You are on page 1of 1

PROJECT: DATE:

Design By:
LATERAL PILE GROUP EFFICIENCY FOR 3D SPACING BETWEEN PILES
FUGRO
SI.No. Pile Group Geometry DIN
ACI 336.3R-93 (FHWA - NHI-10- LYMON C. REESE
(1025:2005-01)
016)

100.00% 100.00% 100.00% 100.00%


1 D

2 100.00% 100.00% 100.00% 86.60%


3D (86.6+86.6)/200=86.6

3 3D 62.50% 60.00% 81.30% 77.18%


(100+25)/200 = 62.5 (70+50)/200 = 60 (100+62.5)/200 = 81 (86.6+67.8)/200=77.18

3D
75.00% 63.33% 8750.00% 80.38%
4 (100*2+25*1)/300 = 75 (70*2+50*1)/3 = 63.3 (100*2+62.5*1)/300=87.5 (2*86.6+67.8)/3=80.38

50.00% 56.67% 75.00% 74.00%


5 (100+2*25)/300=50 (70+2*50)/300 = 56.67 (100+2*62.5)/300=75 (86.6+2*67.8)/300=74
3D

75.00% 63.30% 87.50% 80.30%


6 (100*2+25)/300=75 (2*70+50)/300 =63.3 (2*100+62.5)/300=87.5 (2*86.6+67.8)/300=80.3
3D

3D
62.50% 60.00% 81.30% 77.20%
7 3D 2*(100+25)/400 = 62.5 2*(70+50)/400 = 60 2*(100+62.5)/400 = 81.3 2*(86.6+67.8)/400=77.2

7 aL 4 1
8 50.00% 51.67% 75.00% Not Worked out
8 5 2 (6*0.25+3*1)/9 = 50 3*(0.7+0.5+0.35)/9=51.67 (6*62.5+3*100)/9=75
a
9 6 3

You might also like