You are on page 1of 1

GAC Back washing period

No Items Qty unit Formula


1 Flow Rate 40000 m3/d
2 Inlet TSS 2 ppm
3 Inlet TSS 80 Kg/d =1*2
4 AC
4-1 Width 4.8 m
4-2 Length 7.5 m
4-3 Depth 1.5 m
5 AC Volume 54 m3 /tank 4-1*4-2*4-3
6 AC Volume 216 m3/4tanks 4Tanks
7 TSS Holding Capacity 10 kg-SS/m3-AC Design Basis
8 TSS Holding Weight 2160 kg-SS/AC Tank 6*7
8 Back Washing Period 27 days 8/3

You might also like