You are on page 1of 34

105

Ed

Bu



Educational Version

Building Estimation
program

Enter
Back Footings

Columns
Columns
Beamsor
Beams orTie
TieBeam
Bea

Slabs
Slabs
RoomWalls
Room Walls

Totals
Totals
ootings

olumns
olumns
orTie
or TieBeams
Beams

Slabs
Slabs
om Walls
m Walls
Totals
otals
Back Output Cost In
Project
Name:-

Blinding Concrete Dim. Excavation Dim. Footing Dimention


Name of
Number L B D L
item L B T
m m m m m m m
Input Data
cement(plain. Con.)= kg/m3

cement(Reinf.Con)= 208.96 kg/m3


Footing Reinforcement
Footing Dimention
Cover Bottom Reinforcement Top Reinforcement
B D (cm) Long Direction Short Direction Long Direction Short Direction
m m No./m Dia. mm No./m Dia. mm No./m Dia. mm No./m
Input Output D
Name of Project :- 0

Note :- Steel bars (mm) , L


forcement Amount Lean Reinf. Bottom Reinforcement
Name of Exca. con. Concrete
Short Direction of item Long Direction Short Direction
Dia. mm m3 m m3 m3 Dia. Length Weight Dia. Length
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00
0.00 0.00 ### 0.00 0.00 0 0.00 0.00 0 0.00

Total 0.00 ### 0.00 0.00


Output Data

ote :- Steel bars (mm) , Length of bars (m) and Weights (kg)
rcement Top Reinforcement Amount Of
Short Direction Long Direction Short Direction Steel
Weight Number Dia. Length Weight Dia. Length Weight Ton
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00
0.00 0.00 0 0 0.00 0 0.00 0.00 0.00

0.00
Input Cost

Concrete material quantity

Cement Gravel Sand


Data Unit
Unit
Price $
Ton m3 m3
0.00 0.00 0.00 Cubic
Excavation Working
0.00 0.00 0.00 Meter
0.00 0.00 0.00 Cubic
Plain Concrete Working
0.00 0.00 0.00 Meter
0.00 0.00 0.00
Steel Reinf. Work Ton
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 Cubic
Reinf. Concrete working
0.00 0.00 0.00 Meter
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
Total Cost
0.00 0.00 0.00
0.00 0.00 0.00
Cement Ton
0.00 0.00 0.00
0.00 0.00 0.00 Material Cubic
Gravel
0.00 0.00 0.00 Quantities Meter
0.00 0.00 0.00 Cubic
Sand
0.00 0.00 0.00 Meter
0.00 0.00 0.00
Total Cost of Concrete Material
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

0.00 0.00 0.00


Cost

Item no.
Cost ($) Cement 1
Sand 3
Gravel 6
0.00
C S G
0.15 0.30 0.60
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Back Output Cost
Input Column Data Reinf.
Project Name:- Cement Content (Rei

Col. Section (m) Reinf. Of Col (length "m",


Hight of Col.

No. of Same
Col.sample

Floor

Col. Square or
(m)

Circle Other Shape Main Rein.


Rectangle External

Width Length Dia Area Peri. Dia.1 No. Dia.2 No. No./m Dia.
Reinf. Input Detail Of
Cement Content (Reinf.)= 299 Kg/m3

nf. Of Col (length "m", Dia. "mm") Note:- "Length (m), Weight

Concrete Cover

Concrete(m3)
Col.sample
Tie

Reinf.
Floor
(cm)
Main Reinf.
Internal with Long Dir. Internal with Width Dir. External

No. Width No./m Dia No. Width No./m Dia. Dia.1 Wt. Dia.2 Wt. Dia. L
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0
0 0 0.00 0 0.0 0 0 0 0.0

Total Concrete 0.00 Total amuont of Steel and Concrete Material


Detail Of Column Reinf. Input

te:- "Length (m), Weight (kg) & Diameter (mm) Item


Steel (ton) Concrete Material
Tie Reinf. Cement
External Internal with long Dir. Internal with Short Dir. CementGravel Sand Sand
Main Tie
Wt. No. Dia. L Wt. No. Dia. L Wt. No. Ton m3 m3 Gravel
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 C
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 0.21
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Data
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Price of 1 (m3) Reinf. Conc
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Price of 1 Ton Steel
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Price of 1 Ton Cement
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Price of (1m3) Gravel
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00 Price of (1m3) Sand
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00
0 0 0 0 0.0 0 0 0.0 0.0 0 0.00 0.00 0.00 0.00 0.00

and Concrete Material 0.00 0.00 0.00 0.00 0.00


0.00
Input Analysis of Price & Cost of Columns

Item no.

Cement 1
Sand 2

Gravel 4
S G
0.43 0.85
Prices Table

Data Price ($)


Price of 1 (m ) Reinf. Concrete
3

Price of 1 Ton Steel


Price of 1 Ton Cement
Price of (1m3) Gravel
Price of (1m3) Sand

Sand Gravel Cement Steel

Total Cost without Concrete Material =

Total Cost of Concrete Material =


ns

Concrete 0.00
Steel 0.00
Cement 0.00
Gravel 0.00
Sand 0.00

t Steel Concrete

0.00 Dollar

0.00 Dollar
Back Output

Project Name:-
Item no.
Cement 1
Sand 2
Gravel 4
C S G
0.21 0.43 0.85
Top short
Top Continous

sec. A-A Bottom Continous


Bottom short

B1 B2 A B3

ln1 Ln2 Ln3

Cement Content =

section B1 or Beam Reinf.(diameters are in "mm")


(m)Ln1 or

B2
B1.or B2

Bottom Reinf. Top Reinf Stirrups


Sample

Length

Concr
Beam

Floor

Ln2

No. width depth ete Continous Short Bars Continous Short bars right
cover
cm cm no. dia. no. dia no. dia no. dia no./m dia
To Input

Price Tabel

Data Price $
Top Continous
Price of 1m Reinf. Concrete
3

Bottom Continous
Price of 1 Ton Steel
Price of 1 Ton Cement
Price of 1m3 of Gravel
Price of 1m3 of Sand

Beam Cost without Concrete material $= 0.00

ement Content = 299 kg/m3 Material Cost $= 0.00

e in "mm") Note: (Length "m" , Diameter "mm" & Weight "kg")


Sample beam

Concret

Stirrups Bottom Reinf. Top Reinf. Stirrups


Floor

mideum left Continous Short Continous Short Right


no./m dia no./m dia m3 dia L Wt dia L Wt dia L Wt Wtdia L Wt dia L

0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0


0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
0 0 0.00 0 0.0 0.0 ###0.0 0.0 0 0.0 0.0 ###0 0 0 0 0
Total
0.00
Concrete
Concrete 0.00
Steel 0.00
Cement 0.00
Gravel 0.00
Sand 0.00

Concrete Steel Cement Gravel Sand


m" & Weight "kg") Steel amuont Mterial Quantity
Stirrups "Ton"
CementGravel Sand
Right Midium Left
Main Stirrup
Wt dia L Wt dia L Wt Ton m3 m3
Ln
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0

Total material quantity & Steel 0 0 0 0 0

0
Sand
Back Out Put Input Data
Project Name

Data
Item no.
Cement 1 Cost Of 1m
Sand 2 Cost of 1 ton Of Steel
Gravel 4 Cost of 1 ton Of Ceme
C S G Cost Of 1m
0.21 0.43 0.85 Cost Of 1m
Dimention of "Lb" from
Cost without Concr

Cement Content= 299

Slab Reinfocement
Slab Dimention
Number
Sample

Long Direction ( L) Short Direction (W)


Floor
Slab

L W T Straight Bar Bent Bar Add. Bar Straight Bar Bent Bar
m m cm No/m Dia No/m Dia No/m Dia No/m Dia No/m Dia
a To input Output Data

Data Price $

Cost Of 1m3 Reinf. Concrete


Cost of 1 ton Of Steel
Cost of 1 ton Of Cement
Cost Of 1m3 Of Gravel
Cost Of 1m3 Of Sand
Dimention of "Lb" from figure 0.33
Cost without Concrete Material 0.00 $

Kg/m3 Cost of Only Concrete m 0.00 $ Concrete Steel Ce

Note: Length with (m) , Weight with (kg) & Diameter with (mm) .
Concrete
Sample

rection (W) Long Reinf. Short Rein


Floor
Slab

Add. Bar Str. Bar Bent Bar Add. Bar Str. Bar
No/m Dia m 3 Dia L Wt Dia L Wt Dia L Wt Dia L Wt
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Total 0.0
t Data
0 0

Concrete
Steel
Cement
Gravel
Sand

Steel Cement Gravel Sand

& Diameter with (mm) . Material Quantity


Short Reinf. Steel Cement Gravel sand
Bent Bar Add. Bar Ton
Dia L Wt Dia L Wt Ton m3 m3
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.000 0.0 0.0 0.0

0.0 0.0 0.0 0.0


0
0
0
0
0
Back Output Cost
Project
Name

Number of Room Dimentions c/c (m) Door Dimentions (m)


Name of
Floor same
Items L B H T B
Rooms No.
m m m m m
Input Data
Name of Project :-

thickness(cm)
r Dimentions (m) Window Dimentions (m) Floor Tile Dimentions

Gypsum
Paint Name of
H elevation B H B L Hight (m) item
No.
from F.F(m)
m m m m m
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.30 0.30
Total

0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Out put Input

Name of Project :- 0

Gypsum Block
paint (m )2 Work
Without
slab (m3)
Brick Work
Numbers
Work
Numbers
Floor Tile Numbers
Data
0 0 0 0 0
Paint
0 0 0 0 0
0 0 0 0 0
Gypsum
0 0 0 0 0
0 0 0 0 0
Brick Work
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 Block Work
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 Floor Tile Work
0 0 0 0 0
0 0 0 0 0
1
0 0 0 0 0
0 0 0 0 0 0.9
0 0 0 0 0
0 0 0 0 0 0.8
0 0 0 0 0
0 0 0 0 0 0.7
0 0 0 0 0
0 0 0 0 0 0.6
0 0 0 0 0 0.5
0 0 0 0 0
0 0 0 0 0 0.4
0 0 0 0 0
0 0 0 0 0 0.3
0 0 0 0 0
0 0 0 0 0 0.2
0 0 0 0 0
0.1
0 0 0 0 0
0.00 0.00 0.00 0.00 0 0
Paint Gypsum

#DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 0 0.09
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0! 0
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0 #DIV/0!
0
Cost
1 $= 1200 IDQ

Material Cost Labour Cost

Unit Price Working Price


Unit
IDQ
Unit
IDQ Cost ($)

Square
Kg 0.000
meter
Cubic Square
0.000
meter meter
Cubic
Number 0.000
meter

Cubic
Number 0.000
meter

Square Square
0.000
meter meter

Gypsum Brick Work Block Work Floor Tile Work


k
Back Total of Material &
Project Name :

Plain Concrete Reinf. Concrete Steel

Items Quantity Cost Quantity Cost Quantity Cost


Cubic meter $ Cubic meter $ Ton $
Footings
0.00 0.00 0.00 0.00 0.000 0.00

Columns
--- --- 0.00 0.00 0.000 0.00

Beams Or
Tie Beams --- --- 0.00 0.00 0.000 0.00

Slabs
--- --- 0.00 0.00 0.000 0.00

Wall Paint Gypsum Brick


0.00 0.00 0.00
0.00 0.00 0.000

Total
0.00 0.00 0.00 0.00 0.000 0.00

Total Project Cost= 0.000


al of Material & Cost

Cement Gravel Sand


Quantity Cost Quantity Cost Quantity Cost
Ton $ Cubic meter $ Cubic meter $ P.C
Foundation 0

0.000 0.00 0.00 0.00 0.00 0.00


Column
Beams
salb

0.000 0.00 0.00 0.00 0.00 0.00


P.C
Foundation 0

Column
0.000 0.00 0.00 0.00 0.00 0.00 Beams
Slab

0.000 0.00 0.00 0.00 0.00 0.00

Block Tile $ Total Wall Cost


0.00 0.00
0.000 0.00 0.00

0.000 0.00 0.00 0.00 0.00 0.00

Thousand Dollars
Amount
R.c Steel Cement Gravel Sand
0 0 0 0 0

0 0 0 0 0
0 0 0 0 0
0 0 0 0 0

R.c Steel Cement Gravel Sand


0 0 0 0 0

0 0 0 0 0
0 0 0 0 0
0 0 0 0 0

You might also like