EVENT ANALYSIS REPORT JunrrNo :@ __|TPS:Koradi Unit Capacity:660 MW [Date- 29.12.2015 *Ho Code: station code: To00s [Time 41:42 Ino of days from last synchronization rs - 22 days FZ, Operating conditions at the time of Event Toad MW, [teal Cycles in service Oil Support 329 I A,B,D&E NIL | fs, Nature of Event : rg get trioped on MFToperated on bole inntermidiate header metal temp, high due to wide difference between iow demand & actual feed flow due to TDBFP speed deviation problem. Tacname of First Up, Main Protections & protection on which GCB tripped: Lockout relay 86GA 1/2 operated. 15 A) Observations ‘Winle loading T/G set @ 660MW, TDBFP did not fulfiled feed demand though TDBFP both control V/V (HP/LP)} vide open and speed deviation in TDBFP-B increased and TDBFP-B tripped. [5 B) Remedial Action/work done = =| _| fe. Root Cause Analysis t= At 11.41,51.172 MFT operated on "Furnace 1” Int. header Metal Temp.HiHi"(>540"| ) due to insufficient feed flow. Both TDBFP speed not increased as per DCS ‘set point 5200 rpm. Speed deviation} in actual speed of TDBFP & set point increased more than 1000 rpm , hence TDBFP tripped and boiler metal} ltemperature increased due to insufficient flow. 7—praventive action suggested (Short Term) = The ful load trials of individual TDBFP will be taken with] manual loading at 600MW & above load of TA set. The characteristics will be ‘compared with design data &} accordingly action plan will be decided. IP extraction pressure required to be compared with HBD at load higher} than 500 MW. iS. Preventive action suggested (Long Term) :- Date Time 19. Similar event occurred last time:- SA Implementation Status of Long Term/Short Term measures stated at Sr No 09: 10. Boiler lighted up Time - 13.00 hrs Date- 29.12.2015 f12, 7-A Set Synchronised Date- 29.12.2015 | 112. Remark :- We ew Chief Engineer | 2 ; \6 zB, oy

You might also like