parking
carbon cycle 70 oC hot water tank
anarobe organic
waste biogasconverter
vacum sewer system
carbon cycle
nitrogen balance
electricity + CO2 thermal buffer
seasonal heat storage
new fine wire heat exchangers, use of very-low temperature new light-weight concrete self-sufficiency of general
large span double floor utilities
Energy Producing Greenhouses BreathingWindow.com Two 100mm thick upper and
water / air heat exchangers air / air heat exchanger 85% h-r. under concrete slabs connected by heating / cooling
very low temperature heating 25oC decentral, balanced room-ventilation special structure of reinforcement. electricity
very high temperature cooling 15oC CO2-detaching , intelligent display The firesafe cavity in the floor is drinking water
fine-wire exchanger is 7x more compact 7.5 km, 1/10mm, 500 g accessible. The use of the building is nutrients (nitrogen)
effective than traditional ones copperwire air guides , two 4W fans. flexible forever and also detachable. nitrogen in waste water
(concentrated)
conclusion
On the scale of a 8ha green-
house area and a living quarter
of at least 250 householdings
an ecologically self-supporting
community seems to be already
realistic.
weaving of 2mm copperpipes twinning of 1 /10 mm copperwire 20m1 span, 0.7m thick concrecte double floor
1 / 10 mm tinned copperwire
author : jon kristinsson, kristinsson architectural engineers, noordenbergsingel 10, 7411se, deventer, the netherlands, j.kristinsson@kristinsson.nl
principals : InnovationNetwork and SIGN, www.innovatienetwerk.org/en/, p.t.oei@innonet.agro.nl