0004
Luas DPS
Nama Ruas Saluran/
No No
Gorong - Gorong
Cm2 Km2
1 S.1-2 7.5 0.003 1
2 G.2-3 - - 2
3 S.3-4 32 0.0128 3
4 G.4-5 - - 4
5 S.5-6 9 0.0036 5
6 S.5-7 2.5 0.001 6
7 S.3-8 2.25 0.0009
8 G.8-9 - -
9 S.9-10 9.75 0.0039
10 G.10-11 - -
11 S.11-12 31.5 0.0126
12 S.11-13 2 0.0008
13 G.13-14 - -
14 S.14-15 2.25 0.0009
15 S.14-16 30 0.012
16 S.9-17 10.25 0.0041
17 G.17-18 - -
18 S.18-19 12.5 0.005
19 S.19-20 4.375 0.00175
Luas DPS
Nama Ruas Saluran/ Nama Ruas Saluran/
No
Gorong - Gorong Gorong - Gorong
Cm 2
Km 2
Cm2 Km2
14.5 0.0058
- -
14.25 0.0057
- -
4 0.0016
- -
5.25 0.0021
1 0.0004
2.5 0.001
- -
3.5 0.0014
- -
7 0.0028
2.25 0.0009
Nama Ruas Saluran/
No Panjang Lintasan Aliran Air dari Titik Terj
Gorong - Gorong
di peta di lapangan
Luas DPS cm m
Nama Ruas Saluran/
No Gorong - Gorong Km2 b c'
Sub Sistem 1
1 S.18-20 0.00175 3.9 78
2 S.18-19 0.005 4 80
3 G.17-18 - - -
4 S.9-17 0.0041 7.1 142
5 S.14-16 0.012 3.2 64
6 S.14-15 0.0009 3.1 62
7 G.13-14 - - -
8 S.11-13 0.0008 3.4 68
9 S.11-12 0.0126 4.2 84
10 G.10-11 - - -
11 S.9-10 0.0039 6.9 138
12 G.8-9 - - -
13 S.3-8 0.0009 3.7 74
14 S.5-7 0.001 3.8 76
15 S.5-6 0.0036 4.8 96
16 G.4-5 - - -
17 S.3-4 0.0128 4.1 82
18 G.2-3 - - -
19 S.1-2 0.003 5.8 116
Skala 1 : 2000
Koefisien kekasaran lahan (n) = 0.1
Kecepatan (v) = 1 m/s
Curah hujan maksimum harian (R24) = 122 mm
=(())/
d e f g h
0.078 0 0 53 55 0.026
0.08 0 0 53 55 0.025
- - - - - -
0.142 0 0 49.9 53.9 0.028
0.064 2.4 48 52.8 55 0.034
0.062 0 0 52.8 54.2 0.023
- - - - - -
0.068 0 0 51.1 53 0.028
0.084 7.4 148 51.1 55 0.046
- - - - - -
0.138 0 0 49.9 53.8 0.028
- - - - - -
0.074 0 0 48.3 50.2 0.026
0.076 0 0 51.2 53.1 0.025
0.096 2.7 54 51.2 54.2 0.031
- - - - - -
0.082 6.4 128 49.9 52.9 0.037
- - - - - -
0.116 0 0 16.5 18.9 0.021
0.06 0 0 53.9 55 0.018
0.036 0 0 54.3 55 0.019
- - - - - -
0.056 0.7 14 53.9 55 0.020
- - - - - -
0.192 0 0 48.8 55 0.032
di Lahan di Saluran
Tc
Tl Ts
jam menit jam jam
))/ =(.()^(.
=/( )=/ =( _/) (/
))/(^.) Tc = Tl + Ts')^(/)
0.148 0 0 0.148
0.151 0 0 0.151
- - - -
0.192 0 0 0.192
0.126 0.800 0.013 0.139
0.137 0 0 0.137
- - - -
0.136 0 0 0.136
0.133 2.467 0.041 0.174
- - - -
0.189 0 0 0.189
- - - -
0.144 0 0 0.144
0.147 0 0 0.147
0.156 0.9 0.015 0.171
- - - -
0.139 2.133 0.036 0.175
- - - -
0.187 0 0 0.187
0.142 0 0 0.142
0.110 0 0 0.110
- - - -
0.135 0.233 0.004 0.139
- - - -
0.214 0 0 0.214
0.1292 0 0 0.129
0.1292 0 0 0.129
- - - -
0.1469 0 0 0.147
- - - -
0.1437 0 0 0.144
0.0973 0 0 0.097
0.0973 0 0 0.097
- - - -
0.1550 0 0 0.155
- - - -
0.1590 0.9 0.015 0.174
- - - -
0.2184 0 0 0.218
Intensitas Hujan Debit
I Qo Q1
mm/jam m3/det m3/det
=( _/) (/
)^(/) Qp = 0.278 C.I.a Keterangan Nilai
151.134 0.0257 - 0
149.357 0.0727 - 0
- 0 S.18-20 + S.18-19 0.0984
127.270 0.0508 G.17-18 0.0984
157.346 0.1837 - 0
159.145 0.0139 - 0
- 0 S.14-15 + S.14-16 0.1977
159.858 0.0124 G.13-14 0.1977
135.450 0.1661 - 0
- 0 S.11-12 + S.11-13 0.3762
128.473 0.0488 G.10-11 0.3762
- 0 S.9-10 + S.9-17 0.5233
153.664 0.0135 G.8-9 0.5233
151.761 0.0148 - 0
137.425 0.0481 - 0
- 0 S.5-7 + S.5-6 0.0629
135.184 0.1684 G.4-5 0.0629
- 0 S.3-8 + S.3-4 0.7680
129.171 0.0377 G.2-3 0.7680
155.636 0.0106 - 0
184.147 0.0057 - 0
- 0 S.25-26 0.0057
157.720 0.0506 G.24-25 0.0057
- 0 S.23-27 + S.23-24 0.0670
118.356 0.0979 G.22-23 0.0670
165.508 0.0145 - 0
165.508 0.0451 - 0
- 0 S.40-42 + S.40-41 0.0596
151.903 0.0207 G.39-40 0.0596
- 0 S.38-39 0.0803
154.149 0.0150 G.37-38 0.0803
199.954 0.0078 - 0
199.954 0.0409 - 0
- 0 S.34-35 + S.34-36 0.0486
146.556 0.0228 G.33-34 0.0486
- 0 S.32-33 0.0715
135.685 0.0753 G.31-32 0.0715
- 0 S.30-31 + S.30-37 0.2420
116.623 0.0658 G.30-39 0.2420
Perencanaan Dimensi
QT Q
m3/det
QT = Q o + Q 1
0.0257
0.0727
0.0984
0.1492
0.1837
0.0139
0.1977
0.2101
0.1661
0.3762
0.4249
0.5233
0.5368
0.0148
0.0481
0.0629
0.2313
0.7680
0.8057
0.0106
0.0057
0.0057
0.0564
0.0670
0.1649
0.0145
0.0451
0.0596
0.0803
0.0803
0.0953
0.0078
0.0409
0.0486
0.0715
0.0715
0.1467
0.2420
0.3078
0.0004
Luas DPS
Nama Ruas Saluran/
No Gorong - Gorong
Cm2 Km2
Sub Sistem 1
1 S.1-2 7.5 0.003
2 G.2-3 - -
3 S.3-4 32 0.0128
4 G.4-5 - -
5 S.5-6 9 0.0036
6 S.5-7 2.5 0.001
7 S.3-8 2.25 0.0009
8 G.8-9 - -
9 S.9-10 9.75 0.0039
10 G.10-11 - -
11 S.11-12 31.5 0.0126
12 S.11-13 2 0.0008
13 G.13-14 - -
14 S.14-15 2.25 0.0009
15 S.14-16 30 0.012
16 S.9-17 10.25 0.0041
17 G.17-18 - -
18 S.18-19 12.5 0.005
19 S.19-20 4.375 0.00175
Sub Sistem 2
1 S.21-22 2.75 0.0011
2 G.22-23 - -
3 S.23-24 8.25 0.0033
4 G.24-25 - -
5 S.25-26 0.8 0.00032
6 S.23-27 1.75 0.0007
Sub Sistem 2
1 S.28-29 14.5 0.0058
2 G.29-30 - -
3 S.30-31 14.25 0.0057
4 G.31-32 - -
5 S.32-33 4 0.0016
6 G.33-34 - -
7 S.34-35 5.25 0.0021
8 S.34-36 1 0.0004
9 S.30-37 2.5 0.001
10 G.37-38 - -
11 S.38-39 3.5 0.0014
12 G.39-40 - -
13 S.40-41 2.25 0.0009
n= 0.013
Perencanaan Dimensi
Kemiringan
Panjang Saluran Elevasi Saluran Saluran
b h A P
m m m m m m m
))/
0.1 0.2 0.02 0.5 ^(/)=(/)^(/
0.1170 0.0226 0.0106
)
0.1 0.2 0.02 0.5 0.1170 0.0248 0.0057
0.1 0.2 0.02 0.5 0.1170 0.0180 0.0057
0.2 0.4 0.08 1 0.1857 0.0864 0.0559
0.2 0.4 0.08 1 0.1857 0.1143 0.0665
0.2 0.4 0.08 1 0.1857 0.1945 0.1644
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
Skala 1 :
Koefisien kekasaran lahan (n) =
Kecepatan (v) =
Curah hujan maksimum harian (R24) =
Koefisien Runoff ( C ) =
a b c' d e f
Sub Sistem 1
1 S.18-20 0.00175 3.9 78 0.078 0 0
2 S.18-19 0.005 4 80 0.08 0 0
3 G.17-18 - - - - - -
4 S.9-17 0.0041 7.1 142 0.142 0 0
5 S.14-16 0.012 3.2 64 0.064 2.4 48
6 S.14-15 0.0009 3.1 62 0.062 0 0
7 G.13-14 - - - - - -
8 S.11-13 0.0008 3.4 68 0.068 0 0
9 S.11-12 0.0126 4.2 84 0.084 7.4 148
10 G.10-11 - - - - - -
11 S.9-10 0.0039 6.9 138 0.138 0 0
12 G.8-9 - - - - - -
13 S.3-8 0.0009 3.7 74 0.074 0 0
14 S.5-7 0.001 3.8 76 0.076 0 0
15 S.5-6 0.0036 4.8 96 0.096 2.7 54
16 G.4-5 - - - - - -
17 S.3-4 0.0128 4.1 82 0.082 6.4 128
18 G.2-3 - - - - - -
19 S.1-2 0.003 5.8 116 0.116 0 0
Sub Sistem 2
1 S.23-27 0.0007 3 60 0.06 0 0
2 S.25-26 0.00032 1.8 36 0.036 0 0
3 G.24-25 - - - - - -
4 S.23-24 0.0033 2.8 56 0.056 0.7 14
5 G.22-23 - - - - - -
6 S.21-22 0.0085 9.6 192 0.192 0 0
Sub Sistem 3
1 S.40-42 0.0009 3.1 62 0.062 0 0
2 S.40-41 0.0028 3.1 62 0.062 0 0
3 G.39-40 - - - - - -
4 S.38-39 0.0014 4.1 82 0.082 0 0
5 G.37-38 - - - - - -
6 S.30-37 0.001 3.8 76 0.076 0 0
7 S.34-36 0.0004 1.7 34 0.034 0 0
8 S.34-35 0.0021 1.7 34 0.034 0 0
9 G.33-34 - - - - - -
10 S.32-33 0.0016 4.3 86 0.086 0 0
11 G.31-32 - - - - - -
12 S.30-31 0.0057 5 100 0.1 2.7 54
13 G.29-30 - - - - - -
14 S.28-29 0.0058 8.7 174 0.174 0 0
0.0004
2000
0.1
1.5 m/s
122 mm
0.35 (Daerah perumahan single family)
min maks S Tl Ts
m m m/m jam menit jam
=(.()^(.
=/( =/
)
g h=(())/ ))/(^.)
53 55 0.026 0.148 0 0
53 55 0.025 0.151 0 0
- - - - - -
49.9 53.9 0.028 0.192 0 0
52.8 55 0.034 0.126 1.200 0.020
52.8 54.2 0.023 0.137 0 0
- - - - - -
51.1 53 0.028 0.136 0 0
51.1 55 0.046 0.133 3.700 0.062
- - - - - -
49.9 53.8 0.028 0.189 0 0
- - - - - -
48.3 50.2 0.026 0.144 0 0
51.2 53.1 0.025 0.147 0 0
51.2 54.2 0.031 0.156 1.35 0.0225
- - - - - -
49.9 52.9 0.037 0.139 3.200 0.053
- - - - - -
16.5 18.9 0.021 0.187 0 0
Tc
I Qo Q1
jam mm/jam m3/det m3/det
Perencanaan Dimensi
Nama Ruas
No Saluran/ Gorong -
Q1 QT Gorong di peta
m3/det m3/det cm
=(())/
Nilai QT = Q o + Q 1 a'
Sub Sistem 1
0 0.0257 1 S.18-20 4.5
0 0.0727 2 S.18-19 8.1
0.0984 0.0984 3 G.17-18 0.5
0.0984 0.1492 4 S.9-17 5.8
0 0.1781 5 S.14-16 10.4
0 0.0139 6 S.14-15 2.6
0.1920 0.1920 7 G.13-14 0.5
0.1920 0.2045 8 S.11-13 2.7
0 0.1542 9 S.11-12 10.5
0.3586 0.3586 10 G.10-11 0.5
0.3586 0.4074 11 S.9-10 3.5
0.5058 0.5058 12 G.8-9 0.5
0.5058 0.5192 13 S.3-8 3.2
0 0.0148 14 S.5-7 3.3
0 0.0468 15 S.5-6 3.5
0.0615 0.0615 16 G.4-5 0.5
0.0615 0.2194 17 S.3-4 10.6
0.7386 0.7386 18 G.2-3 0.5
0.7386 0.7763 19 S.1-2 4.9
Sub Sistem 2
0 0.0106 1 S.23-27 3.5
0 0.0057 2 S.25-26 2.1
0.0057 0.0057 3 G.24-25 0.5
0.0057 0.0559 4 S.23-24 3.5
0.0665 0.0665 5 G.22-23 0.5
0.0665 0.1644 6 S.21-22 8.8
Sub Sistem 3
0 0.0145 1 S.40-42 3.7
0 0.0451 2 S.40-41 3.5
0.0596 0.0596 3 G.39-40 0.5
0.0596 0.0803 4 S.38-39 1.9
0.0803 0.0803 5 G.37-38 0.5
0.0803 0.0953 6 S.30-37 3.2
0 0.0078 7 S.34-36 2.1
0 0.0409 8 S.34-35 5.4
0.0486 0.0486 9 G.33-34 0.5
0.0486 0.0715 10 S.32-33 3.6
0.0715 0.0715 11 G.31-32 0.5
0.0715 0.1446 12 S.30-31 5.5
0.2399 0.2399 13 G.29-30 0.5
0.2399 0.3057 14 S.28-29 3.1
Kemiringan Penampang Saluran
anjang Saluran Elevasi Saluran Saluran (TRIAL AND ERROR )
P Q QT
m m m m
P ^(/)=(/)^(/ Q = A. V QT = Q o + Q 1 Q > QT
)