You are on page 1of 3

Date Type Location

23-May WLMS Cabadiangan Steel Bridge, Lilo-an


ARG Brgy. Hall Mulao

6-Jun ARG BISU Cogtong


ARG LGU Sevilla

7-Jun ARG Brgy. Magsaysay


ARG Poblacion Talibon

8-Jun ARG LGU Danao


ARG Catigbian Demo Farm

9-Jun LGU Loon (Site Assessment)


ARG BISU Calape
Action Taken

Installation of arQ-WLMS with High Gain Antenna


Installation of arQ-ARG with High Gain Antenna

Reinstallation arQ-ARG, replacement of tipping bucket (Pronamic)


Reinstallation arQ-ARG, replacement of tipping bucket (Pronamic) and Sim card

Replacement of lithuim Battery, tipping bucket (Pronamic), Sim card and cleaning the station
Replacement of tipping bucket (Pronamic) and cleaning the station

Re-installation arQ-ARG, replacement of tipping bucket (Pronamic)


conduct preventive maintenace and cleaning the station

Site assessmnet for ARG and WLMS


Replacement of arQ-ARG lithuim Battery and cleaning the station
Remarks

Intermittent (smart sim card)


Intermittent (smart sim card)

working Calibrated (New Tipping Bucket from ASTI)


working Calibrated (New Tipping Bucket from ASTI)

Intermittent (smart sim card) Calibrated (New Tipping Bucket from ASTI)
working Calibrated (New Tipping Bucket from ASTI)

working Calibrated (New Tipping Bucket from ASTI)


working

working

You might also like