Year JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total
1995 275.1 205 219.8 194.5 231.5 206.5 83.2 151.7 96.5 123.3 133 183 2103.1
1996 231.5 300.3 141.5 133.3 218.5 116.5 181.5 48.8 55.8 177 57 145.5 1807.2
1997 118 206.3 132.8 155 119.8 121.8 92.3 130.8 1 73.8 208 321.3 1680.9
1998 222.4 27.2 341.7 119.7 158.5 116.9 221.6 302.4 191.3 225.4 176.4 255.1 2358.6
1999 237.5 147.9 157.9 209.3 169.3 190.7 183.5 100.5 119.9 181.2 238.7 257.2 2193.6

Bulan JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Total
Maximum 275.1 300.3 341.7 209.3 231.5 206.5 221.6 302.4 191.3 225.4 238.7 321.3 3065.1
Average 216.9 177.34 198.74 162.36 179.52 150.48 152.42 146.84 92.9 156.14 162.62 232.42 2028.68
Rain plan 197.66 164.12 130.72 183.73
Average day 7.23 5.911333 6.624667 5.412 5.984 5.016 5.080667 4.894667 3.096667 5.204667 5.420667 7.747333 67.62267

Luas Catchmen Area 100 ha


Debit Air Tanah 20.0 l/jam
Luas Sump 300.0 m2
Tinggi Permukaan Air 50.0 mdpl
Tinggi Permukaan
Tambang 75.0 mdpl
Panjang Pipa 300.0 m
1.2
Head Losse m/100m
Mikhael Hutagalung
14306064

Catchment Area 100,000.00 meter2

Daily Rainfall 67.62 mm/day

Inflow 6,762.00 meter3 / day

Ground water 1,728.00 meter3 / day

Total Inflow 8,490.00 meter3

Option Length Width Depth Volume

1 30 25 4 3,000

2 30 20 4 2,400

3 40 15 4 2,400