS-GKEL-1109.pdf100%
New File 11244 Vdaf calculation sheet.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Problem
communication\
New File 67072 SEPCO communication regarding AHS problem
(No mention of coal), GKEL reply.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Rectification
communication\
New File 53760 SEPCO suggestion for modification (No
mention of coal issue).msg100%
New Dir 113 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\Coal MIS\
New File 162304 41337 MT-Linkage Coal Details.msg100%
New File 436736 41337MT- LINKAGE COAL OPEN MARKET 12000
MT DETAILS.msg100%
New File 429568 41337MT- LINKAGE COAL DETAILS (7).msg100%

New File 372224 41337MT- LINKAGE COAL DETAILS.msg100%


New File 315392 93375 MT- LINKAGE COAL DETAILS (1).msg
100%
New File 354816 93375 MT- LINKAGE COAL DETAILS (2).msg
100%
New File 371200 93375 MT- LINKAGE COAL DETAILS (3).msg
100%
New File 487936 93375 MT- LINKAGE COAL DETAILS (5).msg
100%
New File 232448 93375 MT- LINKAGE COAL DETAILS.msg100%
New File 519168 93375 MT-Linkage Coal Details (6).msg100%

New File 435712 93375 MT-Linkage Coal Details.msg100%


New File 84992 DAILY COAL RECEIVING STATUS - GKEL as on
01 06 2013 06 00 am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
02 06 2013 06 00 am.msg100%
New File 86016 DAILY COAL RECEIVING STATUS - GKEL as on
11 06 2013 06 00 am.msg100%
New File 86016 DAILY COAL RECEIVING STATUS - GKEL as on
13 06 2013 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
14 06 2013 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
25 05 2013 06 00 am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
27 05 2013 06 00 am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS AS ON 03rd-
JUL 13 - 06 00am.msg100%
New File 77824 DAILY COAL RECEIVING STATUS AS ON 18th
June 13 - 06 00hrs.msg100%
New File 78336 DAILY COAL RECEIVING STATUS AS ON 19th
June 13 - 06 00hrs.msg100%
New File 91136 DAILY COAL RECEIVING STATUS AS ON 1st
July 13 - 06 00am.msg100%
New File 77312 DAILY COAL RECEIVING STATUS AS ON 20th
June 13 - 06 00hrs.msg100%
New File 84992 DAILY COAL RECEIVING STATUS AS ON 21st
June 13 - 06 00hrs.msg100%
New File 87040 DAILY COAL RECEIVING STATUS AS ON 22nd
June 13 - 06 00hrs.msg100%
New File 81920 DAILY COAL RECEIVING STATUS AS ON 26th
JUNE 13 - 06 00hrs.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 29th
JUNE 13 - 06 00am.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 2nd
July 13 - 06 00am.msg100%
New File 74240 DAILY COAL RECEIVING STATUS AS ON 3 6
13.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 30th
JUNE 13 - 06 00am.msg100%
New File 75264 DAILY COAL RECEIVING STATUS AS ON 4 6
13.msg100%
New File 74752 DAILY COAL RECEIVING STATUS AS ON 9th
June 13 - 06 00hrs.msg100%
New File 91648 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 05th JULY- 13 - 06 00am.msg100%
New File 111616 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 06th JULY- 13 - 06 00am.msg100%
New File 110592 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 07th JULY- 13 - 06 00am.msg100%
New File 103424 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 08th JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 09th JULY- 13 - 06 00am.msg100%
New File 89600 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th JULY- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Sep- 13 - 06 00am.msg100%
New File 113152 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 11th Aug- 13 - 06 00am.msg100%
New File 107008 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 11th JULY- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 12th Aug- 13 - 06 00am.msg100%
New File 114688 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 12th JULY- 13 - 06 00am.msg100%
New File 115200 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 13th JULY- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 14th Aug- 13 - 06 00am.msg100%
New File 115712 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 14th JULY- 13 - 06 00am.msg100%
New File 112128 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 15th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 15th JULY- 13 - 06 00am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 16th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 16th JULY- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 17th Aug- 13 - 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 17th JULY- 13 - 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 18th JULY- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 19th JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 20th JULY- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 21st JULY- 13 - 06 00am.msg100%
New File 78336 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 22th JULY- 13 - 06 00am.msg100%
New File 78336 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 23th JULY- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 25th JULY- 13 - 06 00am.msg100%
New File 112640 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 27th JULY- 13 - 06 00am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 29th JULY- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 30th JULY- 13 - 06 00am.msg100%
New File 96768 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 3rd Aug- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 3rd Sep- 13 - 06 00am.msg100%
New File 96768 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 4th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 5th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 6th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 7th Aug- 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 8th Aug- 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Aug- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Sep- 13 - 06 00am.msg100%
New File 91648 DAILY COAL RECEIVING STATUS GKEL- AS ON
04th- JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-11th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-12th Sep- 13 - 06 00am (4).msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-12th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-15th Oct- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-15th Sep- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-16th Oct- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
-17th Sep- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
-19th Oct- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-1st Oct- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
-20th Oct- 13 - 06 00am.msg100%
New File 77824 DAILY COAL RECEIVING STATUS GKEL- AS ON
-21st Oct- 13 - 06 00am.msg100%
New File 102912 DAILY COAL RECEIVING STATUS GKEL- AS ON
-22nd Aug 13 - 06 00am.msg100%
New File 110592 DAILY COAL RECEIVING STATUS GKEL- AS ON
-23rd Aug 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
-23rdOct- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
-24th Oct- 13 - 06 00 am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-25th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-26th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-28th Sep- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-29th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-2nd Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-30th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-3rd Oct- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-4th Oct- 13 - 06 00am.msg100%
New File 94720 DAILY COAL RECEIVING STATUS GKEL- AS ON
-5th Oct- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
-5th Sep- 13 - 06 00am.msg100%
New File 93696 DAILY COAL RECEIVING STATUS GKEL- AS ON
-6th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-6th Sep- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-7th Oct- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-7th Sep- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-8th Oct- 13 - 06 00am.msg100%
New File 75264 FW DAILY COAL RECEIVING STATUS AS ON 5
6 13.msg100%
New File 121344 MIS-Nov & Dec Linkage Rakes at GKEL.msg
100%
New File 156160 MIS-November Linkage Rakes (8).msg100%
New File 139776 MIS-November Linkage Rakes.msg100%
New File 75264 RE DAILY COAL RECEIVING STATUS - GKEL
as on 12 06 2013 .msg100%
New File 75264 RE DAILY COAL RECEIVING STATUS AS ON 6
6 13.msg100%
New File 84992 RE DAILY COAL RECEIVING STATUS GKEL- AS
ON - 24th JULY- 13 - 06 00am.msg100%
New File 90112 RE DAILY COAL RECEIVING STATUS GKEL- AS
ON -22st Oct- 13 - 06 00am.msg100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\
New File 119296 FW Payment of 70 Crore (1).msg100%
New File 113664 FW Payment of 70 Crore.msg100%
New File 477696 FW revert regarding Non- compliance with
milestone schedule & RRT completion.msg100%
New File 53760 regarding sepco person working without
work permit in ID fan-2A.msg100%
New File 19356 Replies.docx100%
New File 32.7 m Report on Reliabality Run Test for
Unit#1.pdf100%
New File 51712 Sepco Person working without work permit
in Unit-2.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Annexure-A\
New File 16676 Status Annexure- A Unit-1,2 and 3.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Annexure-C\
New File 18205 Status of Annexure -C of RRT Unit-1,2
and 3.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Updated Annexure-B of RRT-1, 2 and 3 punch list\
New File 73019 SEPCO Unit#1 Punch points _GKEL 24-09-
14.xlsx100%
New File 75769 SEPCO Unit#3 Punch list as on 19-12-
14.xlsx100%
New File 361772 SEPCO Unit-2 Punch points_GKEL 19-12-
14.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\C&I\
New File 1.0 m CEMS commujnication.7z100%
New File 2.5 m RE Requisition list of documents for
issues related to C&I systems.msg100%
New File 224680 SWAS communication.7z100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\
New File 162 ~$eplies.docx100%
New File 14262 Ash Quantity Calculations.xlsx100%
New File 19356 Replies.docx100%
New File 114688 Requisition list for documents related to
Fuel Oil Supply Issues.msg100%
New File 136192 Requisition list for issues related to
RRT of Units 1 2 and 3.msg100%
New File 8.8 m SEPCO v GKEL - Statement of Claim.pdf100%

New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_1 Test Reports\
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_1 Test Reports\Test reports
mails\
New File 75776 RE Coal quality.msg100%
New File 123904 Annexure- 9 &11 of RRT document.msg100%
New File 21.0 m Annexure- 9 10&11 of RRT document.msg100%

New File 313856 commissioning protocol _filled for unit


#2 whole start up.msg100%
New File 463360 Filled RRT protocol.msg100%
New File 305152 FW Boiler light up protocol.msg100%
New File 479744 FW Emailing 4 Protocol_before
RRT(GMR).msg100%
New File 70144 Modifed Protocol _After RRT.msg100%
New File 2.0 m RE RRT document word copy for Unit-3
(1).msg100%
New File 1.3 m RE RRT document word copy for Unit-3.msg
100%
New File 1029632 Reviewed UCT protocol .msg100%
New File 332800 RRT document word copy.msg100%
New File 808960 UCT_Protocol for BTG and auxiliaries.msg
100%
New File 1018880 UCT_Protocol.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_10 transmittal which contains
submission of Unit 1 RRT protocol by SEPCO\
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_11 signed copies of boiler light
up, synchronization certificates etc signed by SEPCO to prove COD of Units 1 and 2\
New File 2.3 m BOILER LIGHTUP PROTOCOL- UNIT #1.pdf100%

New File 131931 COMMISSIONING PROTOCOL OF BOILER AND


TURBINE UNIT #1.pdf100%
New File 116659 MILESTONE CERTIFICATE OF BOILER LIGHT UP
UNIT #1.pdf100%
New File 176251 MILESTONE CERTIFICATE OF COAL
SYNCHRONISATION UNIT #1.pdf100%
New File 171287 MILESTONE CERTIFICATE OF OIL
SYNCHRONISATION OF UNIT #1.pdf100%
New File 186819 U#2 COAL SYNCHRO.pdf100%
New File 132495 U#2 INITIAL OPERATION.pdf100%
New File 154631 U#2 LIGHT-UP.pdf100%
New File 183159 U#2 OIL SYNCHRO.pdf100%
New File 5.0 m UNIT WHOLE STARTUP PROTOCOL UNIT #1.pdf
100%
New File 2.6 m Unit-2 Boiler Lightup protocol.pdf100%
New File 2.8 m Unit-2 Unit whole startup protocol.pdf
100%
New File 3.0 m Unit-3 boiler light up protocol..pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_12 availability % of all 3 units
during the non-full load period of respective RRTs\
New File 12186 Availability in RRT period.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_13 mails correspondences of
instances of November 2013 after RRT of Unit 1 when the work permits were being
rejected by SEPCO to GKEL personnel\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_14cross check the average daily
specific coal consumption in kgkWh as mentioned in the table on Pg 131 of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_15 cross check the equipment
trips outages during RRT of Units 1, 2 and 3 as mentioned in the table on Pg 133
of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_16 cross check the chemical log
during RRT of Units 1,2 and 3 as mentioned in the table on Page 134 of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_17 cross check the water
chemistry data during RRT of Units 1, 2 and 3 as mentioned in the table on Page 134
of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_18 validate the average Moisture
content, Ash, Fixed Carbon, Volatile Matter and Gross Calorific Value of coal
during full load and non-full load periods as set out in tables in Pag\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_19 daily usage of coal in Kg and
the resultant ash produced during the RRT of Units 1 and 2\
New File 12448 Technical writeup on CHP and AHP.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\
New File 86.7 m RRT of Unit#3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #1 Signed\
New File 32.7 m Report on Reliabality Run Test for
Unit#1.pdf100%
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #2\
New File 40232 4.Coverpage_RRT Report.docx100%
New File 43008 5.1 Brief.doc100%
New File 284160 5.10Auto loop.doc100%
New File 44074 5.2 Daily report.docx100%
New File 58880 5.3 summary of trippings.doc100%
New File 53248 5.4 Chemical log.doc100%
New File 850944 5.5 Chemical analysis log.doc100%
New File 61440 5.6 Weekly report of chemical laboratory
analysis.doc100%
New File 332800 5.7 Boiler LOG .doc100%
New File 433664 5.8Turbine Log .doc100%
New File 77312 5.9Generater LOG .doc100%
New File 40469 7.Coverpage_Protocol After RRT.docx100%
New File 244887 Annexure-B deffects and
Ommissoins_Updated Punchlist.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #2\PRE RRT PROTOCOLS
AND ANNEXURES\
New File 445440 4 Protocol_before RRT(GMR).doc100%
New File 432030 Annexure-10 Warranty Spares updated 15-
06-2013 (3).xlsx100%
New File 360412 Annexure-8 Unit-2 Punch points_GKEL.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_20 a write up on the issues
related to Stator Water Quality during RRT of Unit 1\
New File 168547 Letter to SEPCO Site-3575.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_21 copy of the Consent to Operate
for Haryana and GRIDCO\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_22 invoice from GRIDCO of May
2013\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_23 technical write up mentioning
why CHP and AHP are very critical to completion of RRT\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_24 15th Nov 2013 to 30th Nov
2013 (within the Operation Period) how many times was BLU done\
New File 3.3 m Generation Report-Nov13_Main.xls100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_25 local police called by SEPCO
on 23rd Nov 2013 or not\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_26 shift logs generator outputs
to determine Unit 1 start and stop dates in November 2013\
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_27 check the emails letters
stating detailed issues in RRT of Unit 2\
New File 242703 Letter to SEPCO Site-3438.pdf100%
New File 213051 Letter to SEPCO Site-3474.pdf100%
New File 174523 Letter to SEPCO Site-3477.pdf100%
New File 196455 Letter to SEPCO Site-3480.pdf100%
New File 429673 Letter to SEPCO Site-3517.pdf100%
New File 288304 Letter to SEPCO Site-3535.pdf100%
New File 187239 Letter to SEPCO Site-3573.pdf100%
New File 205243 Letter to SEPCO Site-3614.pdf100%
New File 155483 Letter to SEPCO Site-3615.pdf100%
New File 188515 Letter to SEPCO Site-3661.pdf100%
New File 175867 Letter to SEPCO Site-3771.pdf100%
New File 193243 Letter to SEPCO Site-3773.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_3 commissioning report for Unit 1
to\
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_3 commissioning report for Unit 1
to\Unit 1 commissioning report-pdf\
New File 114427 Annexure-3.1 LDO leak test Report.pdf100%

New File 72654 Annexure-3.2 Boiler Steam blowing data


Sheet.pdf100%
New File 32399 Annexure-3.3 Boiler hangers, support and
expansion readings.pdf100%
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 53681 Annexure-5.1 Holding time curve.pdf100%
New File 51848 Annexure-5.2 HP cylinder jacket heating
system.pdf100%
New File 20346 Annexure-5.3 TSI parameters during
rolling.pdf100%
New File 19268 Annexure-5.4 TSI parameters during
3000rpm.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 8.8 m Annexure-5.6 Unit #1 GCB failure
report.pdf100%
New File 9.4 m Annexure-5.7 Electrical tests after GCB
failure.pdf100%
New File 155198 Annexure-6.1 Main parameters at 350MW.pdf
100%
New File 20136 Annexure-7.1 Summary data Sheet.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_4 Shift in-charge operation
report (daily report) of Unit 2 and 3\
New Dir 504 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_4 Shift in-charge operation
report (daily report) of Unit 2 and 3\Shift wise operation reports from 06.05.2013
to 24.12.2013\
New File 167424 A -shift report for dated 06 06 2013.msg
100%
New File 113664 A -shift report for dated 10 10 2013 .msg
100%
New File 121856 A- shift report for dated 10 7 13.msg100%
New File 121344 A shift report for dated 12 07 2013.msg
100%
New File 118784 A- shift report for dated 17 06 13.msg
100%
New File 117248 A- shift report for dated 18 06 13.msg
100%
New File 118784 A- shift report for dated 19 06 13.msg
100%
New File 117760 A- shift report for dated 22 06 13.msg
100%
New File 123904 A- shift report for dated 9 7 13.msg100%

New File 119296 A-shift report for date 19 07 2013.msg


100%
New File 107008 A-shift report for dated 01 07 2013.msg
100%
New File 115712 A-shift report for dated 01 08 2013.msg
100%
New File 114688 A-shift report for dated 01 09 2013.msg
100%
New File 103936 A-shift report for dated 01 10 2013.msg
100%
New File 122880 A-shift report for dated 01 11 2013 .msg
100%
New File 118784 A-shift report for dated 02 07 2013.msg
100%
New File 116224 A-shift report for dated 02 08 2013.msg
100%
New File 118272 A-shift report for dated 02 09 2013.msg
100%
New File 105472 A-shift report for dated 02 10 2013.msg
100%
New File 119808 A-shift report for dated 03 06 2013.msg
100%
New File 119296 A-shift report for dated 03 07 2013.msg
100%
New File 117760 A-shift report for dated 03 08 2013.msg
100%
New File 103936 A-shift report for dated 03 09 2013.msg
100%
New File 107008 A-shift report for dated 03 10 2013.msg
100%
New File 118272 A-shift report for dated 04 06 13.msg100%

New File 119808 A-shift report for dated 04 07 2013.msg


100%
New File 117248 A-shift report for dated 04 08 2013.msg
100%
New File 96256 A-shift report for dated 04 09 2013.msg
100%
New File 116224 A-shift report for dated 04 10 2013.msg
100%
New File 171520 A-shift report for dated 05 06 2013.msg
100%
New File 117760 A-shift report for dated 05 07 2013.msg
100%
New File 119808 A-shift report for dated 05 08 2013.msg
100%
New File 117248 A-shift report for dated 05 09 2013.msg
100%
New File 115712 A-shift report for dated 05 10 2013.msg
100%
New File 117248 A-shift report for dated 05 11 2013 .msg
100%
New File 156160 A-shift report for dated 06 07 2013.msg
100%
New File 115712 A-shift report for dated 06 08 2013.msg
100%
New File 116736 A-shift report for dated 06 09 2013.msg
100%
New File 114176 A-shift report for dated 06 10 2013 .msg
100%
New File 117760 A-shift report for dated 07 06 2013.msg
100%
New File 163840 A-shift report for dated 07 07 2013.msg
100%
New File 115712 A-shift report for dated 07 08 2013.msg
100%
New File 114688 A-shift report for dated 07 09 2013.msg
100%
New File 116736 A-shift report for dated 07 10 2013 .msg
100%
New File 118272 A-shift report for dated 08 06 2013.msg
100%
New File 178176 A-shift report for dated 08 07 2013.msg
100%
New File 117248 A-shift report for dated 08 08 2013.msg
100%
New File 115200 A-shift report for dated 08 09 2013.msg
100%
New File 116224 A-shift report for dated 08 10 2013 .msg
100%
New File 160256 A-shift report for dated 09 06 2013.msg
100%
New File 149504 A-shift report for dated 09 08 2013.msg
100%
New File 116224 A-shift report for dated 09 09 2013.msg
100%
New File 115200 A-shift report for dated 09 10 2013 .msg
100%
New File 119296 A-shift report for dated 10 06 2013.msg
100%
New File 117760 A-shift report for dated 10 08 2013.msg
100%
New File 116736 A-shift report for dated 10 09 2013.msg
100%
New File 169472 A-shift report for dated 11 06 2013 .msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 117248 A-shift report for dated 11 08 2013.msg
100%
New File 117760 A-shift report for dated 11 09 2013.msg
100%
New File 113664 A-shift report for dated 11 10 2013 .msg
100%
New File 120320 A-shift report for dated 12 06 2013.msg
100%
New File 117248 A-shift report for dated 12 08 2013.msg
100%
New File 166400 A-shift report for dated 12 09 2013.msg
100%
New File 118784 A-shift report for dated 12 10 2013 .msg
100%
New File 118272 A-shift report for dated 13 06 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 116736 A-shift report for dated 13 08 2013.msg
100%
New File 96768 A-shift report for dated 13 09 2013.msg
100%
New File 110080 A-shift report for dated 13 10 2013 .msg
100%
New File 118784 A-shift report for dated 14 06 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 118784 A-shift report for dated 14 08 2013.msg
100%
New File 112128 A-shift report for dated 14 09 2013.msg
100%
New File 113152 A-shift report for dated 14 10 2013 .msg
100%
New File 119296 A-shift report for dated 15 06 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 105984 A-shift report for dated 15 08 2013.msg
100%
New File 112640 A-shift report for dated 15 09 2013.msg
100%
New File 114176 A-shift report for dated 15 10 2013 .msg
100%
New File 118272 A-shift report for dated 16 06 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 106496 A-shift report for dated 16 08 2013.msg
100%
New File 112128 A-shift report for dated 16 09 2013.msg
100%
New File 113152 A-shift report for dated 16 10 2013 .msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 17 08 2013.msg
100%
New File 113664 A-shift report for dated 17 09 2013.msg
100%
New File 108032 A-shift report for dated 17 10 2013 .msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 117760 A-shift report for dated 18 08 2013.msg
100%
New File 113664 A-shift report for dated 18 09 2013.msg
100%
New File 105472 A-shift report for dated 18 10 2013 .msg
100%
New File 124928 A-shift report for dated 19 08 2013.msg
100%
New File 120832 A-shift report for dated 19 09 2013.msg
100%
New File 113152 A-shift report for dated 19 10 2013 .msg
100%
New File 107520 A-shift report for dated 20 06 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 124928 A-shift report for dated 20 08 2013.msg
100%
New File 120832 A-shift report for dated 20 09 2013.msg
100%
New File 113664 A-shift report for dated 20 10 2013 .msg
100%
New File 99840 A-shift report for dated 21 06 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 117760 A-shift report for dated 21 08 2013.msg
100%
New File 108544 A-shift report for dated 21 09 2013.msg
100%
New File 113664 A-shift report for dated 21 10 2013 .msg
100%
New File 123904 A-shift report for dated 22 07 2013.msg
100%
New File 120320 A-shift report for dated 22 08 2013.msg
100%
New File 103424 A-shift report for dated 22 09 2013.msg
100%
New File 123904 A-shift report for dated 22 10 2013 .msg
100%
New File 119296 A-shift report for dated 23 06 2013.msg
100%
New File 124416 A-shift report for dated 23 07 2013.msg
100%
New File 121856 A-shift report for dated 23 08 2013.msg
100%
New File 95744 A-shift report for dated 23 09 2013.msg
100%
New File 123904 A-shift report for dated 23 10 2013 .msg
100%
New File 121856 A-shift report for dated 24 06 2013.msg
100%
New File 120832 A-shift report for dated 24 07 2013.msg
100%
New File 97792 A-shift report for dated 24 08 2013.msg
100%
New File 113664 A-shift report for dated 24 09 2013.msg
100%
New File 125440 A-shift report for dated 24 10 2013 .msg
100%
New File 119296 A-shift report for dated 25 06 2013.msg
100%
New File 123904 A-shift report for dated 25 07 2013.msg
100%
New File 106496 A-shift report for dated 25 08 2013.msg
100%
New File 115712 A-shift report for dated 25 09 2013.msg
100%
New File 124928 A-shift report for dated 25 10 2013 .msg
100%
New File 118784 A-shift report for dated 26 06 2013.msg
100%
New File 121856 A-shift report for dated 26 07 2013.msg
100%
New File 107008 A-shift report for dated 26 08 2013.msg
100%
New File 114688 A-shift report for dated 26 09 2013.msg
100%
New File 122368 A-shift report for dated 26 10 2013 .msg
100%
New File 155648 A-shift report for dated 27 06 2013.msg
100%
New File 124928 A-shift report for dated 27 07 2013.msg
100%
New File 117760 A-shift report for dated 27 08 2013.msg
100%
New File 115712 A-shift report for dated 27 09 2013.msg
100%
New File 113664 A-shift report for dated 27 10 2013 .msg
100%
New File 155136 A-shift report for dated 28 06 2013.msg
100%
New File 121344 A-shift report for dated 28 07 2013.msg
100%
New File 122368 A-shift report for dated 28 08 2013.msg
100%
New File 119296 A-shift report for dated 28 09 2013.msg
100%
New File 114688 A-shift report for dated 28 10 2013 .msg
100%
New File 162816 A-shift report for dated 29 06 2013.msg
100%
New File 120832 A-shift report for dated 29 07 2013.msg
100%
New File 121344 A-shift report for dated 29 08 2013.msg
100%
New File 117248 A-shift report for dated 29 09 2013.msg
100%
New File 124416 A-shift report for dated 29 10 2013 .msg
100%
New File 106496 A-shift report for dated 30 06 2013.msg
100%
New File 126464 A-shift report for dated 30 07 2013.msg
100%
New File 118784 Ashift report for dated 30 08 2013.msg
100%
New File 116224 A-shift report for dated 30 09 2013.msg
100%
New File 122880 A-shift report for dated 30 10 2013 .msg
100%
New File 121856 A-shift report for dated 31 07 2013.msg
100%
New File 118784 A-shift report for dated 31 08 2013.msg
100%
New File 122368 A-shift report for dated 31 10 2013 .msg
100%
New File 113664 B -shift report for dated 09 10 2013 .msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 118272 B- shift report for dated 17 06 13.msg
100%
New File 116736 B- shift report for dated 18 06 13.msg
100%
New File 118784 B- shift report for dated 19 06 13.msg
100%
New File 118784 B- shift report for dated 20 06 13.msg
100%
New File 117760 B- shift report for dated 21 06 13.msg
100%
New File 120832 B- shift report for dated 7 7 13.msg100%

New File 120320 B- shift report for dated 8 7 13.msg100%

New File 160768 B-shift report for dated 01 07 2013.msg


100%
New File 118272 B-shift report for dated 01 08 2013.msg
100%
New File 115200 B-shift report for dated 01 09 2013.msg
100%
New File 115712 B-shift report for dated 01 10 2013.msg
100%
New File 121856 B-shift report for dated 01 11 2013 .msg
100%
New File 107008 B-shift report for dated 02 07 2013.msg
100%
New File 118272 B-shift report for dated 02 08 2013.msg
100%
New File 116224 B-shift report for dated 02 09 2013.msg
100%
New File 115200 B-shift report for dated 02 10 2013.msg
100%
New File 123904 B-shift report for dated 03 06 2013.msg
100%
New File 107008 B-shift report for dated 03 07 2013.msg
100%
New File 116736 B-shift report for dated 03 08 2013.msg
100%
New File 114688 B-shift report for dated 03 09 2013.msg
100%
New File 116736 B-shift report for dated 03 10 2013.msg
100%
New File 121344 B-shift report for dated 04 06 2013.msg
100%
New File 117248 B-shift report for dated 04 07 2013.msg
100%
New File 117248 B-shift report for dated 04 08 2013.msg
100%
New File 115200 B-shift report for dated 04 09 2013.msg
100%
New File 115712 B-shift report for dated 04 10 2013 .msg
100%
New File 119808 B-shift report for dated 05 06 2013.msg
100%
New File 118272 B-shift report for dated 05 07 2013.msg
100%
New File 119296 B-shift report for dated 05 08 2013.msg
100%
New File 104960 B-shift report for dated 05 09 2013.msg
100%
New File 116224 B-shift report for dated 05 10 2013.msg
100%
New File 117760 B-shift report For dated 06 06 13.msg100%

New File 118784 B-shift report for dated 06 07 2013.msg


100%
New File 116224 B-shift report for dated 06 08 2013.msg
100%
New File 96256 B-shift report for dated 06 09 2013.msg
100%
New File 115712 B-shift report for dated 06 10 2013 .msg
100%
New File 167424 B-shift report for dated 07 06 2013.msg
100%
New File 115712 B-shift report for dated 07 08 2013.msg
100%
New File 117760 B-shift report for dated 07 09 2013.msg
100%
New File 118784 B-shift report for dated 07 10 2013 .msg
100%
New File 120832 B-shift report for dated 08 06 2013.msg
100%
New File 104960 B-shift report for dated 08 08 2013.msg
100%
New File 115712 B-shift report for dated 08 09 2013.msg
100%
New File 113664 B-shift report for dated 08 10 2013 .msg
100%
New File 118272 B-shift report for dated 09 06 2013.msg
100%
New File 183808 B-shift report for dated 09 07 2013.msg
100%
New File 104448 B-shift report for dated 09 08 2013.msg
100%
New File 115712 B-shift report for dated 09 09 2013.msg
100%
New File 118784 B-shift report for dated 10 06 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 116736 B-shift report for dated 10 08 2013.msg
100%
New File 115200 B-shift report for dated 10 09 2013.msg
100%
New File 116736 B-shift report for dated 10 10 2013 .msg
100%
New File 121344 B-shift report for dated 11 06 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 117760 B-shift report for dated 11 08 2013.msg
100%
New File 114688 B-shift report for dated 11 09 2013.msg
100%
New File 117760 B-shift report for dated 11 10 2013 .msg
100%
New File 118272 B-shift report for dated 12 06 2013.msg
100%
New File 118272 B-shift report for dated 12 08 2013.msg
100%
New File 115200 B-shift report for dated 12 09 2013.msg
100%
New File 112640 B-shift report for dated 12 10 2013 .msg
100%
New File 117760 B-shift report for dated 13 06 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 116736 B-shift report for dated 13 08 2013.msg
100%
New File 115200 B-shift report for dated 13 09 2013.msg
100%
New File 113664 B-shift report for dated 13 10 2013 .msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 117760 B-shift report for dated 14 08 2013.msg
100%
New File 100864 B-shift report for dated 14 09 2013.msg
100%
New File 116224 B-Shift report for dated 14 10 2013 .msg
100%
New File 118272 B-shift report for dated 15 06 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 163840 B-shift report for dated 15 08 2013.msg
100%
New File 100352 B-shift report for dated 15 09 2013.msg
100%
New File 114688 B-shift report for dated 15 10 2013 .msg
100%
New File 117760 B-shift report for dated 16 06 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 119296 B-shift report for dated 16 08 2013.msg
100%
New File 100864 B-shift report for dated 16 09 2013.msg
100%
New File 119296 B-shift report for dated 16 10 13.msg100%

New File 120320 B-shift report for dated 17 07 2013.msg


100%
New File 106496 B-shift report for dated 17 08 2013.msg
100%
New File 112640 B-shift report for dated 17 09 2013.msg
100%
New File 113664 B-shift report for dated 17 10 2013 .msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 104960 B-shift report for dated 18 08 2013.msg
100%
New File 113152 B-shift report for dated 18 10 2013 .msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 110080 B-shift report for dated 19 08 2013.msg
100%
New File 115200 B-shift report for dated 19 09 2013
(9).msg100%
New File 119296 B-shift report for dated 19 09 2013.msg
100%
New File 116224 B-shift report for dated 19 10 2013 .msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 123392 B-shift report for dated 20 08 2013.msg
100%
New File 118272 B-shift report for dated 20 09 2013.msg
100%
New File 116736 B-shift report for dated 20 10 2013 .msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 116736 B-shift report for dated 21 08 2013.msg
100%
New File 109568 B-shift report for dated 21 09 2013.msg
100%
New File 116224 B-shift report for dated 21 10 2013 .msg
100%
New File 106496 B-shift report for dated 22 06 2013.msg
100%
New File 127488 B-shift report for dated 22 07 2013.msg
100%
New File 117760 B-shift report for dated 22 08 2013.msg
100%
New File 104448 B-shift report for dated 22 09 2013.msg
100%
New File 122368 B-shift report for dated 22 10 2013 .msg
100%
New File 102400 B-shift report for dated 23 06 2013.msg
100%
New File 126976 B-shift report for dated 23 07 2013
(11).msg100%
New File 128512 B-shift report for dated 23 07 2013.msg
100%
New File 120832 B-shift report for dated 23 08 2013.msg
100%
New File 105472 B-shift report for dated 23 09 2013.msg
100%
New File 124416 B-shift report for dated 23 10 2013 .msg
100%
New File 108544 B-shift report for dated 24 06 2013.msg
100%
New File 120320 B-shift report for dated 24 07 2013.msg
100%
New File 120320 B-shift report for dated 24 08 2013.msg
100%
New File 106496 B-shift report for dated 24 09 2013.msg
100%
New File 124928 B-shift report for dated 24 10 2013 .msg
100%
New File 117760 B-shift report for dated 25 06 2013.msg
100%
New File 120320 B-shift report for dated 25 07 2013.msg
100%
New File 118272 B-shift report for dated 25 08 2013.msg
100%
New File 110080 B-shift report for dated 25 09 2013.msg
100%
New File 129024 B-shift report for dated 25 10 2013 .msg
100%
New File 117760 B-shift report for dated 26 06 2013.msg
100%
New File 120832 B-shift report for dated 26 07 2013.msg
100%
New File 118784 B-shift report for dated 26 08 2013.msg
100%
New File 118784 B-shift report for dated 26 09 2013.msg
100%
New File 121856 B-shift report for dated 26 10 2013 .msg
100%
New File 117248 B-shift report for dated 27 06 2013.msg
100%
New File 125952 B-shift report for dated 27 07 2013.msg
100%
New File 107520 B-shift report for dated 27 08 2013.msg
100%
New File 118272 B-shift report for dated 27 09 2013.msg
100%
New File 121856 B-shift report for dated 27 10 2013 .msg
100%
New File 118272 B-shift report for dated 28 06 2013.msg
100%
New File 122368 B-shift report for dated 28 07 2013.msg
100%
New File 109568 B-shift report for dated 28 08 2013.msg
100%
New File 114176 B-shift report for dated 28 09 2013.msg
100%
New File 122880 B-shift report for dated 28 10 2013 .msg
100%
New File 107520 B-shift report for dated 29 06 2013.msg
100%
New File 121344 B-shift report for dated 29 07 2013.msg
100%
New File 121344 B-shift report for dated 29 08 2013.msg
100%
New File 117248 B-shift report for dated 29 09 2013.msg
100%
New File 122368 B-shift report for dated 29 10 2013 .msg
100%
New File 157696 B-shift report for dated 30 06 2013.msg
100%
New File 123904 B-shift report for dated 30 07 2013.msg
100%
New File 115712 B-shift report for dated 30 09 2013.msg
100%
New File 115712 B-shift report for dated 30 10 2013 .msg
100%
New File 121856 B-shift report for dated 31 07 2013.msg
100%
New File 117760 B-shift report for dated 31 08 2013.msg
100%
New File 122368 B-shift report for dated 31 10 2013 .msg
100%
New File 110080 B-shift report for the dated 14 06
2013.msg100%
New File 115200 C -shift report for dated 09 10 2013 .msg
100%
New File 105984 C- shift report for dated 17 06 13.msg
100%
New File 123904 C- shift report for dated 18 06 13.msg
100%
New File 120320 C- shift report for dated 19 06 13.msg
100%
New File 116736 C- shift report for dated 20 06 13.msg
100%
New File 116736 C- shift report for dated 21 06 13.msg
100%
New File 118272 C shift report for dated 29 06 13 .msg
100%
New File 117760 C shift report for dated 30 06 13 .msg
100%
New File 118784 C- shift report for dated 7 7 13.msg100%

New File 122368 C- shift report for dated 8 7 13.msg100%

New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 119296 C-shift report for dated 01 07 2013.msg
100%
New File 115200 C-shift report for dated 01 08 2013.msg
100%
New File 114176 C-shift report for dated 01 09 2013.msg
100%
New File 113152 C-shift report for dated 01 10 2013.msg
100%
New File 112128 C-shift report for dated 01 11 2013 .msg
100%
New File 161792 C-shift report for dated 01 12 2013.msg
100%
New File 155136 C-shift report for dated 02 07 2013.msg
100%
New File 115200 C-shift report for dated 02 08 2013.msg
100%
New File 115200 C-shift report for dated 02 09 2013.msg
100%
New File 112640 C-shift report for dated 02 10 2013.msg
100%
New File 120832 C-shift report for dated 02 11 2013 .msg
100%
New File 161792 C-shift report for dated 02 12 2013.msg
100%
New File 120832 C-shift report for dated 03 06 2013.msg
100%
New File 158208 C-shift report for dated 03 07 2013.msg
100%
New File 115200 C-shift report for dated 03 08 2013.msg
100%
New File 114688 C-shift report for dated 03 09 2013.msg
100%
New File 104960 C-shift report for dated 03 10 2013.msg
100%
New File 123392 C-shift report for dated 03 11 2013 .msg
100%
New File 122368 C-shift report for dated 03 12 2013.msg
100%
New File 121856 C-shift report for dated 04 06 2013.msg
100%
New File 107008 C-shift report for dated 04 07 2013.msg
100%
New File 116736 C-shift report for dated 04 08 2013.msg
100%
New File 114688 C-shift report for dated 04 09 2013.msg
100%
New File 458240 C-shift report for dated 04 10 2013
(3).msg100%
New File 109056 C-shift report for dated 04 10 2013.msg
100%
New File 122368 C-shift report for dated 04 11 2013 .msg
100%
New File 119808 C-shift report for dated 04 12 2013.msg
100%
New File 118784 C-shift report for dated 05 06 2013.msg
100%
New File 107008 C-shift report for dated 05 07 2013.msg
100%
New File 116736 C-shift report for dated 05 08 2013.msg
100%
New File 116224 C-shift report for dated 05 09 2013.msg
100%
New File 115200 C-shift report for dated 05 10 2013 .msg
100%
New File 124928 C-shift report for dated 05 11 2013 .msg
100%
New File 121856 C-shift report for dated 05 12 2013.msg
100%
New File 117248 C-shift report for dated 06 06 2013.msg
100%
New File 117760 C-shift report for dated 06 07 2013.msg
100%
New File 116224 C-shift report for dated 06 08 2013.msg
100%
New File 115200 C-shift report for dated 06 09 2013.msg
100%
New File 115712 C-shift report for dated 06 10 2013 .msg
100%
New File 122880 C-shift report for dated 06 11 2013 .msg
100%
New File 107008 C-shift report for dated 07 06 2013.msg
100%
New File 115712 C-shift report for dated 07 08 2013.msg
100%
New File 103424 C-shift report for dated 07 09 2013.msg
100%
New File 114688 C-shift report for dated 07 10 2013.msg
100%
New File 121856 C-shift report for dated 07 11 2013 .msg
100%
New File 115200 C-shift report for dated 07 12 2013.msg
100%
New File 117760 C-shift report for dated 08 06 2013.msg
100%
New File 116224 C-shift report for dated 08 08 2013
(10).msg100%
New File 115712 C-shift report for dated 08 08 2013.msg
100%
New File 115712 C-shift report for dated 08 09 2013.msg
100%
New File 113152 C-shift report for dated 08 10 2013 .msg
100%
New File 121856 C-shift report for dated 08 11 2013 .msg
100%
New File 114688 C-shift report for dated 08 12 2013.msg
100%
New File 117760 C-shift report for dated 09 06 2013.msg
100%
New File 116224 C-shift report for dated 09 08 2013.msg
100%
New File 166912 C-shift report for dated 09 09 2013.msg
100%
New File 114176 C-shift report for dated 09 11 2013 .msg
100%
New File 114688 C-shift report for dated 09 12 2013.msg
100%
New File 118784 C-shift report for dated 10 06 2013.msg
100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 104960 C-shift report for dated 10 08 2013.msg
100%
New File 113664 C-shift report for dated 10 09 2013.msg
100%
New File 113664 C-shift report for dated 10 10 2013 .msg
100%
New File 119296 C-shift report for dated 10 11 2013 .msg
100%
New File 163840 C-shift report for dated 10 12 2013.msg
100%
New File 118272 C-shift report for dated 11 06 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 105472 C-shift report for dated 11 08 2013.msg
100%
New File 113664 C-shift report for dated 11 09 2013.msg
100%
New File 113664 C-shift report for dated 11 10 2013 .msg
100%
New File 110080 C-shift report for dated 11 11 2013 .msg
100%
New File 117760 C-shift report for dated 12 06 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 105472 C-shift report for dated 12 08 2013.msg
100%
New File 114688 C-shift report for dated 12 09 2013.msg
100%
New File 111104 C-shift report for dated 12 10 2013 .msg
100%
New File 123904 C-shift report for dated 12 11 2013 .msg
100%
New File 122368 C-shift report for dated 12 12 2013.msg
100%
New File 118272 C-shift report for dated 13 06 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 115712 C-shift report for dated 13 08 2013.msg
100%
New File 114176 C-shift report for dated 13 09 2013.msg
100%
New File 103936 C-shift report for dated 13 10 2013 .msg
100%
New File 175616 C-shift report for dated 13 11 2013 .msg
100%
New File 120320 C-shift report for dated 13 12 2013.msg
100%
New File 118272 C-shift report for dated 14 06 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 116736 C-shift report for dated 14 08 2013.msg
100%
New File 111616 C-shift report for dated 14 09 2013.msg
100%
New File 115200 C-shift report for dated 14 10 2013 .msg
100%
New File 122880 C-shift report for dated 14 11 2013 .msg
100%
New File 121344 C-shift report for dated 14 12 2013.msg
100%
New File 116736 C-shift report for dated 15 06 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118784 C-shift report for dated 15 08 2013.msg
100%
New File 111616 C-shift report for dated 15 09 2013.msg
100%
New File 117248 C-shift report for dated 15 10 2013 .msg
100%
New File 123392 C-shift report for dated 15 11 2013 .msg
100%
New File 119808 C-shift report for dated 15 12 2013.msg
100%
New File 110592 C-shift report for dated 16 06 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 117760 C-shift report for dated 16 08 2013.msg
100%
New File 112128 C-shift report for dated 16 09 2013.msg
100%
New File 112128 C-shift report for dated 16 10 2013 .msg
100%
New File 123904 C-shift report for dated 16 11 2013 .msg
100%
New File 159232 C-shift report for dated 16 12 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 119296 C-shift report for dated 17 08 2013.msg
100%
New File 101888 C-shift report for dated 17 09 2013.msg
100%
New File 113152 C-shift report for dated 17 10 2013 .msg
100%
New File 122368 C-shift report for dated 17 11 2013 .msg
100%
New File 114176 C-shift report for dated 17 12 2013.msg
100%
New File 117248 C-shift report for dated 18 08 2013.msg
100%
New File 104448 C-shift report for dated 18 09 2013.msg
100%
New File 111616 C-shift report for dated 18 10 2013 .msg
100%
New File 121856 C-shift report for dated 18 11 2013 .msg
100%
New File 114176 C-shift report for dated 18 12 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 121344 C-shift report for dated 19 08 2013.msg
100%
New File 120320 C-shift report for dated 19 09 2013.msg
100%
New File 122368 C-shift report for dated 19 10 2013 .msg
100%
New File 113664 C-shift report for dated 19 11 2013 .msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New File 109056 C-shift report for dated 20 08 2013.msg
100%
New File 118784 C-shift report for dated 20 09 2013.msg
100%
New File 124928 C-shift report for dated 20 10 2013 .msg
100%
New File 125440 C-shift report for dated 21 07 2013.msg
100%
New File 97792 C-shift report for dated 21 08 2013.msg
100%
New File 113152 C-shift report for dated 21 09 2013.msg
100%
New File 122368 C-shift report for dated 21 10 2013 .msg
100%
New File 123904 C-shift report for dated 21 11 2013 .msg
100%
New File 120320 C-shift report for dated 21 12 2013.msg
100%
New File 117248 C-shift report for dated 22 06 2013.msg
100%
New File 127488 C-shift report for dated 22 07 2013.msg
100%
New File 117248 C-shift report for dated 22 08 2013.msg
100%
New File 113664 C-shift report for dated 22 09 2013.msg
100%
New File 108544 C-shift report for dated 22 10 2013 .msg
100%
New File 118784 C-shift report for dated 22 11 2013 .msg
100%
New File 120320 C-shift report for dated 23 06 2013.msg
100%
New File 121856 C-shift report for dated 23 07 2013.msg
100%
New File 117248 C-shift report for dated 23 08 2013.msg
100%
New File 113152 C-shift report for dated 23 09 2013.msg
100%
New File 117248 C-shift report for dated 23 10 2013 .msg
100%
New File 158720 C-shift report for dated 24 06 2013.msg
100%
New File 121344 C-shift report for dated 24 07 2013.msg
100%
New File 116736 C-shift report for dated 24 08 2013.msg
100%
New File 159232 C-shift report for dated 24 09 2013.msg
100%
New File 122880 C-shift report for dated 24 10 2013 .msg
100%
New File 105984 C-shift report for dated 25 06 2013.msg
100%
New File 120320 C-shift report for dated 25 07 2013.msg
100%
New File 117248 C-shift report for dated 25 08 2013.msg
100%
New File 111104 C-shift report for dated 25 09 2013.msg
100%
New File 124416 C-shift report for dated 25 10 2013 .msg
100%
New File 117248 C-shift report for dated 26 06 2013.msg
100%
New File 121344 C-shift report for dated 26 07 2013.msg
100%
New File 116736 C-shift report for dated 26 08 2013.msg
100%
New File 110592 C-shift report for dated 26 09 2013.msg
100%
New File 120320 C-shift report for dated 26 10 2013 .msg
100%
New File 117760 C-shift report for dated 27 06 2013.msg
100%
New File 121856 C-shift report for dated 27 07 2013.msg
100%
New File 119808 C-shift report for dated 27 08 2013.msg
100%
New File 114176 C-shift report for dated 27 09 2013.msg
100%
New File 120832 C-shift report for dated 27 10 2013 .msg
100%
New File 117248 C-shift report for dated 28 06 2013.msg
100%
New File 120832 C-shift report for dated 28 07 2013.msg
100%
New File 119296 C-shift report for dated 28 08 2013.msg
100%
New File 113664 C-shift report for dated 28 09 2013.msg
100%
New File 123904 C-shift report for dated 28 10 2013 .msg
100%
New File 122368 C-shift report for dated 29 07 2013.msg
100%
New File 98816 C-shift report for dated 29 08 2013.msg
100%
New File 114688 C-shift report for dated 29 09 2013.msg
100%
New File 121344 C-shift report for dated 29 10 2013 .msg
100%
New File 124928 C-shift report for dated 30 07 2013.msg
100%
New File 98816 C-shift report for dated 30 08 2013.msg
100%
New File 117760 C-shift report for dated 30 09 2013.msg
100%
New File 120832 C-shift report for dated 30 10 2013 .msg
100%
New File 118784 C-shift report for dated 31 07 2013.msg
100%
New File 113152 C-shift report for dated 31 08 2013.msg
100%
New File 112640 C-shift report for dated 31 10 2013 .msg
100%
New File 124416 Night-shift report for dated 20 11
2013 .msg100%
New File 122880 Night-shift report for dated 23 11
2013 .msg100%
New File 122880 Night-shift report for dated 24 11
2013 .msg100%
New File 108032 Night-shift report for dated 25 11
2013 .msg100%
New File 124928 Night-shift report for dated 26 11
2013 .msg100%
New File 122880 Night-shift report for dated 27 11
2013 .msg100%
New File 115712 Night-shift report for dated 29 11
2013 .msg100%
New File 140800 Night-shift report for dated 30 11
2013.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_5 emails letter communication on
Ash Handling plant with SEPCO\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Annexure-A\
New File 15629 Status Annexure- A Unit-1,2 and 3.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Annexure-C\
New File 16719 Status of Annexure -C of RRT Unit-1,2
and 3.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Updated Annexure-B of RRT-1, 2 and 3 punch
list\
New File 75769 Annexure-B Unit#3 Punch list as on 19-
12-14.xlsx100%
New File 73019 Annexure-B Unit#1 Punch points _GKEL 24-
09-14.xlsx100%
New File 361772 Annexure-BUnit-2 Punch points_GKEL 19-12-
14.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_7 compliance list or declaring
RRT to be successful\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_8 Communication by GKEL to SEPCO
that Test Procedures\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_9 RRT test reports of Units 1 and
2, highlight the items equipment system parameters (other than AHP) which
exhibited anomalies\
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\mails\
New File 5.1 m Charging code for back charging of GT-2
of GKEL project .msg100%
New File 187904 Erection completion check sheet format
and protocol for boiler steam blowing.msg100%
New File 166912 RE Reviewed copy for colour coding of
pipelines.msg100%
New File 61440 Requirement of LDO and HFO quantity .msg
100%
New File 626176 unit characteristics test .msg100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\15. UCT & PGT\
New File 130560 Correspondence with SEPCO for PG test
reprot .msg100%
New File 46592 FW GKEL Site Meeting Action Points.msg
100%
New File 229376 LII comments on PG Test report.msg100%
New File 1.1 m mail communications with SEPCO.msg100%
New File 213504 Mom with SEPCO for PG test points.msg100%

New File 1.3 m PG test procedure.msg100%


New File 124928 RE GKEL Site Meeting Action Points
(1).msg100%
New File 75264 Re GKEL Site Meeting Action Points.msg
100%
New File 2.6 m UCT report submitted by SEPCO.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\
New File 124876 SEPCO civil-onshore inv- -091014
(Autosaved).xlsx100%
New File 220804 SEPCO Offshore.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\mail communication\
New Dir 26 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\mail communication\LC\
New File 46592 FW FW LC FOR USD 8 78 084 - FAVG
SEPCO (1).msg100%
New File 845312 Fw FW LC FOR USD 8 78 084 - FAVG
SEPCO .msg100%
New File 100864 FW LC format for second consignment.msg
100%
New File 103424 Fw GKEL - LC Payment mechanism to SEPCO
(4).msg100%
New File 126464 FW GKEL - LC Payment mechanism to SEPCO
(6).msg100%
New File 108032 FW GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 679936 FW OPEN AND ISSUE THE L C(OL-0029)
(1).msg100%
New File 669184 FW OPEN AND ISSUE THE L C(OL-0029).msg
100%
New File 49664 FW Payment received.msg100%
New File 58368 FW Revised covering letter of SEPCO.msg
100%
New File 45568 FW SEPCO - Payment received.msg100%
New File 85504 LC format for second consignment.msg100%

New File 77824 payment for the sencond consignment.msg


100%
New File 61440 RE FW LC FOR USD 8 78 084 - FAVG
SEPCO (2).msg100%
New File 57344 Re FW LC FOR USD 8 78 084 - FAVG
SEPCO .msg100%
New File 83968 Re RE GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 68096 Re GKEL - LC Payment mechanism to SEPCO
(1).msg100%
New File 109568 Re GKEL - LC Payment mechanism to SEPCO
(10).msg100%
New File 101888 Re GKEL - LC Payment mechanism to SEPCO
(2).msg100%
New File 73216 Re GKEL - LC Payment mechanism to SEPCO
(3).msg100%
New File 109056 RE GKEL - LC Payment mechanism to SEPCO
(5).msg100%
New File 90112 RE GKEL - LC Payment mechanism to SEPCO
(7).msg100%
New File 88064 Re GKEL - LC Payment mechanism to SEPCO
(8).msg100%
New File 156672 RE GKEL - LC Payment mechanism to SEPCO
(9).msg100%
New File 143872 RE GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 39424 Revise of LC format.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\
New File 63488 RE Entry Tax Details for Sepco .msg100%

New File 3.2 m ?? Tax to be claimed from GMR.msg100%


New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\
New File 14210 Contract clause for reimbursement of
TAX.docx100%
New File 12038 Tax reimbusement status from GMR .xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ET Claim documents\
New File 323109 ET001.pdf100%
New File 695261 ET002.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\Balance short reimbursement
of ST\
New File 4.0 m Audit conclusion ST12-13.bmp100%
New File 596504 KTPP-OL-SEPS-GKEL-0609.pdf100%
New File 329150 MOM service tax.pdf100%
New File 79378 Notification_No._24_2012_-
_Service_Tax,_dated_06-06-2012.html100%
New File 25389 SEPCO ST workings - # 4.xlsx100%
New File 31570 SEPCO ST workings# 1,2,3.xlsx100%
New File 29234 service tax opinion 09-12-2014.docx100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\ST 41.2lacs claim\
New File 4.0 m Audit conclusion ST12-13.bmp100%
New File 253166 KTPP-OL-SEPS-GKEL-0467.pdf100%
New File 123491 Notification of changing tax rate.pdf100%

New File 134144 POT.PPT100%


New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\ST return\
New File 475901 Form ST-3 12-13Q-2.pdf100%
New File 119467 Sepco2 St3 H2 13-14 (org).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\20. Suspension of Unit#4\
New File 520283 SHP01.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\
New File 1.7 m Letter to SEPCO Site-306.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Boundary Wall\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Delay\
New File 1.4 m MIX DESIGN.PDF100%
New Dir 16 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Land\
New File 6.7 m Doc-1-GKEL to IPICOL.7z100%
New File 8.6 m Doc-5.7z100%
New File 19316 Land Cost details paid to IDCO.xlsx100%
New File 19278 M.1 Land_No objection from Panchayat
1050MW.pdf100%
New File 144621 M.2 Approval from Gram Panchayat
regarding 1400MW.pdf100%
New File 114035 M.3 Approval from Gram Panchayat
regarding watch dogs.pdf100%
New File 157195 M.4 Approval from Gram Panchayat
regarding Township.pdf100%
New File 1010176 Monthly report april 2010(transmittal
0220).msg100%
New File 70298 O.1 Strenghtening of Road rwd.pdf100%
New File 174600 O.2 Permission for strengthening
bridge.pdf100%
New File 165888 RE Monthly progress report -may 2010
(transmittal 0253) (1).msg100%
New File 156672 RE Monthly progress report -may 2010
(transmittal 0253).msg100%
New File 8.8 m RE Requisitions for land acquisition
issue SEPCO Arbitration (1).msg100%
New File 6.8 m RE Requisitions for land acquisition
issue SEPCO Arbitration .msg100%
New File 207872 reply comments on monthly
report(transmittal 0226).msg100%
New File 207872 reply on comments of monthly
report(transmittal 0164).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\
New File 854528 12. FW Excavation Scheme of Main Building
Boiler Foundation of Unit 123.msg100%
New File 1.7 m 16. RE SEPCO Arbitration Requisitions
Clarifications for site access issue.msg100%
New File 1.5 m 16. Sahu Family Dispute -Case.pdf100%
New File 138240 5. Comments on Monthly Progress Report
-January 2010.msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\1. soil
investigation report\
New File 1.7 m 414.pdf100%
New File 1.4 m 415.pdf100%
New File 1.4 m 416.pdf100%
New File 1.4 m 417.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\1. soil
investigation report\Geo tech report\
New File 5.5 m FW GEOE07234 3X350 MW GKEl TPP Commnets
on Geo technical investigation Report .msg100%
New Dir 15 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\4. Blasting
License\
New File 134663 1765.pdf100%
New File 130415 782.pdf100%
New File 279560 annex_3003201109010400.pdf100%
New File 439076 Approval for extension of blasting
license upto 31.03.2012.pdf100%
New File 556112 Approval for MAA Tarini-64.pdf100%
New File 465228 Approvals for Shiv shakti and Swapenswar-
960.pdf100%
New File 478104 Blasting extension till 31.03.2012-
728.pdf100%
New File 408330 blasting-ps.pdf100%
New File 205129 blating.pdf100%
New File 269792 extension of blasting time.pdf100%
New File 147183 Let to DM - approval of blasting agency -
Burhani Exp Ltd.pdf100%
New File 307323 Letter No 800-BSP.pdf100%
New File 841803 MoM on Blasting dated 04.05.11.pdf100%
New File 342776 Monthly Report on Blasting 228.pdf100%
New File 153745 TARENI EXPLOSIVES.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\
New File 78336 RE Ambiguity regarding the L2 Schedules
Schedule L1 & L2.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\L1 schedule\
New File 231555 KTPP-0-SEPC-PLA-SH-0001 Schedule
level ?.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\L2 schedule\
New File 1020983 KTPP-0-SEPC-PLA-SH-0002 Schedule level ?
(1).pdf100%
New File 1.3 m The recover L-2 schedule(20110610).pdf
100%
New Dir 20 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\
New File 16.8 m Copy of Shipping Schedule for GMR
Kamalanga4350MW Power Plant 100613.xls100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D (2).doc100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D (3).doc100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.doc100%
New File 31578 Revised SEPCO shipping-invoicing .xlsx
100%
New File 31690 SEPCO BBU n shipping schedule.xlsx100%
New File 1046016 shipping schedule for GMR Kamalanga
3x350MW Power plant Rev.B.doc100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F (2).pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F (3).pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 325632 Shipping Schedule for GMR Kamalanga Rev E
(3).xls100%
New File 1026560 shipping schedule for GMR
Kamalanga3x350MW Power plant.doc100%
New File 1037312 shipping schedule for GMR
Kamalanga3x350MW Power plant-RevA.doc100%
New File 1.0 m shipping schedule for GMR Kamalanga3350MW
Power plant-A.doc100%
New File 1.9 m shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.DOC100%
New File 958278 shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.PDF100%
New File 10.0 m Shipping schedule(signed and stamped).pdf
100%
New File 10.0 m Shipping schedule(signed and stamped)-rev
F.pdf100%
New File 10.2 m signed shipping schedule.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\Shipping sch\
New File 40042 bill of entry details-SEPCO.xlsx100%
New File 24705 Comprison of original shipping schedule
vs actual-till Jan14.xlsx100%
New File 16.8 m Copy of Shipping Schedule for GMR
Kamalanga4350MW Power Plant 100613.xls100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.doc100%
New File 1046016 shipping schedule for GMR Kamalanga
3x350MW Power plant Rev.B.doc100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 3.6 m Shipping Schedule for GMR Kamalanga
USD.rar100%
New File 1037312 shipping schedule for GMR
Kamalanga3x350MW Power plant-RevA.doc100%
New File 1.0 m shipping schedule for GMR Kamalanga3350MW
Power plant-A.doc100%
New File 1.9 m shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.DOC100%
New File 958278 shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.PDF100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\Shipping Schedule\
New File 231555 KTPP-0-SEPC-PLA-SH-0001 Schedule
level ?.pdf100%
New File 1020983 KTPP-0-SEPC-PLA-SH-0002 Schedule level ?
(1).pdf100%
New File 84992 KTPP-OT-SEPC-GKEL-2153.doc100%
New File 16.4 m L2 Schedule.pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 325632 Shipping Schedule for GMR Kamalanga Rev E
(3).xls100%
New File 10.0 m Shipping schedule(signed and stamped)-rev
F.pdf100%
New File 1.3 m The recover L-2 schedule(20110610).pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Sushil Sir\
New File 8.5 m RE SEPCO Arbitration Requisitions
Clarifications for site access issue.msg100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\4. Construction Water\
New File 5.0 m C-57 GKEL-Angul-SEPCO-10-11-674
reimbursement for payment made against construction water.pdf100%
New File 418816 FW Commissioning report of flow meter
for construction water.msg100%
New File 44544 FW construction water pipe line job .msg
100%
New File 38912 FW Construction Water water pumping to
reservoir..msg100%
New File 2.9 m GMR Quarterly Progress Report no 3.pdf
100%
New File 5.4 m GMR Quarterly Progress Report no 4.pdf
100%
New File 229655 Ground Water Permission.pdf100%
New File 2.3 m Letter to SEPCO Site-1863.pdf100%
New File 1.7 m Letter to SEPCO Site-306.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\4. Construction Water\Water Tankers PO\
New File 1.0 m 4800007860.pdf100%
New File 1.0 m 4800008460.pdf100%
New File 1.0 m 4800010126.pdf100%
New File 1.0 m 4800011502.pdf100%
New File 1.0 m 4800017616.pdf100%
New File 1.0 m PO-Water Tanker-Basant Jena-2010.pdf100%

New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\5. Preliminary\
New File 2.6 m C-71 Dliverable list and submission
schedule dated and signed 22 Jan 2010.pdf100%
New File 18813 Drawing Details_WIP.xlsx100%
New File 389120 FW Revision of Document Deliverable
Schedule - Monthly report (transmittal 0324).msg100%
New File 4.0 m kom 23.07.09_2707200911094900.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\
New File 4.0 m 3 monthly drawing schedule(transmittal
0183).msg100%
New File 192872 annexure-I- Drawings schedule -20100904
Rev A.xlsx100%
New File 90112 KTPP-OT-SEPC-GKEL-0151.doc100%
New File 118272 schedule cover-A.DOC100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\C&I\
New File 104960 adnexa 4-Updated GMR project deliverable
schedule 26 03 10(I&C).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Civil\
New File 126976 adnexa 1-Updated GMR project deliverable
schedule 26 03 10(civil).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Electrical\
New File 393728 adnexa 2-Updated GMR project deliverable
schedule 26 03 10(Electrical).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Mechanical\
New File 241152 adnexa 3-Updated GMR project deliverable
schedule 26 03 10(Mechnical).xls100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\
New File 173056 Design principle considering 4 units.msg
100%
New File 17218 Drawing Details_Final_v1.xlsx100%
New File 633344 Drawings Deliverables Status - Edited
Copy.xls100%
New File 633344 Drawings Deliverables Status.xls100%
New File 389120 FW Revision of Document Deliverable
Schedule - Monthly report (transmittal 0324).msg100%
New File 37034 Master List of Preliminary Engineering
docs.xlsx100%
New File 4.7 m Resulations on M-01-08.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CCB\
New File 353792 excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 195584 FW Reply on the CCR scheme(transmittal
0160).msg100%
New File 142336 RE excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 144896 RE T0326-Foundation of CCB-0(transmittal
0540).msg100%
New File 182272 Reply comments on excavation drawing of
CCB fdn (transmittal 0484).msg100%
New File 821019 Resolutions & Content Sheet.pdf100%
New File 1.3 m T0326-Foundation of CCB-0(transmittal
0540).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CCB Erection\
New File 2.7 m T0327 comment.pdf100%
New File 5.7 m T0327-0 steel structure for CCB
(transmittal 0666).msg100%
New Dir 59 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\Chimney delay\
New File 591872 calculation for foundation of chimney
(transmittal 0372).msg100%
New File 3.5 m Chimney Drawing .msg100%
New File 46080 chimney foundation & ESP foundation &
track hopper drawing review.msg100%
New File 44544 chimney foundation drawing review.msg100%

New File 56320 Chimney foundation drawings review.msg


100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 195072 confirming of chimney design issue(OL
0014).msg100%
New File 200192 Draft of Mechanical Resolutions.msg100%
New File 394752 excavation drawing of chimney & comments
(transmittal 0336).msg100%
New File 338944 excavation plan of chimneys' foundation
pit (transmittal 0329).msg100%
New File 696320 export mode of construction machinery of
chimney (OL-0041).msg100%
New File 850944 foundation drawing of chimney for
prepare discussion.msg100%
New File 423424 FW About the chimney report.msg100%
New File 428544 FW About the chimney report1.msg100%
New File 5.0 m FW Chimney Contractor for GKEL -
Transmittal from SEPCO site KTPP-OT-SEPS-GKEL-0045.msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 51200 FW confirming of chimney design issue(OL
0014) (1).msg100%
New File 44032 FW confirming of chimney design issue(OL
0014) (2).msg100%
New File 209920 FW confirming of chimney design issue(OL
0014).msg100%
New File 60416 FW export mode of construction machinery
of chimney (OL-0041).msg100%
New File 252928 FW for chimney review .msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 73216 FW GEOE07234 GMR Kamalanga TPP
Information required from SEPCO for chimney drawings review .msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 81408 FW GMR Kamalanga Chimney discussions
on 29th October'10.msg100%
New File 1.0 m FW Review of 275m tall chimney design -
Commented drg of embedded parts.msg100%
New File 1.0 m FW Review of 275m tall chimney design -
embedded parts.msg100%
New File 992768 FW Review of design of 275m tall chimney
Embedded parts.msg100%
New File 903168 FW Review of design of 275m tall chimney
Reinforcement around openings .msg100%
New File 1.0 m FW T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 136704 FW Visit of Mr Onkar kapoor on 24th
Sept' 2010.msg100%
New File 116224 General working instructions of
Chimney.msg100%
New File 103424 GEOE07234 GMR Kamalanga TPP - Design of
TG Raft Tg Deck and Chimney.msg100%
New File 133632 GMR Kamalanga Chimney discussions on
29th October'10.msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 76800 RE Chimney foundation drawings review
and Approval.msg100%
New File 146432 RE excavation drawing of chimney &
comments (transmittal 0336).msg100%
New File 143360 RE excavation plan of chimneys'
foundation pit (transmittal 0329).msg100%
New File 56832 RE export mode of construction machinery
of chimney (OL-0041) (1).msg100%
New File 62976 RE export mode of construction machinery
of chimney (OL-0041).msg100%
New File 65536 RE General working instructions of
Chimney.msg100%
New File 140800 RE GMR Kamalanga Chimney discussions
on 29th October'10 (1).msg100%
New File 152064 RE GMR Kamalanga Chimney discussions
on 29th October'10 (2).msg100%
New File 163328 RE GMR Kamalanga Chimney discussions
on 29th October'10 (3).msg100%
New File 261632 RE GMR Kamalanga Chimney discussions
on 29th October'10.msg100%
New File 161792 RE revised drawings for 4 units
(transmittal 0335).msg100%
New File 2.5 m RE T0331-D chimney foundation
(transmittal 0660).msg100%
New File 147968 RE T0334-0-Maintenance Platforms'
drawings of stack(transmittal 0773).msg100%
New File 156160 RE T0401-0-Construction drawing of flue
gas duct racks (transmittal 0770).msg100%
New File 109056 RE Visit of Mr Onkar kapoor on 24th
Sept' 2010.msg100%
New File 58880 Resolutions for T0333.msg100%
New File 95744 Response to chimney drawing.msg100%
New File 998400 T0331- B-CHIMNEY FOUNDATION
DRAWINFS(transmittal 0623).msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.0 m T0331-D chimney foundation (transmittal
0660).msg100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New File 157696 T0333-Chimney inner tube (transmittal
0772).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CW Pump house\
New File 147456 RE S5301Excavation drawings of CW pump
house (transmittal 0437).msg100%
New File 212205 Resolutions.pdf100%
New File 719529 S5301-01.PDF100%
New File 586752 S5301Excavation drawings of CW pump house
(transmittal 0437).msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\DM Water\
New File 163328 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 113664 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 145920 RE T0701-Foundation of DM plant house
and assay building (transmittal 0485).msg100%
New File 1.0 m Resolutions & Content Sheet.pdf100%
New File 1.8 m T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 1.1 m T0701-Foundation of DM plant house and
assay building (transmittal 0485).msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Masterlist\
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Masterlist\Chimney Design\
New File 53248 Chimney design.msg100%
New File 676436 Chimney.zip100%
New File 2.5 m Commented drawings..msg100%
New File 3.0 m FW BALCO Chimney collapse analysis
report .msg100%
New File 99328 FW Comments on T0331 Chimney foundation
drawings calculation (transmittal 0506).msg100%
New File 3.4 m FW Design Informations on Chimney at
GKEL..msg100%
New File 1048064 FW T0331-D chimney foundation
(transmittal 0660).msg100%
New File 131584 Jiangsu xinggang company brief.msg100%
New File 3.0 m jiangsu xinggang form.msg100%
New File 1.6 m Minutes of meeting(Chimney).pdf100%
New File 1.2 m RE Calculationvalues of Chimney raft.msg
100%
New File 1.6 m Review of 275m tall chimney design -
Approved Foundation drawings.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Unit 1- 3\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Unit 4\
New File 3.0 m FW BALCO Chimney collapse analysis
report .msg100%
New File 68608 RE Comments on Technical specification
of CCWP&CTP and Steam Turbine Aux Oil Pumps.msg100%
New File 11.8 m RE Requisition list for issues related
to design changes caused by introduction of Unit 4.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Detail Design\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\IFC\
New File 972563 Content Sheet.pdf100%
New File 3.6 m Resolutions.pdf100%
New File 1.7 m T0601-01.PDF100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Preliminary Dwg\
New File 4.8 m Coal Handling Plant - 2009.pdf100%
New File 860068 Z-01-[4x350]-Civil.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Preliminary Dwg\2010\
New File 496257 37-F4341C2-M-02.PDF100%
New File 603041 37-F4341C2-M-03.PDF100%
New File 205198 37-F4341C2-M-04.PDF100%
New File 371942 37-F4341C2-M-05.PDF100%
New File 419345 37-F4341C2-M-06.PDF100%
New File 278496 37-F4341C2-M-07.PDF100%
New File 343129 37-F4341C2-M-08.PDF100%
New File 888335 37-F4341C2-Z-02.PDF100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\ESP\
New File 5.4 m FW clarification on Engineering Scale
Plan (ESP) of Railway Siding.msg100%
New File 5.2 m FW Engineering Scale Plan (ESP) of
Railway Siding.msg100%
New File 8.5 m FW Layout & Schematic Drawing of Raw
Water Pump House.msg100%
New File 9.5 m Reply to Cao Mail.msg100%
New Dir 20 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\para 287\
New File 160768 para 287- point 10-T0611-REV.0 Structural
drawing of No.2 conveyor gallery and lighting house (transmittal 0896).msg100%
New File 158208 para 287- point 11-T0604-Structural
drawing of TT2-REV.0(transmittal 0971).msg100%
New File 314368 para 287- point 13 and reply-FW GEOE07234
GKEL 4 x 350 MW TPP Comments on Structural dwg of crusher house- REV 0 calc
T0606.msg100%
New File 237568 para 287- point 13-delay- RE T0606-
Structural drawing of crusher house- REV 0 calculation (transmittal 1063).msg100%

New File 125440 para 287- point 14 and reply-FW K0226


FEEDWATER PUMP PROPER SYSTEM PID WITH IO AND EQUIPMENT LIST(transmittal 1094).msg
100%
New File 4.5 m para 287- point 1-T0609-0-STRUCTURAL
DRAWING OF NO.6 TRANSFER TOWER REV0 (transmittal 0596)-.msg100%
New File 2.2 m para 287- point 2-T0614 CONSTRUCTION
DRAWING OF NO.6 CONVEYOR GALLERY RVE-0 (transmittal 0598).msg100%
New File 7.0 m para 287- point 3-T0615-0-Structural
drawing of No.8 conveyor gallery and lighting house (transmittal 0604).msg100%
New File 4.4 m para 287- point 4-T0613-0 drawing
calculation of No. 4 conveyor gallery(transmittal 0625).msg100%
New File 159744 para 287- point 5 and reply-RE T0603-0-
Structural drawing of No.1 transfer tower (transmittal 0650).msg100%
New File 160768 para 287- point 6-T0612-0-NO.3 CONVERYOR
GALLERY (transmittal 0698).msg100%
New File 160256 para 287- point 7 and reply-RE T0605-
STRUCTURAL DRAWING OF No.3 TRANSFER TOWER (transmittal 0750).msg100%
New File 157184 para 287- point 8 and reply-RE
T0608(2)UNDERGROUND STRUCTURAL DRAWING OF TT5 (transmittal 0751).msg100%
New File 248320 para 287- points 9, 10 and 12-Drawing
status 20110308-0.msg100%
New File 237568 para 287- reply of point 13-RE T0606-
Structural drawing of crusher house- REV 0 calculation (transmittal 1063).msg100%

New File 145408 para 287- reply of point 1-RE T0609-0-


STRUCTURAL DRAWING OF NO.6 TRANSFER TOWER REV0 (transmittal 0596).msg100%
New File 152064 para 287- reply of point 2-RE T0614
CONSTRUCTION DRAWING OF NO.6 CONVEYOR GALLERY RVE-0 (transmittal 0598).msg100%
New File 154624 para 287- reply of point 3- RE T0615-0-
Structural drawing of No.8 conveyor gallery and lighting house (transmittal
0604).msg100%
New File 152576 para 287- reply of point 4-RE T0613-0
drawing calculation of No. 4 conveyor gallery(transmittal 0625).msg100%
New File 158208 para 287- reply of point 6-RE T0612-0-
NO.3 CONVERYOR GALLERY (transmittal 0698).msg100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\
New File 154112 Comments on Technical Specification of
400kV Switchyard.msg100%
New File 1.3 m Deviation of the 400kV switchyard
equipment (transmittal 0446).msg100%
New File 332800 FW Engineering Progress - KTPP-OL-SEPS-
GKEL-0399-Regarding Progress of works at Site.msg100%
New File 15.6 m FW Requisition list for issues related
to 400 KV switchyard.msg100%
New File 411137 MOM.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\Contract\
New File 1.6 m 400KV amendment(1).pdf100%
New File 1.6 m 400KV amendment.pdf100%
New File 12.4 m 400KV??????????(20101015)(1).pdf100%
New File 27.5 m Civil works, erection-VOLUME I
(COMMERCIAL PART).pdf100%
New File 61.3 m TECHNICAL SPECIFICATION .pdf100%
New File 27.5 m VOLUME I (COMMERCIAL PART).pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\SOC ref\
New File 711123 C-101 20110204 GKELShifting of 400 KV
Switchyard coordinates towares GT.pdf100%
New File 181947 C-102 20110223 KTPP-OL-SEPS-GKEL-0208.pdf
100%
New File 1.7 m C-103 KTPP-OL-SEPS-GKEL-0216.pdf100%
New File 1.2 m C-104 20110329 GKEL Email re 400kv
switchyard.pdf100%
New File 832688 C-105 20110329 GKEL letter 807 re Change
in the design of 400kV Switchyard.pdf100%
New File 35115 C-107 SEPCO Monthly Progress Report June
2011 pages 1 and 19.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\8. Change in Law\
New File 52934 Appendix - 7 Circulars - on Foreign
Nationals in India.pdf100%
New File 144559 Appendix - 9 -rajya sabha-empolyment
visa.xps100%
New File 143360 ATTACHMENT VIII Man Power Deployment
Schedule 24.06.09.xls100%
New File 159329 Man power deployment.zip100%
New File 11562 manpower analysis.xlsx100%
New File 19162 Sepco Manpower List.zip100%
New File 39486 visa guidelines for chinese
streamlined.mht100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\
New File 269312 Addendum-project policy.doc100%
New File 77734 custom clearance process.docx100%
New File 22833 Custom clearance.xlsx100%
New File 3.3 m Custom Clearence.zip100%
New File 641536 FW Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 1001472 FW shipping schedule.msg100%
New File 615473 Project insurance-(Marine_SCE).pdf100%
New File 375808 RE Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New Dir 16 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\
New File 202240 Billing Breakup for Civil works.msg100%
New File 66048 Confirmation of the port of loading of
critical items.msg100%
New File 29184 Fw 2nd Shipment.msg100%
New File 168448 FW Customs Registration.msg100%
New File 97280 FW duty calculation for silver safety A
C GMR.msg100%
New File 48128 FW Incorporate Site Address in IEC.msg
100%
New File 740864 FW Notification of 4th shipment(OL-
0033).msg100%
New File 179200 FW scan copy of DD.msg100%
New File 153781 Letter to SEPCO Site-1426.pdf100%
New File 91136 Minutes of Meeting_20 10
10_commercial.msg100%
New File 45568 Project Insurance for 4th Unit.msg100%
New File 36864 Re 2nd Shipment.msg100%
New File 98304 RE Delivery Notification of the third
country cargos (OL-0092).msg100%
New File 96768 RE duty calculation for silver safety A
C GMR.msg100%
New File 59392 RE Fw Project registration documents
for GMR required.msg100%
New File 56320 RE Notification of 4th shipment(OL-
0033).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\10th Shipment\
New File 55296 FW PAYMENT NOTICE.msg100%
New File 328950 KTPP-OL-SEPS-GKEL-0231.pdf100%
New File 378866 KTPP-OL-SEPS-GKEL-0241.pdf100%
New File 122465 Letter to SEPCO Site-832.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\12th Shipment\
New File 81408 RE Request for Customs duty approval for
12B and 13th shipment.msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\17th shipment\
New File 67072 FW 17th shipment Customs duty working
(1).msg100%
New File 126464 FW 17th shipment Customs duty
working.msg100%
New File 301806 KTPP-OL-SEPS-GKEL-0272.pdf100%
New File 348266 KTPP-OL-SEPS-GKEL-0275.pdf100%
New File 1.1 m Letter to SEPCO Site-1022.pdf100%
New File 532188 Letter to SEPCO Site-1056.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\21st shipment\
New File 217600 FW Delivery Notification of 21th
Shipment from shanghai(OL-0154) .msg100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\24th 25th shipment\
New File 170496 FW Delivery Notification of 24th
Shipment(0L-0188).msg100%
New File 640000 FW Documents of GMR 24th shipment M V
PRINCE HENRY.msg100%
New File 724721 KTPP-OL-SEPS-GKEL-0367.pdf100%
New File 263405 KTPP-OL-SEPS-GKEL-0375.pdf100%
New File 328926 KTPP-OL-SEPS-GKEL-0380.pdf100%
New File 208673 Letter to SEPCO Site-1303.pdf100%
New File 145913 Letter to SEPCO Site-1425.pdf100%
New File 209885 Letter to SEPCO Site-1475.pdf100%
New File 61952 RE Letter from Andhra Bank.msg100%
New File 198144 RE Re Regarding documents of GMR 25th
shipment M V J SHINE.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\29th Shipment\
New File 414881 Letter to SEPCO Site-1642.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\3rd Shipment\
New File 2.2 m BoE-MV SIVER Safety, GMR0001.pdf100%
New File 116141 DD.pdf100%
New File 625188 Document of 3rd Shipment.doc100%
New File 78336 FW Delivery notification of 3rd shipment
(OL-0034) (1).msg100%
New File 698368 FW Delivery notification of 3rd shipment
(OL-0034).msg100%
New File 696320 FW Destination port of 3rd shipment(OL-
0030) (1).msg100%
New File 1.3 m FW Document of 3rd shipment (OL-
0035).msg100%
New File 717824 FW Notification of 3rd shipment(OL-
0024).msg100%
New File 139776 FW GMR 3rd Shipment customs duty
working.msg100%
New File 73216 FW Mv.Silver Safety - 3rd shipment of GMR
- Bill of Entry.msg100%
New File 466412 Letter to SEPCO Site-517.pdf100%
New File 62976 RE Delivery notification of 3rd shipment
(OL-0034).msg100%
New File 78336 RE Destination port of 3rd shipment(OL-
0030).msg100%
New File 65536 RE Document of 3rd shipment (OL-0035)
(1).msg100%
New File 64000 RE Document of 3rd shipment (OL-
0035).msg100%
New File 118784 RE Transportation Status of 3rd
shipment.msg100%
New File 107520 RE Fw GMR3?????.msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\4th Shipment\
New File 767870 BOE-4th shipment.pdf100%
New File 2.2 m FW Document of 4th Shipment(OL-0047).msg
100%
New File 333686 KTPP-OL-SEPS-GKEL-0160.pdf100%
New File 473642 KTPP-OL-SEPS-GKEL-0168.pdf100%
New File 358928 Letter to SEPCO Site-601.pdf100%
New File 87552 RE GMR4th shipment duty.msg100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\7th Shipment\
New File 59904 Custom duty for 7th shipment-1.msg100%
New File 57856 FW Document of 7th shipment (OL-0074)
(3).msg100%
New File 85504 FW Document of 7th shipment (OL-0074)
(4).msg100%
New File 2.2 m FW Document of 7th shipment (OL-0074)
(5).msg100%
New File 2.2 m FW Document of 7th shipment (OL-0074)
(6).msg100%
New File 45568 FW Document of 7th shipment (OL-
0074).msg100%
New File 45056 FW Import certificate by Energy
Secretary - Govt of Orissa.msg100%
New File 711680 Notification of 7th shipment(OL-0054).msg
100%
New File 73216 RE Custom duty for 7th shipment (1).msg
100%
New File 70144 RE Custom duty for 7th shipment (2).msg
100%
New File 49152 RE Custom duty for 7th shipment (3).msg
100%
New File 73216 RE Custom duty for 7th shipment -2.msg
100%
New File 72192 RE Custom duty for 7th shipment.msg100%

New File 64000 RE Document of 7th shipment (OL-0074)


(1).msg100%
New File 39936 RE Document of 7th shipment (OL-0074)
(2).msg100%
New File 67072 RE Document of 7th shipment (OL-
0074).msg100%
New File 65024 RE Slow progress of discharge at
Paradip.msg100%
New Dir 11 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\Project import\
New File 641536 FW Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 716800 FW Project Import Certificate (4).msg
100%
New File 710144 FW Project Import Certificate (5).msg
100%
New File 739840 FW Project Import Certificate.msg100%
New File 64000 Letter to PS for Project Import
Certificate.msg100%
New File 208673 Letter to SEPCO Site-1303.pdf100%
New File 375808 RE Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 48128 Re Project Import Certificate (1).msg
100%
New File 52224 RE Project Import Certificate (2).msg
100%
New File 62464 RE Project Import Certificate (3).msg
100%
New File 54272 RE Project Import Certificate.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\TC\
New File 193536 FW Document of TC4 & TC5 shipment(OL-
0126).msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\
New Dir 50 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\Project Documents\
New File 107044 13) Mega Power Status Certificate.pdf100%

New File 238296 1491_001.pdf100%


New File 67584 Anil Varne April 2015 Demurrage and
detention charges.msg100%
New File 338944 Approval for Project Policy Extension of
Kamalanga Project expiring on 19th Nov 2012.msg100%
New File 683270 Bill of Lading.pdf100%
New File 244224 Certificate-SCAN-MARINE.doc100%
New File 9.2 m Construction Power Completion.pdf100%
New File 543380 Custom letter for BG.pdf100%
New File 49150 Customs duty Paid Abstract-GKEL-
301214.xlsx100%
New File 80384 Drum lifting of unit-II of GKEL on 31 05
11 early hours.msg100%
New File 191195 ENERGY 7272.pdf100%
New File 59392 FW Custom duty Calculation for TC-6&TC-7
shipments a c GMR-Reg .msg100%
New File 53760 FW Customs duty vide Inv No SEPCO-
GKEL-OFFSHORE-003 TC (USD) Dt 22 02 2011 A c GMR TC-3rd Shipment.msg100%
New File 3.5 m FW Document of 19th Shipment(OL-0155)
.msg100%
New File 2.2 m FW Document of 20th Shipment(OL-0158)
.msg100%
New File 549376 FW Draft Report in GKEL-SEPCO - Steps
forward.msg100%
New File 41472 FW Release of 17 c Consignment.msg100%
New File 66048 FW Request Letters for TRA for TC6 &
7.msg100%
New File 98304 Fwd 17th shipment Customs duty
working.msg100%
New File 758272 Fwd Custom duty Calculation for TC-6&TC-
7 shipments a c GMR-Reg .msg100%
New File 72192 Fwd Despatch report for A-1 and A-2 A c
GMR.msg100%
New File 402944 Fwd Dispatch report of GMR17th
shipment.msg100%
New File 52736 Fwd Duty Cal Sheet Per Vsl M V KOTA PURI
V-049 A C GMR.msg100%
New File 37888 Fwd Regarding commercial invoice of 18th
shipment.msg100%
New File 49664 Fwd Request Letters for TRA for TC 6 &
7.msg100%
New File 89088 Fwd TC-5 SHIPMENT Custom DD.msg100%
New File 54784 Fwd urgent need materials in 17th
shipment.msg100%
New File 13816 GKEL INSURANCE DETAILS.XLSX100%
New File 12506 GKEL Policy Deails.xls.xlsx100%
New File 198275 Import certificate by Secretary Energy-
GKEL.pdf100%
New File 545375 Import certificate-Annexure.pdf100%
New File 7.5 m Insurance kamlanga.pdf100%
New File 332800 Invoice for 18th A shipment.msg100%
New File 1.5 m KM 13 th April 2015 Demurrage and
detention charges.msg100%
New File 24064 Letter to Energy Department.doc100%
New File 93094 Marine Inusrance dated 05th May 2012.pdf
100%
New File 970240 Payment proof for C17 shipment.msg100%
New File 615473 Project insurance-(Marine_SCE).pdf100%
New File 627712 Re RE RE letters of credit of 19th
shipment(OL-0153).msg100%
New File 95744 Re Boiler Drum Lifting of Unit-3 at GKEL
Kamalanga.msg100%
New File 42496 RE Kurnool - Regarding PD Bond for TC5
Shipment.msg100%
New File 69632 Re RE Discrepancy in CNY invoices of A1
and A2 cargo.msg100%
New File 62976 Re RE letters of credit of 19th
shipment(OL-0153).msg100%
New File 139264 RE RE Regarding to marine insurance
policy.msg100%
New File 196608 RE Kurnool - Reply - 17th shipment
Customs duty working.msg100%
New File 32768 Regarding PD Bond for TC5 Shipment.msg
100%
New File 424877 Request letter for amendment in
essentiality.pdf100%
New File 171520 Requisition list for Customs Clearance
issue .msg100%
New File 68608 Steam Drum U#1despatch Intimation.msg100%

New File 167424 Urgent cargo in 18th shipment.msg100%


New Dir 76 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\Project
Documents\Delivery Notifications\
New File 114688 Delivery notification for 21th
shipment.msg100%
New File 113152 Delivery notification for GMR TC8&TC9
shipment.msg100%
New File 2.4 m FW Delivery Notification and Document of
A4 Shipment(OL-0272) (16).msg100%
New File 2.4 m FW Delivery Notification and Document of
A4 Shipment(OL-0272).msg100%
New File 725504 FW Delivery Notification and Document of
A7 Shipment doc(OL-0283) (9).msg100%
New File 725504 FW Delivery Notification and Document of
A7 Shipment doc(OL-0283).msg100%
New File 889344 FW Delivery Notification and Document of
TC18 Shipment doc(OL-0253) (22).msg100%
New File 889344 FW Delivery Notification and Document of
TC18 Shipment doc(OL-0253).msg100%
New File 162304 FW Delivery Notification of TC12
Shipment(OL-208).msg100%
New File 235008 FW Delivery Notification of 22nd
Shipment(OL-0174) .msg100%
New File 217088 FW DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 210432 FW Delivery Notification of 24th
Shipment(0L-0188).msg100%
New File 204800 FW Delivery Notification of 25th
Shipment(OL-202).msg100%
New File 184832 FW Delivery Notification of 26th
Shipment(OL-206).msg100%
New File 211456 FW Delivery Notification of 27th
Shipment(OL-213).msg100%
New File 184320 FW Delivery Notification of 32nd
Shipment(OL-0245) (23).msg100%
New File 184320 FW Delivery Notification of 32nd
Shipment(OL-0245).msg100%
New File 195584 FW Delivery Notification of 35 36 and
A8 Shipment(OL-0286) (8).msg100%
New File 195584 FW Delivery Notification of 35 36 and
A8 Shipment(OL-0286).msg100%
New File 180736 FW Delivery Notification of 37th
Shipment(OL-0295) (6).msg100%
New File 180736 FW Delivery Notification of 37th
Shipment(OL-0295).msg100%
New File 188928 FW Delivery Notification of 38th
Shipment(OL-0303) (2).msg100%
New File 188928 FW Delivery Notification of 38th
Shipment(OL-0303).msg100%
New File 155648 FW Delivery Notification of A3
Shipment(OL-0198).msg100%
New File 173568 FW Delivery Notification of A9
Shipment(OL-0287) (7).msg100%
New File 173568 FW Delivery Notification of A9
Shipment(OL-0287).msg100%
New File 184832 FW Delivery Notification of A9
Shipment(OL-0298) (5).msg100%
New File 184832 FW Delivery Notification of A9
Shipment(OL-0298) .msg100%
New File 176128 FW Delivery Notification of C3 Shipment
doc(OL-0258) (18).msg100%
New File 176128 FW Delivery Notification of C3 Shipment
doc(OL-0258).msg100%
New File 187392 FW Delivery Notification of C4 and 33rd
Shipment(OL-0262) (17).msg100%
New File 187392 FW Delivery Notification of C4 and 33rd
Shipment(OL-0262).msg100%
New File 176128 FW Delivery Notification of C5 Shipment
doc(OL-0276) (13).msg100%
New File 176128 FW Delivery Notification of C5 Shipment
doc(OL-0276).msg100%
New File 189952 FW Delivery Notification of C6 and 34th
Shipment(OL-0278) (10).msg100%
New File 189952 FW Delivery Notification of C6 and 34th
Shipment(OL-0278).msg100%
New File 184832 FW Delivery Notification of C7 and 39th
Shipment(OL-0308) (1).msg100%
New File 184832 FW Delivery Notification of C7 and 39th
Shipment(OL-0308).msg100%
New File 189440 FW Delivery Notification of TC11
Shipment(OL-0195).msg100%
New File 188928 FW Delivery Notification of TC13
Shipment(OL-218).msg100%
New File 175616 FW Delivery Notification of TC14&TC15
Shipment doc(OL-0222).msg100%
New File 178688 FW Delivery Notification of TC16
Shipment(OL-0224).msg100%
New File 166400 FW Delivery Notification of TC19
Shipment(OL-0256) (19).msg100%
New File 182272 FW Delivery Notification of TC19
Shipment(OL-0256) (20).msg100%
New File 182272 FW Delivery Notification of TC19
Shipment(OL-0256) (21).msg100%
New File 166400 FW Delivery Notification of TC19
Shipment(OL-0256).msg100%
New File 199168 FW Delivery Notification of TC8 & TC9
Shipment.msg100%
New File 556032 FW Document of A10 Shipment and Delivery
Notification of A11 Shipment(OL-0301) (3).msg100%
New File 556032 FW Document of A10 Shipment and Delivery
Notification of A11 Shipment(OL-0301).msg100%
New File 143360 Fwd Delivery Notification of 22nd
Shipment.msg100%
New File 133632 Fwd Delivery Notification of 23th
Shipment.msg100%
New File 56320 Fwd Delivery Notification of 28th
Shipment.msg100%
New File 64512 Fwd Delivery Notification of 30th
Shipment.msg100%
New File 68608 Fwd Delivery Notification of 32nd
Shipment (24).msg100%
New File 68608 Fwd Delivery Notification of 32nd
Shipment.msg100%
New File 61952 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (12).msg100%
New File 64000 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (14).msg100%
New File 64000 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (15).msg100%
New File 61952 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment.msg100%
New File 65024 Fwd OL-0278-20120420-Delivery
Notification of C6 and 34th Shipment (11).msg100%
New File 65024 Fwd OL-0278-20120420-Delivery
Notification of C6 and 34th Shipment.msg100%
New File 43520 Re Delivery notification for TC17
shipment (25).msg100%
New File 41984 Re Delivery notification for TC17
shipment (26).msg100%
New File 41984 Re Delivery notification for TC17
shipment (27).msg100%
New File 40448 Re Delivery notification for TC17
shipment (28).msg100%
New File 40448 Re Delivery notification for TC17
shipment (29).msg100%
New File 43520 Re Delivery notification for TC17
shipment.msg100%
New File 86016 RE DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 188416 RE Delivery Notification of A10
Shipment(OL-0298) (4).msg100%
New File 188416 RE Delivery Notification of A10
Shipment(OL-0298) .msg100%
New File 102400 Re FW DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 62464 Re FW Delivery Notification of 28th
Shipment.msg100%
New File 81408 RE Re Re delivery notification for
critical items 23rd shipment.msg100%
New File 61440 Re Re Re delivery notification for
critical items.msg100%
New File 81408 Re RE Re Re delivery notification for
critical items 23rd shipment (30).msg100%
New File 90624 RE RE Re Re delivery notification for
critical items 23rd shipment.msg100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\Others\
New File 30877 Deviations and defects _SEPCO.xlsx100%
New File 3.1 m FW shipping schedule-D & comments reply
(transmittal 0304).msg100%
New File 9.0 m FW Supply contract of Generator.msg100%

New File 9.3 m FW Supply contract of Steam Turbine.msg


100%
New File 9.0 m FW Supply contracts-Supply contract of
boiler.msg100%
New File 5.4 m FW Emailing Site Construction Pictures 13
May 2011.docx.msg100%
New File 5.1 m FW L1L2 SCHEDULE reply comments of the
schedule L1 L2(transmittal 1082).msg100%
New File 409676 MPR Details.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\Others\As Built Drawing\
New File 1.2 m FW Communications regarding as built
drawing trasmittal 2230.msg100%
New File 502272 RE Fw Re RE RE All the AS- BUILT
drawings (transmittal 2230).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR Norton Rose
Fulbright (Asia) LLP - Technical Services Expert Advisor\
New File 55868 Statement of Claim - referencing document
(2).docx100%
New File 57297 Statement of Claim - referencing document
ZN.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\JEV M&E Audit\
New File 2.1 m EC Kick Off Meeting_Draft.pptx100%
New File 955466 JEV Audit Work Plan_27Jul.pdf100%
New File 25194 JEV M&E Audit Info RFI.xlsx100%
New File 1.0 m JEV Site Visit Agenda.docx100%
New File 60135 JEV Site Visit Agenda.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\JEV M&E Audit\Comments
on Draft Report from JEV\
New File 65358 Draft report review v3- Advisian
rev1_25Oct.xlsx100%
New File 15402 Draft report review v5- JEV
rev1_27Oct_Neoh.xlsx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D.docx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_rev1.docx100%
New File 6.9 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_tc.docx100%
New File 6.5 m JEV ME Audit Report 171027 - 3rd Draft to
Client- Rev D_Neoh.docx100%
New File 6.5 m JEV ME Audit Report 171030 - 3rd Draft to
Client- Rev E_tc.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\JEV M&E Audit\Draft
Final 01 November 2017\
New File 3.0 m JEV M&E Audit Report Draft_01November.pdf
100%
New File 5.8 m JEV ME Audit Report 171101 - Final Draft
to EC- Rev F -clean.docx100%
New File 5.9 m JEV ME Audit Report 171101 - Final Draft
to EC- Rev F -tc.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\JEV M&E Audit\ref\
New File 17.8 m Individual Report - Jimah (Malaysia)
FINAL.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\JEV M&E Audit\Sent to
Finance\
New File 16796 JEV M&E Audit Work Budget.xlsx100%
New File 16082 JEV ME Audit Work Budget_r1.xlsx100%
New Dir 4 C:\AdvisianActive\01 Projects\JEV M&E Audit\Site
Field Exit Meeting\
New File 1.4 m JEV Field Exit Meeting_10Aug.pptx100%
New File 503931 JEV Field Exit Meeting_10Aug_Final.pdf
100%
New File 1.4 m JEV Field Exit Meeting_15Aug.pptx100%
New File 504920 JEV Field Exit Meeting_15Aug_rev1.pdf100%

New Dir 20 C:\AdvisianActive\01 Projects\JEV M&E Audit\Working\


New File 323394 JEV Financial Performance Assessment.docx
100%
New File 22523 JEV Financial Worksheet (final).xlsx100%

New File 737217 JEV Financials_working_19June.xlsx100%


New File 774049 JEV Financials_working_23Oct.xlsx100%
New File 4.5 m JEV ME Audit Report 170918- Draft 1-
Internal Review.docx100%
New File 4.5 m JEV ME Audit Report 170918- Draft 1-
Internal Review_Neoh.docx100%
New File 6.9 m JEV ME Audit Report 170918- Draft 2.1-
Internal Review.docx100%
New File 6.9 m JEV ME Audit Report 170918- Draft 2.1-
Internal Review_Neoh.docx100%
New File 6.6 m JEV ME Audit Report 170929- Internal
Draft Final.docx100%
New File 6.8 m JEV ME Audit Report 171002- First Draft
to Client - Rev B- clean.docx100%
New File 6.8 m JEV ME Audit Report 171002- First Draft
to Client - Rev B- tc.docx100%
New File 6.5 m JEV ME Audit Report 171009 - 2nd Draft to
Client- Rev C.docx100%
New File 3.2 m JEV ME Audit Report 171009 - 2nd Draft to
Client- Rev C.pdf100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean.docx100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean_rev1.docx100%
New File 7.0 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean_rev1_Neoh.docx100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- tc.docx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_rev1.docx100%
New File 77472 Manpower Benchmark.xlsx100%
New File 531908 NEO Compiled from ST Reports.xlsx100%
New Dir 37 C:\AdvisianActive\01 Projects\Kanbauk FS\
New File 45575 Advisian Financial Inputs Sheet
170816.docx100%
New File 119830 COMBINED CYCLE POWER PLANTi EMPLOYER
MFS.docx100%
New File 1.0 m Copy of SIEMENS B1 AK1_Neoh_AK 30Aug.xlsm
100%
New File 1.5 m Copy of SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev1 AK.xlsm100%
New File 1.5 m Copy of SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev3AK.xlsm100%
New File 44370 Copy of Simplified levelized tariff CCGT
07Jan2016_SIPP.xlsx100%
New File 22523 Financial Inputs Sheet.docx100%
New File 1.0 m Financial model clarifications_neoh.docx
100%
New File 196609 FM Inputs Deck.pptx100%
New File 361007 Gas Consumptions.xlsx100%
New File 360937 Gas Consumptions_rev1.xlsx100%
New File 18752 Kanbauk 2 Units H_560MW Analysis_No
PTT.pdf100%
New File 68070 Kanbauk Kickoff Meeting MOM_neoh.docx100%

New File 627101 MIC IRR calculation_IPP portion.xlsx100%

New File 1030008 SIEMENS B1 AK1_Neoh 29Aug.xlsm100%


New File 1.2 m SIEMENS Kanbauk 02Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 03Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 04Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 04Oct_trial.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_656pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_712pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev1.xlsm100%

New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev2.xlsm100%

New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev3.xlsm100%

New File 1.4 m SIEMENS Kanbauk 08Oct_FINAL.xlsm100%


New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs.xlsm100%
New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev1.xlsm100%
New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev2.xlsm100%
New File 1.4 m SIEMENS Kanbauk 08Oct_FINAL_rev1.xlsm100%

New File 1.5 m SIEMENS Kanbauk 09Oct.xlsm100%


New File 2.0 m SIEMENS Kanbauk 10Oct.xlsm100%
New File 1.6 m SIEMENS Kanbauk 10Oct_6pm.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev1.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev2.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev4.xlsm100%
New File 578456 SPG Siemens Total Project Structure.pdf
100%
New Dir 5 C:\AdvisianActive\01 Projects\Kanbauk FS\Proposal
Materials\
New File 5.0 m 20170622 Kanbauk Proposal.pptx100%
New File 3.2 m 20170627 Kanbauk Power Proposal -
Technical - Final.pdf100%
New File 2.6 m 20170629 Kanbauk Power Tender
Presentation.pdf100%
New File 5.8 m 20170629 Kanbauk Power Tender
Presentation.pptx100%
New File 469315 Kanbauk Feasibility Study TOR.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Kanbauk FS\Proposal
Materials\Siemens Total Materials\
New File 3.0 m Kanbauk FS Presentation 090717.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Kanbauk FS\ref\
New File 5.9 m CCGT Template.xlsm100%
New File 857138 Coal Plant.xlsx100%
New File 3.5 m IPP Financial Modeling_rev 00_for
Poyry_20150608.xlsm100%
New Dir 52 C:\AdvisianActive\01 Projects\Kanbauk FS\superceded\
New File 1.3 m Copy of SIEMENS Kanbauk 02Oct-FD
Edit0H.xlsm100%
New File 1.1 m Demo FM Mini.xlsm100%
New File 3.7 m DEMO Project Financial Model
201700808.xlsm100%
New File 3.7 m DEMO Project Financial Model
20170628.xlsm100%
New File 16384 F797C030100%
New File 1.0 m SIEMENS B1 AK1_Neoh_AK 30Aug.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0C_Neoh.xlsm
100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev1.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev2.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev3.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0H_Neoh.xlsm
100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2 (TL).xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2_Neoh.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_430pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_435pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_550pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_611pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_630pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_645pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_915pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_931pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1030am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1130am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1153am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_115pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_130pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_230pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_236pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_245pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_251pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_315pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_339pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_354pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_430pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_450pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_520pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_620pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_631pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_640pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_645pm.xlsm100%
New File 1.5 m SIEMENS Kanbauk 10Oct.xlsm100%
New File 1.0 m SIEMENS Kanbauk 12Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 12Sept_rev1.xlsm100%
New File 1.1 m SIEMENS Kanbauk 12Sept_rev1_internal
neoh.xlsm100%
New File 1.0 m SIEMENS Kanbauk 13Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 26Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 26Sept_rev1.xlsm100%
New File 1024031 SIEMENS Kanbauk 26Sept_rev2.xlsm100%
New File 1.1 m SIEMENS Kanbauk 26Sept_rev3.xlsm100%
New File 1.2 m SIEMENS Kanbauk 26Sept_rev4.xlsm100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV - Tariff Review\
New File 1.4 m ADVISIAN CONTRACT_Final.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\KEV - Tariff
Review\Engagement Letter\
New Dir 2 C:\AdvisianActive\01 Projects\KEV - Tariff
Review\Project Management\
New File 315723 2240 CSOC KEV_neoh.docx100%
New File 87978 2240 CSOC KEV_SIGNED.pdf100%
New Dir 30 C:\AdvisianActive\01 Projects\KEV M&E Audit\
New File 165 ~$20170314 KEV_Budget.xlsx100%
New File 165 ~$Kick Off Meeting with EC.pptx100%
New File 18809 20170314 KEV_Budget.xlsx100%
New File 92966 20170317 KEV_Budget.xlsx100%
New File 94283 20170321 KEV_Budget.xlsx100%
New File 9.5 m 20170329 Full Report - VOL 2_Rev B.docx
100%
New File 1.7 m 5YX326782_Ranhill Rugading ME
Audit_Internal Kick-off_draft.pptx100%
New File 24883 Appendix A.xlsx100%
New File 63518 Audit Plan - KEV ME Audit (30-10-
2017)_Neoh.docx100%
New File 524820 DOSH Availability Calculation.xlsx100%
New File 2.1 m Internal Kick Off Meeting & Scoping
Opportunity for KEV_150317.pdf100%
New File 391798 Kapar-Logo1.png100%
New File 319977 KEV 0129.pdf100%
New File 21006 KEV Asset Overview.docx100%
New File 167936 KEV CTR.xls100%
New File 470016 KEV M&E Audit Schedule.mpp100%
New File 97737 KEV M&E Audit Schedule.pdf100%
New File 13800 KEV Target Questions.xlsx100%
New File 4.6 m Kick Off Meeting with EC.pptx100%
New File 77448 Manpower Benchmark.xlsx100%
New File 162299 Master Spreadsheet.pptx100%
New File 127015 Master Spreadsheet.xlsx100%
New File 255405 medium_fuel_oil.jpg100%
New File 4.2 m Meeting with KEV.pptx100%
New File 48520 Org Chart.pptx100%
New File 295044 Org Chart_withpic.pptx100%
New File 171466 R3 - Journey Risk Assessment.docx100%
New File 89388 R3 - Journey Risk Assessment.pdf100%
New File 97837 RFS.pdf100%
New File 98034 Scope for WP Singapore.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Advisian
Team Internal Kick Off\
New File 1.5 m Advisian KEV Internal Kick Off.pptx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\
New File 94350 20170321 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 05 May\
New File 107229 KEV_Budget_FINAL_WE05May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 12 May\
New File 107259 KEV_Budget_FINAL_WE12May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 14 Apr\
New File 106896 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 19 May\
New File 107268 KEV_Budget_FINAL_WE19May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 21 Apr\
New File 106700 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 24 Mar\
New File 94364 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 28 APr\
New File 106811 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Draft
Submitted to EC 31 Jul\
New File 5.1 m KEV ME Audit Report Draft
Final_31July.docx100%
New File 3.6 m KEV ME Audit Report Draft
Final_31July.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Field
Exit Meeting\
New File 573321 KEV Field Exit Meeting_04May17.pptx100%
New File 455509 KEV Field Exit Meeting_16May.pdf100%
New File 573808 KEV Field Exit Meeting_16May.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Internal
Kick Off With KEV\
New File 2.1 m KEV Internal Kick Off Meeting 160317.pdf
100%
New File 1.5 m KEV Internal Kick Off.pptx100%
New Dir 4 C:\AdvisianActive\01 Projects\KEV M&E Audit\KEV Audit
Work Plan\
New File 2.8 m KEV Audit Work Plan.pdf100%
New File 4.6 m KEV Audit Work Plan.pptx100%
New File 2.3 m KEV Audit Work Plan_20Apr.pdf100%
New File 4.6 m KEV Audit Work Plan_20Apr.pptx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Labour
Summary from Finance\
New File 163896 Project Labour Summary_WE
12May2017_302020-00442 KEV M&E Audit.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Meeting
with KEV Management\
New File 664875 M&E Audit Outcome.pptx100%
New Dir 27 C:\AdvisianActive\01 Projects\KEV M&E Audit\Neoh
Working\
New File 162 ~$V ME Audit Report Draft
Final_31July.docx100%
New File 162 ~$V ME Audit Report Draft_19July.docx100%

New File 162 ~$V ME Audit Report Working_23May.docx


100%
New File 802273 KEV Financials_working.xlsx100%
New File 857042 KEV Financials_working_09May.xlsx100%
New File 870569 KEV Financials_working_20Jul.xlsx100%
New File 3.1 m KEV M&E Audit Report Structure_08May.docx
100%
New File 3.1 m KEV M&E Audit Report Structure_10May.docx
100%
New File 3.5 m KEV M&E Audit Report Structure_12May.docx
100%
New File 3.5 m KEV M&E Audit Report Structure_15May.docx
100%
New File 2.1 m KEV ME Audit Info RFI_Neoh Working.xlsx
100%
New File 5.1 m KEV ME Audit Report Draft
Final_31July.docx100%
New File 3.6 m KEV ME Audit Report Draft
Final_31July.pdf100%
New File 4.5 m KEV ME Audit Report Draft_12June.docx100%

New File 4.5 m KEV ME Audit Report Draft_13June KEV


comments.docx100%
New File 4.5 m KEV ME Audit Report Draft_13June.docx100%

New File 2.5 m KEV ME Audit Report Draft_13June.pdf100%

New File 4.9 m KEV ME Audit Report Draft_20July.docx100%

New File 4.2 m KEV ME Audit Report Structure_16May.docx


100%
New File 4.2 m KEV ME Audit Report Structure_16May_neoh
commented.docx100%
New File 4.4 m KEV ME Audit Report Working_08June.docx
100%
New File 4.4 m KEV ME Audit Report Working_09June.docx
100%
New File 4.5 m KEV ME Audit Report Working_11June.docx
100%
New File 4.4 m KEV ME Audit Report Working_22May_r1.docx
100%
New File 4.4 m KEV ME Audit Report Working_22May_r2.docx
100%
New File 4.4 m KEV ME Audit Report Working_23May.docx
100%
New File 703259 KEV_Availability Records.xlsx100%
New Dir 16 C:\AdvisianActive\01 Projects\KEV M&E Audit\ref\
New File 5.0 m 1_ST_Proses semakan dan keputusan
penetapan tarif elektrik di semenanjung malaysia (1).pdf100%
New File 3.1 m 110618 GNS_CCGTIE_Proposal_20120926.doc
100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 81.9 m Annual Monitoring Report 2012 Rev 1.docx
100%
New File 1.1 m B&V - NREL- cost - report.pdf100%
New File 3.0 m BLCP DD Draft Final Report(clean).doc100%

New File 171081 Copy_of


2010_Only_Generating_Unit_Statistical_Brochure_ All_ Units_ Reporting.zip100%
New File 55482 GADS 2011-2015 Statistics.xlsx100%
New File 8.2 m M5 TEDD Report_final_17 Dec 2013
(clean).doc100%
New File 6.3 m MD2 Final Due Diligence Report_Rev1.doc
100%
New File 79360 NERC GADS Definitions.doc100%
New File 44.0 m NS Draft Prelim Due Diligence
Report_2011.04.12.doc100%
New File 234172 Pahlawan Panglima costs 160902.xlsx100%
New File 4.9 m Performance Analysis
DL_2011_RARPR_FINAL.pdf100%
New File 4.7 m
PUB_Performance_of_Generating_Plant_2010_WEC.pdf100%
New File 4.2 m Registered Guidelines on Tariff
Determination Under IBR for TNB.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Report
Structure\
New File 162 ~$set 10.docx100%
New File 2.8 m Asset 10.docx100%
New File 3.0 m KEV M&E Audit Report Structure_07May.docx
100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Sent to
Finance\
New File 16830 KEV M&E Audit Work Budget.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Sent to
KEV\
New File 1.4 m Additional Data from KEV_07June.docx100%

New File 1.4 m Additional Data from KEV_16May.docx100%


New File 2.1 m KEV M&E Audit Info RFI.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Site
Visit Agenda\
New File 1.0 m KEV Site Visit Agenda_03-04May.docx100%
New File 107596 KEV Site Visit Agenda_03-04May.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\Manjung 4 IE\
New File 2.4 m 102020-00026-IE-REP-1020 High Speed and
Delayed Auto Reclosing.doc100%
New File 1.1 m 102020-00026-IE-REP-1020 High Speed and
Delayed Auto Reclosing.pdf100%
New File 2.8 m 102020-00026-IE-REP-1021 Submit Data and
Simulation Model.doc100%
New File 6.7 m 102020-00026-IE-REP-1021 Submit Data and
Simulation Model.pdf100%
New File 550623 APS-TNBJ-7714 Manjung-4-Auto-Reclosing -
Addendum.pdf100%
New File 104313 APS-TNBJ-7714.pdf100%
New File 129965 APS-TNBJ-7728.pdf100%
New File 9.8 m Final Report on Model Development and
Validation for Mnjg U4 20170418.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Manjung 4 IE\Old
Reports\
New File 3.2 m 102020-00026-IE-REP-1016 High Speed and
Delayed Auto Reclosing.pdf100%
New File 718848 102020-00026-IE-REP-1016 High Speed and
Delayed Autro Reclosing 1.doc100%
New File 299520 102020-00026-IE-REP-1017 Generator
Parameter Verification Test.doc100%
New File 6.8 m 102020-00026-IE-REP-1017 Generator
Parameter Verification.pdf100%
New Dir 40 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\
New File 162 ~$170930 Project Horse List of Parties
v1_advisian.docx100%
New File 236802 20170921_Zenith_MP_Negroni_Agenda.pdf100%

New File 39597 20170922 - Hours Estimate.xlsx100%


New File 165063 20170930 Project Horse List of Parties
v1_advisian.docx100%
New File 231021 20171005 Project Horse - Financial Inputs
Sheet.xlsx100%
New File 261435 20171013 Project Horse - Financial Inputs
Sheet_rev1.xlsx100%
New File 261434 20171013 Project Horse - Financial Inputs
Sheet_TW_PH.xlsx100%
New File 261880 20171013 Project Horse - Financial Inputs
Sheet_TW_PH_15Oct.xlsx100%
New File 268834 20171013 Project Horse - Financial Inputs
Sheet_TW_PH_16Oct.xlsx100%
New File 15580 20171013 Project Horse - info request
(Advisian).xlsx100%
New File 55138 20171014 Project Horse - QA_14Oct.xlsx
100%
New File 1.6 m Advisian Nebras Equis DD Internal Kick
Off.pptx100%
New File 1.6 m Advisian Nebras Equis DD Internal Kick
Off_rev1.pptx100%
New File 1.3 m Advisian Nebras Equis DD Kick Off
Meeting.pdf100%
New File 1.5 m Advisian Nebras Equis DD Kick Off
Meeting.pptx100%
New File 251722 Asset List.xlsx100%
New File 5.9 m Evaluation Matrix.xlsx100%
New File 6.0 m Evaluation Matrix_12Oct.xlsx100%
New File 6.0 m Evaluation Matrix_13Oct.xlsx100%
New File 6.0 m Evaluation Matrix_15Oct.xlsx100%
New File 5.9 m Evaluation Matrix_rev1.xlsx100%
New File 5.9 m Evaluation Matrix_rev2.xlsx100%
New File 230346 Financial Inputs Sheet.xlsx100%
New File 37421 Flow Chart.docx100%
New File 2.4 m Japan Projects.pdf100%
New File 36144 Net Generation Calculations R3.docx100%
New File 37374 Net Generation Calculations R3_neoh.docx
100%
New File 14057 Notes.docx100%
New File 20565 O&M Estimates 19Oct.docx100%
New File 3.7 m Project Horse - Australian Red Flag Map
and Checklist.docx100%
New File 230239 Project Horse - Financial Inputs
Sheet_Neoh.xlsx100%
New File 243183 Project Horse - Financial Inputs
Sheet_rev1.xlsx100%
New File 3.7 m Project Horse - Philippines Red Flag Map
and Checklist.docx100%
New File 981296 Project Horse - Philippines Red Flag Map
and Checklist_16Oct_rev1.pdf100%
New File 3.7 m Project Horse - Philippines Red Flag Map
and Checklist_rev1.docx100%
New File 3.6 m Project Horse - Red Flag Map and
Checklist_Neoh.docx100%
New File 3.6 m Project Horse - Red Flag Map and Project
Checklist.docx100%
New File 1.0 m Project Horse - Taiwan Red Flag Map and
Checklist_Rev1.pdf100%
New File 13442 Red Flag Map.xlsx100%
New File 22739 Tax information checklist.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Agreement\
New File 1.4 m Nebras_Advisian Due Diligence
Contract_03Oct17.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\From Llewellyn\
New File 300815 02.03.01.01 Downer - CAPE YORK SOLAR
STORAGE PROJECT - Energy Yield Report.pdf100%
New File 977225 02.03.01.04 Jacobs Cape York Solar Farm
Resource and Yield Assessment Report 12072017.pdf100%
New File 3.6 m 160719 AC009 Manildra FINAL DRAFT.docx
100%
New File 193212 AC009- Manildra Solar Farm R1.docm100%
New File 3.6 m Equis DD - Solar template.docx100%
New File 1.4 m Equis DD - wind template.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Lantau Group\
New File 2.2 m Backup Material TLG_PH v2 _20171016.pptx
100%
New File 1.0 m Backup Material TLG_TW v2_20171016.pptx
100%
New File 8.2 m Financial Model TLG Indicative
Inputs_ID_20171016.zipx100%
New File 208725 Financial Model TLG
Inputs_PH_20171016.xlsx100%
New File 699031 Financial Model TLG
Inputs_TW_20171016.xlsx100%
New Dir 11 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Management Presentations\
New File 614619 Expert Session A (Distribution Structure)
- Negroni.pdf100%
New File 4.6 m Expert Session A (Legal & Tax Structure)
- Negroni.pdf100%
New File 1.9 m Expert Session B (Finance and Financial
Performance) - Negroni.pdf100%
New File 2.1 m Expert Session B (Financial Modeling and
Forecasts) - Negroni.pdf100%
New File 21.7 m Expert Session C & D (Resource Assessment
& Site Feasibility, O&M, Monitoring & Construction) - Negroni.pdf100%
New File 8.0 m Expert Session E (Country Development
Strategies & Status Quo) - PPT - Negroni.pdf100%
New File 893174 Expert Session E (Country Development
Strategies & Status Quo)_Mingus Case Study - Negroni.pdf100%
New File 3.2 m Expert Session E (Country Development
Strategies & Status Quo)_Wawa - Negroni.pdf100%
New File 9.7 m Expert Session E (Country Development
Strategies & Status Quo)_Word - Negroni.pdf100%
New File 18.2 m Management Presentation Slides (Day 1) -
Negroni.pdf100%
New File 24.5 m Zenith Information Memorandum vFinal-
Swami Comment.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\1.3 Virtual Data Room Checklists\
New Dir 8 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\1.3 Virtual Data Room
Checklists\1.3.8 29 September 2017\
New File 236029 1.3.8.1 20170929 VDR checklist -
Philippines.pdf100%
New File 138536 1.3.8.2 20170929 VDR checklist -
Taiwan.pdf100%
New File 41931 1.3.8.3 20170929 VDR checklist -
Thailand.pdf100%
New File 168112 1.3.8.4 20170929 VDR checklist -
Australia.pdf100%
New File 16343 1.3.8.5 20170929 VDR checklist - Japan KK
Entities.pdf100%
New File 435965 1.3.8.6 20170929 VDR checklist -
Japan.pdf100%
New File 230126 1.3.8.7 20170929 VDR checklist -
Indonesia.pdf100%
New File 172250 1.3.8.8 20170929 VDR checklist -
India.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Proposal\
New File 141532 Cover Letter_Nebras Power_Advisian
Proposal_22092017.pdf100%
New File 11.2 m Nebras Project Horse Due Diligence
Proposal Rev0.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Proposal\RFP\
New File 94333 CRF Project Horse.xlsx100%
New File 244849 CSOC COF-0008-COR-EN.docx100%
New File 57320 Due Diligence Contract.docx100%
New File 607469 Technical RFP - Project Horse (Final)
Advisian.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Q&A\
New Dir 2 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Q&A\Batch 1 08 Oct\
New File 17090 20170930 Project Horse - QA -
Advisian_Tech.xlsx100%
New File 17367 20171006 Project Horse - Info request
list - Advisian_Tech.xlsx100%
New Dir 10 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Report Template\
New File 162 ~$uis DD - Solar_Neoh.docx100%
New File 162 ~$uis DD - wind template_Nebras.docx100%

New File 3.6 m Equis DD - Solar template.docx100%


New File 3.6 m Equis DD - Solar template_Nebras.docx100%

New File 681161 Equis DD - Solar template_Nebras.pdf100%

New File 3.6 m Equis DD - Solar.docx100%


New File 3.6 m Equis DD - Solar_Neoh.docx100%
New File 1.4 m Equis DD - wind template.docx100%
New File 1.4 m Equis DD - wind template_Nebras.docx100%

New File 422109 Equis DD - wind template_Nebras.pdf100%


New Dir 4 C:\AdvisianActive\01 Projects\PLNE\
New File 166887 02. Bascom.xlsx100%
New File 2.0 m Advisian Track 4B FPTA Internal Kick
Off.pptx100%
New File 1.7 m PLN Enjiniring_Kick Off Meeting 30th
August 2017.pptx100%
New File 4.4 m PLN Enjiniring_Technical Team
Presentation_03042017.pptx100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Light\
New File 10.0 m Project Light Technology Due Diligence
Report - Appendix A Gas Assets-clean .docx100%
New File 3.7 m Project Light Technology Due Diligence
Report - Appendix B Hydro Assets_....pdf100%
New File 1.3 m Project Light Technology Due Diligence
Report - Appendix C Geothermal Assets_14 Dec 2016.docx100%
New File 15.7 m Project Light Technology Due Diligence
Report - Executive Summary Draft.docx100%
New Dir 25 C:\AdvisianActive\01 Projects\Project Lighthouse\
New File 165 ~$Master Spreadsheet.xlsx100%
New File 2.5 m 20170313 Advisian WorleyParsons
Proposal_Technical Due Diligence.pdf100%
New File 1.3 m 202 GPRI 2017-2020 budget_Neoh.xls100%
New File 1.3 m 202.01 GPRI 2017-2020
budget_reforecast_Neoh.xls100%
New File 3.0 m 205.01 PPC 2017-2021
budget_reforecast_Neoh.xls100%
New File 128970 301 List of PSAs with Contract Capacity
in MW.pdf100%
New File 19185 ADIA-Logo-360x200.png100%
New File 1.9 m Annual Report.pdf100%
New File 1.0 m Asset Information.xlsx100%
New File 17121 Electrical.docx100%
New File 170281 Master Spreadsheet.xlsx100%
New File 274709 Master Spreadsheet_v2.xlsx100%
New File 121601 Meralco Distribution Service.pdf100%
New File 1013229 Meralco Shareholding Structure.pdf100%
New File 146147 Plant assumptions_TLG 070417_neoh.docx
100%
New File 4.7 m Project Beagle - Report Template.docx100%

New File 1.3 m Project Beagle_Teaser_vF.PDF100%


New File 96518 Risk Register Template_Lighthouse.xlsx
100%
New File 145001 Risk Register
Template_Lighthouse_13Apr_Neoh.xlsx100%
New File 229226 Risk Register
Template_Lighthouse_31Mar.xlsx100%
New File 96517 Risk Register Template_Lighthouse_v2.xlsx
100%
New File 221017 Risk Register Template_Lighthouse_v3.xlsx
100%
New File 66840 Standard Table of Contents.docx100%
New File 18957 Toledo Power Site Visit.docx100%
New File 5.0 m Vol 4 Project Beagle - Global Business
Power (GBP) (Tim, Llewellyn, Gabriel).docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\
New File 3.3 m April 6 Plant Tour Materials - Cebu
Site.pptx100%
New File 1.7 m Cebu Site TSD report.pptx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\CEDC\
New File 58394 Plant Performance Reports for CEDC from
(2012 to present).xlsx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\CPS\
New File 43663 2011 TPC CPS Operational Statistics.xlsx
100%
New File 44306 2012 TPC CPS Operational Statistics.xlsx
100%
New File 44752 2013 TPC CPS Operational Statistics.xlsx
100%
New File 44637 2014 TPC CPS Operational Statistics.xlsx
100%
New File 44686 2015 TPC CPS Operational Statistics.xlsx
100%
New File 44957 2016 TPC CPS Operational Statistics.xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\SPS\
New File 40073 2011-2016 SPS TG4 Operational
Statistics.xlsx100%
New File 40009 2011-2016 SPS TG5 Operational
Statistics.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\TPC1A\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\MOH REPORT\
New File 12.5 m U3 MOH Accomplishment Report January 14-
Feb.7 2017.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\
New File 915585 WESM Registration.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\List of Outages\
New File 302485 PEDC Unit 1 List of Outages 2011-2016.pdf
100%
New File 313238 PEDC Unit 2 List of Outages 2011-2016.pdf
100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Maintenance Activities\
New File 766289 2016 Annual Technical Services Department
Report Annexes.pdf100%
New File 3.8 m 2016 Annual Technical Services Department
Report.pdf100%
New File 914451 PEDC Annual PMS Actual Costing.pptx100%
New File 20911 PEDC Annual PMS Costing.xlsx100%
New File 394855 PEDC New Design of Vortex Finder
Drawing.pdf100%
New File 925289 PEDC U1 Furnace Air Nozzles Report.pdf
100%
New File 2.4 m PEDC U1 Post Project Report on Refractory
Works.pdf100%
New File 609984 PEDC U1 Post Project Report on Thermal
Coat Application Works.pdf100%
New File 592646 PEDC U1 Project Report on Thermal Coat
Application.pdf100%
New File 190305 PEDC U1 Q Map.pdf100%
New File 596980 PEDC U2 Project Report on Thermal Coat
Application.pdf100%
New File 343809 PEDC U2 Q Map.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Maintenance Activities\PEDC MOH&PMS Executive
Summaries\
New File 134672 Unit-1 2011 PMS ES.pdf100%
New File 262945 Unit-1 2012 PMS ES.pdf100%
New File 126473 Unit-1 2013 PMS ES.pdf100%
New File 104707 Unit-1 2014 PMS ES.pdf100%
New File 43922 Unit-1 2015 MOH ES.pdf100%
New File 127425 Unit-2 2012 PMS ES.pdf100%
New File 98106 Unit-2 2013 PMS ES.pdf100%
New File 243827 Unit-2 2014 PMS ES.pdf100%
New File 202212 Unit-2 2015 PMS ES.pdf100%
New File 108118 Unit-2 2016 MOH ES.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Monthly Operational Report\
New File 77504 Monthly Operational Report PEDC 12
2012.tif100%
New File 59537 Monthly Operational Report PEDC 12
2013.pdf100%
New File 451727 Monthly Operational Report PEDC 12
2014.pdf100%
New File 51274 Monthly Operational Report PEDC 12
2015.pdf100%
New File 52361 Monthly Operational Report PEDC 12
2016.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Permits\
New File 1.7 m DENR ECC PEDC.pdf100%
New File 1.1 m DENR PTO PEDC.pdf100%
New File 3.6 m ERC 2016 GCMR and GCIS PEDC.pdf100%
New File 1000018 ERC COC PEDC 1&2.pdf100%
New File 536943 ERC PAO PEDC3.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\QAQC and PLE Activities\
New File 231034 2017 CBM with PM Module and WO.xlsx100%
New File 594432 FIR-QAC-17-001 U1 PMS DEC 2016 - JAN
2017.doc100%
New File 3.4 m FIR-QAC-17-001.pdf100%
New File 30.3 m FIR-QAC-17-002 U1 PMS Dec 25-Jan14 2017
Electrical-NMT.doc100%
New File 1.3 m FIR-QAC-17-002.pdf100%
New File 735212 FIR-QAC-17-003 UTG of unit 1 boiler and
backpass.docx100%
New File 5.5 m FIR-QAC-17-003.pdf100%
New File 164352 FIR-QAC-17-004 LPT of unit 1 Turbine
blade and valve joints of steam drum.doc100%
New File 941986 FIR-QAC-17-004.pdf100%
New File 236032 FIR-QAC-17-005 MPT of unit 1 Daerator
and valve joints of steam drum -.doc100%
New File 1.7 m FIR-QAC-17-005.pdf100%
New File 66048 PEDC PLANT ENGINEERING AND DESIGN-6 Year
PMS Program.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\
New File 984650 ERC 2016 GCMR and GCIS GBHPRI.pdf100%
New File 3.7 m ERC 2016 GCMR and GCIS PPC.pdf100%
New File 40407 FUEL DATA (5 years).xlsx100%
New File 915585 WESM Registration.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\GBHPRI Permits\
New File 1.1 m DENR ECC GBHPRI.pdf100%
New File 1.1 m DENR PTO GBHPRI.PDF100%
New File 589111 ERC COC GBHPRI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\Monthly Operational Report\
New File 1.8 m 2012 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2013 PPC & GBHPRI Plant MOR.PDF100%
New File 264558 2014 PPC & GBHPRI Plant MOR.PDF100%
New File 223344 2015 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2016 PPC & GBHPRI Plant MOR.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\Plant Outages\
New File 199844 2012 PPC & GBH Summary of Outages.pdf100%

New File 73497 2013 PPC and GBH Summary of Outages.pdf


100%
New File 1.0 m 2014 PPC & GBH Summary of Outages.pdf100%

New File 127674 2015 PPC and GBHPRI Summary of


Outages.pdf100%
New File 136418 2016 PPC and GBHPRI Summary of
Outages.pdf100%
New File 1.1 m 2017 PPC & GBH Summary of Outages.pdf100%

New Dir 5 C:\AdvisianActive\01 Projects\Project


Lighthouse\BACKUP\PPC & GBHPRI Info\PMS Implementation\
New File 141989 PPC & GBH - PMS IMPLEMENTATION 2012.pdf
100%
New File 75268 PPC & GBH - PMS IMPLEMENTATION 2013.pdf
100%
New File 74791 PPC & GBH - PMS IMPLEMENTATION 2014.pdf
100%
New File 68895 PPC & GBH - PMS IMPLEMENTATION 2015.pdf
100%
New File 29565 PPC & GBH - PMS IMPLEMENTATION 2016.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\PPC Permits\
New File 2.0 m DENR ECC PPC 1&2.pdf100%
New File 3.6 m DENR ECC PPC 3.pdf100%
New File 1.5 m DENR ECC PPC 4.pdf100%
New File 1.0 m DENR PTO PPC 1&2.pdf100%
New File 219187 DENR PTO PPC 3.pdf100%
New File 414929 DENR PTO PPC 4.pdf100%
New File 1.0 m ERC COC PPC 1&2.pdf100%
New File 2.2 m ERC COC PPC 3.pdf100%
New File 2.2 m ERC COC PPC 4.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\System Volume Information\
New File 76 IndexerVolumeGuid100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Budget from Llewellyn\
New File 89864 Beagle Project structure.pptx100%
New File 21492 Copy of Project Beagle_Budget_R1.xlsx100%

New Dir 4 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu


Power (CEDC)\
New File 3.3 m April 6 Plant Tour Materials - Cebu
Site.pptx100%
New File 1.7 m Cebu Site TSD report.pptx100%
New File 155691 GBPC Single Line Diagram 2-2-2017.pdf100%

New File 28915 Toledo Power Site Visit TJ_neoh.docx100%

New Dir 0 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu


Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\
New Dir 1 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\CEDC\
New File 58394 Plant Performance Reports for CEDC from
(2012 to present).xlsx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\CPS (Carmen)\
New File 43663 2011 TPC CPS Operational Statistics.xlsx
100%
New File 44306 2012 TPC CPS Operational Statistics.xlsx
100%
New File 44752 2013 TPC CPS Operational Statistics.xlsx
100%
New File 44637 2014 TPC CPS Operational Statistics.xlsx
100%
New File 44686 2015 TPC CPS Operational Statistics.xlsx
100%
New File 44957 2016 TPC CPS Operational Statistics.xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\SPS\
New File 40073 2011-2016 SPS TG4 Operational
Statistics.xlsx100%
New File 40009 2011-2016 SPS TG5 Operational
Statistics.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\TPC1A\
New Dir 1 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\MOH REPORT\
New File 12.5 m U3 MOH Accomplishment Report January 14-
Feb.7 2017.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\
New File 162 ~$tes on Site Visit to PEDC and PPC on
Thursday 6 April 2017_neoh.docx100%
New File 38245 Notes on Site Visit to PEDC and PPC on
Thursday 6 April 2017_neoh.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\
New File 915585 WESM Registration.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\List of Outages\
New File 302485 PEDC Unit 1 List of Outages 2011-2016.pdf
100%
New File 313238 PEDC Unit 2 List of Outages 2011-2016.pdf
100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Maintenance Activities\
New File 766289 2016 Annual Technical Services Department
Report Annexes.pdf100%
New File 3.8 m 2016 Annual Technical Services Department
Report.pdf100%
New File 914451 PEDC Annual PMS Actual Costing.pptx100%
New File 20911 PEDC Annual PMS Costing.xlsx100%
New File 394855 PEDC New Design of Vortex Finder
Drawing.pdf100%
New File 925289 PEDC U1 Furnace Air Nozzles Report.pdf
100%
New File 2.4 m PEDC U1 Post Project Report on Refractory
Works.pdf100%
New File 609984 PEDC U1 Post Project Report on Thermal
Coat Application Works.pdf100%
New File 592646 PEDC U1 Project Report on Thermal Coat
Application.pdf100%
New File 190305 PEDC U1 Q Map.pdf100%
New File 596980 PEDC U2 Project Report on Thermal Coat
Application.pdf100%
New File 343809 PEDC U2 Q Map.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Maintenance Activities\PEDC MOH&PMS Executive
Summaries\
New File 134672 Unit-1 2011 PMS ES.pdf100%
New File 262945 Unit-1 2012 PMS ES.pdf100%
New File 126473 Unit-1 2013 PMS ES.pdf100%
New File 104707 Unit-1 2014 PMS ES.pdf100%
New File 43922 Unit-1 2015 MOH ES.pdf100%
New File 127425 Unit-2 2012 PMS ES.pdf100%
New File 98106 Unit-2 2013 PMS ES.pdf100%
New File 243827 Unit-2 2014 PMS ES.pdf100%
New File 202212 Unit-2 2015 PMS ES.pdf100%
New File 108118 Unit-2 2016 MOH ES.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Monthly Operational Report\
New File 77504 Monthly Operational Report PEDC 12
2012.tif100%
New File 59537 Monthly Operational Report PEDC 12
2013.pdf100%
New File 451727 Monthly Operational Report PEDC 12
2014.pdf100%
New File 51274 Monthly Operational Report PEDC 12
2015.pdf100%
New File 52361 Monthly Operational Report PEDC 12
2016.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Permits\
New File 1.7 m DENR ECC PEDC.pdf100%
New File 1.1 m DENR PTO PEDC.pdf100%
New File 3.6 m ERC 2016 GCMR and GCIS PEDC.pdf100%
New File 1000018 ERC COC PEDC 1&2.pdf100%
New File 536943 ERC PAO PEDC3.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\QAQC and PLE Activities\
New File 231034 2017 CBM with PM Module and WO.xlsx100%
New File 594432 FIR-QAC-17-001 U1 PMS DEC 2016 - JAN
2017.doc100%
New File 3.4 m FIR-QAC-17-001.pdf100%
New File 30.3 m FIR-QAC-17-002 U1 PMS Dec 25-Jan14 2017
Electrical-NMT.doc100%
New File 1.3 m FIR-QAC-17-002.pdf100%
New File 735212 FIR-QAC-17-003 UTG of unit 1 boiler and
backpass.docx100%
New File 5.5 m FIR-QAC-17-003.pdf100%
New File 164352 FIR-QAC-17-004 LPT of unit 1 Turbine
blade and valve joints of steam drum.doc100%
New File 941986 FIR-QAC-17-004.pdf100%
New File 236032 FIR-QAC-17-005 MPT of unit 1 Daerator
and valve joints of steam drum -.doc100%
New File 1.7 m FIR-QAC-17-005.pdf100%
New File 66048 PEDC PLANT ENGINEERING AND DESIGN-6 Year
PMS Program.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\
New File 984650 ERC 2016 GCMR and GCIS GBHPRI.pdf100%
New File 3.7 m ERC 2016 GCMR and GCIS PPC.pdf100%
New File 40407 FUEL DATA (5 years).xlsx100%
New File 915585 WESM Registration.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\GBHPRI Permits\
New File 1.1 m DENR ECC GBHPRI.pdf100%
New File 1.1 m DENR PTO GBHPRI.PDF100%
New File 589111 ERC COC GBHPRI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\Monthly Operational Report\
New File 1.8 m 2012 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2013 PPC & GBHPRI Plant MOR.PDF100%
New File 264558 2014 PPC & GBHPRI Plant MOR.PDF100%
New File 223344 2015 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2016 PPC & GBHPRI Plant MOR.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\Plant Outages\
New File 199844 2012 PPC & GBH Summary of Outages.pdf100%

New File 73497 2013 PPC and GBH Summary of Outages.pdf


100%
New File 1.0 m 2014 PPC & GBH Summary of Outages.pdf100%

New File 127674 2015 PPC and GBHPRI Summary of


Outages.pdf100%
New File 136418 2016 PPC and GBHPRI Summary of
Outages.pdf100%
New File 1.1 m 2017 PPC & GBH Summary of Outages.pdf100%

New Dir 5 C:\AdvisianActive\01 Projects\Project


Lighthouse\Panay Power\PPC & GBHPRI Info\PMS Implementation\
New File 141989 PPC & GBH - PMS IMPLEMENTATION 2012.pdf
100%
New File 75268 PPC & GBH - PMS IMPLEMENTATION 2013.pdf
100%
New File 74791 PPC & GBH - PMS IMPLEMENTATION 2014.pdf
100%
New File 68895 PPC & GBH - PMS IMPLEMENTATION 2015.pdf
100%
New File 29565 PPC & GBH - PMS IMPLEMENTATION 2016.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\PPC Permits\
New File 2.0 m DENR ECC PPC 1&2.pdf100%
New File 3.6 m DENR ECC PPC 3.pdf100%
New File 1.5 m DENR ECC PPC 4.pdf100%
New File 1.0 m DENR PTO PPC 1&2.pdf100%
New File 219187 DENR PTO PPC 3.pdf100%
New File 414929 DENR PTO PPC 4.pdf100%
New File 1.0 m ERC COC PPC 1&2.pdf100%
New File 2.2 m ERC COC PPC 3.pdf100%
New File 2.2 m ERC COC PPC 4.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\SBPL\
New File 1.4 m SBPL Quezon_Project Presentation for Site
Visit-04052017 .pptx100%
New Dir 50 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\
New File 3.3 m 20170404_131928.jpg100%
New File 3.9 m 20170404_131937.jpg100%
New File 4.3 m 20170404_132209.jpg100%
New File 4.2 m 20170404_132211.jpg100%
New File 3.7 m 20170404_184926.jpg100%
New File 3.2 m 20170404_185521.jpg100%
New File 3.3 m 20170404_185524.jpg100%
New File 4.2 m 20170404_185705.jpg100%
New File 3.0 m 20170404_195438.jpg100%
New File 3.4 m 20170404_195447.jpg100%
New File 3.0 m 20170404_200235.jpg100%
New File 2.9 m 20170404_200259.jpg100%
New File 3.3 m 20170404_200339.jpg100%
New File 4.5 m 20170406_062726.jpg100%
New File 4.5 m 20170406_062729.jpg100%
New File 3.8 m 20170406_062744.jpg100%
New File 5.3 m 20170406_062815.jpg100%
New File 5.8 m 20170406_062817.jpg100%
New File 3.9 m 20170406_162720.jpg100%
New File 4.0 m 20170406_162730.jpg100%
New File 3.6 m 20170406_162738.jpg100%
New File 3.6 m 20170406_162744.jpg100%
New File 3.5 m 20170406_162801.jpg100%
New File 3.8 m 20170406_162806.jpg100%
New File 3.2 m 20170406_162810.jpg100%
New File 3.2 m 20170406_162814.jpg100%
New File 3.2 m 20170406_162817.jpg100%
New File 3.4 m 20170406_162821.jpg100%
New File 3.5 m 20170406_192223.jpg100%
New File 3.7 m 20170407_062333.jpg100%
New File 3.4 m 20170407_064651.jpg100%
New File 3.0 m 20170407_064654.jpg100%
New File 4.6 m 20170407_073233(0).jpg100%
New File 4.2 m 20170407_073233.jpg100%
New File 5.3 m 20170407_073452(0).jpg100%
New File 3.7 m 20170407_075522.jpg100%
New File 3.5 m 20170407_075550.jpg100%
New File 3.4 m 20170407_075551.jpg100%
New File 3.6 m 20170407_075627.jpg100%
New File 3.6 m 20170407_075705.jpg100%
New File 3.4 m 20170407_075723.jpg100%
New File 3.3 m 20170407_075737.jpg100%
New File 3.0 m 20170407_080325_001.jpg100%
New File 2.8 m 20170407_134411.jpg100%
New File 2.9 m 20170407_134412.jpg100%
New File 3.0 m 20170407_134413.jpg100%
New File 3.6 m 20170407_134415.jpg100%
New File 3.5 m 20170407_191544.jpg100%
New File 4.4 m 20170408_111018.jpg100%
New File 4.1 m 20170408_111020.jpg100%
New Dir 25 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\CEDC\
New File 3.2 m 20170407_104012.jpg100%
New File 3.2 m 20170407_104017.jpg100%
New File 3.2 m 20170407_104041.jpg100%
New File 4.0 m 20170407_104808.jpg100%
New File 3.9 m 20170407_105421.jpg100%
New File 2.0 m 20170407_105826_001.jpg100%
New File 4.5 m 20170407_105835.jpg100%
New File 4.1 m 20170407_110428.jpg100%
New File 4.0 m 20170407_110527.jpg100%
New File 3.8 m 20170407_110627.jpg100%
New File 4.4 m 20170407_110629.jpg100%
New File 4.3 m 20170407_110746.jpg100%
New File 4.1 m 20170407_110813.jpg100%
New File 4.3 m 20170407_110817.jpg100%
New File 4.6 m 20170407_111614.jpg100%
New File 3.9 m 20170407_111819.jpg100%
New File 4.6 m 20170407_111835.jpg100%
New File 2.5 m 20170407_111855.jpg100%
New File 5.4 m 20170407_112245.jpg100%
New File 3.8 m 20170407_112541.jpg100%
New File 3.2 m 20170407_112638_001.jpg100%
New File 4.1 m 20170407_112927.jpg100%
New File 5.4 m 20170407_113203.jpg100%
New File 5.2 m 20170407_113212.jpg100%
New File 5.4 m 20170407_113228.jpg100%
New Dir 35 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\PEDC\
New File 3.6 m 20170406_105625.jpg100%
New File 3.3 m 20170406_105637.jpg100%
New File 4.9 m 20170406_110007.jpg100%
New File 6.3 m 20170406_110113.jpg100%
New File 6.3 m 20170406_110116.jpg100%
New File 6.6 m 20170406_110120.jpg100%
New File 6.4 m 20170406_110151.jpg100%
New File 4.4 m 20170406_110208.jpg100%
New File 4.6 m 20170406_110550.jpg100%
New File 4.8 m 20170406_110915.jpg100%
New File 3.9 m 20170406_111137.jpg100%
New File 3.9 m 20170406_111141.jpg100%
New File 3.8 m 20170406_111411.jpg100%
New File 4.9 m 20170406_111811.jpg100%
New File 3.6 m 20170406_111816.jpg100%
New File 4.7 m 20170406_111954.jpg100%
New File 4.5 m 20170406_112134.jpg100%
New File 4.6 m 20170406_112135.jpg100%
New File 4.6 m 20170406_112155.jpg100%
New File 4.1 m 20170406_112410.jpg100%
New File 4.2 m 20170406_112518.jpg100%
New File 4.5 m 20170406_112610.jpg100%
New File 4.4 m 20170406_112743.jpg100%
New File 4.2 m 20170406_112842.jpg100%
New File 3.6 m 20170406_112849.jpg100%
New File 4.8 m 20170406_112917.jpg100%
New File 3.7 m 20170406_114652.jpg100%
New File 3.2 m 20170406_114722.jpg100%
New File 4.0 m 20170406_115126.jpg100%
New File 3.5 m 20170406_115447.jpg100%
New File 2.1 m 20170406_115454.jpg100%
New File 4.4 m 20170406_115702.jpg100%
New File 5.3 m 20170406_120011.jpg100%
New File 5.4 m 20170406_120012.jpg100%
New File 4.5 m 20170406_134228.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\PPC\
New File 3.8 m 20170406_134354.jpg100%
New File 5.4 m 20170406_134426.jpg100%
New File 5.2 m 20170406_134433.jpg100%
New File 4.5 m 20170406_134508.jpg100%
New File 4.3 m 20170406_135113.jpg100%
New File 4.4 m 20170406_135242.jpg100%
New File 3.8 m 20170406_135311.jpg100%
New File 3.7 m 20170406_135413.jpg100%
New File 4.7 m 20170406_135609.jpg100%
New File 4.1 m 20170406_135639.jpg100%
New File 4.2 m 20170406_140504.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\SBPL Site Visit\
New File 4.1 m 20170405_110908.jpg100%
New File 4.1 m 20170405_110921.jpg100%
New File 4.7 m 20170405_111126.jpg100%
New File 5.1 m 20170405_111915.jpg100%
New File 4.9 m 20170405_112557.jpg100%
New Dir 17 C:\AdvisianActive\01 Projects\Project Needle\
New File 162 ~$170123 Project Needle Proposal
FFFF.docx100%
New File 4.7 m 20170109 Briefing on Reimagining TNB to
Tech Advisor.pptx100%
New File 5.0 m 20170123 Project Needle Proposal
FFFF.docx100%
New File 129482 20170208 Repowering Plan.pdf100%
New File 21574 20170225 Financial Inputs_neoh.xlsx100%
New File 1.0 m Agenda Advisian.docx100%
New File 20280 Gaps in the Report.docx100%
New File 1.0 m KEV - Plant Information.docx100%
New File 19349 Project Needle Site Visit Plan_7 Feb 2017
v1.xlsx100%
New File 26332 Project Needle Technical Document Request
List_9 Feb 2016.xlsx100%
New File 304109 Project Needle_Execution
Plan_25012017_V1.pdf100%
New File 1.0 m Project Needle_Site Visit Questionnaire
and WalkDown List_V3.xlsx100%
New File 1.0 m Project Needle_Site Visit Questionnaire
and WalkDown List_V4.xlsx100%
New File 76320 REAP_04042017_Capacity Factor for TNB
Power Plants (2017-2036)_latest run.xlsx100%
New File 105472 Report Submission Cover Letter.doc100%
New File 194168 Report Submission Cover Letter.pdf100%
New File 1.0 m TNB Janamanjung - Plant Information.docx
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Advisors
Meeting (26 Jan)\
New File 4.6 m Project Needle - Advisors Briefing -
20170126 v4.pptx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Serdang (Putrajaya)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Sultan Iskandar (Johor)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Tuanku Jaafar (Negeri Sembilan)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJCB Connaught Bridge (Selangor)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\SJ Gelugor\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\SJ Sultan Ismail (PAKA)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\TNB Prai\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\KEV\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\TNB Janamanjung\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Bersia & Temenggor\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Cameron Highlands\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Kenyir\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Pergau\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\
New File 14196 List of Generation Document rev i.xlsx
100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Annual Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Audit Financial Statement\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Division Account\
New File 467524 DA Period 11 Report for FY2016
(Generation).pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Financial Projection\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Management Account\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\EPC\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\GSA\
New File 18.5 m GSA Final_signed stamped copy.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LLA\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\Final LTMP II Agreement\
New File 1.3 m Part 1.pdf100%
New File 4.2 m Part 2.pdf100%
New File 2.6 m Part 3.pdf100%
New File 2.5 m Part 4.pdf100%
New File 1.7 m Part 5.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\LTMP for SJ Tuanku Jaafar\
New File 1.3 m Part 1.pdf100%
New File 4.2 m Part 2.pdf100%
New File 2.6 m Part 3.pdf100%
New File 2.5 m Part 4.pdf100%
New File 1.7 m Part 5.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\O&M\
New File 9.5 m Appendix A.pdf100%
New File 304240 Appendix B.pdf100%
New File 395335 Appendix C.pdf100%
New File 172297 Appendix D.pdf100%
New File 370283 Appendix E.pdf100%
New File 444080 Appendix F.pdf100%
New File 26.4 m Continues of Schedule A.pdf100%
New File 13.2 m Contract Agreement TNB 346-2014.pdf100%
New File 413335 Flowchart Remaco SCM.pdf100%
New File 9.1 m MSA Contract Agreement TNB 346-2014 MSA -
No Figure 1.pdf100%
New File 26.5 m Schedule A.pdf100%
New File 4.1 m Schedule B.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\PSA\
New File 889944 Parts and Services Agreement between TNB
REMACO and GE Energy Parts International and GE Power System (Malaysia) and%.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\
New File 3.8 m CAMERON HIGHLANDS SLA.pdf100%
New File 32.0 m HULU TERENGGANU SLA.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Connaught Bridge\
New File 1.2 m 3_CBPS_3rd Letter_28Sep2014.pdf100%
New File 755894 Appendix A.pdf100%
New File 813977 Appendix B.pdf100%
New File 667072 Appendix C.pdf100%
New File 198295 Appendix D.pdf100%
New File 270385 Appendix E.pdf100%
New File 112627 Appendix F.pdf100%
New File 1010025 Appendix G.pdf100%
New File 122931 Appendix H.pdf100%
New File 59586 Appendix I.pdf100%
New File 99642 Appendix J.pdf100%
New File 198517 Appendix L.pdf100%
New File 5.7 m CBPS.rar100%
New File 2.1 m SLA TD & GD CBS.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Putrajaya\
New File 353420 Appendix A.pdf100%
New File 637464 Appendix B.pdf100%
New File 677866 Appendix C.pdf100%
New File 192673 Appendix D.pdf100%
New File 287917 Appendix E.pdf100%
New File 16329 Appendix F.pdf100%
New File 576356 Appendix G.pdf100%
New File 127419 Appendix H.pdf100%
New File 60552 Appendix I.pdf100%
New File 102447 Appendix J.pdf100%
New File 150420 Appendix L.pdf100%
New File 61359 PJPS GT4 & GT5 10 yr Extension - Offer
Letter from EC.pdf100%
New File 281069 PJPS GT4 & GT5 Supplemental Agreement.pdf
100%
New File 1.6 m SLA TD &GD SJ Putrajaya.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sultan Mahmud Kenyir\
New File 598678 App A.pdf100%
New File 1.2 m App B.pdf100%
New File 857874 App C & D.pdf100%
New File 1.2 m App E & G.pdf100%
New File 2.0 m App H, I & L.pdf100%
New File 133728 Exhibit.pdf100%
New File 3.1 m Main Body.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sungai Perak\
New File 973906 Appendix B.pdf100%
New File 278839 Appendix C.pdf100%
New File 203347 Appendix D.pdf100%
New File 239777 Appendix E.pdf100%
New File 472179 Appendix G.pdf100%
New File 133677 Appendix H.pdf100%
New File 76735 Appendix I.pdf100%
New File 195545 Appendix L.pdf100%
New File 178130 Contents SLA Between PD & GD.pdf100%
New File 41937 Exhibit 2.pdf100%
New File 27457 Exhibit 3.pdf100%
New File 75844 Exhibit 4.pdf100%
New File 4.5 m PGAU.rar100%
New File 1.8 m SLA Agreement.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sungai Perak\SJ Pergau\
New File 352068 Appendix A.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJSI Pasir Gudang\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\SLA TJPS
GF1\
New File 14.0 m 4344_001.pdf100%
New File 2.1 m 4344_033.pdf100%
New File 2.1 m 4344_072.pdf100%
New File 2.1 m 4344_108.pdf100%
New File 2.1 m 4344_146.pdf100%
New File 1.2 m 4344_173.pdf100%
New Dir 15 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\SLA TJPS
GF2\
New File 1.2 m Appendix A.pdf100%
New File 2.0 m Appendix B.pdf100%
New File 682740 Appendix C.pdf100%
New File 281002 Appendix D.pdf100%
New File 2.4 m Appendix E.pdf100%
New File 78058 Appendix F.pdf100%
New File 1.5 m Appendix G.pdf100%
New File 201086 Appendix H.pdf100%
New File 104606 Appendix I.pdf100%
New File 165426 Appendix J.pdf100%
New File 263970 Appendix L.pdf100%
New File 214378 Exhibit.pdf100%
New File 2.2 m Main Body.pdf100%
New File 321810 PD2 COD.pdf100%
New File 10.5 m PORT DICKSON2 SLA.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\State Water Agreements\
New File 2.3 m Agreement - State & LLN.pdf100%
New File 212331 Batang Padang Hydro-Electric Scheme
Agreement.pdf100%
New File 813027 Batang Padang Supplimentary Agreement.PDF
100%
New File 676293 Bersia Hydro-Electric Project
Agreement.pdf100%
New File 617705 Bersia Supplimentary Agreement.pdf100%
New File 1.9 m CAMERON HIGHLANDS HYDRO-ELECTRIS
SCHEME.pdf100%
New File 646681 Chenderoh Hydro-Electric Scheme
Agreement.pdf100%
New File 505172 Chenderoh Supplimentary Agreement.pdf100%

New File 1.0 m Kajian Semula bayaran Tahunan Untuk


Penjanaan Elekt Oleh Tnb bg SJ Sultan Mahmud Kenyir.pdf100%
New File 731637 Kenering Hydro-Electric Project
Agreement.pdf100%
New File 784892 Kenering Supplimentary Agreement.pdf100%

New File 1.1 m pergau agreement.pdf100%


New File 1.8 m Perjanjian Tambahan Kedua Royalti
Penggunaan Air SJSM Kenyir.pdf100%
New File 1.2 m Sg. Piah Agreement.pdf100%
New File 1.7 m Temengor agreement.pdf100%
New File 1.2 m Temengor Hydro-Electricity Scheme
Agreement.pdf100%
New File 839737 Temengor Supplimentary Agreement.pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\
New File 230582 AMP for AM Department 2017 - final.xlsx
100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJ Gelugor\
New File 3.4 m AMP FY1617.pdf100%
New File 421888 Copy of Copy of Copy of Copy of GAMM -10
years service delivery plan 11th March 2016.xls100%
New File 22427 SJ Gelugor Annex C Asset
ManagementPerformance Measures and Targets_28012016.docx100%
New File 19311 SJ Gelugor Annex G Asset Management
Continual Improvement Checklist (2) (2).docx100%
New File 17533 SJ Gelugor Annex H Service Level Measures
and Targets (2).docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJ Putrajaya\
New File 842459 AMP FY1516 Rev02 Signed.pdf100%
New File 282370 Annex C.pdf100%
New File 40025 Annex G Asset Management Continual
Improvement Checklist FY17.pdf100%
New File 40920 Annex H Service Level Measures and
Targets FY17.pdf100%
New File 308736 PJPS GAMM - AMP FY1516 rev03.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJCB\
New File 19430 Annex C Asset ManagementPerformance
Measures and Targets.docx100%
New File 17522 Annex G Asset Management Continual
Improvement Checklist.docx100%
New File 14571 Annex H Service Level Measures and
Targets.docx100%
New File 389120 SJJC_Strategic Asset Management Plan
FY14-18 review 19_02_2016.xls100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJCH\
New File 56533 AMP CHPS 16 rev2.xlsx100%
New File 76369 AMP CHPS 16 rev3.xlsx100%
New File 20338 Annex C Asset ManagementPerformance
Measures and Targets - CHPS 16.docx100%
New File 26618 Annex G Asset Management Continual
Improvement Checklist - SJJCH Overall.docx100%
New File 19856 Annex H Service Level Measures and
Targets.docx100%
New File 28103 Project List CHPS 16 Rev 2.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSI Paka\
New File 132477 SJSI PAKA AMP FY16-17- Revised.xlsx100%
New File 14843 SJSI Paka Annex G Asset Management
Continual Improvement Checklist October __Submission.docx100%
New File 17710 SJSI Paka Annex H Service Level Measures
and Targets Oct _Submission.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSI Pasir
Gudang\
New File 15680 Annex G Asset Management Continual
Improvement Checklist.docx100%
New File 14521 Annex H Service Level Measures and
Targets.docx100%
New File 359424 SJSI PG AMP - Service Delivery Plan as
4.4.2016.xls100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSM Kenyir\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJTJ Port
Dickson\
New File 636116 AMP_TJPS.pptx100%
New File 18911 Annex C Asset ManagementPerformance
Measures and Targets oct 2016.docx100%
New File 18679 Annex G Asset Management Continual
Improvement Checklist oct 2016.docx100%
New File 17541 Annex H Service Level Measures and
Targets update Oct 2016.docx100%
New File 344064 Copy of TJPS Asset Management Plan (10-
Year)-update Oct 16.xls100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SSJ Sungai Perak\
New File 359424 AMP Template FY2016 - FY2026 rev 1.xls
100%
New File 16423 Annex C Asset ManagementPerformance
Measures and Targets.docx100%
New File 21155 Annex G Asset Management Continual
Improvement Checklist_SGPK.docx100%
New File 15537 Annex H Service Level Measures and
Targets.docx100%
New File 18632 Annex H Service Level Measures and
Targets_FY2016.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\Revised AMP Document
for 5 stations\
New File 14439 Annex H Service Level Measures and
Targets - PGPS.docx100%
New File 18905 Annex H Service Level Measures and
Targets SJSM Kenyir 2017.docx100%
New File 14682 Annex H Service Level Measures and
Targets-FY1617 CBPS.docx100%
New File 16039 CHPS Annex H Service Level Measures and
Targets.docx100%
New File 15099 SJ Gelugor Annex H Service Level Measures
and Targets GLGR.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Corporate Financing\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Financial Model\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Financial Model\DSPM\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Generation EBIT, R&M and Budget\
New File 408726 EBITDA R&M and BUDGET.xlsx100%
New File 16879 PM & CM Cost.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Project Financing\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Treasury\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational Structure\
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure Generation Divison\
New File 978744 11. Kelulusan JTK Struktur Aset Operasi&
Aset Mgmt.pdf100%
New File 171520 3. AO Structure Tree (ORI) lulus
01.08.2013.vsd100%
New File 151040 4. AM Structure Tree (ORI) Lulus
01.08.2013.vsd100%
New File 69338 Approved HQ Gen Struktur Organisasi Makro
Penjanaan.pdf100%
New File 79354 Kelulusan SMOD PMO.pdf100%
New File 79229 SMOD 01012015.PDF100%
New File 69338 Struktur Organisasi Makro Penjanaan.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJ Gelugor\
New File 94141 Approved non Exec SJ Gelugur 10072015.pdf
100%
New File 182548 Gelugor PS Org Chart Exec.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJCB Klang\
New File 1008828 Approved Structure Stesen Jambatan
Connaught - 01.01.2015.pdf100%
New File 135460 CBPS Non Exec Approved by EC Nov14.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJCH\
New File 145392 Approved Exec Structure Cameron Highlands
by Group.pdf100%
New File 296448 Final Cadangan Non Exec Structure Ulu
Jelai 31102014 - Dispensary Amendments with names.vsd100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSI Paka\
New File 21118 SJ_Paka_new Org Struc as at June 2014.pdf
100%
New File 357376 Structure Of Paka_Non Exec as of April
2015.vsd100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSI Pasir Gudang\
New File 347136 Non Exec - SJSIP Gudang Dec2015.vsd100%

New File 53760 struktur organisasi Eksekutif Pasir


Gudang 2014.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSM Kenyir\
New File 147166 Approved Exec Structure Sultan Mahmud
Kenyir by Group.pdf100%
New File 206369 SJSM Kenyir_Exec_Organizational Structure
with Names_Apr 2015.jpg100%
New File 298141 SJSM Kenyir_Non Exec_Organizational
Structure with Names.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation structure SJTJ Port Dickson\
New File 74879 TJPS Executive Organisational Structure
with Names, 19 Jan 2015.pdf100%
New File 128417 TJPS Non Executive Organisational
Structure with Names, 5 Jan 2015.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SSJ Sungai Perak\
New File 90933 SSJ SG Perak Approved Exec Structure
071014.pdf100%
New File 61780 Structure SSJ Sg Perak Non Exec.pptx100%

New Dir 1 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisational Structure SJ Putrajaya\
New File 35351 PJPS 2014 structure (June)- no name.pdf
100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\
New File 8.1 m Generation Division Annual report FY
2016.pdf100%
New File 7.0 m GENERATION DIVISION ANNUAL REPORT FY2014
Draft.pdf100%
New File 4.8 m Generation Division Annual Report
FY2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\Asset
Management Implementation Plan to Energy Comission\
New File 6.7 m Asset Management Implementation Plan
Report 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\Asset
Management Performance Report to Energy Comission\
New File 2.0 m GD Asset Performance Report FY2015.pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\GD
Strategic Asset Management Plan\
New File 5.1 m TNB Generation Division SAMP.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Transformation\
New File 1.4 m 20150618 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 1.9 m 20150812 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 39790 20161212 List of Power Plants and PPA
Expiry Date.pdf100%
New File 28815 20161212 TNB EBITDA per MW Analysis.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\Accidents
Description and Audit Score\
New File 241537 MAKLUMAT KEMALANGAN A_KERJA TNB TNBG 2011
- 2016.xlsx100%
New File 234318 Score SEMS for all power plants and
remaco_2013.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\FY 2014_2015\
New File 142336 1._EC_Report_2015_GEN.xls100%
New File 757107 LAPORAN_ST__2015_v3a.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\FY 2015_2016\
New File 1.7 m LAPORAN ST 2016 V3.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Statistical Data (SLA Plants)\
New File 160659 Statistical SJ Cameron Highlands.xlsx100%

New File 173380 Statistical SJ Connaught Bridge.xlsx100%

New File 155935 Statistical SJ Gelugor.xlsx100%


New File 386560 Statistical SJ Putrajaya.xls100%
New File 654848 Statistical SJ Sultan Iskandar Pasir
Gudang.xls100%
New File 1.5 m Statistical SJ Sultan Ismail Paka.xls100%

New File 2.9 m Statistical SJ Sultan Mahmud Kenyir.xlsx


100%
New File 4.8 m Statistical SJ Sungai Perak.xls100%
New File 265252 Statistical SJ Tuanku Jaafar PD.xlsx100%

New Dir 0 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Legal\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Encumbrances & Caveat\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Land Property Development Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Land Title\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Lease Agreement\
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\State Water Agreement\
New File 2.3 m Agreement - State & LLN.pdf100%
New File 212331 Batang Padang Hydro-Electric Scheme
Agreement.pdf100%
New File 813027 Batang Padang Supplimentary Agreement.PDF
100%
New File 676293 Bersia Hydro-Electric Project
Agreement.pdf100%
New File 617705 Bersia Supplimentary Agreement.pdf100%
New File 1.9 m CAMERON HIGHLANDS HYDRO-ELECTRIS
SCHEME.pdf100%
New File 646681 Chenderoh Hydro-Electric Scheme
Agreement.pdf100%
New File 505172 Chenderoh Supplimentary Agreement.pdf100%

New File 1.0 m Kajian Semula bayaran Tahunan Untuk


Penjanaan Elekt Oleh Tnb bg SJ Sultan Mahmud Kenyir.pdf100%
New File 731637 Kenering Hydro-Electric Project
Agreement.pdf100%
New File 784892 Kenering Supplimentary Agreement.pdf100%

New File 1.1 m pergau agreement.pdf100%


New File 1.8 m Perjanjian Tambahan Kedua Royalti
Penggunaan Air SJSM Kenyir.pdf100%
New File 1.2 m Sg. Piah Agreement.pdf100%
New File 1.7 m Temengor agreement.pdf100%
New File 1.2 m Temengor Hydro-Electricity Scheme
Agreement.pdf100%
New File 839737 Temengor Supplimentary Agreement.pdf100%

New Dir 0 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Legal\Assets\Summary of Freehold & Leasehold
Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Tenancy Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Way Leave & Right of Way Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Agreement exceeding threshold\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Joint Development Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Joint Venture Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Memorandum of Understanding\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Shareholder's Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Corporate Document\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Insurance\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Intellectual Properties Document\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Intellectual Properties Document\TNB's
Registered Trade Marks\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\License\
New File 1.6 m New Generating License ST 2014.pdf100%
New File 4.9 m TNB HULU TERENGGANU LICENSE
LA12_1_1_39(G) wef 20082015.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\List of Panel Lawyers\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\Material Litigation\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\Approved Plan Outage Schedule\
New File 741513 Approved Planned Outage Schedule
CY2015.pdf100%
New File 799058 Approved Planned Outage Schedule
CY2016.pdf100%
New File 907379 Approved Planned Outage Schedule for
CY2014.pdf100%
New File 1.5 m POS 2016 - 2017.pdf100%
New File 3.5 m TNBG.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\Plants Outage Monitoring\
New File 45602 Generation Division Outage Monitoring
FY1011-1.xlsx100%
New File 27485 Generation Division Outage Monitoring
FY1112.xlsx100%
New File 44026 Generation Division Outage Monitoring
FY1213.xlsx100%
New File 64263 Generation Division Outage Monitoring
FY1314.xlsx100%
New File 47245 Generation Division Outage Monitoring
FY1415.xlsx100%
New File 20707 Generation Division Outage Monitoring
FY1516 - (Sep - Dec) Finance.xlsx100%
New File 210258 TNBG_POSCY2017-2021_Rev1 6 dec.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Annual Reports\
New File 6.4 m Generation Division Annual Report
2008.pdf100%
New File 5.9 m Generation Division Annual Report
2011.pdf100%
New File 8.1 m Generation Division Annual report FY
2016.pdf100%
New File 3.0 m Generation Division Annual Report
FY2009.pdf100%
New File 3.7 m Generation Division Annual report
FY2010.pdf100%
New File 7.0 m Generation Division Annual report
FY2014.pdf100%
New File 4.8 m Generation Division Annual Report
FY2015.pdf100%
New File 5.5 m TNB Annual Report FY 2012.pdf100%
New File 5.2 m TNB Annual Report FY2013.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Asset Management
Implementation Plan to Energy Comission\
New File 6.7 m Asset Management Implementation Plan
Report 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Asset Management Performance
Report to Energy Comission\
New File 2.0 m GD Asset Performance Report FY2015.pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Strategic Asset Management
Plan\
New File 5.1 m TNB Generation Division SAMP.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\GST Payment\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\GST Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Income Tax Payment\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Income Tax Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Audit\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Estimates\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Exemption Incentive\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Withholding Tax\
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Valuer Report (Power Plant)\
New File 1.5 m 3441_002.pdf100%
New File 629918 3442_001.pdf100%
New File 3.1 m CV SJ CONNAUGHT BRIDGE.pdf100%
New File 2.6 m CV SJ SULTAN ISKANDAR P.GUDANG.pdf100%
New File 3.3 m CV SJ TUANKU JAAFAR P.DICKSON.pdf100%
New File 792324 CV TANJONG 12, SEPANG POWER.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\FM
Models from Maybank\
New File 6.2 m Project Needle - GenCo Model_Second
Draft_Advisian.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\KPI
Templates\
New File 39741 1.0 Asset X - Plant Information.xlsx100%

New File 1.0 m 2.0 Asset X - PPA.xlsx100%


New File 1.0 m 3.0 Asset X - O&M Evaluation.xlsx100%
New File 1.0 m 4.0 Asset X - Lost Production Data.xlsx
100%
New File 1.0 m 5.0 Asset X - LTSA Evaluation.xlsx100%
New File 32791 6.0 Asset X - FSA_CSA_Coal.xlsx100%
New File 31953 6.0 Asset X - FSA_GSA_Gas.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\LTSA
Review\
New File 251 Notes.txt100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\LTSA
Review\Reference Files\
New File 60037 comments on LTSA DR.docx100%
New File 10987 costs ltsa R1.xlsx100%
New File 3.0 m DD MEPE Myanmar Thaketa 151109 final
draft+rk.docx100%
New File 524288 Jacobs comments CSA_PUP7_ENAP - Aconcagua
- Chile_2014-08-04_R6.doc100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Needle\Presentations to TNB\
New File 975595 20170308_Project Needle Advisian Debrief
to Dato Zainuddin.pdf100%
New File 1.8 m 20170308_Project Needle Advisian Debrief
to Dato Zainuddin2.pdf100%
New File 176183 Highlights in PSC Meeting.pptx100%
New File 7.3 m Presentation to TNBG_v3.pptx100%
New File 1.0 m Project Needle - Advisian Progress Update
for 14Apr2017.pptx100%
New File 7.3 m Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_26032017.pptx100%
New File 939166 Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_26032017_FINAL.pdf100%
New File 887060 Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_27032017.pdf100%
New File 6.8 m Project Needle_TNB Generation Meeting 18
Apr.pptx100%
New File 1.1 m Project Needle_TNB Generation Meeting 18
Apr_rev1.pdf100%
New File 7.1 m Project Needle_TNB Generation Meeting 18
Apr_rev1.pptx100%
New File 1.4 m Repositioning of TNB Assets for
CAPEX.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Project
Needle Kick-off (25 Jan)\
New File 498883 Project Needle - key contact list -
20170125.pptx100%
New File 1.8 m Project Needle kick-off - 20170125
(FINAL).pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project Needle\Project
Needle Templates\
New File 1.0 m Project Needle - workplan template -
20170125 v0.1.pptx100%
New File 1.0 m Project Needle - workstream progress
template - 20170125 v0.1.pptx100%
New File 21765 Project Needle_Workplan_Site Visit
Questionnaire and WalkDown List_25012017_V1.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Reference\
New File 2.9 m Ancillary Service Study.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Reference\Manjung 4 PPA\
New File 1.4 m Appendix to Tender (Amended 6 May
2011) .pdf100%
New File 522098 PPA - Responsibility of IE Highlighted -
MAN.pdf100%
New File 500502 TNBJ Main Body - POWER PURCHASE
AGREEMENT.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Reference\Manjung 4 PPA\PPA - Appendix\
New File 249339 A - Project Description Design
Conditions.pdf100%
New File 85881 B - FACILITY TECH REQ AND OPER CHAR.pdf
100%
New File 77807 C - TEST - CAP, HEAT RATE ANNUAL AVA
CAP.pdf100%
New File 57139 D - ENERGY ACCOUNTING AND TNB METERING
EQUIPMENT.pdf100%
New File 112678 E - DESIGN OF THE INTERCONNECTION
FACILITIES.pdf100%
New File 65279 F- FUEL FACILITIES.pdf100%
New File 192717 G - PAYMENT FOR ENERGY, AVAILABILITY AND
START-UPS.pdf100%
New File 31177 H - OPERATION AND MAINTENANCE.pdf100%
New File 113930 I - ENVIRONMENTAL STANDARDS.pdf100%
New File 238180 J - DETERMINATION OF FUEL PRICE.pdf100%
New File 68087 K - CONSEQUENCES OF TERMINATION.pdf100%
New File 35712 L- Description Of Site.pdf100%
New File 27129 M - INPUT DATA AND INITIAL FINANCIAL
MODEL.pdf100%
New File 12614 N - WALK AWAY EVENTS.pdf100%
New File 24581 O - SHARED FACILITIES.pdf100%
New File 18392 P - PRINCIPLES FOR SHARED FACILITIES
AGREEMENT.pdf100%
New File 15872 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Site
Visit\
New File 162 ~$sir Gudang.docx100%
New File 31983 Pasir Gudang.docx100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\superceded slides\
New File 7.3 m Presentation to TNB CFO.pptx100%
New File 7.3 m Presentation to TNB CFO_v2.pptx100%
New File 7.3 m Presentation to TNB CFO_v3.pptx100%
New File 7.3 m Presentation to TNB CFO_v4.pptx100%
New File 7.3 m Presentation to TNB CFO_v5.pptx100%
New File 7.5 m Presentation to TNBG.pptx100%
New File 7.5 m Presentation to TNBG_v1.pptx100%
New File 975646 Presentation to TNBG_v2.pdf100%
New File 7.4 m Presentation to TNBG_v2.pptx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\TNBG
Transformation\
New File 1.4 m 20150618 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 1.9 m 20150812 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 2.1 m 20160405 COE roll out Exec.pdf100%
New File 39790 20161212 List of Power Plants and PPA
Expiry Date.pdf100%
New File 28815 20161212 TNB EBITDA per MW Analysis.pdf
100%
New File 143998 TNB Procurement Transformation.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\
New File 89498 20161212 List of Power Plants and PPA
Expiry Date.xlsx100%
New File 88698 20161212 List of Power Plants and PPA
Expiry Date_v2.xlsx100%
New File 6.0 m 20170302 Full Report_draft - VOL 2.docx
100%
New File 7.2 m 20170315 Full Report_draft - VOL 1.docx
100%
New File 810496 EBITDA R&M and BUDGET_neoh.xls100%
New File 417057 EBITDA R&M and BUDGET_neoh.xlsx100%
New File 30337 Graphical Indicators.xlsx100%
New File 30053 Graphical Indicators_v2.xlsx100%
New File 1.4 m Graphical.pptx100%
New File 1.4 m Graphical_v2.pptx100%
New File 89267 Malaysia Power Market.pptx100%
New File 59356 Manpower Benchmark.xlsx100%
New File 599492 Master Spreadsheet_Combined.xlsx100%
New File 2.5 m Project Needle - Advisian Opportunity and
Risk Matrix.docx100%
New File 65117 Project Needle - Compiled Risk Register
20170324.xlsx100%
New File 1.5 m Risks Reward Profile.pptx100%
New File 1.6 m Scenario Analysis Asset X.pptx100%
New Dir 11 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FM inputs Neoh\
New File 28816 20170225 Financial Inputs_WBedit.xlsx100%

New File 1003592 20170330 Advisian CAPEX OPEX


Projections_v3.xlsx100%
New File 1029029 20170402 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.1 m 20170405 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.2 m 20170406 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.2 m 20170413 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 1.2 m 20170418 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 1.2 m 20170419 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 15215 Availability and Capacity Factor
Inputs.xlsx100%
New File 160944 Generated Energy Based on REAP
Forecast.xlsx100%
New File 92380 Project Needle - Advisian
Discussion_Neoh.pptx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FM inputs Neoh\Superceded\
New File 501452 20170321 Advisian CAPEX OPEX
Projections.xlsx100%
New File 538978 20170322 Advisian CAPEX OPEX
Projections.xlsx100%
New File 716472 20170323 Advisian CAPEX OPEX
Projections.xlsx100%
New File 809166 20170328 Advisian CAPEX OPEX
Projections.xlsx100%
New File 901876 20170328 Advisian CAPEX OPEX
Projections_v2.xlsx100%
New File 905434 20170328 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New Dir 16 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FROM TNBG\
New File 162 ~$170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 22MAR.docx100%
New File 162 ~$170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.docx100%
New File 7.9 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_24Apr_clean.docx100%
New File 8.6 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_24Apr_trackchanged.docx100%
New File 8.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh18Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh19Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh21Apr.docx100%
New File 6.3 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT).pdf100%
New File 8.0 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_clean.docx100%
New File 8.6 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged.docx100%
New File 8.7 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged_with comments.docx100%
New File 6.3 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged_with comments.pdf100%
New File 7.3 m Comments from VP GD based on Volume 1
report.msg100%
New File 39207 Recommendations High Level Action
Plan_rev ii(WB).xlsx100%
New File 39558 Recommendations High Level Action
Plan_rev ii_17Apr Advisian.xlsx100%
New File 7.3 m Tracked change_20170425 Volume
1_Opportunity Identification Scoping Rev C (DRAFT).pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FROM TNBG\Superceded\
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 01Apr.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 02Apr.docx100%
New File 7.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 22MAR.docx100%
New File 7.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 29MAR.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh10Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.doc100%
New File 7.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.docx100%
New File 7.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh17Apr.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_WB(6Apr).docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\
New File 165 ~$CCGT Typical Curve.xlsx100%
New File 165 ~$Master Spreadsheet.xlsx100%
New File 162 ~$sir Gudang Draft.docx100%
New File 637754 CCGT Typical Curve.xlsx100%
New File 267827 Master Spreadsheet.xlsx100%
New File 85809 Pasir Gudang Putrajaya Draft_neoh.docx
100%
New File 75357 Pasir Gudang & Putrajaya Draft.docx100%
New File 45064 Pasir Gudang Draft.docx100%
New File 31983 Pasir Gudang.docx100%
New File 30156 Work Notes Neoh.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\
New File 165 ~$Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons.xlsx100%
New File 54413 Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Alstom GT3A Dec 2016 C-Insp
Commissioning Report\
New File 2.2 m CFRG034566_Recommissioning_161128_1.pdf
100%
New File 2.8 m CFRG034566_Recommissioning_161128_2.pdf
100%
New File 3.0 m CFRG034566_Recommissioning_161128_3.pdf
100%
New File 3.3 m CFRG034566_Recommissioning_161128_4.pdf
100%
New File 5.8 m CFRG034566_Recommissioning_161128_5.pdf
100%
New File 891168 CFRG034566_Recommissioning_161128_6.pdf
100%
New File 60928 RE Costing for PGPS GT3A
Commissioning.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Alstom GT3B Oct 2015 C-Insp
Commissioning Report\
New File 7.1 m GT3B Commissioning Report.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Annual Reports\
New File 2.1 m Annual Report FY1213 - 1 of 2.pdf100%
New File 1.8 m Annual Report FY1213 - 2 of 2.pdf100%
New File 370608 Annual Report FY1314.pdf100%
New File 2.1 m Annual Report FY1415 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1415 - 2 of 3.pdf100%
New File 1.1 m Annual Report FY1415 - 3 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 2 of 3.pdf100%
New File 1.4 m Annual Report FY1516 - 3 of 3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\
New File 54874 Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons rev6.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Alstom GT3A Dec
2016 C-Insp Commissioning Report\
New File 2.2 m CFRG034566_Recommissioning_161128_1.pdf
100%
New File 2.8 m CFRG034566_Recommissioning_161128_2.pdf
100%
New File 3.0 m CFRG034566_Recommissioning_161128_3.pdf
100%
New File 3.3 m CFRG034566_Recommissioning_161128_4.pdf
100%
New File 5.8 m CFRG034566_Recommissioning_161128_5.pdf
100%
New File 891168 CFRG034566_Recommissioning_161128_6.pdf
100%
New File 60928 RE Costing for PGPS GT3A
Commissioning.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Alstom GT3B Oct
2015 C-Insp Commissioning Report\
New File 7.1 m GT3B Commissioning Report.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Annual Reports\
New File 2.1 m Annual Report FY1213 - 1 of 2.pdf100%
New File 1.8 m Annual Report FY1213 - 2 of 2.pdf100%
New File 370608 Annual Report FY1314.pdf100%
New File 2.1 m Annual Report FY1415 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1415 - 2 of 3.pdf100%
New File 1.1 m Annual Report FY1415 - 3 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 2 of 3.pdf100%
New File 1.4 m Annual Report FY1516 - 3 of 3.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Before vs After
DMC Upgrade\
New File 1.7 m Alstom Presentation After GT3B DMC.pdf
100%
New File 65032 Before DMC Upgrading simulation Data.pdf
100%
New File 3.4 m DMC Correction Curve.pdf100%
New File 2.6 m GT3B 13D Performance Test Report Before
and After Compresor Upgrading.pdf100%
New File 934817 Performance test procedure Pasir Gudang
DMC GT3B.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\CCP Performance
during COD\
New File 655585 Performance Test during COD 1of 4.pdf100%

New File 184049 Performance Test during COD 2 of 4.pdf


100%
New File 3.5 m Performance Test during COD 3 of 4.pdf
100%
New File 3.2 m Performance Test during COD 4 of 4.pdf
100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\GT3A 2016 Pre and
Post Overhaul Performance Report\
New File 896639 0769_001.pdf100%
New File 1.0 m PGPS GT3A 7th C-Inspection Pre Outage
Performance Assessment - Sep 16 pdf.pdf100%
New File 1.5 m PGPS GT3A Post Outage Assessment.pptx100%

New File 1.4 m PGPS Post Mortem Meeting - GT3A Vibration


Performance After Major Overha....pptx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Monthly
Performance Reports\
New File 1.0 m MPR_11-12_rev2.xls100%
New File 1.1 m MPR_12-13.xls100%
New File 1.3 m MPR_13-14.xls100%
New File 1.5 m MPR_13-14rev1.xls100%
New File 1.5 m MPR_14-15 (August 2015).xls100%
New File 1.6 m MPR_15-16.xls100%
New File 1.5 m MPR_16-17.xls100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Performance Test
by Remaco (Dec 2016)\
New File 9.8 m Full Performance Test Rev 1.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Performance Test
by Remaco (Jan 2016)\
New File 11.4 m Test Report.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Station
Commissioning Report\
New File 3.7 m CCP Planned Outaged for Major Overhaul
Commissioning Report Oct 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\TAAC CY 2017\
New File 10.9 m TAAC Report for SJSI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Before vs After DMC Upgrade\
New File 1.7 m Alstom Presentation After GT3B DMC.pdf
100%
New File 65032 Before DMC Upgrading simulation Data.pdf
100%
New File 3.4 m DMC Correction Curve.pdf100%
New File 2.6 m GT3B 13D Performance Test Report Before
and After Compresor Upgrading.pdf100%
New File 934817 Performance test procedure Pasir Gudang
DMC GT3B.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\CCP Performance during COD\
New File 3.5 m Performance Test during COD 1of 4.pdf100%

New File 184049 Performance Test during COD 2 of 4.pdf


100%
New File 3.5 m Performance Test during COD 3 of 4.pdf
100%
New File 3.2 m Performance Test during COD 4 of 4.pdf
100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\GT3A 2016 Pre and Post Overhaul
Performance Report\
New File 896639 0769_001.pdf100%
New File 1.0 m PGPS GT3A 7th C-Inspection Pre Outage
Performance Assessment - Sep 16 pdf.pdf100%
New File 1.5 m PGPS GT3A Post Outage Assessment.pptx100%

New File 1.4 m PGPS Post Mortem Meeting - GT3A Vibration


Performance After Major Overha....pptx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Monthly Performance Reports\
New File 1.0 m MPR_11-12_rev2.xls100%
New File 1.1 m MPR_12-13.xls100%
New File 1.3 m MPR_13-14.xls100%
New File 1.5 m MPR_13-14rev1.xls100%
New File 1.5 m MPR_14-15 (August 2015).xls100%
New File 1.6 m MPR_15-16.xls100%
New File 1.5 m MPR_16-17.xls100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Performance Test by Remaco (Dec
2016)\
New File 9.8 m Full Performance Test Rev 1.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Performance Test by Remaco (Jan
2016)\
New File 11.4 m Test Report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\SLA\
New Dir 16 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\SLA\PGPS\
New File 2.6 m Appendix A.pdf100%
New File 679418 Appendix B.pdf100%
New File 650690 Appendix C.pdf100%
New File 183387 Appendix D.pdf100%
New File 308691 Appendix E.pdf100%
New File 71114 Appendix F.pdf100%
New File 899663 Appendix G.pdf100%
New File 124247 Appendix H.pdf100%
New File 110750 Appendix I.pdf100%
New File 101863 Appendix J.pdf100%
New File 148967 Appendix L.pdf100%
New File 2.2 m Contents.pdf100%
New File 87362 Exhibit 2.pdf100%
New File 30033 Exhibit 3.pdf100%
New File 56217 Exhibit 4.pdf100%
New File 7.5 m SJPG.rar100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Station Commissioning Report\
New File 3.7 m CCP Planned Outaged for Major Overhaul
Commissioning Report Oct 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\TAAC CY 2017\
New File 10.9 m TAAC Report for SJSI.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Recevied from TNB 18 May\
New File 162 ~$170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_shar.docx100%
New File 8.2 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_clean_NEOH WIP.docx100%
New File 8.2 m 20170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_shar.docx100%
New File 8.2 m 20170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_tracked change.docx100%
New File 8.1 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.docx100%
New File 7.2 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New File 8.1 m 20170605 Volume 1_Opportunity
Identification Scoping Rev D (Final).docx100%
New File 5.7 m 20170605 Volume 2_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New File 8.2 m 20170605 Volume 2_Opportunity
Identification Scoping Final_Rev 0.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Recevied from TNB 18 May\Sent to Client\
New File 3.9 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Ref\
New File 1.7 m 1July2014-
Review_of_Vesting_Contract_Level_Revised_Draft_Report_.pdf100%
New File 8.3 m ESCRI-General-Project-Report-Phase-1.pdf
100%
New File 267348 ESCRI-General-Project-Report-Phase-
1_Executive Summary.pdf100%
New File 713380 Guide to Ancillary Services in the
National Electricity Market.pdf100%
New File 11.6 m IRENA_Power_to_Change_2016.pdf100%
New File 335042
Loads_providing_Ancillary_Services_main_report_62701.pdf100%
New File 773376 NEMS_111010.pdf100%
New File 602911 Phillippines ANCILLARY SERVICES
Procurement Plan.pdf100%
New File 1.4 m ppt_pgen16c_mt.pdf100%
New File 360279 stuandhughflorida.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Risk Register\
New File 55150 Project Needle - Consolidated Risk
Register.xlsm100%
New File 105499 Project Needle - Risk Parameter (2).pdf
100%
New File 126460 Project Needle - Technical Risk Register
(2).pdf100%
New File 99305 Risk Parameters 5 June.pdf100%
New File 330571 TNB Risk Parameter_Post Workshop (with
comments).pdf100%
New File 149961 TNB Risk Parameter_Post Workshop.pdf100%

New Dir 11 C:\AdvisianActive\01 Projects\Project Needle\Working


Files\Sent to Maybank\
New File 23891 20170225 Financial Inputs.xlsx100%
New File 42015 20170303 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 70899 20170310 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 70865 20170313 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 251993 20170328 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 358161 20170330 Advisian CAPEX OPEX Projections
by Advisian.xlsx100%
New File 399054 20170406 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 502416 20170419 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 540514 20170419 Project Needle_CAPEX OPEX
Projections by Advisian_FINAL.xlsx100%
New File 10954 Availability and Capacity Factor
Inputs.xlsx100%
New File 136001 Generated Energy Based on REAP
Forecast_Maybank.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Sent to Maybank\PDF\
New File 115257 1 FM Inputs - Cover Page.pdf100%
New File 110739 2 Scenario Integration.pdf100%
New File 243994 3 Base Case - BAU.pdf100%
New File 246441 4 Case 1.pdf100%
New File 247568 5 Case 2.pdf100%
New File 246968 6 Case 3.pdf100%
New File 608500 Appendix G - Financial Model Inputs.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Sent to TNB\
New File 7.2 m 20170315 Volume 1_Opportunity
Identification & Scoping Rev B (DRAFT).docx100%
New File 7.2 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New Dir 27 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\superceded reports\
New File 2.4 m 20170224 Full Report_draft - Neoh
Working.docx100%
New File 5.0 m 20170226 Full Report_draft - Neoh
Update.docx100%
New File 479854 20170227 Advisian CAPEX OPEX
Projections.xlsx100%
New File 5.0 m 20170227 Full Report_draft - Neoh Update
section 3.docx100%
New File 5.0 m 20170227 Full Report_draft - Neoh
Update.docx100%
New File 3.5 m 20170228 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 5.5 m 20170228 Full Report_draft - VOL 2_neoh
update.docx100%
New File 3.5 m 20170301 Full Report_draft - VOL 1.docx
100%
New File 481066 20170302 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.6 m 20170302 Full Report_draft - VOL 1.docx
100%
New File 3.6 m 20170302 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 6.8 m 20170302 Full Report_draft - VOL 2
updated.docx100%
New File 7.0 m 20170302 Full Report_draft - VOL 2.docx
100%
New File 3.7 m 20170305 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 8.8 m 20170305 Full Report_draft - VOL 2_Rev
A(13Mar)_Neoh Comment.docx100%
New File 503746 20170306 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.8 m 20170306 Full Report_draft - VOL 1_Neoh
Update2.docx100%
New File 3.6 m 20170306 Full Report_draft - VOL 1_Neoh
Update3.docx100%
New File 3.6 m 20170306 Full Report_draft - VOL 1_Neoh
Update4.docx100%
New File 512413 20170307 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.8 m 20170307 Full Report_draft - VOL 1.docx
100%
New File 3.8 m 20170308 Full Report_draft - VOL 1.docx
100%
New File 514136 20170310 Advisian CAPEX OPEX
Projections.xlsx100%
New File 4.2 m 20170312 Full Report_draft - VOL 1.docx
100%
New File 499395 20170313 Advisian CAPEX OPEX
Projections.xlsx100%
New File 7.1 m 20170313 Full Report_draft - VOL 1.docx
100%
New File 14784 Outlook PM 2016 (1) 32.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\TOC Sent to EY\
New File 614486 Project Needle - Advisian Opportunity and
Risk Matrix.pdf100%
New File 239986 Project Needle - Volume 1_ Opportunity
Identification & Scoping.pdf100%
New File 282152 Project Needle - Volume 2_ Asset Level
Review-TOC.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Volume 2 latest\
New File 9.5 m 20170329 Full Report - VOL 2_Rev B.docx
100%
New Dir 4 C:\AdvisianActive\01 Projects\San Pedro South Africa
Plant\
New File 1007052 Energies FinModel_5175xof sens_v4 .xlsx
100%
New File 75089 Snedai_Broto700MW_CostEstimate_v2.xlsx
100%
New File 15.1 m Tech fin analysis_neoh.docx100%
New File 15.1 m Tech& fin analysis.docx100%
New Dir 12 C:\AdvisianActive\01 Projects\SBPC M&E Audit\
New File 18539 20170314_Sepangar Bay_Budget_Neoh.xlsx
100%
New File 191058 Org Chart_withpic.pptx100%
New File 1.3 m SBPC Field Exit Meeting_07Aug_draft.pptx
100%
New File 774222 SBPC Field Exit Meeting_07Aug_Final.pdf
100%
New File 1.3 m SBPC Field Exit Meeting_07Aug_Final.pptx
100%
New File 1.0 m SBPC Finance Meeting.docx100%
New File 3.3 m SBPC Kick Off Meeting.pptx100%
New File 536576 SBPC M&E Audit Schedule.mpp100%
New File 17179 SBPC M&E Audit Work Budget_20June.xlsx
100%
New File 4.5 m SBPC ME Audit Report_Draft_17Aug_Neoh
comments.docx100%
New File 1.0 m SBPC Site Visit Agenda.docx100%
New File 59582 SBPC Site Visit Agenda.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Audit
Work Plan\
New File 1.0 m SBPC Audit Work Plan_19June.pdf100%
New File 1.2 m SBPC Audit Work Plan_19June.pptx100%
New File 1.0 m SBPC Audit Work Plan_Final.pdf100%
New File 1.2 m SBPC Audit Work Plan_Final.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Draft
Submitted to ST 21 Sep\
New File 2.1 m SBPC M&E Audit Report_Draft
Final_21Sep.pdf100%
New File 3.1 m SBPC ME Audit Report_Final Draft to ST
RevD_21Sep_clean.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Request
for Information\
New File 2.1 m SBPC M&E Audit Info RFI.xlsx100%
New File 32137 SBPC M&E Audit Info RFI_Finance_v2.xlsx
100%
New File 25379 SBPC M&E Audit Info RFI_v2.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Working\
New File 315920 SBPC Financial Performance
Assessment.docx100%
New File 750948 SBPC Financials_working_19June.xlsx100%
New File 4.1 m SBPC ME Audit Report Draft_11August.docx
100%
New File 24.1 m SBPC ME Audit Report_Draft 2-
1_22AugNeoh.docx100%
New File 3.2 m SBPC ME Audit Report_Draft 23Aug.docx100%

New Dir 38 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\


New File 162 ~$ Extract - Technical_Advisian23Aug.docx
100%
New File 7.0 m 20170518 Advisian Proposal_LTA SIPP.pptx
100%
New File 7.9 m 20170618 FPTA SIPP Track 4A Tech DD.docx
100%
New File 8.0 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.docx100%
New File 3.5 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.pdf100%
New File 8.0 m 20170713 FPTA SIPP Track 4A Tech DD_First
Draft_neoh.docx100%
New File 8.1 m 20170713 FPTA SIPP Track 4A Tech DD_First
Draft_neoh_r1.docx100%
New File 11.7 m 20170717 FPTA SIPP Track 4A Tech DD
TC_Neoh 19Jul.docx100%
New File 11.5 m 20170719 ITA SIPP Track 4A Tech DD
tc_neoh 20Jul.docx100%
New File 9.3 m 20170720 ITA SIPP Track 4A Tech DD tc
r1_Neoh26Jul.docx100%
New File 1.0 m 2017-L001_ITA Cert.doc100%
New File 1.0 m 2017-L001_ITA Cert_Milestone Offshore
A.doc100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft #1.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft #1.docx100%
New File 1.4 m 4A Project_LTA Agreement DRAFT.docx100%
New File 1.0 m Advisian Track 4A FPTA Internal Kick
Off.pdf100%
New File 1.3 m Advisian Track 4A FPTA Internal Kick
Off.pptx100%
New File 146819 Bouchain Operations.txt100%
New File 214795 Bouchain Operations.xlsx100%
New File 16940 Contact Details_LTA_Advisian.docx100%
New File 282225 CSOC - Melaka 020517.docx100%
New File 282564 CSOC - Track 4A.docx100%
New File 327726 Degradation Curve.xlsx100%
New File 10724 Delay Analysis.xlsx100%
New File 247793 Figures for report.pptx100%
New File 1.1 m Financial Model_Example_Advisian.docx100%

New File 8.0 m FPTA SIPP TEMPLATE_Rev 1.0 NEOH


170616.docx100%
New File 5.2 m FPTA SIPP TEMPLATE_Rev 1.0 Neoh.docx100%

New File 4.7 m FPTA SIPP TEMPLATE_Rev 1.0.docx100%


New File 52758 IM Extract - Technical (Sept
14)_Advisian.docx100%
New File 53734 IM Extract - Technical_Advisian23Aug.docx
100%
New File 54152 IM Extract - Technical_Advisian24Aug.docx
100%
New File 30884 L-00XX-2015-SD_ICE Cert_draft 24 Nov.docx
100%
New File 1.1 m L-XX_ITA Cert_draft 23Oct.doc100%
New File 1.8 m SIPP CSOC & RCF.zip100%
New File 14816 SIPP Track 4A_Division of Works.xlsx100%

New File 466432 SPG ITA Questionnaire 2017_Neoh jz.doc


100%
New File 472064 SPG ITA Questionnaire 2017_Neoh.doc100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Budget\
New File 20220 SIPP LTA_Budget_Neoh.xlsx100%
New File 19480 SIPP LTA_Budget_Neoh_v1.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Budget
Tracking\
New File 167209 Project Labour Summary_WE
16Jun2017_302020-00447 SIPP LTA-Track 4A SIPP 1440MW.lsx.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\
New File 1.6 m 170710 EIA Approval.pdf100%
New File 354370 170804 Degradation Table.pdf100%
New File 964778 Draft LTSA rev5.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\6. Lenders model\
New File 5.9 m CCGT Template.xlsm100%
New File 5.6 m Track4A Lenders Model - 22 May 2017 v1.4_
Sipp@2016.xlsm100%
New File 5.6 m Track4A Lenders Model - 22 May 2017 v1.5
(1).xlsm100%
New File 5.6 m Track4A Lenders Model - 22 May 2017
v1.6.xlsm100%
New File 5.8 m Track4A Lenders Model - 22 May 2017
v1.8.xlsm100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\01.1 Supplemental PPA\
New File 594954 SUPPLEMENT PPA-13062017094105.pdf100%
New File 9216 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\04.1 Supplemental EPC Contract\
New File 465162 Supp EPCC Contract Page 75, 79, 80, 81,
88 & 114.pdf100%
New File 931306 Supplemental EPCC Mainbody.pdf100%
New File 51200 Thumbs.db100%
New Dir 8 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\04.1 Supplemental EPC
Contract\Supplemental EPCC Schedules\
New File 283320 Schedule CC page 54.pdf100%
New File 30.4 m Schedule CC.pdf100%
New File 6.8 m Schedule DD.pdf100%
New File 565449 Schedule EE,FF & GG.pdf100%
New File 2.0 m Schedule O.pdf100%
New File 63243 Schedule S.pdf100%
New File 437070 Schedule U & V.pdf100%
New File 148992 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\15.
Civil Contractors Reference List\
New File 43648 Experience list - MIEI.PDF100%
New File 8.2 m Experience list - Sumitomo.pdf100%
New File 165884 Experience list - TCC.PDF100%
New File 87050 Experience list - TEPC.PDF100%
New File 47104 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\22.
Extract Letter from EC\
New File 125760 160527 - EC to SIPP.pdf100%
New File 48128 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\36.
Draft O&M Agreement\
New File 12800 Thumbs.db100%
New File 1.2 m Track 4A OM Agreement version 4 draft
(issued 18 June 2017).pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\61. PGU
Specification\
New File 123346 160907_Letter to SIPP_Gas Composition.pdf
100%
New File 29184 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\
New File 99571 Advisian QA_batch 1_08June2017-
responses16june2017.xlsx100%
New File 830163 SUPPLEMENT PPA-13062017094105.pdf100%
New File 9216 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 1\
New File 169201 0_Environmental Review Criteria.pdf100%
New File 4.5 m 1_EXECUTIVE SUMMARY.pdf100%
New File 4.4 m 2_RINGKASAN EKSEKUTIF.pdf100%
New File 43.8 m 3_EIA MAIN REPORT.pdf100%
New File 56832 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\
New File 386990 COVER FOR APPENDICES.pdf100%
New File 77312 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\A_SCOPING MEETING\
New File 725543 1_NOTA MESYUARAT (SIGNED).pdf100%
New File 2.1 m 2_LAMPIRAN 1_SLAID PEMBENTANGAN PENGGERAK
PROJEK.pdf100%
New File 13.5 m 3_LAMPIRAN 2_SLAID PEMBENTANGAN
JURURUNDING EIA.pdf100%
New File 7870 dividers (BLUE COLOR PAPER).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\B_BASELINE FIELD WORKS
REPORT\
New File 6.1 m Baseline Field Work Report.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\C_COA OF BASELINE STUDY
RESULTS\
New File 4.3 m 1_Pasir Gudang Ambient Air COA.pdf100%
New File 6.5 m 2_Pasir Gudang Marine Water COA.pdf100%
New File 1.2 m 3_Pasir Gudang River Water COA.pdf100%
New File 8589 dividers (BLUE COLOR PAPER).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\D_QUESTIONNAIRE FOR SOCIO AND
PUBLIC HEALTH\
New File 913089 QUESTIONNAIRE.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\E_ADM REPORT\
New File 8.3 m AQ WRITE-UP (STAND ALONE).pdf100%
New Dir 13 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\F_QRA MODELLING RESULTS AND
CONTOURS\
New File 42235 Appendix F1.pdf100%
New File 50207 Appendix F10.pdf100%
New File 50210 Appendix F11.pdf100%
New File 43951 Appendix F2.pdf100%
New File 44658 Appendix F3.pdf100%
New File 38466 Appendix F4.pdf100%
New File 39979 Appendix F5.pdf100%
New File 38743 Appendix F6.pdf100%
New File 40076 Appendix F7.pdf100%
New File 36423 Appendix F8.pdf100%
New File 50814 Appendix F9.pdf100%
New File 3.9 m CONTOURS.pdf100%
New File 15252 dividers (BLUE COLOR PAPER).pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\G_COASTAL HYDRAULIC REPORT\
New File 2.7 m Hydraulic Study SIPP.pdf100%
New File 16384 Thumbs.db100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\G_COASTAL HYDRAULIC
REPORT\APPENDICES\
New File 2.8 m APPENDIX A LAYOUT PLAN (A1 SIZE).pdf100%

New File 1.6 m APPENDIX B Grab Sampling.pdf100%


New File 279801 APPENDIX C TempProf.pdf100%
New File 9.1 m APPENDIX D TSS.pdf100%
New File 480358 APPENDIX E_SURVEY PLAN.pdf100%
New File 9907 dividers (BLUE COLOR PAPER).pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\19.EPC Schedules\
New File 6.7 m Schedule CC.pdf100%
New File 6.8 m Schedule DD.pdf100%
New File 565449 Schedule EE,FF & GG.pdf100%
New File 2.0 m Schedule O.pdf100%
New File 63243 Schedule S.pdf100%
New File 437070 Schedule U & V.pdf100%
New File 133632 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\3. EPC Slides\
New File 33280 Thumbs.db100%
New File 2.6 m Track 4A Project CCGT - EPC
(Construction) 15.06.17 [Compatibility Mod....pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\4.Owner's project and construction management
organisation chart\
New File 399089 4a.SPG Org Chart 20170614.pdf100%
New File 52901 4b.OE Org Chart.pptx100%
New File 31744 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\5. OE TOR\
New File 19456 Thumbs.db100%
New File 814652 TOR OE for Project 4A Issued.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\7.Supplemental EPCC\
New File 931306 7.Supplemental EPCC.pdf100%
New File 21504 Thumbs.db100%
New Dir 11 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\A. Additional information\
New File 182832 275kV Power Cable Datasheet (20170327-
01).pdf100%
New File 2.0 m 275kV Power cable routing.pdf100%
New File 246860 9HA.02 Fuel Transfer
Philosophy_Preliminary_20160606.pdf100%
New File 12681 ABB Reference List_Rev 2017-02-09.pdf100%

New File 320184 Hyosung reference list for TR.pdf100%


New File 54039 Hyundai Reference for TR above
1,000MVA.PDF100%
New File 5.7 m LS 66-500kV EHV Cable system.pdf100%
New File 1.5 m Nexans 60-
500_kV_High_Voltage_full_BD2.pdf100%
New File 8627 TBEA reference list for Transformers
Above 1000MVA.pdf100%
New File 51712 Thumbs.db100%
New File 94127 TMEIC_Reference List of Generator
Transformer Toshiba CTC.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 2 Questionnaire\
New File 106259 Advisian QA_batch 2_28 June 2017-All.xlsx
100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\
New File 548280 SPG Track 4A EPC Contract Supplemental
Agreement (version 5 18 May 2017)....pdf100%
New File 34816 Thumbs.db100%
New File 561595 TNB 4A Pasir Gudang OM Agreement (version
2 20 April 2017)_THL_127445481....pdf100%
New File 1.8 m Track 4A draft Long Term Service
Agreement Revision 2 (22 May 2017)_THL_....pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\01 Power Purchase Agreement\
New File 6.6 m APPENDIX A.pdf100%
New File 9.2 m APPENDIX B.pdf100%
New File 3.0 m APPENDIX C.pdf100%
New File 1.6 m APPENDIX D.pdf100%
New File 7.1 m APPENDIX E.pdf100%
New File 755701 APPENDIX F.pdf100%
New File 9.5 m APPENDIX G.pdf100%
New File 1.1 m APPENDIX H.pdf100%
New File 971214 APPENDIX I.pdf100%
New File 1.1 m APPENDIX J.pdf100%
New File 2.9 m APPENDIX K.pdf100%
New File 842483 APPENDIX L.pdf100%
New File 830373 APPENDIX M.pdf100%
New File 190974 APPENDIX N.pdf100%
New File 1.9 m EXHIBIT 1.pdf100%
New File 24.4 m STAMPED COPY. PPA041016.pdf100%
New File 80896 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\02 Gas Sales Agreement\
New File 15.1 m Gas Sales Agreement.pdf100%
New File 6144 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\03 Land Lease Agreement\
New File 832986 Land Lease Agreement.pdf100%
New File 7680 Thumbs.db100%
New Dir 32 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\04 EPC Contract\
New File 444928 Thumbs.db100%
New File 74.0 m Track 4A_745972_signed_Main Body.pdf100%

New File 770.2 m Track 4A_745972_signed_Schedule A.pdf 0%


100%
New File 2.1 m Track 4A_745972_signed_Schedule AA.pdf
100%
New File 161860 Track 4A_745972_signed_Schedule B.pdf100%

New File 6.4 m Track 4A_745972_signed_Schedule BB.pdf


100%
New File 102941 Track 4A_745972_signed_Schedule C.pdf100%

New File 1.1 g Track 4A_745972_signed_Schedule CC.pdf


0% 100%
New File 197066 Track 4A_745972_signed_Schedule D.pdf100%

New File 39.7 m Track 4A_745972_signed_Schedule DD.pdf


100%
New File 164933 Track 4A_745972_signed_Schedule E.pdf100%

New File 153944 Track 4A_745972_signed_Schedule F.pdf100%

New File 15.3 m Track 4A_745972_signed_Schedule G.pdf100%

New File 169758 Track 4A_745972_signed_Schedule H.pdf100%

New File 162129 Track 4A_745972_signed_Schedule I.pdf100%

New File 107354 Track 4A_745972_signed_Schedule J.pdf100%

New File 112064 Track 4A_745972_signed_Schedule K.pdf100%

New File 106315 Track 4A_745972_signed_Schedule L.pdf100%

New File 108030 Track 4A_745972_signed_Schedule M.pdf100%

New File 1.0 m Track 4A_745972_signed_Schedule N.pdf100%

New File 115019 Track 4A_745972_signed_Schedule O.pdf100%

New File 107628 Track 4A_745972_signed_Schedule P.pdf100%

New File 151166 Track 4A_745972_signed_Schedule Q.pdf100%

New File 335298 Track 4A_745972_signed_Schedule R.pdf100%

New File 170239 Track 4A_745972_signed_Schedule S.pdf100%

New File 436081 Track 4A_745972_signed_Schedule T.pdf100%

New File 202809 Track 4A_745972_signed_Schedule U.pdf100%

New File 5.9 m Track 4A_745972_signed_Schedule V.pdf100%

New File 1017079 Track 4A_745972_signed_Schedule W.pdf100%


New File 773315 Track 4A_745972_signed_Schedule X.pdf100%

New File 853623 Track 4A_745972_signed_Schedule Y.pdf100%

New File 132676 Track 4A_745972_signed_Schedule Z.pdf100%

New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders


LTA\dataroom\Executed agreemtn\
New File 4.7 m EPC Supplemental Agreement No 2.pdf100%
New File 3.9 m Long Term Service Agreement.pdf100%
New File 17.1 m Operation and Maintenance Agreement.pdf
100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\LTSA\
New File 1.4 m Track 4A draft LTSA Revision 7 GE
response version - 9 Aug 2017 -sent.doc100%
New File 1.5 m Track 4A Pasir Gudang draft FINAL LTSA
Revision 10 (7 September 2017) (clean)-ExecutionCopy-R2.doc100%
New File 1.3 m Track 4A Pasir Gudang draft FINAL LTSA
Revision 8 (27 August 2017)_THL_1....doc100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\O&M Agreement\
New File 33.3 m SPG Track 4A draft FINAL OM Agreement
version 8 (3 September 2017) (clean).docx100%
New File 2.3 m SPG Track 4A draft FINAL OM Agreement
version 8 (3 September 2017) (compared with version 7 dated 28 August 2017).pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Draft


Report Comments from Client\
New File 3.6 m 20170704 FPTA SIPP Track 4A Tech DD_First
Draft (FA)_GF TNB.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\
New File 6.5 m Advisian Capability Track Records.zip100%

New File 1.5 m Advisian Lenders Engineer Experience.pdf


100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 236544 i) Transaction Services Team
Experience.doc100%
New File 37072 i) Transaction Services Team
Experience.pdf100%
New File 232448 ii) H-Class Machine Experience.doc100%
New File 39185 ii) H-Class Machine Experience.pdf100%
New File 395388 Master List GT and Class Experience.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\Advisian Corporate Brochures\
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 630119 Finance Project Finance and PPP PRINT.pdf
100%
New File 1.0 m Fossil Power flier.pdf100%
New File 757325 Resource and Industry Power Capability-
ver4-web.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\Advisian Experience List\
New File 1.5 m Advisian Lenders Engineer Experience.pdf
100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 37072 i) Transaction Services Team
Experience.pdf100%
New File 39185 ii) H-Class Machine Experience.pdf100%
New File 395388 Master List GT and Class Experience.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft Submitted to Client\
New File 8.6 m 20170726 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.4 m 20170726 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 9.4 m 20170726 ITA SIPP Track 4A Tech DD
tc.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft to Client 07 Aug\
New File 8.6 m 20170808 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.4 m 20170808 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 8.6 m 20170808 ITA SIPP Track 4A Tech DD.docx
100%
New File 3.4 m 20170808 ITA SIPP Track 4A Tech DD.pdf
100%
New File 8.7 m 20170910 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 52304 Comments ITA SIPP Track 4A Tech DD Draft
Final 170807.docx100%
New Dir 21 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft to JLM 11 Sept\
New File 8.6 m 20170911 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 8.7 m 20170911 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 3.1 m 20170911 ITA SIPP Track 4A Tech DD.pdf
100%
New File 8.7 m 20170916 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.1 m 20170916 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 3.2 m 20170916 ITA SIPP Track 4A Tech DD
Final.pdf100%
New File 8.8 m 20170916 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev2.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev3.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev4.docx100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev1.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev2.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev3.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev4.pdf100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc_rev2.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc_rev3.docx100%
New File 766957 Summary of Comments on Report Advisian
from JLM 12 Sep.pdf100%
New File 761579 Summary of Comments on Report Advisian
from JLM 12 Sep_Advisian.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\First
Draft Submitted to Client\
New File 8.0 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.docx100%
New File 3.5 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.pdf100%
New File 37376 Thumbs.db100%
New Dir 8 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Agreements\
New File 1.1 m 4A Project_IE Agreement Appendix 1_draft
#1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 1_draft
#1_NA_Advisian23Oct.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev2.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev2_Advisian23Oct.docx100%
New File 1.4 m 4A Project_IE Agreement_DRAFT_180817.docx
100%
New File 797433 IE Proposal_Reltency_Neoh.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Agreements\superceded\
New File 1.4 m 4A Project_IE Agreement DRAFT.docx100%
New File 1.4 m 4A Project_LTA
Agreement_DRAFT_260517.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Scope to LEONG\
New File 202789 Independent Engineer Scope of Work.docx
100%
New Dir 15 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\
New File 121856 01a Cover Letter_Mandate.doc100%
New File 130295 01a Cover Letter_Mandate.docx100%
New File 249925 2142 - CSOC Tract 4A Rev00
6Sep17_Final.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft_260517.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_Final.docx100%
New File 115855 4A Project_ LTA Agreement Appendix
1_Final.pdf100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft_260517.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_Final.docx100%
New File 52123 4A Project_ LTA Agreement Appendix
2_Final.pdf100%
New File 1.4 m 4A Project_LTA
Agreement_DRAFT_260517.docx100%
New File 244535 4A Project_LTA
Agreement_FINAL_06Sep17.pdf100%
New File 1.4 m 4A Project_LTA
Agreement_FINAL_06Sep17_rev1.docx100%
New File 1.5 m 4A Project_LTA
Agreement_FINAL_06Sep17_rev2.docx100%
New File 4.0 m Advisian - Sub - Lenders Technical
Advisors (LTA) Mandate Signing_signed.pdf100%
New File 3.1 m img-X25101622-0001.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\14 Aug\
New File 1.1 m 170724 4A Project_ LTA Agreement Appendix
2_draft_19062017 Advisian Com. (TNB - 28 July 2017)_Advisian 14Aug.docx100%
New File 1.2 m 4A Project_ LTA Agreement Appendix
1_draft_19062017 Advisian Comments_06072017 (TNB - 28 July 2017)_Advisian
14Aug.docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017 (TNB - ....docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017 (TNB - 28 July 2017) Advisian 14Aug2017.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Advisian Comments\
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft_19062017 Advisian Comments_06072017.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft_19062017 Advisian Comments_06072017.docx100%
New File 1.5 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Final Clean 29 Aug\
New File 1.4 m 4A Project_LTA Agreement_DRAFT_29Aug
Clean.docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_30Aug
Clean.docx100%
New File 283235 CSOC - SIPP Track 4A 30Aug.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Final Clean 29 Aug\From TNB 29 Aug\
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_Advisian 14Aug20...(TNB 29082017).docx100%
New File 1.6 m RE Track 4a Advisisan Draft engagement
letter for Independent Technical Advisor (ITA).msg100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\ref\
New File 3.9 m 2015 09 29 GNPD_BV Professional Services
Agreement_GNPDrev clean_BV Accepted revClients v 3_Final 15032016.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\superceded\
New File 1.4 m 4A Project_LTA Agreement Client
Suggestions_DRAFT_250517 Rev01_Neoh.docx100%
New File 1.4 m 4A Project_LTA Agreement DRAFT.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Q&A\
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Q&A\Batch 1\
New File 12063 Advisian Q&A_batch 1_07June2017.xlsx100%

New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders


LTA\Q&A\Batch 2\
New File 104665 Advisian QA_batch 2_28 June 2017.xlsx100%

New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\ref\


New File 13.1 m GE Power and Renewable Energy Investor
Meeting 030817.pdf100%
New File 517453 gea32885-bouchain-whitepaper-final-aug-
2016.pdf100%
New File 643070 GT-Development-Roadmaps_2017-04-19.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 1\
New File 69246 Manjung 5 Tech and Env DD QA batch 1
(27082013)_TNB Respond 30082013.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 2\
New File 23600 Poyry Q&A_batch 2_6 Sept 2013.xlsx100%
New File 69632 Poyry QA_financial model_batch 2_7
Oct.xls100%
New File 14831 Q33_noise guarantees.docx100%
New File 19102 Q40_CW intake pipe design.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 3\
New File 318206 Poyry QA_batch 3_7Oct - Main
(18102013).xlsx100%
New File 310078 Poyry QA_batch 3_7Oct.xlsx100%
New File 13291 Q73 attachment.docx100%
New File 16008 Q74 attachment.docx100%
New File 14604 Q9 attachment.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 4 - tech & financial\
New File 64097 Poyry QA_batch 4_24 Oct 2013.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 5\
New File 64627 Poyry QA_batch 5_29 Oct 2013 -
Answers.xlsx100%
New File 64592 Poyry QA_batch 5_29 Oct 2013.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 6\
New File 66158 Poyry QA_batch 6_4 Nov 2013.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\financial model\
New File 14056 Poyry Q&A_financial model_9 Sept
2013.xlsx100%
New File 17139 Q6_scheduled maintenance plan.docx100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\REF 3B
draft LTA Agreement\
New File 41964 3B Project_ LTA Agreement Appendix
1_draft #1.doc.zip100%
New File 16731 3B Project_ LTA Agreement Appendix
2_draft #1.doc.zip100%
New File 23824 3B Project_ LTA Agreement Appendix
3_draft #1.doc.zip100%
New File 35554 3B Project_ LTA Agreement main body_draft
#1.doc.zip100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\REF 3B
draft LTA Agreement\password 3a3b\
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\SIPP
CSOC & RCF\
New File 438185 CRF-0043_005_Project.pdf100%
New File 2.0 m Track 4a Advisisan Draft engagement
letter for Independent Technical Advisor (ITA).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\superceded\
New File 1.2 m 4A Project_ LTA Agreement Appendix
1_draft #1.doc100%
New File 1.2 m 4A Project_ LTA Agreement Appendix
2_draft #1.doc100%
New Dir 4 C:\AdvisianActive\01 Projects\TNB Life Extension
Report by Paul\
New File 1.5 m Asset Life Extension Report_CBPS CCGT Rev
0_6 Apr 2011.pdf100%
New File 2.0 m Microsoft Word - Asset Life Extension
Report Rev 1 25-3-2011.pdf100%
New File 4.3 m TNB 101010-00023 REP 0002 PASIR GUDANG
Rev 0_280712_final.pdf100%
New File 4.6 m TNB Report_PAKA_102020-00023-REP-0001
final.pdf100%
New Dir 21 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\
New File 156665 302020-00445TP-L001 - Performance
Guarantee Submission.pdf100%
New File 221804 Asset 7.docx100%
New File 73143 Bank Draft for Performance Bond.pdf100%
New File 297804 IRF TNBJ M&E Audit Kick Off.pdf100%
New File 38496 IRF-030-Mayflower cars rental_Lumut.docx
100%
New File 471915 janamanjung-100112231301-phpapp01.pdf100%

New File 2.1 m KEV M&E Audit Info RFI.xlsx100%


New File 196230 Master Spreadsheet.pptx100%
New File 123447 Master Spreadsheet.xlsx100%
New File 525926 NEO Compiled from ST Reports.xlsx100%
New File 266328 Org Chart.pptx100%
New File 109568 Performance Guarantee Submission.doc100%

New File 148060 Picture 001.jpg100%


New File 2.3 m TNBJ Kick Off Meeting.pptx100%
New File 1.4 m TNBJ M&E Audit Bank
Guarantee_Advisian.pdf100%
New File 2.1 m TNBJ M&E Audit Info RFI.xlsx100%
New File 25136 TNBJ M&E Audit Info RFI_v2.xlsx100%
New File 63706 TNBJ M&E Audit Manning Schedule.pdf100%
New File 1.0 m TNBJ Site Visit Agenda_12 July.docx100%
New File 56387 TNBJ Site Visit Agenda_12 July.pdf100%
New File 1.0 m TNBJ Site Visit Agenda_14-15 June.docx
100%
New Dir 7 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Audit
Work Plan\
New File 4.6 m TNBJ Audit Work Plan_20Apr.pptx100%
New File 711674 TNBJ Audit Work Plan_26May.pdf100%
New File 1.0 m TNBJ Audit Work Plan_26May.pptx100%
New File 719862 TNBJ Audit Work Plan_26May_final.pdf100%

New File 1.0 m TNBJ Audit Work Plan_26May_final.pptx100%

New File 719046 TNBJ Audit Work Plan_26May_rev2.pdf100%


New File 1.0 m TNBJ Audit Work Plan_26May_rev2.pptx100%

New Dir 3 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Budget


sent to Finance\
New File 25917 20170315_TNBJ M&E_Budget_Neoh_v3.xlsx100%

New File 15909 TNBJ M&E Audit Work Budget_26May.xlsx100%

New File 16117 TNBJ M&E Audit Work Budget_29June.xlsx


100%
New Dir 2 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Draft
Submitted to EC 07 Sep\
New File 4.1 m TNBJ ME Audit Report
Draft_07September_clean.docx100%
New File 2.3 m TNBJ ME Audit Report
Draft_07September_clean.pdf100%
New Dir 11 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Draft
Submitted to TNBJ 11Aug\
New File 4.2 m TNBJ ME Audit Report Draft_01Sep.docx100%

New File 111449 TNBJ ME Audit Report Draft_04September -


comments .docx100%
New File 4.3 m TNBJ ME Audit Report
Draft_04September.docx100%
New File 4.3 m TNBJ ME Audit Report
Draft_07September.docx100%
New File 4.1 m TNBJ ME Audit Report
Draft_07September_clean.docx100%
New File 2.3 m TNBJ ME Audit Report
Draft_07September_clean.pdf100%
New File 4.1 m TNBJ ME Audit Report Draft_11August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_24August.docx
100%
New File 360307 TNBJ ME Audit Report Draft_25August -
comments_Neoh29Aug.docx100%
New File 4.1 m TNBJ ME Audit Report Draft_25August.docx
100%
New File 4.2 m TNBJ ME Audit Report
Draft_29August_Neoh.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\from PF\
New File 779197 TNBJ_Availability Records.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\TNBJ M&E
Audit\Schedule\
New File 624640 TNBJ M&E Audit Schedule.mpp100%
New File 413696 TNBJ M&E Audit Schedule_v2.mpp100%
New Dir 3 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Site
Field Exit Meeting\
New File 1.6 m TNBJ Field Exit Meeting_03Aug.pptx100%
New File 1.0 m TNBJ Field Exit Meeting_03Aug_final.pdf
100%
New File 1.7 m TNBJ Field Exit Meeting_03Aug_final.pptx
100%
New Dir 14 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Working\
New File 162 ~$BJ ME Audit Report Draft_04July.docx
100%
New File 162 ~$BJ ME Audit Report Draft_13June.docx
100%
New File 77487 Manpower Benchmark.xlsx100%
New File 123592 Master Spreadsheet.xlsx100%
New File 739671 TNBJ Financials_working_19June.xlsx100%
New File 4.1 m TNBJ ME Audit Report Draft_04July.docx
100%
New File 4.3 m TNBJ ME Audit Report Draft_06August.docx
100%
New File 4.3 m TNBJ ME Audit Report Draft_07August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_09August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_11August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_13June.docx
100%
New File 360307 TNBJ ME Audit Report Draft_25August -
comments_Neoh.docx100%
New File 4.3 m TNBJ ME Audit Report Draft_31Jul.docx100%

New File 723292 TNBJ_Availability Records.xlsx100%


New Dir 19 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\
New File 94680 20171003_Edra and Advisian Meeting
Agenda_Advisian response to comments (Neoh).docx100%
New File 69833 Advisian QA_batch 1_14August.xlsx100%
New File 72063 Advisian QA_batch 2_30August.xlsx100%
New File 72422 Advisian QA_batch 2_30August_rev1.xlsx
100%
New File 2.0 m Advisian Track 4B FPTA Internal Kick
Off.pptx100%
New File 1.0 m Advisian Track 4B FPTA Internal Kick
Off_14Aug.pdf100%
New File 15533 Contact Details.docx100%
New File 332579 Degradation Curve.xlsx100%
New File 115621 Edra Alor Gajah_EC Review.docx100%
New File 48785 Edra and Advisian Meeting Agenda_Advisian
response to comments (ADVISIAN 05 Oct).docx100%
New File 20713 Edra LTA_Budget_Neoh.xlsx100%
New File 20813 Edra LTA_Budget_Neoh_r1.xlsx100%
New File 21853 Edra LTA_Budget_Neoh_r2.xlsx100%
New File 52840 IM Extract - Technical (Sept 14).docx100%

New File 52752 IM Extract - Technical (Sept


14)_Advisian.docx100%
New File 268276 Melaka - Information Memorandum (for
Advisian's confirmation)_Advisian 23 Oct.docx100%
New File 74240 Queries on Advisian - Draft report dated
9 Oct_Advisian.doc100%
New File 216576 Queries on draft report to Advisian (4
Oct 2017)(CIMB)_advisian.doc100%
New File 220672 Queries on draft report to Advisian (4
Oct 2017)(CIMB)_advisian_09Oct.doc100%
New Dir 7 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\
New File 18.6 m 03 LNTP Agreement dd 23 Mar 2017.pdf100%

New File 72.6 m 06 Gas Supply Agreement dd 11 Apr


2017.pdf100%
New File 70217 Advisian QA_batch 1_14August_reply (21-
08-2017).xlsx100%
New File 97525 Draft EESB-KNSB OM Agreement (clean)
(12102017).docx100%
New File 50505 Edra Energy - KNSB technical and
management services agreement (GL 30 12....docx100%
New File 5.3 m Project Melaka Model 20171011 v1 (Sent to
KPMG).xlsm100%
New File 5.3 m Project Melaka Model 20171016 v1 (Sent to
KPMG).xlsm100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\Appendices\
New File 7.9 m App 1.1 PAT Endorsement.pdf100%
New File 49.2 m App 2.1 Land Titles.pdf100%
New File 111.0 m App 4.1 Test Results.pdf100%
New File 9.2 m App 4.2(a) Survey forms.pdf100%
New File 11.4 m App 4.2(b) Minutes.pdf100%
New File 92.8 m App 5.1 Hydraulic Report.pdf100%
New File 7.7 m App 5.2(a) Consequence Modelling
Results.pdf100%
New File 7.6 m App 5.2(b) Failure Frequencies.pdf100%
New File 7.7 m App 5.3(a) Peak Runoff Estimation.pdf100%

New File 8.0 m App 5.3(b) USLE and Sediment Yield


Calculation.pdf100%
New File 11.2 m App 5.3(c) Conceptual ESCP.pdf100%
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\Main Report\
New File 46.8 m Cover_declaration.pdf100%
New File 8.0 m EV803-8013-Chap1-final.pdf100%
New File 13.5 m EV803-8013-Chap2-final.pdf100%
New File 7.7 m EV803-8013-Chap3-final.pdf100%
New File 37.0 m EV803-8013-Chap4-final.pdf100%
New File 31.1 m EV803-8013-Chap5-final.pdf100%
New File 8.2 m EV803-8013-Chap6-final.pdf100%
New File 7.7 m EV803-8013-Chap7-final.pdf100%
New File 9.8 m EV803-8013-ES-final.pdf100%
New File 9.8 m EV803-8013-RE-final.pdf100%
New File 7.9 m EV803-8013-TOC-final.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\01 Addendum Report\
New File 12.1 m Addendum Report -final.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\02 Additional QRA Report\
New File 11.4 m Additional QRA Study-gas buffer-
190916.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01 PPA\
New File 81.2 m 01 PPA dd 20 Apr 2017 (Appx A - C).pdf
0% 100%
New File 99.0 m 01 PPA dd 20 Apr 2017 (Appx D - N &
Exhibits).pdf 0% 100%
New File 116.2 m 01 PPA dd 20 Apr 2017 (Main body).pdf 0%
100%
New File 34816 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\02\
New File 9.2 m Surat Kelulusan Laporan EIA.pdf100%
New File 8.7 m Surat keputusan rayuan semakan syarat
kelulusan EIA no 31, 31 dan 33.pdf100%
New File 15.8 m Syarat-syarat kelulusan EIA.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\03\
New File 7.8 m OE Organization Chart.pdf100%
New File 9.2 m Project Melaka - Project Management
Organization.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\04\
New File 10.1 m OE Services Agreement - Signed.pdf100%
New File 28.3 m Owner's Engineer experience list.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra


LTA\dataroom\05. LTSA dated 30 May 2017\
New File 51.0 m 05. LTSA dated 30 May 2017.pdf100%
New File 12800 Thumbs.db100%
New Dir 6 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\06\
New File 18566 Bob Cuthbertson (OE Project Manager).docx
100%
New File 18506 Matthew Loughnan (OE Engineering
Manager).docx100%
New File 21358 Md Shamsul Bahrin Hussain (Edra Project
Director).docx100%
New File 18944 Mun Sang Yip (Edra Deputy Project
Director).docx100%
New File 18901 Peter Smart (OE Project Director).docx
100%
New File 18694 Tham Weng Choun (Edra Project
Manager).docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\07\
New File 7.7 m Indicative OM Organization Structure.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\KM1\
New File 9.1 m 10 F1321A - 1ap Edra Energy Sdn.Bhd.-
Model.pdf100%
New File 9.8 m 11 F1321 - Edra Energy.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\KM2\
New File 8.0 m F1421 - 001A (19-01-2017)-Model.pdf100%
New File 8.2 m F1421 - Conditional Approval.pdf100%
New File 8.2 m F1421 - Rezoning SPC Approval.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\EPC\
New File 43.4 m Melaka EPC Volume 1 of 8_CIMB.pdf 0%
100%
New File 69.9 m Melaka EPC Volume 2 of 8_CIMB.pdf 0%
100%
New File 70.1 m Melaka EPC Volume 3 of 8_CIMB.pdf 0%
100%
New File 49.5 m Melaka EPC Volume 4 of 8_CIMB.pdf100%
New File 63.1 m Melaka EPC Volume 5 of 8_CIMB.pdf100%
New File 67.7 m Melaka EPC Volume 6 of 8_CIMB.pdf 0%
100%
New File 22.2 m Melaka EPC Volume 7 of 8_CIMB.pdf100%
New File 18.2 m Melaka EPC Volume 8 of 8_CIMB.pdf100%
New File 84480 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\EPC Contractor\
New File 24.2 m 6. Capability of and certainty of plant
delivery by the EPC contractor.pdf100%
New File 20992 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Feasibility Study Final Report\
New File 19.6 m 7. Melaka - Feasibility Study Final
Report (Annex) 23-Mar-15.pdf100%
New File 12.7 m 7. Melaka - Feasibility Study Final
Report 23-Mar-15.pdf100%
New File 20992 Thumbs.db100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\FM\
New File 5.3 m Project Melaka Model 20170804 v1
(Sent).xlsm100%
New Dir 9 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Land Docs\
New File 2.3 m 08 & 09 SPA Malacca Land dd 21 Mar
2016.pdf100%
New File 1.9 m 11 SPA YM-EESB Lot 4676 partial dd 31 May
2016.pdf100%
New File 1.4 m 13 LLA Lot 4695 dd 27 Jul 2016.pdf100%
New File 1.4 m 14 LLA Lot 9323 dd 27 Jul 2016.pdf100%
New File 1.9 m 15. LLA Panglima (Lot 14770) dated
7.12.2016.pdf100%
New File 1.9 m 16. LLA Panglima (Lot 4640) dated
7.12.2016.pdf100%
New File 2.0 m 17. LLA Powertek (Lot 4702) dated
7.12.2016.pdf100%
New File 2.0 m 18. LLA Powertek (Lot 4703) dated
7.12.2016.pdf100%
New File 41984 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\LNTP Insurance Policies\
New File 477940 19.1 LNTP - Cover Note.pdf100%
New File 3.3 m 19.2 Project Melaka - LNTP - CAR.pdf100%

New File 804367 19.3 Project Melaka - LNTP - WC.pdf100%


New File 29184 Thumbs.db100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\
New File 70217 Advisian QA_batch 1_14August_reply (21-
08-2017).xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\
New Dir 12 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\Appendices\
New File 7.9 m App 1.1 PAT Endorsement.pdf100%
New File 49.2 m App 2.1 Land Titles.pdf100%
New File 111.0 m App 4.1 Test Results.pdf 0% 100%
New File 9.2 m App 4.2(a) Survey forms.pdf100%
New File 11.4 m App 4.2(b) Minutes.pdf100%
New File 92.8 m App 5.1 Hydraulic Report.pdf100%
New File 7.7 m App 5.2(a) Consequence Modelling
Results.pdf100%
New File 7.6 m App 5.2(b) Failure Frequencies.pdf100%
New File 7.7 m App 5.3(a) Peak Runoff Estimation.pdf100%

New File 8.0 m App 5.3(b) USLE and Sediment Yield


Calculation.pdf100%
New File 11.2 m App 5.3(c) Conceptual ESCP.pdf100%
New File 22016 Thumbs.db100%
New Dir 12 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\Main Report\
New File 46.8 m Cover_declaration.pdf100%
New File 8.0 m EV803-8013-Chap1-final.pdf100%
New File 13.5 m EV803-8013-Chap2-final.pdf100%
New File 7.7 m EV803-8013-Chap3-final.pdf100%
New File 37.0 m EV803-8013-Chap4-final.pdf100%
New File 31.1 m EV803-8013-Chap5-final.pdf100%
New File 8.2 m EV803-8013-Chap6-final.pdf100%
New File 7.7 m EV803-8013-Chap7-final.pdf100%
New File 9.8 m EV803-8013-ES-final.pdf100%
New File 9.8 m EV803-8013-RE-final.pdf100%
New File 7.9 m EV803-8013-TOC-final.pdf100%
New File 153088 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\01 Addendum Report\
New File 12.1 m Addendum Report -final.pdf 0% 100%
New File 14336 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\02 Additional QRA Report\
New File 11.4 m Additional QRA Study-gas buffer-
190916.pdf100%
New File 19968 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\02\
New File 9.2 m Surat Kelulusan Laporan EIA.pdf100%
New File 8.7 m Surat keputusan rayuan semakan syarat
kelulusan EIA no 31, 31 dan 33.pdf100%
New File 15.8 m Syarat-syarat kelulusan EIA.pdf 0% 100%

New File 105472 Thumbs.db100%


New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\03\
New File 7.8 m OE Organization Chart.pdf100%
New File 9.2 m Project Melaka - Project Management
Organization.pdf100%
New File 109568 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\04\
New File 10.1 m OE Services Agreement - Signed.pdf100%
New File 28.3 m Owner's Engineer experience list.pdf100%

New File 28672 Thumbs.db100%


New Dir 6 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\06\
New File 18566 Bob Cuthbertson (OE Project Manager).docx
100%
New File 18506 Matthew Loughnan (OE Engineering
Manager).docx100%
New File 21358 Md Shamsul Bahrin Hussain (Edra Project
Director).docx100%
New File 18944 Mun Sang Yip (Edra Deputy Project
Director).docx100%
New File 18901 Peter Smart (OE Project Director).docx
100%
New File 18694 Tham Weng Choun (Edra Project
Manager).docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\07\
New File 7.7 m Indicative OM Organization Structure.pdf
100%
New File 25600 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\KM1\
New File 9.1 m 10 F1321A - 1ap Edra Energy Sdn.Bhd.-
Model.pdf100%
New File 9.8 m 11 F1321 - Edra Energy.pdf100%
New File 36352 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\KM2\
New File 8.0 m F1421 - 001A (19-01-2017)-Model.pdf100%
New File 8.2 m F1421 - Conditional Approval.pdf100%
New File 8.2 m F1421 - Rezoning SPC Approval.pdf100%
New File 123904 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Track Record\
New File 15.7 m 8. Track Record of and Service Support
for the Power Plant Technology.pdf 0% 100%
New File 17920 Thumbs.db100%
New Dir 48 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\First
Draft to Client 29 Aug\
New File 162 ~$171106 FPTEA Edra Track 4B Tech DD-
Final.docx100%
New File 8.6 m 201709 FPTEA Edra Track 4B Tech DD_neoh-
tc.docx100%
New File 8.2 m 20170918 FPTEA Edra Track 4B Tech
DD_clean.docx100%
New File 2.4 m 20170918 FPTEA Edra Track 4B Tech
DD_clean.pdf100%
New File 8.3 m 20170918 FPTEA Edra Track 4B Tech
DD_clean_rev1.docx100%
New File 2.4 m 20170918 FPTEA Edra Track 4B Tech
DD_clean_rev1.pdf100%
New File 9.4 m 20170918 FPTEA Edra Track 4B Tech
DD_tc.docx 0% 100%
New File 3.0 m 20170918 FPTEA Edra Track 4B Tech
DD_tc.pdf100%
New File 8.3 m 20170918 FPTEA Edra Track 4B Tech
DD_tc_rev1.docx100%
New File 2.3 m 20170918 FPTEA Edra Track 4B Tech
DD_tc_rev1.pdf100%
New File 8.7 m 20171002 FPTEA Edra Track 4B Tech DD-
clean.docx100%
New File 2.6 m 20171002 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.7 m 20171002 FPTEA Edra Track 4B Tech DD-
tc.docx100%
New File 3.7 m 20171002 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
clean_rev1_EL.docx 0% 100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
tc.docx 0% 100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
tc_rev1.docx 0% 100%
New File 8.7 m 20171009 FPTEA Edra Track 4B Tech DD-
clean.docx100%
New File 2.6 m 20171009 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.8 m 20171009 FPTEA Edra Track 4B Tech DD-
tc.docx 0% 100%
New File 2.7 m 20171009 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171017 FPTEA Edra Track 4B Tech DD-
clean.docx 0% 100%
New File 2.7 m 20171017 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.7 m 20171017 FPTEA Edra Track 4B Tech DD-
tc.docx100%
New File 2.7 m 20171017 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171020 FPTEA Edra Track 4B Tech DD-
tc_Final.docx 0% 100%
New File 2.7 m 20171031 FPTEA Edra Track 4B Tech DD-
Clean_Final(FA) comments 02 Nov.pdf100%
New File 8.7 m 20171031 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 8.7 m 20171102 FPTEA Edra Track 4B Tech DD-
clean_Final.docx 0% 100%
New File 2.7 m 20171102 FPTEA Edra Track 4B Tech DD-
clean_Final.pdf100%
New File 8.7 m 20171102 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 2.7 m 20171102 FPTEA Edra Track 4B Tech DD-
tc_Final.pdf100%
New File 8.7 m 20171106 FPTEA Edra Track 4B Tech DD-
Final.docx 0% 100%
New File 2.7 m 20171106 FPTEA Edra Track 4B Tech DD-
Final.pdf100%
New File 8.8 m 20171106 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 74983 Advisian QA_batch 2_30August_rev1
(Response) Advisian 18 Aug.xlsm100%
New File 6.7 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_Clean for submission.docx100%
New File 6.8 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_Comments from FA 09Sep.docx100%
New File 3.0 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_for submission.pdf100%
New File 7.7 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_redline.docx100%
New File 9.1 m FPTEA Edra Track 4B Tech DD_20170915-
Final.docx 0% 100%
New File 8.9 m FPTEA Edra Track 4B Tech DD_20170915-
Final_Emily_TT.docx100%
New File 182784 Queries on draft report to Advisian (27
Sep 2017)(CIMB) - Advisian 02 Oct.doc100%
New File 167038 Risk Register Template_Edra_EPC-
20170915.xlsx100%
New File 165897 Risk Register Template_Edra_EPC-
20170918.xlsx100%
New File 1.3 m Summary of Comments on Report Advisian 08
Sep from CIMB FA.pdf100%
New File 2.7 m Summary of Comments on Report Advisian
from Edra.pdf100%
New File 15591 To Fransesco.docx100%
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\LTA
Agreements\
New File 129485 01a Cover Letter_Mandate.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
1_draft_290517.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
1_Final.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
2_draft_290517.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
2_Final.docx100%
New File 1.4 m 4B Project_LTA Agreement DRAFT.docx100%
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
(CIMB 230617) Rev01 Advisian 16July2017.docx100%
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
(CIMB 230617) Rev02 Advisian 17July2017.docx100%
New File 1.4 m 4B Project_LTA
Agreement_DRAFT_290517.docx100%
New File 1.4 m 4B Project_LTA
Agreement_Final_07November2017.docx100%
New File 4.1 m RE Advisian for Project Melaka - Finance
Parties' Technical Environmental Advisor RFP.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\LTA
Agreements\to Client 17 Aug\
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
Rev02 Advisian 17July2017(Edra CIMB 070817)_Advisian 17Aug.docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\Working\
New File 162 ~$A Edra Track 4B Tech
DD_TT_Neoh_20170816.docx100%
New File 6.8 m ITA Edra Track 4B Tech DD.docx100%
New File 5.8 m ITA Edra Track 4B Tech DD_201708028-
Compilation 2_TT_NEOH29Aug.docx100%
New File 4.8 m ITA Edra Track 4B Tech DD_AVAILABILITY
SECTION 7.2.12.docx100%
New File 5.3 m ITA Edra Track 4B Tech
DD_TT_20170816.docx100%
New File 5.3 m ITA Edra Track 4B Tech
DD_TT_Neoh_20170824.docx100%
New File 42179 PPA_Neoh.xlsx100%
New File 34455 Review on PPA, GSA, LTSA.docx100%
New File 166635 Risk Register Template_Edra_EPC- 20170829
Emily_TT_Neoh.xlsx100%
New File 166625 Risk Register Template_Edra_EPC- 20170829
Emily_TT_Neoh_v2.xlsx100%
New Dir 13 C:\AdvisianActive\02 Commercial\
New File 8.4 m 20170122 URA CM Technical Proposal_FULL
SET.PDF100%
New File 11.6 m 20170220 Presentation to
SEDA_v1_Neoh.pptx100%
New File 84594 AdvisianOverview_Info_A3_Glo_0116.pdf100%

New File 6.3 m ATM-2017PA0008_Advisian Response.pdf.pdf


100%
New File 246701 Case Study - DD for ARENA.pdf100%
New File 345905 Case Study - DD for ARENA.pptx100%
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 1.6 m ESCRI (Energy Storage for Renewable
Integration).pdf100%
New File 5.7 m ISD-17-6146 - Advisian - Regional Rail
Transaction Management V2 - Non-Commercial Schedules.pdf100%
New File 1.4 m Malaysia Terms of Engagement - Review
Services, Due Dilligence, Reliance.docx100%
New File 638369 Northern Beaches Busway Proposal Draft
for Discussion rev2.pdf100%
New File 376354
PetchemsProjectDevelopment_Infographics_A4_Chemicals_Sprint_0817_Step2.pdf
100%
New File 423936 SBPC M&E Audit Schedule.mpp100%
New Dir 5 C:\AdvisianActive\02 Commercial\Advisian New Energy
Future (renewables)\
New File 1.8 m
1_NEFElectricVehiclesChapter1_TL_A4_Inf_Glo_0615_A4Web.pdf100%
New File 1.7 m
2_NEFElectricVehiclesChapter1_IG_A3_Inf_Glo_0615.pdf100%
New File 1.2 m
3_NEFElectricVehiclesChapter2_TL_A4_Inf_Glo_0616_A4Web.pdf100%
New File 1.0 m
4_NEFElectricVehiclesChapter2_IG_A3_Inf_Glo_0816.pdf100%
New File 5.4 m Advisian New Energy Future.zip100%
New Dir 6 C:\AdvisianActive\02
Commercial\Advisian_Infra_Water_Power_Solar\
New File 2666 302020-00447 - Track 4A SIPP FPTA.lnk100%

New File 3.1 m Global Renewable Capability_Solar.pdf100%

New File 1.4 m Power Brochure.pdf100%


New File 1.8 m Social Infrastructure Brochure.pdf100%
New File 9.5 m The New Energy Future.pdf100%
New File 1.9 m Water Brochure.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\Bangaladesh RFP\
New File 124416 01a Cover Letter_IFC.doc100%
New File 117237 01a Cover Letter_IFC_Siva.docx100%
New File 74513 15092017_IFC Summit Meghnaghat Cover
Letter.pdf100%
New File 2.1 m 15092017_IFC Summit Meghnaghat Techno-
Commercial Proposal.pdf100%
New File 20158 IFC_Hours Estimate.xlsx100%
New File 19937 IFC_Hours Estimate_rev1.xlsx100%
New File 835414 Summit M2 IE TOR_draft - Summit v1.pdf
100%
New File 4.8 m Summit Meghnaghat Techno-Commercial
Proposal_Rev1.docx100%
New File 4.7 m Summit Meghnaghat Techno-Commercial
Proposal_Rev3.docx100%
New File 4.7 m Summit Meghnaghat Techno-Commercial
Proposal_Rev4.docx100%
New Dir 6 C:\AdvisianActive\02 Commercial\CSP Business Case\
New File 20536 CSP Budget.xlsx100%
New File 20539 CSP Budget_rev1.xlsx100%
New File 14.5 m CSP Business Case.pdf100%
New File 21.1 m CSP Business Case.pptx100%
New File 6.3 m CSP Business Case_mini.pdf100%
New File 63669 Org Chart.pptx100%
New Dir 10 C:\AdvisianActive\02 Commercial\Dragon Capital
(Vietnam Solar)\
New File 5.9 m 1. DC_brochure.pdf100%
New File 1.1 m 2. Energy.briefing_DC.pdf100%
New File 7.0 m 20170912_Proposal for Project Mangosteen
FS_For Submission_with appendices.pdf100%
New File 628994 3. Project_Mangosteen_teaser.pdf100%
New File 122751 3.1 RFP_DC_Mangosteen.pdf100%
New File 613727 4. Project_Honeydew_teaser.pdf100%
New File 124616 4.1 RFP_DC_Honeydew.pdf100%
New File 2.6 m 5. VN_ADB_energy-road-map.pdf100%
New File 2.2 m 5.1 VN_ADB_Power-sector-reforms.pdf100%
New File 308368 6. Questionnaires.pdf100%
New Dir 30 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\
New File 162 ~$chno-Commercial Proposal.docx100%
New File 111616 01a Cover Letter_CIMB.doc100%
New File 248832 01a Cover Letter_Edra.doc100%
New File 6.9 m 20170518 Advisian Proposal_LTA Edra.pptx
100%
New File 6.6 m Advisian IE Edra.pptx 0% 100%
New File 6.6 m Advisian IE Edra_edited copy.pptx100%
New File 9.0 m Advisian Transaction Services Team
Experience.pptx100%
New File 24557 CRM Data Entry Power.docx100%
New File 282225 CSOC - Melaka 020517.docx100%
New File 135168 CSOC Approval by Dennis F and Steve P.msg
100%
New File 357675 Edra CSOC and CRF.zip100%
New File 1.0 m Edra FPTEA Clarifications_24May.pdf100%
New File 6.2 m Edra FPTEA Clarifications_24May.pptx100%

New File 8.5 m Edra LTA Techno-Commercial Proposal.docx


100%
New File 8.5 m Edra LTA Techno-Commercial
Proposal_rev2.docx100%
New File 8.6 m Edra LTA Techno-Commercial
Proposal_Rev3_11052017.docx100%
New File 8.5 m Edra LTA Techno-Commercial
Proposal_Rev4_11052017.docx100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_Rev5_17052017.docx100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_Rev6_18052017.docx100%
New File 8.9 m Edra LTA Techno-Commercial
Proposal_Rev8.docx100%
New File 3.0 m Edra LTA Techno-Commercial
Proposal_Rev8.pdf100%
New File 20156 Edra LTA_Proposal Budget_Neoh.xlsx100%
New File 11514 Expenses.xlsx100%
New File 72395 Figures.pptx100%
New File 71680 H-Class Machine Experience 0616.doc100%
New File 2.6 m Independent Engineer Certs.xlsx100%
New File 77460 Org Chart.pptx100%
New File 644644 Project Melaka - Finance Parties'
Technical & Environmental Advisors RFP (24 April 2017).pdf100%
New File 62736 RCF_PN-017.pdf100%
New File 169713 RCF_PN-017.xlsx100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\
New File 45056 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.01 Tender Documents\
New File 644644 Project Melaka - Finance Parties'
Technical & Environmental Advisors RFP (24 April 2017).pdf100%
New File 222208 Thumbs.db100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.02 Correspondence\
New File 871936 01 Request.msg100%
New Dir 14 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 104448 01a Cover Letter_CIMB.doc100%
New File 111616 01a Cover Letter_Edra.doc100%
New File 86687 01b WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 86687 Apndx A - CCM.pdf100%
New File 721786 Apndx B - WPI_BOE 2017.pdf100%
New File 74029 Apndx C - Experience.docx100%
New File 353172 Apndx D - SOW from the RFP.pdf100%
New File 467502 Apndx F - Contract T&C.pdf100%
New File 467502 Apndx F Contract T&C.pdf100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_rev2.docx100%
New File 8.9 m Edra LTA Techno-Commercial
Proposal_Rev7_18052017.docx100%
New File 117760 Thumbs.db100%
New Dir 9 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx A - Company Profile\
New File 162 ~$mpany Profile.docx100%
New File 731657 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 564781 Att 3 - Form 9 [Name Change].pdf100%
New File 906682 Att 4 - Form 24.pdf100%
New File 84974 Att 5 - Form 49.pdf100%
New File 92980 Company Profile.docx100%
New File 2.2 m Company Profile.pdf100%
New File 117760 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx C - Experience\
New File 385024 i) Transaction Services Team
Experience.doc100%
New File 230400 ii) H-Class Machine Experience.doc100%
New File 70929 iii) Advisian MY Due Diligence
Experience.docx100%
New File 74259 iv) Advisian MY Experience.docx100%
New File 33280 Thumbs.db100%
New Dir 26 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx D - CVs\
New File 162 ~$ Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m Adam Aspinall_CV.docx100%
New File 112238 Adam Aspinall_CV.pdf100%
New File 108747 Ahmad Danial_CV.pdf100%
New File 595623 Andy Zheng_CV.pdf100%
New File 68608 Diana Gao_CV.pdf100%
New File 1.1 m Foo Hah CV_May '17.docx100%
New File 98300 Foo Hah_CV.pdf100%
New File 1.2 m Francesco Ricciardi_CV.docx100%
New File 161865 Francesco Ricciardi_CV.pdf100%
New File 1.0 m Leong Yoke Heng CV_May'17.docx100%
New File 91161 Leong Yoke Heng_CV.pdf100%
New File 93248 Llewellyn Owens_CV.pdf100%
New File 1.0 m Saravanan Supaiyah CV.docx100%
New File 160250 Saravanan Supaiyah_CV.pdf100%
New File 118489 Siva Sreedharan_CV.pdf100%
New File 87372 Sudhakar Surapaneni_CV.pdf100%
New File 1.0 m Teresa Tam_CV.docx100%
New File 102570 Teresa Tam_CV.pdf100%
New File 1.0 m Terrel LaRoche_CV.docx100%
New File 91639 Terrel LaRoche_CV.pdf100%
New File 121856 Thumbs.db100%
New File 1.1 m Zi Neoh_CV.docx100%
New File 119281 Zi Neoh_CV.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx D - CVs\Native\
New File 1.1 m Adam Aspinall_CV.docx100%
New File 1.0 m Ahmad Danial_CV.docx100%
New File 1.0 m Diana Gao_CV.docx100%
New File 1.1 m Foo Hah_CV.docx100%
New File 1.2 m Francesco Ricciardi_CV.docx100%
New File 1.0 m Leong Yoke Heng_CV.docx100%
New File 1.0 m Saravanan Supaiyah_CV.docx100%
New File 1.0 m Teresa Tam_CV.docx100%
New File 1.0 m Terrel LaRoche_CV.docx100%
New File 1.1 m Zi Neoh_CV.docx100%
New Dir 0 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.04 CVs\
New Dir 4 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.05 Risk Classification Form\
New File 24688 CRM Data_PN-017.docx100%
New File 161794 Project Melaka_BNB.pdf100%
New File 94692 RCF_PN-017.xlsx100%
New File 315392 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\Edra
CSOC and CRF\
New File 282225 CSOC - Melaka 020517.docx100%
New File 135168 CSOC Approval by Dennis F and Steve P.msg
100%
New File 62736 RCF_PN-017.pdf100%
New Dir 4 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\reply
from Edra\
New File 14818 IE rev1.1 - Response from Advisian
INTERNAL.xlsx100%
New File 14156 IE rev1.1 - Response from Advisian.xlsx
100%
New File 14797 IE rev1.1 - Response from
Advisian_Neoh_01Aug.xlsx100%
New File 14729 IE rev1.2_Advisian.xlsx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Edra Solar TA\
New File 26177 Edra PV_Budget.xlsx100%
New File 24.6 m Edra Solar TA Techno-Commercial
Proposal_Draft_Neoh.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Edra Solar TA Case
Study\
New File 86052 Appendix 1 - 11 HQ-Project-102017-
0008.docx100%
New File 25889 Appendix 1 - Letter of
Acknowledgement.pdf100%
New File 40914 Appendix 5.docx100%
New File 21208 Edra Case Study PV_Budget.xlsx100%
New File 1.7 m Edra Proposal 20171020_Internal
Review_Commercial_Neoh.docx100%
New File 4.2 m Edra Proposal 20171020_Internal
Review_JE_Neoh.docx100%
New File 663578 Request For Proposal - HQ-PROJECT-102017-
0008.pdf100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra Solar TA Case
Study\Clarifications\
New File 35012 Commercial Clarification Questionnaire No
2 Advisian_Neoh.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\
New File 76959 1-8 HQ-JIMAH-062017-0018.docx100%
New File 1.5 m Financial Proposal_JEV.docx100%
New File 382976 Jimah M&E Audit Schedule_v2.mpp100%
New File 20312 Jimah M&E_Budget.xlsx100%
New File 48255 Org Chart.pptx100%
New File 3.5 m Technical Proposal_JEV.docx100%
New File 1.0 m The Approach.pptx100%
New Dir 11 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\
New File 162 ~$chnical Proposal.docx100%
New File 246784 01 Cover Letter_New JEV.doc100%
New File 721786 Apndx B BOE 2017.pdf100%
New File 484864 Apndx C Exhibit 2 - Compliance to SOW.doc
100%
New File 559104 Apndx E Exhibit 4 - Past Experience.doc
100%
New File 504320 Apndx F Exhibit 5 - Compliance to T&C.doc
100%
New File 474624 Apndx G Exhibit 6 - Checklist.doc100%
New File 493568 Apndx H Exhibit 7 - Unpriced
Commercial.doc100%
New File 3.6 m Technical Proposal_JEV.docx100%
New File 1.3 m Technical Proposal_JEV.pdf100%
New File 552448 Thumbs.db100%
New Dir 9 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\Apndx A Company Profile\
New File 162 ~$mpany Profile.docx100%
New File 731657 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 564781 Att 3 - Form 9 [Name Change].pdf100%
New File 906682 Att 4 - Form 24.pdf100%
New File 84974 Att 5 - Form 49.pdf100%
New File 92980 T1 - Company Profile.docx100%
New File 2.3 m T1 - Company Profile.pdf100%
New File 210432 Thumbs.db100%
New Dir 8 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\Apndx D Exhbt 3\
New File 1.8 m 01 Exhibit 3 - Foo Hah.doc100%
New File 967168 02 Exhibit 3 - Neoh.doc100%
New File 2.0 m 03 Exhibit 3 - Siva.doc100%
New File 2.1 m 04 Exhibit 3 - Mukesh Shukla.doc100%
New File 578560 05 Exhibit 3 - Emily Lim.doc100%
New File 1.1 m 06 Exhibit 3 - Siow Phei Fang.doc100%
New File 496128 Exhibit 3 - Key Personnel [TEMPLATE].doc
100%
New File 147968 Thumbs.db100%
New Dir 16 C:\AdvisianActive\02 Commercial\John Keels TA Bid\
New File 18.4 m 20170907 Advisian Proposal_Technical
Advisor_Neoh.pptx100%
New File 23.0 m 20170912 Advisian Proposal_Technical
Advisor- Neoh.pptx100%
New File 8.2 m 20170914 Advisian Proposal_Technical
Advisor_Final.pdf100%
New File 19.6 m 20170914 Advisian Proposal_Technical
Advisor_Final.pptx100%
New File 3.9 m 20170914 JKL Sri Lanka_Technical
Advisor_Proposal.pdf100%
New File 2.8 m Appendices - JKH TA Proposal.zip100%
New File 395388 Appendix A - Master List GT and Class
Experience.pdf100%
New File 103635 Appendix B - PV Experience List - Apr
2017.pdf100%
New File 179709 Appendix C - Wind Experience List - Apr
2017.pdf100%
New File 2.4 m Appendix D - Detailed CVs.pdf100%
New File 201370 CSP and Hybrid Experience List - Apr
2017.pdf100%
New File 21019 JKH_Hours Estimate.xlsx100%
New File 20550 JKH_Hours Estimate_rev1.xlsx100%
New File 996469 Renewables Experience List - Apr 2017.pdf
100%
New File 606408 Request for Proposal for the Provision of
Technical Advisory Services_31 08 2017.pdf100%
New File 34738 SCOPE OF WORK.docx100%
New Dir 15 C:\AdvisianActive\02 Commercial\KEV Business Review\
New File 6.0 m Advisian KEV Business Review
Proposal_Final_22June17.pdf100%
New File 516907 CVs.pdf100%
New File 726552 CVs_Updated.pdf100%
New File 20104 KEV BR_Budget.xlsx100%
New File 20848 KEV BR_Budget_rev2.xlsx100%
New File 14.6 m KEV Business Review Proposal_Final.pdf
100%
New File 23.8 m KEV Business Review Proposal_Final.pptx
100%
New File 5.7 m KEV Business Review
Proposal_Revised_07Aug2017.pdf100%
New File 14.7 m KEV Business Review
Proposal_Revised_Final.pdf100%
New File 23.9 m KEV Business Review
Proposal_Revised_Final.pptx100%
New File 1.5 m Kick Off Meeting with KEV.pptx100%
New File 948889 Kick Off Meeting with KEV_30Oct.pdf100%
New File 1.4 m Malaysia Terms of Engagement - Review
Services, Due Dilligence, Reliance.docx100%
New File 255405 medium_fuel_oil.jpg100%
New File 63981 Org Chart.pptx100%
New Dir 16 C:\AdvisianActive\02 Commercial\KEV Proposal\
New File 595527 05 Technical Schedule T3 - CV [R
Ellis].docx100%
New File 7.2 m 20170116 KEV Proposal_Neoh.docx100%
New File 18761 20170119 KEV_Budget.xlsx100%
New File 18794 20170124 KEV_Budget.xlsx100%
New File 19727 Advisian KEV Pricing.xlsx100%
New File 2.9 m Advisian M&E Audit - Serudong Power.doc
100%
New File 63944 Advisian Serudong Org Chart.pptx100%
New File 18579 Advisian Serudong Pricing_r1.xlsx100%
New File 8.3 m Advisian_KEV Clarification
Meeting_060217.pptx100%
New File 4.2 m Advisian_WP_KEV Proposal Soft Copy.zip
100%
New File 429336 KEV Site Visit.pdf100%
New File 366587 KEV_Proposal Submission_Transmittal.pdf
100%
New File 78078 Serudong M&E Audit.pod.xml100%
New File 169865 Technical Schedule T3 - Neoh.docx100%
New File 182573 Technical Schedule T4.docx100%
New File 1.2 m Technical Schedule T4_Advisian.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\Malakoff Masinloc
Proposal\
New File 8.3 m 20170814_Masinloc Due Diligence_Final for
Submission Malakoff.pptx100%
New File 529907 2017-09-20 Term of Reference Technical
Advisor V1.pdf100%
New File 3.9 m 20170929_Masinloc DD Proposal_Final.pdf
100%
New File 8.2 m 20170929_Masinloc Due Diligence_Final for
Submission Malakoff - clean copy.pptx100%
New File 8.2 m 20170929_Masinloc Due
Diligence_TrackChanges.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Malakoff Masinloc
Proposal\ref\
New File 8.2 m 20170814_Masinloc Due Diligence_Final for
Submission.pptx100%
New File 4.9 m 20170830_Masinloc Due Diligence_Proposal
Addendum.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Meralco DD Proposal\
New File 16.4 m 20170315 Advisian WorleyParsons
Proposal_Technical Due Diligence.pptx100%
New File 16.3 m 20170411 Advisian WorleyParsons
Proposal_Technical Due Diligence (2).pptx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Sepangar Bay M&E
Audit\
New File 18539 20170314_Sepangar Bay_Budget_Neoh.xlsx
100%
New File 105386 M&E Audit Invitation_Advisian.pdf100%
New File 48207 Org Chart.pptx100%
New File 423936 SBPC M&E Audit Schedule.mpp100%
New File 378368 SBPC M&E Audit Schedule_v2.mpp100%
New File 420569 Sepangar - ME Letter TOR.pdf100%
New File 8.4 m Techno-Commercial Proposal.docx100%
New Dir 1 C:\AdvisianActive\02 Commercial\Sepangar Bay M&E
Audit\goby\
New File 8.5 m Technical Proposal_TNBJ.docx100%
New Dir 10 C:\AdvisianActive\02 Commercial\Serudong Proposal\
New File 162 ~$161220 Serundong Proposal_Neoh.docx100%

New File 6.8 m 20161220 Serundong Proposal_Neoh.docx100%

New File 18238 20161220 Serundong_Budget_Neoh.xlsx100%


New File 18268 20170125_Serundong_Budget_Neoh.xlsx100%
New File 2.9 m Advisian M&E Audit - Serudong Power.doc
100%
New File 63944 Advisian Serudong Org Chart.pptx100%
New File 18579 Advisian Serudong Pricing_r1.xlsx100%
New File 2.5 m Advisian_Serudong Clarification
Meeting_250117.pdf100%
New File 9.4 m Advisian_Serudong Clarification
Meeting_250117.pptx100%
New File 78078 Serudong M&E Audit.pod.xml100%
New Dir 7 C:\AdvisianActive\02 Commercial\SESB\
New File 12.8 m 20170616 SESB Proposal_Technical_Neoh
Final.pdf100%
New File 27.9 m 20170616 SESB Proposal_Technical_Neoh
Final.pptx100%
New File 6.6 m 20170616_SESB Proposal_Commercial.pptx
0% 100%
New File 64849 Org Chart.pptx100%
New File 24319 SESB_Budget.xlsx100%
New File 15909 TNBJ M&E Audit Work Budget_26May.xlsx100%

New File 54296 Training Framework.pptx100%


New Dir 2 C:\AdvisianActive\02 Commercial\SESB\From Jeff\
New File 8.5 m 20170608_Technical Proposal.docx100%
New File 240631 Appendix A - Referece ARENA .pdf100%
New Dir 5 C:\AdvisianActive\02 Commercial\SESB\RFP\
New File 8.5 m 20170226_Technical Proposal_v3.docx100%
New File 139264 Attachments for RFP Study of SESB.doc100%

New File 179095 RFP Study of SESB.pdf100%


New File 348706 Standard Consultancy Agreement.pdf100%
New File 366588 TOR Study of SESB Final.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\SESB\superceded\
New File 6.6 m SESB Proposal_Commercial.pptx 0% 100%
New File 27.4 m SESB Proposal_Technical.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Shell Equis DD\
New File 19.6 m Shell Due Diligence Proposal - FINAL.docx
100%
New File 11.6 m Shell Renewable Portfolio Due Diligence -
Advisian Proposal_Final_22082017.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\SIPP IE Proposal\
New File 4.1 m 20160927 SIPP IE Proposal.pdf100%
New File 7.0 m 20170518 Advisian Proposal_LTA SIPP.pptx
100%
New File 1.2 m 20170518 Advisian Revised Offer_LTA
SIPP.pdf100%
New File 679834 Annex A - Team Detailed CV.pdf100%
New File 77055 Org Chart.pptx100%
New File 11905 SIPP PRICING.xlsx100%
New Dir 4 C:\AdvisianActive\02 Commercial\SK ENS Dominican
Republic FS Proposal\
New File 481461 Regas CTRs_with Neoh inputs..xlsx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic.pptx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic_15May.pptx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic_18May_rev2.pptx100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB DGS Proposal\
New File 1.5 m 20161122 TNB DGS Proposal.pdf100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\
New File 23717 20170227 TNB_RC Audit_Budget.xlsx100%
New File 15254 Fee Schedule_Neoh.xlsx100%
New File 15285 Fee Schedule_Neoh_v2.xlsx100%
New File 1.2 m ITB - TNB_Regulatory Compliance Audit.pdf
100%
New File 77690 Manpower Chart.pdf100%
New File 74248 Microsoft Project - TNB M&E Audit
Schedule_r3.pdf100%
New File 317952 TNB M&E Audit Schedule.mpp100%
New File 222442 TNB M&E Audit Schedule.pdf100%
New File 428032 TNB M&E Audit Schedule_final.mpp100%
New File 562688 TNB M&E Audit Schedule_r1.mpp100%
New File 97307 TNB M&E Audit Schedule_r1.pdf100%
New File 69337 TNB M&E Audit Schedule_r2.pdf100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.01 Tender Documents\
New File 713086 Conditions of Contract.pdf100%
New File 1.7 m ITB - TNB_Regulatory Compliance Audit.pdf
100%
New File 448010 Sec 1 - TOR_TNB_Regulatory Compliance
Audit.pdf100%
New File 126464 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.02 Correspondence\
New File 150016 01 Request.msg100%
New File 87040 02 Tender Bulletin.msg100%
New File 217757 Letter Collect ITB.pdf100%
New File 267811 Letter of Invitation to Bid.pdf100%
New File 25088 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$chnical Proposal.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 162 ~$nancial Proposal.docx100%
New File 117760 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\
New File 65293 Org Chart.pptx100%
New File 65775 Org Chart_v1.pptx100%
New File 31232 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\
New Dir 18 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\
New File 162 ~$2020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 60416 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Car rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Financial Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\KPMG Inputs\
New File 572733 Cover letters.pdf100%
New File 3.6 m KPMG's power sector credentials.pptx100%

New File 70612 Scope of work Financial Performance.pptx


100%
New File 48640 Thumbs.db100%
New File 46698 TNB TNIAD0106288_23.01.17.docx100%
New File 44656 TNB TNIAD0106288_24.01.17.docx100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\02 Address_Cover_Spine\
New File 1014272 A3Cover Tech_Landscape.ppt100%
New File 1018368 A4Cover Comm.PPT100%
New File 215552 Address [DO NOT USE].doc100%
New File 45056 Address.doc100%
New File 1014272 SPINE 40MM.PPT100%
New File 134656 Thumbs.db100%
New File 159232 Transmittal_Comm_002.doc100%
New File 154624 Transmittal_Tech_001.doc100%
New Dir 13 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\
New File 343040 03 Cover Letter_Tech.doc100%
New File 864351 03 Cover Letter_Tech.pdf100%
New File 86687 03a WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 7.2 m 20170209 TNB M&E Audit.docx100%
New File 8.5 m 20170226_Technical Proposal_v3.docx100%
New File 681331 27022017085851.pdf100%
New File 220999 27022017090100.pdf100%
New File 95285 Advisian CRF-0043-COR-EN A Rev 1.xlsx100%

New File 721786 Apndx B - WPI_BOE 2017.pdf100%


New File 467502 Apndx F Contract T&C.pdf100%
New File 102344 CRF-0043_173.xlsx100%
New File 117248 Letter of Undertaking_v1.doc100%
New File 17525 TNB RC AUDIT Cover letter v2.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx A T1 Company Profile\
New File 162 ~$chnical Schedule T1 - Company
Profile.docx100%
New File 734565 Att 1 - MOF.pdf100%
New File 86687 Att 2 - CCM.pdf100%
New File 906682 Att 3 - Form 24.pdf100%
New File 148787 Technical Schedule T1 - Company
Profile.docx100%
New File 96389 Technical Schedule T1 - Company
Profile_new.docx100%
New File 118272 Thumbs.db100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx C T2 Experience\
New File 162 ~$chnical Schedule T2 - Experience.docx
100%
New File 80724 Technical Schedule T2 - Experience.docx
100%
New File 102190 Technical Schedule T2 - Experience.pdf
100%
New File 80726 Technical Schedule T2 -
Experience_new.docx100%
New File 455092 Technical Schedule T2 -
Experience_new.pdf100%
New File 13824 Thumbs.db100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\
New File 162 ~$ Technical Schedule T3 - CV [Neoh].docx
100%
New File 279552 Divider_Attachments.ppt100%
New File 605314 Technical Schedule T3 - CV
[TEMPLATE].docx100%
New File 31744 Thumbs.db100%
New Dir 20 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\CVs\
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m 01 Foo Hah_CV.docx100%
New File 118489 02 Siva Sreedharan_CV.pdf100%
New File 87372 03 Sudhakar Surapaneni_CV.pdf100%
New File 1.1 m 03 Zi Neoh_CV.docx100%
New File 1.0 m 05 Robert Ellis CV.docx100%
New File 1.1 m Adam Aspinall.docx100%
New File 1.0 m Advisian New CV template.docx100%
New File 1.6 m Bruce Miller.doc100%
New File 1.0 m Frank Sutton CV 20170224.docx100%
New File 326656 Gabriel S C Rocha.doc100%
New File 1.0 m Kevin Gan.docx100%
New File 116743 KPMG Team CVs.pptx100%
New File 1.5 m Mohamad Baihaki.docx100%
New File 1.0 m Mukesh Shukla.docx100%
New File 38033 Mukesh Shuklaxxx.docx100%
New File 28436 R Ellis_CV [Original].docx100%
New File 208128 Teresa Tam.pdf100%
New File 76800 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\Not complete\
New File 100888 Technical Schedule T3 - CV [Adam
Aspinall].docx100%
New File 101343 Technical Schedule T3 - CV [Gabriel].docx
100%
New File 15360 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\PRINTED\
New File 162 ~$ Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 93136 01 Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 139261 02 Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 95616 03 Technical Schedule T3 - CV [Neoh].docx
100%
New File 83071 Technical Schedule T3 - CV [Teresa].docx
100%
New File 79588 Technical Schedule T3 - CV [Bob
Ellis].docx100%
New File 103669 Technical Schedule T3 - CV [Bruce
Miller].docx100%
New File 624845 Technical Schedule T3 - CV [Kevin].docx
100%
New File 79210 Technical Schedule T3 - CV [Mukesh
Shukla].docx100%
New File 84069 Technical Schedule T3 - CV Alan Yau.docx
100%
New File 84821 Technical Schedule T3 - CV Emily
Choo.docx100%
New File 98808 Technical Schedule T3 - CV Frank
Sutton.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx E T4 Methodology\
New File 162 ~$chnical Schedule T4 - Methodology.docx
100%
New File 162 ~$chnical Schedule T4 -
Methodology_New.docx100%
New File 1.3 m Technical Schedule T4 - Methodology.docx
100%
New File 1.6 m Technical Schedule T4 -
Methodology_New.docx100%
New File 20992 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Financial Audited Account\
New File 11776 Thumbs.db100%
New File 3.8 m WPS AUDITED ACCOUNT FY2012.pdf100%
New File 1.0 m WPS AUDITED ACCOUNT FY2013.pdf100%
New File 1.0 m WPS AUDITED ACCOUNT FY2014.pdf100%
New File 1.6 m WPS AUDITED ACCOUNT FY2015.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\Financial Proposal\
New File 343040 03 Cover Letter_Financial.doc100%
New File 853095 03 Cover Letter_Financial.pdf100%
New File 713086 Conditions of Contract.pdf100%
New File 6.7 m Financial Proposal_v1.docx100%
New File 134656 Form of Agreement.doc100%
New File 9728 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\SUPERCEDED\
New File 9.1 m 20170226_Technical Proposal_v1.docx100%
New File 8.4 m 20170226_Technical Proposal_v2.docx100%
New File 6.9 m Financial Proposal.docx100%
New File 103936 Letter of Undertaking.doc100%
New File 8.9 m Technical Proposal.docx100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\SUPERCEDED\NOT USED\
New File 8.6 m Technical Proposal.docx100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.04 CVs\
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.05 Risk Classification Form\
New File 432609 23012017101416.pdf100%
New File 445398 CRF-0043_173.pdf100%
New File 103440 CRF-0043_173.xlsx100%
New File 111821 NPIS Rev.41 TNB Needle Ph1.docx100%
New File 1009889 NPIS Rev.41 TNB Needle Ph1.pdf100%
New File 967767 NPIS Rev.41 TNB Needle Ph1_Rev.1.pdf100%

New File 203264 Thumbs.db100%


New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\
New File 451596 102020-FY13-007-PRP-0001-FINANCIAL-R1.pdf
100%
New File 1.2 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.pdf
100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.1 Tender Document\
New File 92950 Extracted Tender Doc #T1126012 for
Finance.pdf100%
New File 301281 Invitation letter WORLEY_10Dec12.pdf100%

New File 4.3 m Tender Doc #T1126012.doc100%


New File 1.5 m Tender Doc #T1126012.pdf100%
New File 29184 Thumbs.db100%
New File 40196 TOR.docx100%
New File 346546 TOR.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\
New File 63488 Tech & Financial envelope_inside.doc100%

New File 25600 TNB Bid Envelope_A4size_outside.doc100%


New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Email\
New File 79113 TNB invitation_10Dec12.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Incoming\
New File 252325 KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Cover Letter).pdf100%
New File 22528 Thumbs.db100%
New File 19094 TNB letter of extn.pdf100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Outgoing\
New File 55471 102020-FY13-007-007-LET-0001_ACK.pdf100%

New File 173056 102020-FY13-007-LET-0001.doc100%


New File 193536 102020-FY13-007-LET-0002.doc100%
New File 59540 102020-FY13-007-LET-0002.pdf100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Outgoing\Attachments to LET-
0002\
New File 1.3 m Certificates.pdf100%
New Dir 17 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 49664 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Car
rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Financial
Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\
New File 48128 Technical Schedule T3 - CV template.doc
100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Formatted CVs\
New File 113664 Technical Schedule T3 - Aloot.doc100%
New File 43342 Technical Schedule T3 - Barrie Cook.docx
100%
New File 286720 Technical Schedule T3 - Biasizzo.doc100%

New File 519168 Technical Schedule T3 - Biswajit.doc100%

New File 350720 Technical Schedule T3 - Chee.doc100%


New File 97280 Technical Schedule T3 - Darling.doc100%
New File 22812 Technical Schedule T3 - Ildeu Alves
Leao.docx100%
New File 60416 Technical Schedule T3 - Miller.doc100%
New File 47616 Technical Schedule T3 - Neoh.doc100%
New File 478208 Technical Schedule T3 - Nitin Panhale.doc
100%
New File 1.0 m Technical Schedule T3 - Robertson.doc100%

New File 5.9 m Technical Schedule T3 - Wirges.doc100%


New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Local CVs\
New File 162 ~$chnical Schedule T3 - Azri.doc100%
New File 1.6 m Technical Schedule T3 - Azri.doc100%
New File 46080 Technical Schedule T3 - George.doc100%
New File 48640 Technical Schedule T3 - MFMN.doc100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Unformatted\
New File 182272 Aloot_King 2013.doc100%
New File 312832 Biasizzo_Charles 2013.doc100%
New File 63452 Cook Barrie.pdf100%
New File 141824 Darling_Chris 2013.doc100%
New File 86016 ILDEU ALVES LEAO.doc100%
New File 84992 Miller_Bruce 2013.doc100%
New File 1.4 m Nitin.head.jpg100%
New File 1.7 m Wirges_Graeme 2013.doc100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.5 Risk Assessment & PIF\
New File 177664 FY13-007-Bid No Bid Form.doc100%
New File 88605 FY13-007-Bid.pdf100%
New File 176128 FY13-007-PIF.doc100%
New File 113744 FY13-007-PIF.pdf100%
New File 167473 FY13-007-RCF.pdf100%
New File 113152 FY13-007-RCF.xls100%
New File 57856 Thumbs.db100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNBJ M&E Audit\
New File 18583 20170315_TNBJ M&E_Budget_Neoh.xlsx100%
New File 25012 20170315_TNBJ M&E_Budget_Neoh_v2.xlsx100%

New File 25917 20170315_TNBJ M&E_Budget_Neoh_v3.xlsx100%

New File 48396 Org Chart.pptx100%


New File 8.4 m Technical Proposal_TNBJ.docx100%
New File 378368 TNBJ M&E Audit Schedule.mpp100%
New File 397312 TNBJ M&E Audit Schedule_v2.mpp100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\
New File 45056 Thumbs.db100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.01 Tender Documents\
New File 1.5 m aal52304100%
New File 614883 Conditions of Contract T&C.pdf100%
New File 223210 Invitation Letter.pdf100%
New File 2.3 m ITB_Financial Proposal.pdf100%
New File 1.8 m ITB_Technical.pdf100%
New File 42703 Tender Bond Format.docx100%
New File 618192 Tender Bond Format.pdf100%
New File 25622 The Agreement.docx100%
New File 68428 The Agreement.pdf100%
New File 197120 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.02 Correspondence\
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 117760 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\
New File 65831 Org Chart.pptx100%
New File 31232 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\
New Dir 18 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\
New File 162 ~$2020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
0% 100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
0% 100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 60416 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Car rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf 0% 100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Financial Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\Old
Proposal Ref\
New File 4.6 m 102020-FY13-013-PRP-0001-R2.doc100%
New File 3.9 m Appendix 1 - TOR.pdf100%
New File 240222 HSBC Bid Bond.pdf100%
New File 311733 HSBC letter.pdf100%
New File 212758 KWSP-MAY and JUNE13.pdf100%
New File 22.8 m OLD - TNBJ Tender Invitation_21May13.pdf
0% 100%
New File 64075 SOCSO-MAY and JUNE13-0001.pdf100%
New File 184832 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\Old
Proposal Ref\Final Proposal Technical & Financial\
New File 2.7 m Financial Proposal.pdf100%
New File 8.8 m Technical Proposal.pdf100%
New File 108544 Thumbs.db100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\02 Address_Cover_Spine\
New File 1014272 A3Cover Tech_Landscape.ppt100%
New File 1033728 A4Cover Comm.PPT100%
New File 215552 Address [DO NOT USE].doc100%
New File 45056 Address.doc100%
New File 1014272 SPINE 40MM.PPT100%
New File 134656 Thumbs.db100%
New File 159232 Transmittal_Comm_002.doc100%
New File 359933 Transmittal_Comm_002.pdf100%
New File 154624 Transmittal_Tech_001.doc100%
New File 351040 Transmittal_Tech_001.pdf100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\
New File 162 ~$chnical Proposal.docx100%
New File 721786 Apndx B - WPI_BOE 2017.pdf100%
New File 467502 Apndx F Contract T&C.pdf100%
New File 117248 Letter of Undertaking.doc100%
New File 8.5 m Technical Proposal.docx 0% 100%
New File 64512 Thumbs.db100%
New File 17525 TNB RC AUDIT Cover letter v2.docx100%
New File 86687 WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New Dir 9 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx A T1
Company Profile\
New File 162 ~$chnical Schedule T1 - Company
Profile.docx100%
New File 734565 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 16522 Att 3 - TNB Vendor Certificate_Advisian
2017.pdf100%
New File 564781 Att 4 - Form 9 [Name Change.pdf100%
New File 906682 Att 5 - Form 24.pdf100%
New File 84974 Att 6 - Form 49.pdf100%
New File 92536 Technical Schedule T1 - Company
Profile_new.docx100%
New File 154624 Thumbs.db100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx C T2
Experience\
New File 162 ~$chnical Schedule T2 - Experience.docx
100%
New File 80724 Technical Schedule T2 - Experience.docx
100%
New File 102190 Technical Schedule T2 - Experience.pdf
100%
New File 80726 Technical Schedule T2 -
Experience_new.docx100%
New File 455092 Technical Schedule T2 -
Experience_new.pdf100%
New File 13824 Thumbs.db100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\
New File 162 ~$ Technical Schedule T3 - CV [Neoh].docx
100%
New File 279552 Divider_Attachments.ppt100%
New File 605314 Technical Schedule T3 - CV
[TEMPLATE].docx100%
New File 31744 Thumbs.db100%
New Dir 20 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\CVs\
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m 01 Foo Hah_CV.docx100%
New File 118489 02 Siva Sreedharan_CV.pdf100%
New File 87372 03 Sudhakar Surapaneni_CV.pdf100%
New File 1.1 m 03 Zi Neoh_CV.docx100%
New File 1.0 m 05 Robert Ellis CV.docx100%
New File 1.1 m Adam Aspinall.docx100%
New File 1.0 m Advisian New CV template.docx 0% 100%
New File 1.6 m Bruce Miller.doc100%
New File 1.0 m Frank Sutton CV 20170224.docx100%
New File 326656 Gabriel S C Rocha.doc100%
New File 1.0 m Kevin Gan.docx100%
New File 116743 KPMG Team CVs.pptx100%
New File 1.5 m Mohamad Baihaki.docx100%
New File 1.0 m Mukesh Shukla.docx100%
New File 38033 Mukesh Shuklaxxx.docx100%
New File 28436 R Ellis_CV [Original].docx100%
New File 208128 Teresa Tam.pdf100%
New File 76800 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\Not complete\
New File 100888 Technical Schedule T3 - CV [Adam
Aspinall].docx100%
New File 101343 Technical Schedule T3 - CV [Gabriel].docx
100%
New File 15360 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\PRINTED\
New File 162 ~$ Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 93136 01 Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 139261 02 Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 95616 03 Technical Schedule T3 - CV [Neoh].docx
100%
New File 83071 Technical Schedule T3 - CV [Teresa].docx
100%
New File 79588 Technical Schedule T3 - CV [Bob
Ellis].docx100%
New File 103669 Technical Schedule T3 - CV [Bruce
Miller].docx100%
New File 624845 Technical Schedule T3 - CV [Kevin].docx
100%
New File 79210 Technical Schedule T3 - CV [Mukesh
Shukla].docx 0% 100%
New File 84069 Technical Schedule T3 - CV Alan Yau.docx
100%
New File 84821 Technical Schedule T3 - CV Emily
Choo.docx100%
New File 98808 Technical Schedule T3 - CV Frank
Sutton.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx E T4
Methodology\
New File 162 ~$chnical Schedule T4 - Methodology.docx
100%
New File 162 ~$chnical Schedule T4 -
Methodology_New.docx100%
New File 1.3 m Technical Schedule T4 - Methodology.docx
100%
New File 1.6 m Technical Schedule T4 -
Methodology_New.docx100%
New File 20992 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\KWSP & SOCSO\
New File 745836 Advisian_EPF-0001.pdf100%
New File 18402 Advisian-SOCSO.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\
New File 344576 01 Cover Letter_Financial.doc100%
New File 86687 01a WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 6.7 m 02 Financial Proposal.docx100%
New File 614883 Conditions of Contract T&C.pdf100%
New File 50862 Form of Agreement.docx100%
New File 24576 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory Docs\
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory
Docs\01 Bank Statements\
New File 100268 01 Dec 16 WPS Advisian.pdf100%
New File 95999 02 Jan 17 WPS Advisian.pdf100%
New File 92889 03 Feb 17 WPS Advisian.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory
Docs\02 Financial Report\
New File 1.0 m FY2014.pdf 0% 100%
New File 1.6 m FY2015.pdf100%
New File 37.5 m FY2016.pdf100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.04 CVs\
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.05 Risk Classification Form\
New File 203264 Thumbs.db100%
New Dir 13 C:\AdvisianActive\02 Commercial\WP India\
New File 782487 GDC Commercial Standard Presentation
(1).pdf100%
New File 782487 GDC Commercial Standard Presentation.pdf
100%
New File 337964 IN Power Engineering Organization -
Mumbai.pptx100%
New File 36315 Leverage GDC.DOCX100%
New File 254978 Master Experience List -CFPP.PDF100%
New File 202386 Mumbai - POWER Eng Discipline Capability
Matrix - R1_May2017.xlsx100%
New File 361675 Power Generation Team Profile.docx100%
New File 1.8 m Power Network - Electrical.pdf100%
New File 1001144 POWER RESUME.rar100%
New File 1.3 m WP India -Power Projects Experience
Sep17.pdf100%
New File 504661 WP India -Power_Achievements - Sep17.pdf
100%
New File 1.1 m WP India -Power_Capabilites - Sep17.pdf
100%
New File 583542 WP Mumbai Power System Studies.pdf100%
New Dir 24 C:\AdvisianActive\03 Templates\
New File 165 ~$Advisian Timesaver Template.pptx100%
New File 19.7 m 2017.10 Project Ocean - Advisian Final
Report_Advisian format_vFF.pptx100%
New File 36.4 m Advisian Client Engagement Pack.pptx100%

New File 277481 Advisian Presentation Standard.potx100%


New File 151636 Advisian Presentation Widescreen.potx100%

New File 145971 Advisian Proposal A4 Landscape.potx 0%


100%
New File 345408 Advisian Proposal A4 Portrait.potx100%
New File 177476 Advisian Proposal US Letter
Landscape.potx100%
New File 119883 Advisian Proposal US letter Portrait.potx
100%
New File 11.6 m Advisian Timesaver Template.pptx100%
New File 1.0 m Agenda Advisian.dotx100%
New File 53456 CH-GM3 (version 1.2).xlsb100%
New File 49.1 m doingnothingisnotanoption-slideshare-
final-161129034426.pptx100%
New File 15988 Excel Template.xltx100%
New File 1.5 m flevy__148.ppt100%
New File 1.0 m MOM Advisian.dotx100%
New File 2.0 m PPT_Dark_Advisian.potx100%
New File 2.0 m PPT_Light_Advisian.potx 0% 100%
New File 2.8 m Proposal Advisian.dotm100%
New File 2.8 m Report Advisian.dotm100%
New File 3.4 m sdr-smart-city-smart-utility.pdf100%
New File 27582 Simplified levelized tariff
06Jan2016.xlsx100%
New File 7.9 m Timesaver tool_2017.pptx100%
New File 6.9 m transactivenetworks-inthenzretailcontext-
161222235032.pptx 0% 100%
New Dir 0 C:\AdvisianActive\03 Templates\Market Study and
Forecast\
New Dir 3 C:\AdvisianActive\03 Templates\Market Study and
Forecast\CCGT models from Neoh\
New File 5.3 m Annex 3.4.1 & 3.4.2 Financial Forms, Data
Book and Model.xlsm100%
New File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
100%
New File 90370 Track 4A - TNB FM User Manual - EC.docx
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Indonesia\
New File 920733
EGP_Indonesia_Updated_market_report_rev2_29032016.pdf100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Malaysia\
New File 2.2 m EGP_Malaysia_Final_report_29082014.pdf
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Philippines\
New File 8.0 m Philippines market report June 2014.pdf
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Thailand\
New File 1.5 m
Blackstone_Thailand_Market_report_26092014.pdf100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Vietnam\
New File 1.2 m EGP Vietnam Final Report_17062016.pdf100%

New Dir 15 C:\AdvisianActive\03 Templates\MC Reports\


New File 3.8 m
BAIN_REPORT_The_global_diamond_report_2013.pdf100%
New File 1.1 m BCG - Media_in_NYC_2012.pdf100%
New File 860454 BCG_Economic Impact of Emissions
Standards in California report.pdf100%
New File 860454 BCG_Role of Technology in Small and
Medium Enterprise Growth.pdf100%
New File 421076 bcg-detailedpresentation.pdf100%
New File 1.3 m Ethan M. Rasiel The McKinsey Way Using
the Techniques of the Worlds Top Strategic Consultants to Help You and Your
Business.pdf100%
New File 335354 Examples-of-Strategy-Consulting-Firm-
Client-Presentations.pdf100%
New File 1.4 m McKinsey - 5776-capturing-the-full-
electricity-efficiency-potentia.pdf100%
New File 3.1 m McKinsey -
MGI_UK_From_austerity_to_prosperity_full_report.pdf100%
New File 862253 Mckinsey
18_A_Board_perspective_on_enterprise_risk_management.pdf100%
New File 466343 McKinsey From-compliance-to-value-
creation.pdf100%
New File 3.2 m McKinseyStudy.pdf100%
New File 221632 mckinsey-usps-future-bus-model2.pdf100%
New File 895257 PWC Enterprise Risk Management.pdf100%
New File 1.0 m THE MCKINSEY APPROACH TO PROBLEM
SOLVING.pdf100%
New Dir 10 C:\AdvisianActive\04 Career Development Plans\
New File 171413 Being a Consultant.pdf100%
New File 26660 Billings PBS Scoring Graphs.xlsx100%
New File 3.4 m Career Development Manual.docx100%
New File 1022837 Career Development Manual.pdf100%
New File 742217 CompetencyFramework Dec16.pptx100%
New File 42496 Consultant Career Plan.xls100%
New File 21246 KPI Template.xlsx100%
New File 53952 Promotion form Snr Consultant to
Associate (Accomplished).xlsx100%
New File 49152 Senior Consultant Career Plan.xls100%
New File 45568 Senior Consultant to Associate Promotion
Recommendation Form.xls100%
New Dir 27 C:\AdvisianActive\05 Capabilities Presentation
Slides\
New File 17.5 m 20170222 Presentation to SEDA_v3.pptx100%

New File 1.7 m Advisian Lenders Engineer Experience.pdf


100%
New File 12.2 m Advisian_LTA
Meeting_EDRA_21042017_Final_V1.0.pptx100%
New File 1.1 m Biomass Capability and Experience.pdf100%

New File 334415 Case Study - South Australian


Blackout.pdf100%
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 5.4 m
CustomerSuccessStorySouthernSeawaterA4_Fly_Inf_0913.pdf100%
New File 1.0 m Fossil Power flier.pdf100%
New File 1.1 m FSRU and FSU LNG Capabilities_Feb2016.pdf
100%
New File 20.3 m FSRU and FSU LNG
Capabilities_Feb2016.pptx100%
New File 905190 Gas Turbine Capability.pdf100%
New File 4.0 m Lenders Engineer.pptx100%
New File 1.1 m LNG Project Experience_current for
profile 25apr17.docx100%
New File 243560 LNG Project Experience_current for
profile 25apr17.pdf100%
New File 7.2 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New File 9.0 m Malaysian ITA & IE PPA Scope.pptx 0%
100%
New File 9.0 m Malaysian ITA & IE PPA Scope_v2.pptx 0%
100%
New File 3.8 m Meeting with SBPC.pptx100%
New File 5.2 m Power from LNG_Edra 25 Sept.pdf100%
New File 10.1 m Power from LNG_Edra 25 Sept.pptx100%
New File 12.7 m Presentation to TNB - new Energy_v1.pptx
100%
New File 757325 Resource and Industry Power Capability-
ver4-web.pdf100%
New File 49662 Waste to Energy-Apr2017.pdf100%
New File 596514 Water Capabilities.pdf100%
New File 2.4 m Water Capabilities.pptx100%
New File 12.3 m Water Management for Sustainable
Business_Cap_A4_IE_GL_HiRes.pdf100%
New File 179709 Wind Experience List - Apr 2017.pdf100%
New Dir 2 C:\AdvisianActive\05 Capabilities Presentation
Slides\Gas to Power\
New File 20.3 m FSRU and FSU LNG
Capabilities_Feb2016.pptx100%
New File 7.2 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Lenders Engineer\
New File 1.7 m Advisian Lenders Engineer Experience.pdf
100%
New File 1.0 m Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 2.2 m Finance Project Finance and PPP PRINT.PDF
100%
New File 2.3 m Technical and Commercial Due Dilligence
PRINT.PDF100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Lenders Engineer\Reduced Size\
New File 1.5 m Advisian Lenders Engineer Experience.pdf
100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 630119 Finance Project Finance and PPP PRINT.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 20 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\
New File 1.1 m
Bolero146MWPVPlant_CS_A4_Inf_Glo_0117_Rev0.pdf100%
New File 200895 CSP and Hybrid Experience List - Apr
2017.pdf100%
New File 469216 CSP Hybrid Systems flier.pdf100%
New File 1.4 m Due Diligence for Large
Solar_CS_A4_0816.pdf100%
New File 4.0 m Edra - LNG Credentials.zip100%
New File 7.0 m Edra - Renewables Credentials.zip100%
New File 208987 Energy Storage Experience List - Apr
2017.pdf100%
New File 1.4 m Energy Storage Systems flier.pdf100%
New File 1.4 m Indicative Project Team Structure.pdf100%

New File 3.0 m Indicative Project Team Structure.pptx


100%
New File 218121 Maria-Elena Hybrid Solar and
Heat_CS_A4_0816.pdf100%
New File 1.4 m Microgrid Systems.pdf100%
New File 728602 New Energy Experience List - Aug 2017.pdf
100%
New File 109749 PV Experience List - Apr 2017.pdf100%
New File 665937 PV Power Systems__Global flier.pdf100%
New File 1.0 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_(i-web) resized.pdf100%
New File 9.4 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_(i-web).pdf100%
New File 1.9 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_SS-PRINT.pdf100%
New File 661998 Renewables Experience List - Apr 2017.pdf
100%
New File 233041 Solar Dawn.pdf100%
New Dir 3 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - LNG Credentials\
New File 1.1 m FSRU and FSU LNG Capabilities_Feb2016.pdf
100%
New File 243560 LNG Project Experience_current for
profile 25apr17.pdf100%
New File 2.8 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New Dir 2 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\
New File 1.0 m Advisian Renewable Energy Credentials.pdf
100%
New File 1.4 m Indicative Project Team
Structure_Edra.pdf100%
New Dir 1 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\01 Experience List\
New File 728602 New Energy Experience List - Aug 2017.pdf
100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\02 CSP, Smart Grid,
Battery Storage & PV Fliers\
New File 469216 CSP Hybrid Systems flier.pdf100%
New File 388664 Energy Storage Systems flier.pdf100%
New File 947705 Microgrid Systems.pdf100%
New File 665937 PV Power Systems__Global flier.pdf100%
New Dir 7 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\03 CV_Technical PM for
SEA Region\
New File 264291 CV_Pi Hua Tan.pdf100%
New File 124964 Eoghan Quinn_CV.pdf100%
New File 140623 Gilein Steensma_CV.pdf100%
New File 173111 Marco Antonio Gomez_CV.pdf100%
New File 143003 Miller_Bruce_CV.pdf100%
New File 187397 Paul Ebert_CV.pdf100%
New File 136143 RodTouzelCVGeneral.pdf100%
New Dir 3 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\04 Case Studies\
New File 232680
Bolero146MWPVPlant_CS_A4_Inf_Glo_0117_Rev0.pdf100%
New File 254548 Due Diligence for Large
Solar_CS_A4_0816.pdf100%
New File 218121 Maria-Elena Hybrid Solar and
Heat_CS_A4_0816.pdf100%
New Dir 1 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Wind Farm Brochures\
New File 1.0 m Offshore Wind Brochure_Rev5.pdf100%
New Dir 8 C:\AdvisianActive\06 Misc\
New File 229560 ADVISIAN SSM.pdf100%
New File 721786 Apndx B WPI_BOE 2017.pdf100%
New File 86687 Att 2 - CCM.pdf100%
New File 18158 FEPA Project Descriptions.docx100%
New File 29050 Medical Claim Form Template.xlsx100%
New File 731657 MOF.pdf100%
New File 81920 Probationary Review Form 10 -
Template_neoh.doc100%
New File 117760 SPG Advisian TNB Vendor.xls100%
New Dir 39 C:\AdvisianActive\07 Library\
New File 2.1 m 05_The_sun_shines_bright_on_CSP.pdf100%
New File 1.7 m 1July2014-
Review_of_Vesting_Contract_Level_Revised_Draft_Report_.pdf100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 1.6 m 9HX173281 SSP_LTA Final DD_2014.02.12.pdf
100%
New File 8.8 m 9HX298971 Paiton 10 FS Draft Report 23 -
Nov 15 1200MW R4.pdf100%
New File 1.4 m AEMC-Overview-28-September-2017.PDF100%
New File 2.9 m An Introduction to Coal Quality.pdf100%
New File 339115 Arbitration and Dispute Resolution in the
Electricity Industry.pdf100%
New File 889317
ASEAN_Guideline_on_Renewable_Energy_Supp.pdf100%
New File 889312 ASEAN-Best-Practice-Policy-Guidelines-RE-
Support-Mechanisms-1.pdf100%
New File 2.6 m Assessment of the Role of LNG within the
Phillipines Market.pdf100%
New File 1.1 m B&V - NREL- cost - report.pdf100%
New File 655527 CCGT KEMA REVIEW_RMC_Calcs.pdf100%
New File 171081 Copy_of
2010_Only_Generating_Unit_Statistical_Brochure_ All_ Units_ Reporting.zip100%
New File 2.5 m DD-Getting-the-Most-Out-of-Due-
Diligence.pdf100%
New File 707759 Effect_of_surface_moisture_in_coal
(1).pdf100%
New File 1.7 m EMA - Review of Vesting Price Technical
Parameters - Draft report.pdf100%
New File 29483 EPC Contractor Bid Evaluation
Criteria.xlsx100%
New File 1.8 m

Final_Inception_Report_Economic_Costs_of_Natural_Gas_for_Myanar_Domestic_Market.pdf
100%
New File 376949 Fuel-Gas-Blending-Paper.pdf100%
New File 55482 GADS 2011-2015 Statistics.xlsx100%
New File 3.4 m GE Maintenance Intervals.pdf100%
New File 6.9 m
IRENA_Leveraging_for_Onshore_Wind_2017.pdf100%
New File 8.0 m
IRENA_Leveraging_for_Solar_PV_2017_summary.pdf100%
New File 1.2 m Leader Solar 29MW FM.xlsm100%
New File 1.9 m Mapping the Economics of US Coal Power
and Rise of Renewables.pdf100%
New File 2.4 m McKinsey on Finance Number 61.pdf100%
New File 481492 Minchener_coal quality.pdf100%
New File 1.9 m MITEI-WP-2016-01.pdf100%
New File 79360 NERC GADS Definitions.doc100%
New File 4.9 m Performance Analysis
DL_2011_RARPR_FINAL.pdf100%
New File 952031 Poyry - running-on-empty-brochure.pdf100%

New File 1.5 m Project Alpha - Review of Base Case


Financial Model.pdf100%
New File 4.1 m Project Alpha Tech DD.pdf100%
New File 1.5 m Project Alpha_Financial DD and TDD
Report_2016 12 07.pdf100%
New File 2.3 m RE_Technologies_Cost_Analysis-CSP.pdf100%

New File 2.9 m Roadmap-for-flexibility-services-to-2030-


Poyry-and-Imperial-College-London.pdf100%
New File 805424 Sample GKS Staffing Report.pdf100%
New File 285766 Session 2 Module 2 Coal Properties and
Effect on Cobustion.pdf100%
New Dir 4 C:\AdvisianActive\07 Library\AEMO System Framework
Study\
New File 127646 Infographic-1.pdf100%
New File 160687 Infographic-2.pdf100%
New File 1.9 m System-Security-Market-Frameworks-Review-
Final-Report.pdf100%
New File 572777 System-Security-Market-Frameworks-Review-
Final-Report-Information-Shee.pdf100%
New Dir 1 C:\AdvisianActive\07 Library\Burma\
New File 6.8 m Tanintharyi FS Report_FINAL_rev2 31 Oct
2013.doc100%
New Dir 1 C:\AdvisianActive\07 Library\CHP Rojana DD\
New File 2.6 m 20150923 Rojana Technical Due Diligence
Report_KTB_RJP_BV_Final.pdf100%
New Dir 3 C:\AdvisianActive\07 Library\Coal Fired Power Plants\
New File 3.0 m BLCP DD Draft Final Report(clean).doc100%

New File 6.3 m MD2 Final Due Diligence Report_Rev1.doc


100%
New File 187323 Mong Duand 2 report on project
fundamentals.pdf100%
New Dir 5 C:\AdvisianActive\07 Library\DNV GL Outlooks\
New File 8.8 m DNV GL Energy Transistion Outlook
2017_Exec summary_lowres single.pdf100%
New File 8.9 m DNV GL_ Energy Transition Outlook
2017_renewables_lowres single_0109.pdf100%
New File 3.4 m DNV GL_Energy Transistion Outlook
2017_oil gas_lowres single_3108_3.pdf100%
New File 38.7 m EA_DNVGL_ETO_FullBook_07_09.pdf100%
New File 5.6 m ETO2017_Renewables_Exec_Summary.pdf100%
New Dir 2 C:\AdvisianActive\07 Library\from Llewellyn\
New File 8.4 m Kennedy Energy Park - Due Diligence
Report Rev H.docm100%
New File 2.3 m Kennedy Energy Park - Red Flag report
FINAL.pptx100%
New Dir 23 C:\AdvisianActive\07 Library\From Siva\
New File 162 ~$PD Independent Engineer's Technical Due
Diligence Final Report 20160321_Client Issue _CBC_Reissued.docx100%
New File 142848 1,Program Intro, Economic
Benchmarking.doc100%
New File 39936 1,Rades, Project Data Sheet.xls100%
New File 418816 2,Program Guide, MARI.doc100%
New File 30208 2,Rades, Checklist, PPA Evaluation.xls
100%
New File 17408 3,Rades, Checklist, FSA Evaluation.xls
100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 17920 5,Rades KCAL converter.xls100%
New File 29184 6,Impact of Heat Rate Improvement.xls100%

New File 46317 Att C, Introduction to KPI's, final.docx


100%
New File 91909 Att D, Master List of Potential
KPI's.xlsx100%
New File 65448 Att E, Cascaded KPI's on an Org Chart
(sample).pdf100%
New File 162816 Copy of 106, Best Practices Matrix, Plant
Ops, Draft, Jan 11, 2011.xls100%
New File 147456 Copy of 107, Best Practices Matrix, Plant
Maint, Draft, Jan 11, 2011.xls100%
New File 22585 Copy of Lost Production Data Template, GM
Meeting.xlsx100%
New File 43008 Copy of Templates, MARI Data Collection
Forms.xls100%
New File 356110 EBITDA analysis.pptx100%
New File 114106 Financial
Model_Example_Advisian_Philippines.docx100%
New File 3.3 m GNPD Independent Engineer's Technical Due
Diligence Final Report 20160321_Client Issue _CBC_Reissued.docx100%
New File 13549 Navigant data and KPI analysis.xlsx100%
New File 198421 Project Jaguar_Evaluation of Indonesian
Coal Market and Coal Supply for GNPK Project_Final_14042015.docx100%
New File 4.5 m
WEF_Renewable_Infrastructure_Investment_Handbook.pdf100%
New File 22528 z7,Rades Fundamental Observations.xls100%

New Dir 1 C:\AdvisianActive\07 Library\Indah Water Report\


New File 3.4 m 20161212 Indah TDD_Final
Report_Client_Issue_Rev1.pdf100%
New Dir 75 C:\AdvisianActive\07 Library\Lantau Group\
New File 2.2 m Backup Material TLG_PH v2 _20171016.pptx
0% 100%
New File 1.0 m Backup Material TLG_TW v2_20171016.pptx
100%
New File 1.6 m calendar_2017.pdf100%
New File 151689 Cocktail_RSVP.pdf100%
New File 151704 Cocktail_RSVP_yes.pdf100%
New File 39369 EEIadvert.pdf100%
New File 244035 focus_china_may13.pdf100%
New File 2.7 m intro_tlg.pdf100%
New File 944311 peek_around_region.pdf100%
New File 1.2 m peek_around_region_june12.pdf100%
New File 1.9 m peek_cny2013.pdf100%
New File 1.0 m peek_james.pdf100%
New File 1.1 m peek_liutong_xiao.pdf100%
New File 1.0 m peek_lkd.pdf100%
New File 2.4 m peek_milan.pdf100%
New File 1.7 m peek_move.pdf100%
New File 1.3 m peek_neil_josh.pdf100%
New File 961719 peek_xinmin.pdf100%
New File 301502 pique_china.pdf100%
New File 630630 pique_china_chinese.pdf100%
New File 760763 pique_hk_to_texas.pdf100%
New File 138157 pique_ldc.pdf100%
New File 338139 pique_ppine_wesm.pdf100%
New File 387096 pique_single_buyer.pdf100%
New File 891059 pique_titanic.pdf100%
New File 540110 powergen_manu_mt.pdf100%
New File 488211 powergen_manu_sf.pdf100%
New File 1.0 m powergen_ppt_mt.pdf100%
New File 1.1 m powergen_ppt_sf.pdf100%
New File 657158 powergen_ppt_tp.pdf100%
New File 1.5 m ppt_aie16_lz.pdf100%
New File 785558 ppt_apex12.pdf100%
New File 584552 ppt_asian_power_markets.pdf100%
New File 610842 ppt_bday12.pdf100%
New File 3.0 m ppt_cost_trends.pdf100%
New File 3.7 m ppt_gug.pdf100%
New File 686371 ppt_interconnectivity13_ns.pdf100%
New File 982638 ppt_interconnectivity13_tp.pdf100%
New File 440963 ppt_lessons_from_electricity.pdf100%
New File 1.3 m ppt_LNG_congress13.pdf100%
New File 948871 ppt_malaysia_power_sector.pdf100%
New File 709492 ppt_mps_tp.pdf100%
New File 1.3 m ppt_natural_gas_revolution.pdf100%
New File 497574 ppt_overly_constrained_decision.pdf100%
New File 1.2 m ppt_pewp17_sf.pdf100%
New File 898600 ppt_pgen12_mtt.pdf100%
New File 1.0 m ppt_pgen12_sf.pdf100%
New File 1.8 m ppt_pgen16_lz.pdf100%
New File 1.3 m ppt_pgen16_sf.pdf100%
New File 2.1 m ppt_pgen16a_mt.pdf100%
New File 1.7 m ppt_pgen16b_mt.pdf100%
New File 1.4 m ppt_pgen16c_mt.pdf100%
New File 1.0 m ppt_pgen16r_sf.pdf100%
New File 1.3 m ppt_pgen16s_sf.pdf100%
New File 2.0 m ppt_pgene16_sf.pdf100%
New File 1.2 m ppt_pgenme13.pdf100%
New File 1.0 m ppt_psea17_sf.pdf100%
New File 1.1 m ppt_rec16_sf.pdf100%
New File 4.5 m ppt_remnin.pdf100%
New File 4.5 m ppt_renmin.pdf100%
New File 4.2 m ppt_roundtable12.pdf100%
New File 1.7 m ppt_sea16_sf.pdf100%
New File 462815 ppt_solar16_sf.pdf100%
New File 1.2 m ppt_solargrid16_sf.pdf100%
New File 787947 ppt_ugas_bali.pdf100%
New File 881369 renmin_chi.pdf100%
New File 768360 renmin_eng.pdf100%
New File 1.5 m tlg_calendar_thumb.pdf100%
New File 728956 tlgon_econreg_jan17.pdf100%
New File 739329 tlgon_econreg_jun17.pdf100%
New File 672232 tlgon_hk_feb17.pdf100%
New File 672230 tlgon_hk_jan17.pdf100%
New File 618280 tlgon_policy_nov16.pdf100%
New File 910641 tlgon_renmin_may17.pdf100%
New File 2.1 m tlgon_uhv_jun17.pdf100%
New Dir 14 C:\AdvisianActive\07 Library\Liberisation of
Electricity Market\
New File 3.3 m 2016-0608-Japan_s_Market_Reform-
Koyama.pdf100%
New File 1008217 5-Soh_Sai_Bor__EMA__FINAL.pdf100%
New File 2.7 m Deloitte - gx-er-energy-market-reform-in-
europe.pdf100%
New File 1.5 m Deloitte - gx-er-market-reform-
germany.pdf100%
New File 871369 Deloitte - gx-er-market-reform-uk.pdf100%

New File 958595 Deloitte - gx-er-merket-reform-france.pdf


100%
New File 1.6 m Deloitte - Power-Market-2025-Study.pdf
100%
New File 108206 Electricity_market_in_Singapore_2014.pdf
100%
New File 773376 EMA Introduction- NEMS_111010.pdf100%
New File 2.6 m Eugene_Toh_EMA.pdf100%
New File 1.5 m IEA - Lessons From Liberalised
Electricity Markets.pdf100%
New File 1.7 m KPMG -
2013PHInvestmentGuideInvestmentGuideTheEnergyReportPhilippines.pdf100%
New File 2.8 m KPMG - jp-en-new-era-energy.pdf100%
New File 340133 Lessons Learned From Electricity Market
Liberalization.pdf100%
New Dir 5 C:\AdvisianActive\07 Library\McKinsey Articles\
New File 567976 Battery-storage-The-next-disruptive-
technology-in-the-power-sector.pdf100%
New File 2.4 m Energy-2050-Insights-from-the-ground-
up.pdf100%
New File 2.6 m McKinsey on Sustainability and Resource
Productivity Issue 4.pdf100%
New File 1.9 m The circular economy Moving from theory
to practice.pdf100%
New File 1.2 m The-new-economics-of-energy-storage.pdf
100%
New Dir 6 C:\AdvisianActive\07 Library\Philippines\
New File 2.6 m FINAL Report - BUD 05jul07.doc100%
New File 3.4 m GNPD Independent Engineer's Technical Due
Diligence Report Draft R8 2015....docx100%
New File 9.5 m ORIX - TDD Final Report - Annexes -
4June.pdf100%
New File 1.0 m ORIX - TDD Final Report for Diesel Power
Plants - 5June13.docx100%
New File 889154 ORIX - TDD Final Report for Diesel Power
Plants - 5June13.pdf100%
New File 5.2 m Therma South Due Diligence Report Final
Report July 22, 2013. docx.docx100%
New Dir 3 C:\AdvisianActive\07 Library\Reliability Centered
Maintenance\
New File 3.7 m Chapter 11 - Reliability Centered
Maintenance.pdf100%
New File 3.7 m IntroductiontoAladonRCM3Brochure.pdf100%

New File 1.6 m RCM - Introduction and Basis.pdf100%


New Dir 1 C:\AdvisianActive\07 Library\Safety\
New File 936895 EEA Safety in Design Guide Draft 6.docx
100%
New Dir 3 C:\AdvisianActive\07 Library\Solar WInd\
New File 1.3 m 110560_Project Duke
Flyer_WF_DD_2011.09.22.doc100%
New File 1.1 m 110707_Project Phesi_DD_2012.09.20b.docx
100%
New File 1.1 m X187929_Leader PV BP_DD_2013.09.25.doc
100%
New Dir 9 C:\AdvisianActive\07 Library\Solar WInd\Proposal and
Agreements\
New File 626468 127000269 VTE_1.2MW-
SolarPP_LTA_20171002.docx100%
New File 223744
9HX177674_HGH_Wind_Farm_OE_Draft_2014.01.07_YP_Marked._comment_by_Medhi.doc
100%
New File 83323 9HX270558 SUPER TA
Agreement_draft20170627.docx100%
New File 709272 Poyry X345555 Leader 29MW
PV_ITA_20170314_Poyry_final.pdf100%
New File 2.5 m X341655 FKW and KR2 wind
farms_LTA_20170131.docx100%
New File 195113 X349048 HNM OE_Rev.C_20170606.docx100%
New File 8.4 m X353056 InfraCo_Solar Project in
Vietnam_DD_draft20170710.doc100%
New File 191853 X353254 EA Bin
Thuan_TA_Draft_20170626.docx100%
New File 382614 X353536_NWE_Romklao_LTA_20170705a.docx
100%
New Dir 1 C:\AdvisianActive\07 Library\Thailand\
New File 5.4 m PD Draft Design Concept Report_28 March
2013.doc100%
New Dir 0 C:\AdvisianActive\08 References\
New Dir 10 C:\AdvisianActive\09 FM Models\
New File 10.5 m Copy of Project J1
20160531.0_jaysatu.xlsm100%
New File 411167 Gas Engine v Gas Turbine_Levelized
tariff_141128_r2.xlsm100%
New File 10.2 m Project J1 201603129.0M_jaysatu.xlsm100%

New File 28044 Simplified levelized tariff


06Jan2016.xlsx100%
New File 317440 SIPP vs TNB tariff.msg100%
New File 407715 Test.xlsm 0% 100%
New File 410901 Test2.xlsm 0% 100%
New File 410958 Test3.xlsm100%
New File 411510 Test4.xlsm100%
New File 480629 Test5.xlsm100%
New Dir 3 C:\AdvisianActive\09 FM Models\Advisian\
New File 623796 20170410 Advisian Template Desal
model.xlsm 0% 100%
New File 322535 Business Case Model Template 20179293
1200 DRAFT2.xlsm100%
New File 231462 Training Presentation92.xlsx100%
New Dir 5 C:\AdvisianActive\09 FM Models\Advisian\Training\
New File 20919 Financial Model Training Excel
Example.xlsx100%
New File 1.9 m Financial Modelling REV B.pdf100%
New File 3.0 m Financial Modelling REV B.pptx 0% 100%

New File 495612 LNG Regasification Financial Model Ver 8


23APR17.xlsm100%
New File 1.0 m Technical Note for Financial Analysis -
DRAFT for DISCUSSION 1.docx100%
New Dir 5 C:\AdvisianActive\09 FM Models\Guides\
New File 350438 Achilles-Financial-Analysis-Model-For-
Suppliers-Demonstrate-Financial-Stability.pdf100%
New File 10.4 m Financial Analysis and Business
Evaluation.pdf100%
New File 1.4 m Financial Modelling Fundamentals.pdf100%

New File 89230 financialmodelingpresentation-


140409222222-phpapp01.pdf100%
New File 43.9 m Paul Pignataro Financial Modeling and
Valuation A Practical Guide to Investment Banking and Private Equity.pdf100%
New Dir 3 C:\AdvisianActive\09 FM Models\Simplified Levelised
Tariff Template\
New File 2.5 m Levelised tariffs.msg100%
New File 120832 SIPP levelized tariff calculation.msg100%

New File 124928 Template for levelized tariff


estimation.msg100%
New Dir 4 C:\AdvisianActive\10 Books\
New File 1.3 m Ethan M. Rasiel The McKinsey Way Using
the Techniques of the Worlds Top Strategic Consultants to Help You and Your
Business.pdf100%
New File 2.4 m McKinsey on Finance Number 61.pdf100%
New File 6.6 m Tim Koller, Marc Goedhart, David Wessels
Valuation Measuring and Managing the Value of Companies.pdf100%
New File 10782 Untitled.docx100%

------------------------------------------------------------------------------

Total Copied Skipped Mismatch FAILED Extras


Dirs : 1038 1038 0 0 0 0
Files : 7085 7085 0 0 0 0
Bytes : 14.384 g 14.384 g 0 0 0 0
Times : 0:48:46 0:04:50 0:00:00 0:00:36

Ended : Sat Nov 11 23:03:12 2017

You might also like