ITEMS TO BE CHECKED CHECKED DATE


YES / NO
1 Earthing installation to specification, standard drawing assembly &
design drawing requirements
2 Terminations to equipment / structures conform to requirements
3 Location, size, type & insulation colour as per specifications
4 Thermal connections (CADWELDS) as per spec. & drawing
5 Thermal connections are properly insulated
6 All earth conductor risers are protected properly above grade
7 Continuity between earth conductor & metal junction boxes, cable-trays
& all equipment requiring EARTHING conform to specifications
8 Copper earth bars installed at locations as per drawing
9 Earth conductors on trays & in structures are properly supported
10 Earth ring system on buildings to be 70mm earth conductor connected
to 2 earth rods at opposite corners
11 All earth conductors entering equipment by compression gland
12 Earthing of motors conform to specification
13 All earthing checks & tests performed & recorded on QTR-6
14 All deviations, revisions or changes are recorded for As Builts

Remarks: