YES / NO 1 Earthing installation to specification, standard drawing assembly & design drawing requirements 2 Terminations to equipment / structures conform to requirements 3 Location, size, type & insulation colour as per specifications 4 Thermal connections (CADWELDS) as per spec. & drawing 5 Thermal connections are properly insulated 6 All earth conductor risers are protected properly above grade 7 Continuity between earth conductor & metal junction boxes, cable-trays & all equipment requiring EARTHING conform to specifications 8 Copper earth bars installed at locations as per drawing 9 Earth conductors on trays & in structures are properly supported 10 Earth ring system on buildings to be 70mm earth conductor connected to 2 earth rods at opposite corners 11 All earth conductors entering equipment by compression gland 12 Earthing of motors conform to specification 13 All earthing checks & tests performed & recorded on QTR-6 14 All deviations, revisions or changes are recorded for As Builts