Professional Documents
Culture Documents
Upgrading Units BKP 8-2013
Upgrading Units BKP 8-2013
We tailor upgrading units according to customer preferences and needs. Units are build and
assembled according to Finnish standards and norms. All units are tested and approved before
sending to a customer. Units are ready for delivery 6-8 months from order.
Technical specification:
10-25 m3/h Farm biogas upgrading unit, includes compression to 200 bar for vehicle filling and 150-
480 liter compressed gas storage for quick filling, manually regenerated gas desiccant dryer, odorization
system and filling nozzle NGV1. Gas storage bottles enable quick filling of 1-4 vehicles depending
storage size and as a whole the upgrading system can produce fuel for 10-15 vehicles.
Ask for offer!
40-100 m3/h Upgrading unit, automatic gas drying, upgraded gas is piped to the filling station where it
will be compressed to high pressure and stored in bottles. We also resale filling stations that can be
connected to upgrading unit.