You are on page 1of 10

LAMPIRAN A

DATA PENGAMATAN
Tabel A.1 Data Analisa Laboratorium tanggal 22 Mei 2017
Absorber
Inlet (F1)
Jam 00.00 08.00 16.00 Rata-rata
Komponen % % % %
H2 59,61 59,99 60,85 60,15
N2 20,58 19,58 19,44 19,87
CH4 0,12 0,17 0,14 0,14
AR 0,32 0,29 0,29 0,30
CO 0,18 0,23 0,22 0,21
CO2 19,19 19,74 19,06 19,33
TOTAL DRY 100,00 100,00 100,00 100,00

Stripper
Outlet (F2)
Jam 00.00 08.00 16.00 Rata-rata
Komponen % % % %
H2 0,80 0,80 0,80 0,80
N2 0,20 0,20 0,30 0,23
CH4 - - - -
AR - - - -
CO - - - -
CO2 99,00 99,00 98,90 98,97
TOTAL DRY 100,00 100,00 100,00 100,00
LAMPIRAN B
CONTOH PERHITUNGAN NERACA MASSA DESAIN

1. F1 (Aliran masuk CO2 Absorber)


3
102.794
Laju alir H2 =
3 x 100%
171.420

= 59,97 %
3
35.365
Laju alir N2 =
3 x 100%
171.420

= 20,63 %
3
576
Laju alir CH4 =
3 x 100%
171.420

= 0,34 %
3
422
Laju alir Ar =
3 x 100%
171.420

= 0,25 %
3
515
Laju alir CO =
3 x 100%
171.420

= 0,30 %
3
31.748
Laju alir CO2 =
3 x 100%
171.420

= 18,52 %
Total Dry = 171.420 Nm3/Hr
Laju alir H2O = 1.815 Nm3/Hr
Wett Total = total dry + laju alir H2O
= 171.420 Nm3/Hr + 1.815 Nm3/Hr
= 173.235 Nm3/Hr

2. F2 (Aliran keluar CO2 stripper)


3
256
Laju alir H2 =
3 x 100%
31.929

= 0,80 %
3
64
Laju alir N2 =
3 x 100%
31.929

= 0,20 %
3
31.609
Laju alir CO2 =
3 x 100%
31.929

= 99,00 %
Total Dry = 31.929 Nm3/Hr
Laju alir H2O = 1.426 Nm3/Hr
Wett Total = total dry + laju alir H2O
= 31.929 Nm3/Hr + 1.426 Nm3/Hr
= 33.355 Nm3/Hr

3. F3 (Aliran Keluar CO2 Absorber)


Masuk = Keluar
F1 = F2 + F3
F3 = F1 F2
= 173.235 Nm3/Hr 33.355 Nm3/Hr
= 139.880 Nm3/Hr
4. Efisiensi Keluaran CO2
CO2 keluar
= [ CO2 masuk ] x 100%
31.609
= [31.748] 100%

= 99,56 %
LAMPIRAN C
CONTOH PERHITUNGAN NERACA MASSA AKTUAL

F3 F2

61-101-E 61-102-E

F1

1. F1 (Aliran masuk CO2 Absorber)


Pada perhitungan Main CO2 Removal aliran masuk ke CO2 absoerber (F1),
F1 tidak ada alat ukur yang tersedia di lapangan sehingga digunakan pendekatan
desain (rate operasi 100%).
F1 Desain 173,236.00 Nm3/Hr.
a. Perhitungan rate operasi
Desain natural gas / Hr = 28,235 Nm3/Hr
data operasi x 1000
Rate operasi = desain natural gas/hr 100%
KNm3
22,25 x 1000
Hr
= x 100%
28,235 3/

= 78,80 %
F1 desain x rate operasi
Flow F1 = 100
173,236,00 x 78,80%
= 100

= 136,504.77 Nm3/Hr
b. Perhitungan gas kering dan H2O
Temperatur = 66,25 oC
Tekanan Aliran = 30 Kg/cm2G
= 30 Kg/cm2A + 1,033
= 31,03 Kg/cm2A
Tekanan parsial H2O :
Tekanan parsial H2O =26,57 kPa x 103 x 1,02 x 10-5
= 0,271 Kg/cm2A
Pada tekanan aliran 31,03 Kg/cm2A temperaturnya 66,25 oC sehingga
tekanan parsial yang didapatkan 26,57 (steam table) atau 0,271 Kg/cm2A.

c. Flow gas kering


Flow masuk ke 61-101-E adalah 136.504,77 Nm3/Hr dengan temperatur
66,25 oC dengan tekanan 31,03 Kg/cm2A maka tekanan parsial H2O yang
didapatkan adalah 0,271 Kg/cm2A (steam table).
tekanan parsial H2O
Fraksi H2O = tekanan aliran
Kg
0,271
cm2A
= Kg
31,03
cm2A

= 0,0087
(1fraksi H2O)
Flow gas kering F1 = X flow F1
1
(10,0087)
= X 136.504,77
1

= 135,312.59 Nm3/Hr
H2O pada flow F1 = Flow F1 Flow gas kering
= 136.504,77 135.312,59
= 1,192.19 Nm3/Hr
d. Flow Komponen
flow gas kering x komponen
Flow komponen = 100
flow gas kering x BM komponen
= 22,4
135.321,59 59,96
Flow H2 = 100

= 81,390.52 Nm3/hr
81.138,82 2
= 22,4

= 7,267.01 Kg/Hr
135.321,59 20,32
Flow N2 = 100

= 26,882.10 Nm3/hr
26,882.10 2
= 22,4

= 33.602,63 Kg/Hr
135.321,59 0,13
Flow CH4 = 100

= 193.95 Nm3/hr
193,95 2
= 22,4

= 138.53 Kg/Hr
135.321,59 0,21
Flow Ar = 100

= 405,94 Nm3/hr
405,94 2
= 22,4

= 724,89 Kg/Hr
135.321,59 0,21
Flow CO = 100

= 284,16 Nm3/hr
284,16 2
= 22,4

= 355,20 Kg/Hr
135.321,59 19,17
Flow CO2 =
100

= 26.155,92 Nm3/hr
26.155,92 2
= 22,4

= 51.377,71 Kg/Hr
Total Dry = H2 + N2 + CH4 + Ar +CO + CO2
= 135.312,59 Nm3/hr
= 93.465,96 Kg/Hr
Flow H2O = 1.192,19 Nm3/Hr
1.192,19 18
= 22,4

= 958,01 Kg/Hr
Flow Total = Total Dry + Flow H2O
= 93.465,96 + 958,01
= 94.423,97 Kg/Hr

2. F2 (Aliran keluar CO2 Sripper)


Menggunakan alat ukur 61-F1-1030
61-F1-1030 = 27,02 KNm3/Hr
= 27.018,33 Nm3/Hr
a. Perhitungan gas kering dan H2O
Temperatur = 35,22 OC
Tekanan Aliran = 0,767 Kg/Cm2G
= 0,767 + 1,033
= 1,800
Tekanan parsial H2O
Tekanan parsial H2O = 5,71 Kpa x 103 x 1,02 x 10-5
= 0,058 Kg/cm2 A
Pada tekanan aliran 1,800 Kg/cm2 A temperaturnya 35,22 oC, sehingga
tekana parsial yang didapatkan 5,71 KPa atau 0,058 Kg/Cm2A (steam table).

b. Flow gas kering


Flow gas masuk ke 61-101-E adalah 26.144,84 Nm3/Hr dengan
temperatur 35,22 oC dengan tekanan aliran 1,800 Kg/cm2A maka tekanan
parsial H2O 0,058 Kg/cm2A (steam table).
tekanan parsial H2O
Fraksi H2O = tekanan aliran
Kg
0,058
cm2A
= Kg
1,800
cm2A

= 0,0332
(1fraksi H2O)
Flow gas kering F2 = X flow F2
1
(10,0323)
= X 27.018,33
1

= 26.144,84 Nm3/Hr
H2O pada flow F2 = Flow F2 Flow gas kering
= 27.018,33 26.144,84
= 873,50 Nm3/Hr

c. Flow komponen

flow gas kering x komponen


Flow F2 = 100
flow gas kering x BM komponen
= 22,4
26.144,84 0,75
Flow H2 = 100

= 209,16 Nm3/hr
209,16 2
= 22,4

= 18,67 Kg/Hr
26.144,84 0,10
Flow N2 = 100

= 61,00 Nm3/hr
61,00 2
= 22,4

= 76,26 Kg/Hr
26.144,84 99,15
Flow CO2 = 100

= 25.874,67 Nm3/hr
25.874,67 2
= 22,4

= 50.825,25 Kg/Hr
Total Dry = H2 + N2 + CO2
= 26.144,84 Nm3/hr
= 50.920,18 Kg/Hr
Flow H2O = 873,50 Nm3/Hr
873,50 18
= 22,4

= 701,92 Kg/Hr
Flow Total = Total Dry + Flow H2O
=50.920,18 + 701,92
= 51.622,10 Kg/Hr

3. F3 (Aliran kluar C02 Absorber)


Menggunakan neraca massa
Masuk = keluar
F1 = F2 + F3
F3 = F1- F2
F3 = 136.504,77 - 27.018,33
= 109.486,44 Nm3/Hr

4. Efisiensi Penyerapan CO2


CO2 keluar
= [ CO2 masuk ] x 100%
25.874,67
= [26.155,92] 100%

= 98,92 %