CONSOLIDATION SETTLEMENT ANALYSIS

Project No. :
Project :
GERBANG NUSAJAYA
LOCATION : MC 10 by :
BOREHOLES: BH 53-55 Date : CL Design for Surcharge
=================================================== a b Month Settlement
INPUT for SETTLEMENT CALCULATION : 1 54.085
Original Ground Level = 0m 2 76.487
Height of Fill , H = 8.2 m fill m 3 93.677
3
Fill Unit Weight = 20 kN/m 4 108.169
2
Surcharge = 0 kN/m 5 120.937
2
Pressure , dP = 163.5891 kN/m 6 132.480
GWL = 0 m below OGL 7 143.094
Rest Period, t = 0.3333 years = 3.9996 Months width of embankment, b = 30 8 152.974
width of sloping area, a = 18 9 162.254
FINAL SETTLEMENT = 0.352 m for FILL height 8.17946 m 10 171.031
Only this row 11 179.378
12 187.203
During Rest Period 0.3333 years,
can be used
Settlement during Rest = 108 mm Please input the embankment
Degree of Consolidation
Total Settlement during Rest
= 30.7%
108 mm
geometry before input the soil Input fill height
parameters
FINAL SETTLEMENTS OF SUBSOIL LAYERS
here E.g.= 8m. During
Rest
No. From To Thk Depth (m) Mid Point Mid of CR RR Unit PcOCR Po u Po' P OC Stl. NC Stl. Final Settlement (m) Cv D U Setlm
RL RL (m) (m) depth (kN/m2) (kN/m2) (kN/m2) (kN/m2)
Weight (m) (m) 8.18 m dP = -103.5891 3.0 m fill dP = -103.5891 3.0 m fill 2.5 m fill
2
3.0 m fill (m /yr) (m) (%) (m)
1 0.0 -1.0 1.00 1 0.5 0.5 0.000 0 15.00 18.17
7.00 7.5 4.9 2.60 163.59 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
2 -1.0 -2.0 1.00 2 1.5 1.5 0.000 0 15.00 31.14
4.00 22.50 14.7 7.79 163.58 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
3 -2.0 -3.0
1.00 3 2.50.000 2.5 0 15.00 3.00 38.93 37.50 24.5 12.98 163.57 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
4 -3.0 -4.0
1.00 4 3.50.180 3.5
0.015 17.00 2.00 38.33 53.50 34.3 19.17 163.53 0.005 0.122 0.127 0.005 0.057 0.061 0.005 0.057 0.061 0.051 0.061 2.00 3.0 30.71 0.039
5 -4.0 -5.0
1.00 5 4.50.180 4.5
0.015 17.00 1.70 44.80 70.50 44.1 26.36 163.47 0.003 0.113 0.116 0.003 0.051 0.055 0.003 0.051 0.055 0.045 0.055 2.00 3.0 30.71 0.036
6 -5.0 -6.0
1.00 6 5.50.180 5.5
0.015 17.00 1.50 50.32 87.50 54.0 33.55 163.38 0.003 0.107 0.109 0.003 0.048 0.051 0.003 0.048 0.051 0.042 0.051 2.00 3.0 30.71 0.034
7 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
8 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
9 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
10 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
11 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
12 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
13 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
14 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
15 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
16 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
17 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
18 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 58.9 37.14 163.32 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
19 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 2. Click163.32
58.9 37.14 iterate0.000
and the 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
20 -6.0 -6.0 6 60.180 6.0
0.015 17.00 1.50 55.71 96.00 spreadsheet
58.9 37.14 163.32 will
0.000use0.000
the 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.00 3.0 30.71 0.000
Total Settl. = 0.352 0.167 0.167 0.138 0.167 m 0.108
equivalent fill height
100% Conso 0.352 0.150 0.150 0.124 0.150
(taking into Immed 0.000 0.000 0.000 0.000 0.000
================================================ Total 0.352 0.150 0.150 0.124 0.150
VERTICAL DRAINS used to accelerate consolidation :
consideration water).
Rest Period ----------> 3.This gives newt =total0.08 years 90% Fill Thickness Settlement
Net Fill
Drain Spacing (square)------>
Coefficient of Horizontal Consolidation
settlement. TheChSeq =
=
fill 1.5 m
14 m2/yr 0.33461
8.18
8.18
0.352
0.352
7.827
7.827
Ratio of kh/ks -----------> height is re-calculated
kh/ks = 2 Fill Unit Weight20.000 8.18 0.352 7.827
GWL 0.000 8.18 0.352 7.827
Degree of HORIZONTAL Consolidation, Uh =
again based on the 65.40 %<== DO NOT CHANGE 8.18 0.352 7.827
Degree of VERTICAL Consolidation, Uv = updated settlement. 30.71 %<== DO NOT CHANGE 8.18 0.352 7.827
AVERAGE Degree of Consolidation, Uavg = 76 %<== DO NOT CHANGE Fill height settlement blw water eq. fill height NFH 8.18 0.352 7.827
(Assuming Degree of Vertical Consolidation negligible)
4. The process is 8.000 0.348 0.348 8.177 7.6523 8.18 0.352 7.827
Settlement during Rest Period = repeated
0.268 untilmthe eq. fill NOT CHANGE
<== DO 8.3477 8.17717537 0.352165 0.352 8.179 7.9956 8.18 0.352 7.827
Residual Deg. of Consolidation = 24.0 % 8.3522 8.179428003 0.352221 0.352 8.179 7.9999 8.18 0.352 7.827
height is stable which 8.3522 8.179456371 0.352221 0.352 8.179 8.0000 8.18 0.352 7.827
================================================ also means the 8.3522 8.179456729 0.352221 0.352 8.179 8.0000
8.3522 8.179457 0.352221 0.352 8.179 8.0000
settlement is stable. 8.3522 8.179457 0.352221 0.352 8.179 8.0000
5.The embankment fill 8.3522 8.179457 0.352221 0.352 8.179 8.0000
8.3522 8.179457 0.352221 0.352 8.179 8.0000
height to be proposed is 8.3522 8.179457 0.352221 0.352 8.179 8.0000
8.3522m (first column), 8.3522 8.179457 0.352221 0.352 8.179 8.0000
8.3522 8.179457 0.352221 0.352 8.179 8.0000
as this will give a total fill 8.3522 8.179457 0.352221 0.352 8.179 8.0000
settlement of 0.352m 8.3522 8.179457 0.352221 0.352 8.179 8.0000
8.3522 8.179457 0.352221 0.352 8.179 8.0000
(with buoyancy effects 8.3522 8.179457 0.352221 0.352 8.179 8.0000
incld.) which will not
lower than design road
level of 8m high. (refer
OP13)