Lokasi : Palembang
pekerjaan cor beton set mix manual m3 4.50 m3 4.50 140,000.00 630000
semen portland zak 27.00
pasir m3 2.93
kerikil m3 3.83
pipa pvc 8" btg 14.00 m1 54.00 10,000.00 540000
socket pvc 8" bh 8.00
klem pipa pvc 1/2 ltr klg 1.00
SUBTOTAL PEKERJAAN
SUBTOTAL PEKERJAAN
SUBTOTAL PEKERJAAN
SUBTOTAL PEKERJAAN
V ALAT KERJA
1 Scaffolding set 18.00
catwalk bh 6.00
roda bh 18.00
2 bodem 2,5 kg bh 1.00
3 bodem 5 kg bh 1.00
4 jack hammer bh 1.00
5 mesin bor beton bh 1.00
6 pemotong beton unit 1.00
7 gerobak sorong unit 2.00
8 cangkul bh 2.00
9 sekop bh 2.00
10 pahat beton bh 1.00
11 gerinda 4" bh 2.00
12 mata gerinda bros besi kpg 50.00
13 bor tangan bh 2.00
14 mata bor besi bh 6.00
15 travo las 900 watt unit 1.00
16 cutting wheel 14" unit 1.00
17 mata cutting wheel bh 12.00
18 gunting besi tangan uk. 12mm bh 1.00
19 tool set tukang set 1.00
20 drum air kapasitas 200 ltr bh 1.00
21 ember air kap. 12 ltr bh 4.00
22 ember cor lusin 1.00
23 kabel uk 100 m bh 1.00
24 lampu 45 watt bh 3.00
25 fitting lampu bh 3.00
26 terminal listrik 2 lubang bh 3.00
27 terminal listrik 4 lubang bh 3.00
28 steker bh 6.00
29 kuas 3" lusin 0.50
SUBTOTAL PEKERJAAN
VI ALAT SAFETY
sepatu boot psg 9.00
safety helmet kuning bh 9.00
safety helmet putih bh 2.00
ID Card bh 2.00
Safety rompi bh 11.00
sarung tangan kain lusin 3.00
sarung tangan karet psg 2.00
sarung tangan kulit psg 2.00
police line roll 1.00
kacamata las bh 2.00
pelindung wajah las bh 2.00
kacamata utk gerinda bh 3.00
SUBTOTAL PEKERJAAN
persipan
mobilisasi demobilisasi alat ls 1.00 1.00 2,500,000.00
mobilisasi demobilisasi pekerja ls 1.00 10.00 800,000.00
mess pekerja ls 2.00 2.00 1,000,000.00
pekerja
site maneger org 1.00
super pesor org 1.00
tukang org 6.00
tenaga org 4.00
SUBTOTAL PEKERJAAN
TOTAL 80,015,856.00
org HARIAN (hr) UPAH/HARI (Rp) JUMLAH UPAH (Rp)
4 10 250000 10000000
3 2 250000 1500000
4 150000
3 150000
2 3 135000 810000
2 1 135000 270000
1 1 135000 135000
2 2 135000 540000
2
4 5.5 135000 2970000
3 10 135000 4050000
2 1 135000 270000
2 1 135000 270000
4 6 135000 3240000
4 1 135000 540000
2 3 135000 810000
1 1 135000 135000
3 7 135000 2835000
11 pembersihan ls 2,000,000
NO MATERIAL / ALAT SPESIFIKASI VOLUME SATUAN satuan volume harga satuan bahan
I KEBUTUHAN MATERIAL
1 besi siku 30x30x3 uk. 30x30mm tbl=3 mm, p=6 m 155.00 btg kg
2 besi siku 50x50x5 uk. 50x50mm tbl=5 mm, p=6 m 5.00 btg kg
3 besi siku 50x50x3 uk. 50x50mm tbl=3 mm, p=6 m 5.00 btg kg
4 cnp 150x50x20x3 uk. 150x50x20mm tbl=3mm, p= 6 m 31.00 btg kg
plat baja uk. Tbl = 2 mm 26.40 m2 kg
5 plat strip 4x25 mm pjg 6 m p=6m 2.00 btg kg
6 plat strip 5x50mm p=6m 12.00 m1 kg
7 besi 5mm uk. 5mm, p= 12 m 10.00 btg kg
8 besi 8 mm uk. 8mm, p= 12 m 11.00 btg kg
9 besi 10 mm uk. 10mm, p= 12 m 36.00 btg kg
10 kawat duri kebutuhan 58 roll. 1 roll = 6,5 kg , 2750.00 m1 m1
11 kawat ikat (bendrat) 18.50 kg
12 kawat remos tbl 2 mm 5.00 kg
13 plat aluminium uk. 1x2m, tbl = 0,9mm. 1 lbr = 4,80 kg 100.00 lbr m1
14 kayu 4/6 uk. 4x6 cm, p = 4 m 171.00 btg
15 triplek 8 mm uk. 1,22x2,44m, tebal=8mm 5.00 lbr m2
16 papan 2/20 18.00 lbr m2
17 paku 1,5" 11.95 kg
18 paku 2" 13.95 kg
19 paku 2,5" 2.60 kg
20 pipa pvc 4" p 4m1 merk champion, p = 6 m 13.50 btg m1 54
21 socket PVC 8" 8.00 bh
22 pipa PVC 4" uk. 6 m merk champion, p = 6 m 12.00 btg m1 48
23 elbow PVC 4" 18.00 bh
24 lem pipa 1.00 klg
26 kawat las RB-26, 1 ktk = 5 kg 10.00 kg
27 atap longspan tbl = 0.35 , uk. 0,75m x 6 m 1422.20 m2
28 baut longspan 2" uk. 12x50 mm , 9918.00 pcs
29 batu bata 2112.00 bh
30 semen portland semen padang @50 kg 106.00 zak dikirim ke lapangan
31 pasir 12.78 m3 dikirim ke lapangan
32 kerikil 12.64 m3 dikirim ke lapangan
33 cat besi hitam cat besi warna hitam merk 14.36 ltr dikirim ke lapangan;grill dan pagar
ROBANI
Site Manager
harga satuan jumlah harga jumlah harga
upah bahan upah hr org upah jlh upah harian keterangan
2800
2800
2800
2800
2800
2800
2800
2000
2000
2000
600