EVENT ANALYSIS REPORT
JunrrNo :@ __|TPS:Koradi Unit Capacity:660 MW
[Date- 29.12.2015
*Ho Code: station code: To00s [Time 41:42 Ino of days from last synchronization
rs
- 22 days
FZ, Operating conditions at the time of Event
Toad MW, [teal Cycles in service Oil Support
329 I A,B,D&E NIL |
fs, Nature of Event :
rg get trioped on MFToperated on bole inntermidiate header metal temp, high due to wide difference between
iow demand & actual feed flow due to TDBFP speed deviation problem.
Tacname of First Up, Main Protections & protection on which GCB tripped:
Lockout relay 86GA 1/2 operated.
15 A) Observations
‘Winle loading T/G set @ 660MW, TDBFP did not fulfiled feed demand though TDBFP both control V/V (HP/LP)}
vide open and speed deviation in TDBFP-B increased and TDBFP-B tripped.
[5 B) Remedial Action/work done =
=|
_|
fe. Root Cause Analysis t= At 11.41,51.172 MFT operated on "Furnace 1” Int. header Metal Temp.HiHi"(>540"|
) due to insufficient feed flow. Both TDBFP speed not increased as per DCS ‘set point 5200 rpm. Speed deviation}
in actual speed of TDBFP & set point increased more than 1000 rpm , hence TDBFP tripped and boiler metal}
ltemperature increased due to insufficient flow.
7—praventive action suggested (Short Term) = The ful load trials of individual TDBFP will be taken with]
manual loading at 600MW & above load of TA set. The characteristics will be ‘compared with design data &}
accordingly action plan will be decided. IP extraction pressure required to be compared with HBD at load higher}
than 500 MW.
iS. Preventive action suggested (Long Term) :-
Date Time
19. Similar event occurred last time:-
SA Implementation Status of Long Term/Short Term measures stated at Sr No 09:
10. Boiler lighted up Time - 13.00 hrs Date- 29.12.2015
f12, 7-A Set Synchronised Date- 29.12.2015 |
112. Remark :-
We ew
Chief Engineer |
2 ; \6
zB, oy