Professional Documents
Culture Documents
22 - E1021 - Rev 4
22 - E1021 - Rev 4
81
81
01/A1
8GRT18
8GRT7 8GRT20
914
970
6
8GRT19
995
6
5889
8GRT2
1103
TRD2
245
6000
5
TRD2
10000
81 1081
2970
2720
995
8NGRT1
01/A
6
MATCH LINE A-A
995
8GRT15
01/03 01/AUX
6
GRATING PLAN AT EL. 132.530 (T.O.G.)
995
8GRT15
6
995
8GRT15
998
TRD2
2
6
01/B
01/A
995
8GRT15
1047
6
9GRT1
6
995
8GRT15
1047
6
9GRT2
4 07.08.2017 ISSUED FOR CONSTRUCTION RMK KJC PJF
995
8GRT15
Al-Zour Refinery Project
6
8GRT8 Purchaser review and comments do not indicate the responsibility or liability for accuracy and completeness
of this documemt or alter any contractual terms and conditions :
8GRT17
970
P055AZOR-01-28-1-S008-002-REV-B
713
P055AZOR-01-28-1-S008-003-REV-C REJECTED NOT ACCEPTED REVIEWED WITH COMMENTS REVIEWED WITHOUT COMMENTS
81
131 993 15 980 15 942 356 DOCUMENT TITLE : 01 CRUDE UNIT BATTERY LIMIT PIPE RACK
ERECTION DRAWING
A1
3. : DENOTES ORIENTATION MARK.
REV : PAGES :
VENDOR DOCUMENT No : 28
COMPANY CATEGORY :