You are on page 1of 1
PASE IL Rakindo we ANION ANNEXURE ‘Seek teat All statutory approvals from commencement to commissioning of lifts shall be obtained by the ( ontractor from the Inspector of Lifts and / or other authorities, However. the client will provide all ueeesssay assistance for providing documents, drawings and certificates pertaining to other it required. Iie contractor shall pay necessary fees in connection with the approval of installation of lft. Wiring of main and earth wires from the source of supply to the machine room terminating in a 'PIC switch fuse ‘Sltible lighting of the shaft wayand machine room exhaust fan, rubber mat, fire extinguisher and first Aid to be provided Proper power supply along with necessary accessories like MCB rating will be provided in the machine room as per G.A drawings The Lift power wiring should be taken outside lft shaft, The single phase wiring for lft and bulk head fitings also to be taken from ground floor to lift machine room separately for each lift. IST OF SUGGESTED VENDOR FOR ELEVATOR 1.M/S JOHNSON LIFTS 2Mis OTIS, INDIA 3. M/s MASPRO, ITALY 4, M/s KONE, INDIA 5. M/s FUJI, JAPAN 6. M/s MITSUBUSHI 7. MIS HITACHI

You might also like