Justin Hatfield
MATH 1210
Pipeline Project
The following report lists the options and their related costs for the Vernal, Utah pipeline,
Option A: Uti
The int option utilizing only BLM land will be to lay a total of 64
miles of pipe from the drill to the refinery as follows: 8 miles west
from the drill, then 16 miles south, and finally 40 miles east to the
refinery. The cost of laying pipe is $480,000 per mile. So the total cost
of this option is $30,720,000 ($480,000 per mile for 64 miles).
be ‘second option utilizing only BLM land will be to go through the
mountain east of the drill. This option lays pipe for a total of 48 miles
(32 miles east of the drill and then 16 miles south to the refinery) at a
cost of $480,000 per mile for a cost of $23,040,000. However the
additional costs of going through mountain of $5,900,000 including:
$4,500,000 for drilling through the mountain, $600,000 for an impact
ing Only BLM Land
Total cost = + 64 = $20,720,000
0miee- BM Grosna
Pirate oun
‘Dron BUM Ground
study, and $800,000 for 8 months of delay. Therefore the total cost for this option is $23,040,000 laying pipe plus
the additional $5,900,000 totaling $28,940,000.
Option B: Running Pipe through Private Ground
Option B1: Cost $30,052,753.92
‘Foutilze the private ground, an additional $360,000 per mi
of-way cost is added to the original $480,000 per mile of pipeline cost
for a total of $840,000 per mile for using the private ground. The
distance through the private ground directly from the drill to the
refinery is approximately 35.777 miles (32+ 16 = /T280 ~ 35.777).
So the cost is $30,052,753.92 ($840,000 per mile for 35.777 miles).
1
Option B2: Cost $28,800,000
fone pipeline the fewest miles across the private ground, we
would lay 16 miles of pipe straight south from the drill across the
private ground for a cost of $13,440,000 (16 miles at a cost of
$840,000 per mile). Then we would run 32 miles of pipe straight east
on BLM ground to the refinery for a cost of $15,360,000 (32 miles at
the BLM pipe cost of $480,000). This option is then a total cost of
$28,800,000 ($13,440,000 plus $15,360,000),
Total Cost = $840,000 * 35.777 = $30,052,753,.92
Toeeecsinatanstseenans serene
3h
“20 mins- ALM oun
($840,000 * 16) + ($480,000 * 32) = $28,800,000
Sderiles
“Dmiee BLM Couns
a
g
&
a_Aatvest Cost Option ytifzing Both Private and SLY. Sround,
Palais 1e ee ane southeast from the drill
equals a total pr
$10,012,334.40).
Detailed Calculations
C(x) = 840,000,768 + ¥? + 480,000(32 ~ x)
(a) = 840,000(256 + x2)'/? + (15,360,000 ~ 40,0002)
61 = (2x)840,000(5) (256 + 4)# — 480,000
840,000"
sex xP
cw) 480,000
840,000%
— 480,000,
G@ie+ ey
840,000
£00000 Gee xy
810000" a564 9}
(2564 x2)2
(286+ x4)3480,000
(640,000/18 +27)?
230,400,000(256 + 2
05,600,000x2
705,600,000x
'58,982,400,000 + 230,400,000x* = 705,600,002"
58,982,400,000 = 475,200,000
124212125 = x?
11,14097 =x
(1G + 1114097? ~ VIBUTTZIIS ~ 19.496697
—
wand = 6963106258
ran™¥(. 696310625)
y= 90
across the
ata cost of $840,000 per mile
ate land cost of $16,377,225.48. Then the pipeline
will go au east on Bu ud for 2083803 laa conf
$480,000 per mile for a total BLM cost of $10,012,334.40. Therefore,
the total cost for this option is $26,389,559.88 ($16,377,225.48 plus
Purim
soil - BM Grune
yn 55"
|e 221 0m04
eum rund
ome BLM Ground
O= H4.85°
0 = 34.8499"