You are on page 1of 6
© cuwarr narionat PETROLEUM COMPANY PROJECTS, DEPARTMENTS REQUEST FOR PRESSURE TEST. Contractor: senna Sub-Contractor: Project Name: : Request No, Contract No. nts Dates TEST PACKAGE NO {TEM DESCRIPTION: PING CLASS & MATERIAL: AREA: ‘TEST MEDIUM! PRESSURE: DATE & TIMEOF TEST: CHECKERT ‘Any modifications done a site Yes/No (yen stack prov. ‘Materials installed are conforming tothe approved drawings spes. Yes! No (Gf No' each: KNPC approval) Line Mechanically completed including pipe supports YesNo Vents & Drains installed ea No PWHT (any) completed Yes/No NDT Completed Yes! No Orifice plate, check valve, relief valve ete removed & spools spade installed Yeo No ‘Test instrument (pumps, clits gags) Installed Ye No Line accepted for pressure test Yes! No (Goren est, precautions of NPC Se 93 A? Shel DEP 7.001010 sabe kes) Proper supports guides are provided for Individual pipe spools testing, if any. Yes! No ccurcxep py: ConTRACTOR ENGINEER KNPC CONSTN. ENGINEER PD NAME NAME DATE bare, INSPECTION COMMENTS: RNP TSP. ENGR-PD NAME Dare Pusoussiotsi te sesnm6) KUWAIT NATIONAL PETROLEUM CO. -ROJECTS DEPARTMENT |awoienr TEMPERATURE: fresrresuur Jcontracror oc encneeR Jeane: losre C1 neceeres |uNE RELEASED FOR FINAL PANTING! INSULATION PRESSURE TEST REPORT Jeoue L ‘su contacter ett, ae contact oe [EOUIPHENTTUNE NO, TEST PACKAGENO| JReF.orwos. _ 10120040-FS 2089004 (1.01) REV-02 ee (PENT LUNE NO. ‘SPECIIEATIONS Remake = | cou JConTRAGTOR ENGINEER "IPC CONSTRUCTION ENGINEER rane ae: oat: are fresr Pressure: Iresr eum: WATER frame staRTED (1 revecren vs (wo NPC INSPECTION ENGINEER. ae oar KUWAIT NATIONAL PETROLEUM COMPANY PROJECTS DEPARTMENTS ‘Sub Contractor Report No. : Date ‘TEST PACKAGE No. Sr ‘Complance status a Requirements Yer No | N/A] __Remarks Drawings attached to the package are 1 {atest approved revision. Field changes/ site modifications (iF 2 | any) are approved. 3 [Welds visually inspected. PT] MT carried out on filet] branch 4 | welds 5_| RT carried out on butt welds | Orfice lange welding internal inspection PWHT carried out. €) RT/PT/MT carried out after PWHT. b) Hardness checked, PMI completed. Leak test for branch reinforced pad ‘complete 410 | Thickness measurement survey 1 | Feit content check for austenite SS welds 12 | Inspection documentation] records are complete / signed in all respects. ‘ll welded temporary supports, cleats, 13 | etc,, have been removed and surface checked. 14 | Any temporary Binds 7 flanges are welded? IF'YES, requirements S. No. 3,4, &5 are carried out. Notes: - Contractor QC Engineer shall verify final instalation at ste while certifying on SOBL. = In case of "Random Examination’ percentage to be spe:fed in the ‘Remarks’ column. ‘Contractor QC Engineer [RNPC Inspection Enginesr Name: Name Date PRO.QNS 9-02-5081 Rov (497.5) ¢ KUWATT NATIONAL PETROLEUM COMPANY PROJECTS DEPARTMENTS, PIPING CHECKLIST Sub-Contractor: Repot No.: Date: TEST PACK NO. ‘Compliance status Check point ‘Yes | No[ N/A Remarks 1 | Wald History shat 2 [SO as per P& 1D 3 | Pipes) fitings- size) rating) materials ‘4 | Welcing 5 _| Stess relieving ‘6 [Line slopes 7 | Branches at correc Iocatons ‘B| Branches reinforced ‘3 Weep holes in RF pads TO_| Correct size material-bots & gaskets ‘11 Valve specifications correct ‘12__| Sealant on threaded connedtons 13__[ HPV) LPD installed '14_[ Orfice plates orientation correct 15 | Onfice flange extra openings seal welded 16 | Orfce flange internal inspection '17_| Specified Binds instaled 418_[ NOT Completed 19 | Pipe supports as per drawing. 20_| Anchoe/ Guides as per erawing. 21 _| Shoe supports as per drawing. 22_| Spring hangers installed 23 | Cold seting as per drawing. 24 [ Lock on spring support 25 [Temporary supports removed 26 | Valves direction corect 27_[Waive bypass installed 28 | Chain/ extension wheel installed 29[ Lines dea of debris 30_| Thermo-wellsinstaled “31_[ Clearance for insuaton-adequate '32__| Reducer type and orientation 33_| TSV/ PSV Installed as per P& 1D. 34 | Thickness & Material verfication oF temporary blinds / flange connection, if am [35_[ Flange torque tightening "36 [Thickness measurement ‘Any ofher comments: Contractor's Engineer KNPC Construction Engineer - PD Signature Signature Name Name Date Date 915 9.0502 es, 5090872017) sar eucopoteg nu taro sup 09 ues ue eG) {NOSALYS —_OuborsuKD ad wR FE aH OU Hh 1) IODA | I | 1 TVA Wo — “yermanes | (aot | avar ou 12 {80089 | uouw0 owenosa0 con'owa | 28 SIO = TERDRAS PRT ‘uopetes| Bunuied ‘Suneoo exyreiaud Bujpnpu Gud 9 Ue © suo heres 8 soryoes Suny 913 pue vonoajaid ao Uosinig uosouog uornedsy) = woyshs BujBed Busproul wae nuweooeL o woisKg joquep peouenpy pue uoneatdcy J2IndweD =o ‘swaeAsjoquoo Ss20010 Buipnjpu| uopeivownisy|—o ‘OVA 8 eames 8 ‘j0 woudinbe anes Burpnjauy ASUKPeN evoqeiedg 2 ‘S¥SEV OINETONOD, NOWMARNOSIO AINIOWS FON LINK au loarowd _ FUL Loarowe ‘Siva ONINSS! Tsim HoNnd SINaHLav4a0 $193F0ud Coren anvans WaseULad WHOL Wino, son rs ma oo - = 3 ee coe aaa oa oe

You might also like