AIM
TE.050 SYSTEMS INTEGRATION TEST
SCRIPT
<Company Long Name>
<Subject>
Author: <Author>
Creation Date: May 24, 1999
Last Updated: May 28, 1999
Document Ref: <Document Reference Number>
Version: DRAFT 1A
Approvals:
<Approver 1>
<Approver 2>
TE.050 Systems Integration Test Script Doc Ref: <Document Reference Number>
May 28, 1999
Document Control
Change Record
3
Date Author Versio Change Reference
n
24-May- <Author> Draft No Previous Document
99 1a
Reviewers
Name Position
Distribution
Copy Name Location
No.
1 Library Master Project Library
2 Project Manager
3
4
Note To Holders:
If you receive an electronic copy of this document and print it out, please
write your name on the equivalent of the cover page, for document
control purposes.
If you receive a hard copy of this document, please write your name on
the front cover, for document control purposes.
<Subject> Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. DRAFT 1A )
Company Confidential - For internal use only
TE.050 Systems Integration Test Script Doc Ref: <Document Reference Number>
May 28, 1999
Contents
Document Control.......................................................................................ii
Overview.....................................................................................................1
Century Date Compliance.....................................................................1
Systems Integration Test Sequences..........................................................2
Systems Integration Test Specifications.....................................................3
Data Profile.................................................................................................4
Defect Log...................................................................................................5
Open and Closed Issues For This Deliverable.............................................6
Open Issues...........................................................................................6
Closed Issues.........................................................................................6
<Subject> Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. DRAFT 1A )
Company Confidential - For internal use only
Doc Ref:
Overview
The Systems Integration Test Script tests the integration between the
target application system and legacy and third-party applications with
respect to a specific systems integration. A separate test script will be
established for each integration between Oracle Applications and third-
party or legacy systems.
The systems integration test measures the coexistence of your
application system with the neighboring application systems in the
enterprise with which it must interface. The systems integration test uses
test scripts comprised of system test sequences from two or more
systems that interface. The systems integration test checks the
integration points between separate systems to confirm that they are
able to work together from a process flow perspective and from a data
integration perspective.
Systems Integration Test Scripts address the following:
• systems integration sequences using converted data
• lock testing simulating user load, executing identical scenarios
• batch window test on full converted data volumes (for example,
financial close period, MRP run, and Payroll run)
Century Date Compliance
In the past, two character date coding was an acceptable convention due
to perceived costs associated with the additional disk and memory
storage requirements of full four character date encoding. As the year
2000 approached, it became evident that a full four character coding
scheme was more appropriate.
In the context of the Application Implementation Method (AIM), the
convention Century Date or C/Date support rather than Year2000 or Y2K
support is used. It is felt that coding for any future Century Date is now
the modern business and technical convention.
Every applications implementation team needs to consider the impact of
the century date on their implementation project. As part of the
implementation effort, all customizations, legacy data conversions, and
custom interfaces need to be reviewed for Century Date compliance.
Testing activities need to make sure that all interfaces and application
extensions are coded for century date compliance. Systems integration
test scripts should include steps for testing century date compliance.
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only
Doc Ref:
Systems Integration Test Sequences
Sequenc Date Time Test Name Description Tester Test Status Pass/Fail Notes
e#
APTI10 TBD TBD Invoice Import Imports invoices from J.S. Elcaro Active Pass
external system
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only
Doc Ref:
Systems Integration Test Specifications
Scenari Test Action Expected Actual
o Step Role or Path Expected Results Actual Results Cycle Time Cycle Time Status
Step
APTI10 Run Superuser NORR Production job will Normal end-of job > 2 min 1.5 Min. Active
Payables complete normally with no
Invoice exceptions
Import
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only
Doc Ref:
Data Profile
Scenari Business Data Business
o Object Condition Rule Type Status
Step
APTI10 External Invoices Entered Invoices Pay vendor invoices Open Active
Invoices
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only
Doc Ref:
Defect Log
Defect ID Test Step Module Name Defect Resolution Re-Test By Re-Test Date Pass/Fa Status
Number Referenc Description il (open,
e closed, in
process)
1 APTI10 AP Invoice Import Developer B. Dinger 01/01/00 Pass Closed
failed reloaded
invoice import
file
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only
Doc Ref:
Open and Closed Issues For This Deliverable
Open Issues
ID Issue Resolution Responsibility Target Impact
Date Date
Closed Issues
ID Issue Resolution Responsibility Target Impact
Date Date
Open and Closed Issues For This Deliverable
File Ref: 39155691.doc (v. )
Company Confidential - For internal use only