A.

65

BS.1a - BS.1 BS.1 - BS.2


A = 279.47 Ha m = 1.00 A = 246.88 Ha m = 1.00
Q = 194.08 l/dt k = 50 Q = 171.44 l/dt k = 50
b = 0.60 m v = 0.338m/dt b = 0.55 m v = 0.328m/dt
SITUASI BANGUNAN S, 1 : 2000
h = 0.52 m i = 0.000250 h = 0.50 m i = 0.000250
w = 0.54 m w = 0.54 m

+937.07

+937.07
0.20 0.30

+938.54 +938.54

1:
1

1.06
+938.00

30
0.
+938.54

+938.00

+935.54
0.20
1.00

1.00
+938.54 B E +935.54
+937.48

+937.48
D

0.30 0.30
A

1:1

1:1

1:1
A

1:1
LEGENDA :

0.55
0.60

+937.48 +934.50 0.30 0.60 0.60

1:1

+934.50
1:1

1:1

1:1
1:4
PASANGAN BATU KALI
D
POTONGAN C - C

+935.00

+935.54
+938.54

1.00
1.00

+938.54 C +938.54
E +935.54
F F
Skala 1 : 50 1:3
PASANGAN BATU KALI
+937.07

+937.07
1:2:3
PASANGAN BETON BERTULANG

DENAH 1:2:4
Skala 1 : 100
PASANGAN BETON TUMBUK
G G

+937.53
0.20

+935.54 +935.54
SKALA 1:100
0 2 4 6 8 10 m

+934.50

0.20 SKALA 1:50


+938.54
0 1 2 3 4 5 m

1.16
+935.00 0.20 0.20

+935.54 +935.54
+934.50

0.30 0.30

1.04
+935.00

30

1
1:
0.

1:
+938.03

+938.03

1
0.60 0.55 0.65 +934.50

0.30 0.30
B POTONGAN D - D 0.30 0.55 0.30
0.50 BS.1 Ka
Skala 1 : 50
POTONGAN E - E
+937.07 +937.07
A = 32.59 Ha m = 1.00
+937.53
+937.80 Q = 47.26 l/dt k = 35
+938.03 +938.03
b = 0.50 m v = 0.230m/dt Skala 1 : 50
1.00 1.00 h = 0.27 m i = 0.000500
w = 0.23 m

1.06
1.00 0.20 0.20
+938.54 +938.54 +938.54 +938.54 +938.54
+938.00 0.20 0.20

1.01
+937.48 +938.03 +938.03
0.60

+937.90

0.30 0.30 0.50


+937.80

1
1:

1:
1
+937.53 +937.53

0.30 0.30
0.30 3.76 6.00

30
1.60

0.
+935.54

+935.00 +935.00
+934.50 0.60 0.30 0.60 0.30 0.50 0.30
+934.50 1:4
0.60

POTONGAN A - A
Skala 1 : 100 0.60 1.00 1.10
2.50 POTONGAN F - F POTONGAN G - G
Skala 1 : 50 Skala 1 : 50

Provinsi
1.00 0.30 Sumatera Utara
+938.54
Proyek Irigasi
0.60 1.06

+937.90 +938.03
+937.69 +937.80 Sisuar-Suar
+937.53 +937.53
0.60

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
0.60 KABUPATEN TOBA SAMOSIR Toba Samosir
0.60 0.55 0.60 1.45 0.81 0.48 1.50 0.96 2.50
GAMBAR : No. Lembar : -

POTONGAN B - B No. Register : -

Skala 1 : 100 Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
8
A .9 E.02

BS.1 - BS.2

A = 246.88 Ha m = 1.00 BS.2 - BS.3


Q = 171.44 l/dt k = 50
A = 237.39 Ha m = 1.00
b = 0.55 m v = 0.328m/dt
Q = 164.85 l/dt k = 50
h = 0.50 m i = 0.000250
b = 0.55 m v = 0.324m/dt
w = 0.54 m
h = 0.49 m i = 0.000250 SITUASI BANGUNAN S, 1 : 2000
w = 0.52 m

+923.90

+923.90 +924.04
+924.16

+923.62

0.20
1.00
C

1.00
+924.16 B E +924.04

+923.12
D
A A

1:1
1:1

1:1

0.55
0.55
+923.12 +923.03

1:1

1:1

+923.03
1:1
LEGENDA :
D

+923.52

+924.04 +923.90
+924.16

1.00
+924.16
1.00

+924.16 C E
+924.04
F F
+923.90

1:4
PASANGAN BATU KALI

DENAH
1:3
PASANGAN BATU KALI

Skala 1 : 100
G G 1:2:3
PASANGAN BETON BERTULANG

+923.29
1:2:4
PASANGAN BETON TUMBUK
0.20 0.30

+924.16 +924.16

SKALA 1:100

1.04
+923.62

30
0.

1:
0 2 4 6 8 10 m

1
+923.12

0.30 0.30
0.30 0.55 0.65 SKALA 1:50
0 1 2 3 4 5 m
POTONGAN C - C
Skala 1 : 50
+923.79

+923.79

B BS.2 Ka
0.50
A = 9.49 Ha m = 1.00
+923.29
+923.42 Q = 13.76 l/dt k = 35
0.20
+923.79 +923.90 +923.90 +923.79 b = 0.50 m v = 0.160m/dt 0.20 0.20 0.20
h = 0.13 m i = 0.000500 +924.16 +924.16 +924.16 +924.16
1.00 1.00 +924.04 +924.04
w = 0.37 m

1.13

1.01
+923.52 +923.52

30

1
1:
0.

1:
1
+923.03 +923.03

0.30 0.30

0.30 0.30
0.60 0.50 0.60 0.30 0.55 0.30

1.04
POTONGAN D - D POTONGAN E - E
1.00 Skala 1 : 50 Skala 1 : 50
+924.16 +924.04
1:1

+923.62
1:1

+923.52 +923.52
+923.12 +923.03 +923.03
0.60

0.60

0.30 3.74 5.30 2.50


1.00 1.10

POTONGAN A - A 0.20 0.20

Skala 1 : 100 +924.16 +924.16 +924.16


0.20 0.20
+924.16

+923.79 +923.79

0.87

0.30 0.30 0.50


+923.52

1
1:
+923.42

1:
1
+923.29 +923.29

0.30 0.30

30
0.
1.00 0.30
+924.16
+923.79
0.60 1.04

+923.62 +923.52 0.60 0.30 0.60 0.30 0.50 0.30


+923.29 +923.43 +923.42
+923.29
+923.12
0.60

0.390.42 1.50
0.60
0.84 2.50
POTONGAN F - F POTONGAN G - G
Skala 1 : 50 Skala 1 : 50
0.60 0.55 0.60 1.45
Provinsi

POTONGAN B - B Sumatera Utara

Skala 1 : 100 Proyek Irigasi

Sisuar-Suar

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
KABUPATEN TOBA SAMOSIR Toba Samosir

GAMBAR : No. Lembar : -

No. Register : -

Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
B.02 3
B .0
1.00 1.00 BS.3 Ki
+919.90 +919.90
A = 8.00 Ha m = 1.00
+919.41 +919.41 D .0
+919.18
+918.99
Q = 11.60 l/dt k = 35
1
b = 0.50 m v = 0.200m/dt
0.50
h = 0.19 m i = 0.000500
B
w = 0.23 m

+919.41

+919.41
SITUASI BANGUNAN S, 1 : 2000
0.20 0.30

+919.90 +919.90

1:
1

1.01
+919.38

30
0.
+918.89

+918.99

0.30 0.30
BS.3 - BS.4
BS.2 - BS.3
A = 179.13 Ha m = 1.00
A = 237.39 Ha m = 1.00 I I Q = 124.40 l/dt k = 50
Q = 164.85 l/dt k = 50 0.30 0.55 0.60
b = 0.50 m v = 0.302m/dt
b = 0.55 m v = 0.324m/dt
h = 0.44 m i = 0.000250

POTONGAN C - C
h = 0.49 m i = 0.000250 LEGENDA :
w = 0.50 m
w = 0.52 m

Skala 1 : 50

+919.90
1:4
PASANGAN BATU KALI
+919.90

+919.38

H H

0.20

+919.38
1.00

+919.90 C E

1.00
+919.38
+918.89

D 1:3
A A PASANGAN BATU KALI

1:1
1:1

1:1
0.20 0.20
0.55

0.50
+918.89 +918.14 +918.44
+919.90 +919.90
1:2:3

1:1
1:1

1:1
PASANGAN BETON BERTULANG

+918.44
0.20 0.20

+918.88

+919.38
D
+919.90

+919.38 +919.38 +919.38 +919.38

1.00
+919.38
1.00

+919.90
C E
F F

0.94
1:2:4
+918.88 +918.88 PASANGAN BETON TUMBUK

1.24

30

1
+919.90

1:

1:
0.

1
+918.44
DENAH

0.30 0.30
+918.14

Skala 1 : 100

0.30 0.30
SKALA 1:100

0.30 0.50 0.30 0 2 4 6 8 10 m


0.60 0.50 0.60

G G
POTONGAN D - D POTONGAN E - E
+918.85

Skala 1 : 50 Skala 1 : 50 SKALA 1:50


0 1 2 3 4 5 m

0.20 0.20

+919.90 +919.90 +919.90 +919.90


0.20 0.20

+919.45 +919.45

1.05
+919.28

0.60
+919.18

1
1:

1:
1
+918.85 +918.85

30
0.30 0.30

0.30 0.30
0.
+919.45

+919.45

0.60 0.30 0.60 0.30 0.50 0.30

POTONGAN F - F POTONGAN G - G
0.50 B BS.3 Ka Skala 1 : 50 Skala 1 : 50
A = 50.26 Ha m = 1.00
+918.85
+919.18 Q = 72.88 l/dt k = 35
+919.45 +919.45 b = 0.50 m v = 0.262m/dt
+919.90 +919.90
h = 0.33 m i = 0.000500
1.00 1.00
w = 0.27 m

0.20 0.20

+919.90 +919.90 +919.90 +919.90


0.20 0.20

0.91
+919.41 +919.41
+919.28

0.30 0.30 0.42


+919.18

1
1:

1:
1
1.01 +918.99 +918.99

0.30 0.30
1.00

30
0.
+919.90
+919.38 +919.38
+919.28
+918.89 +918.79 +918.88 +918.88 0.60 0.30 0.60 0.30 0.50 0.30
0.60

+918.44
1:4
0.60

+918.14

0.30 3.71 6.25


1.20 2.50
POTONGAN H - H POTONGAN I - I
1.10 2.50
Skala 1 : 50 Skala 1 : 50
POTONGAN A - A
Skala 1 : 100
Provinsi

1.00 1.00 Sumatera Utara


0.30 0.30
+919.90 +919.90 Proyek Irigasi
+919.41 +919.38 +919.45 Sisuar-Suar
+919.18 +919.28 +919.28 +919.18
+919.14
+918.99 +918.99 +919.89 +919.00
+918.85 +918.85
0.60

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


0.60

IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR


0.60 KABUPATEN TOBA SAMOSIR Toba Samosir
0.60
2.50 0.90 1.00 0.450.57 1.10 0.60 0.55 0.60 No. Lembar : -
1.10 0.99 0.45 1.00 0.90 2.50 GAMBAR :

No. Register : -
POTONGAN B - B
Skala 1 : 100 Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
1.00 1.00 BS.4 Ki

+911.67 +911.67 A = 17.75 Ha m = 1.00


+911.33 +911.44 +911.33 Q = 25.74 l/dt k = 35
+911.25
b = 0.50 m v = 0.200m/dt
0.50
h = 0.19 m i = 0.000500
B
w = 0.23 m

BS.4

+911.67

+911.67
SITUASI BANGUNAN S, 1 : 2000

0.20 0.30

+912.14 +912.14

1:
1

0.94
+911.64

30
0.
+911.20

0.30 0.30
0.30 0.50 0.60
LEGENDA :
POTONGAN C - C
Skala 1 : 50 1:4

+911.25
BS.3 - BS.4 PASANGAN BATU KALI
BS.4 - BS.5
A = 179.13 Ha m = 1.00
Q = 124.40 l/dt k = 50
I I A = 143.63 Ha m = 1.00
Q = 99.74 l/dt k = 50 1:3
b = 0.50 m v = 0.302m/dt PASANGAN BATU KALI
b = 0.50 m v = 0.286m/dt
h = 0.44 m i = 0.000250
h = 0.39 m i = 0.000250
w = 0.50 m
w = 0.50 m
1:2:3
+911.33

PASANGAN BETON BERTULANG

+911.33
0.20
0.20 0.20 0.20
+912.14 +912.14 +912.14 +912.14
+912.04 +912.04
1:2:4
PASANGAN BETON TUMBUK
+912.14

+911.64

H H

+912.04
0.20
1.00

0.99
C

1.00
+912.14 E

0.89
+912.04
+911.20

+911.54 +911.54
D

30

1
1:

1:
A A

0.

1
1:1

1:1

1:1
+911.15 +911.15

0.30 0.30

0.30 0.30
SKALA 1:100

0.50
0.50

+911.20 +911.15
0 2 4 6 8 10 m

1:1
1:1

1:1

+911.15
0.60 0.50 0.60 0.30 0.50 0.30

+911.54

+912.04
+912.14

1.00
1.00

+912.14 C +912.04
F F
E
POTONGAN D - D POTONGAN E - E
Skala 1 : 50 Skala 1 : 50 SKALA 1:50

+911.33
+911.33

0 1 2 3 4 5 m

DENAH
Skala 1 : 100
G G 0.20 0.20
+911.25

+912.14 +912.14 +912.14 +912.14


0.20 0.20

0.89
+911.67 +911.67
+911.54

0.30 0.30 0.42


+911.44

1
1:

1:
1
+911.25 +911.25

0.30 0.30

30
0.
+911.67

+911.67

0.60 0.30 0.60 0.30 0.50 0.30

POTONGAN F - F POTONGAN G - G
B BS.4 Ka
0.50
A = 17.75 Ha m = 1.00 Skala 1 : 50 Skala 1 : 50
+911.25
+911.44 +911.33 +911.33 Q = 25.74 l/dt k = 35
+911.67 +911.67 b = 0.50 m v = 0.200m/dt
h = 0.19 m i = 0.000500
1.00 1.00
w = 0.23 m

0.20 0.20

+912.14 +912.14 +912.14 +912.14


0.20 0.20

0.89
+911.67 +911.67
+911.54

0.30 0.30 0.42


+911.44

1
1:

1:
1
0.94 +911.25 +911.25

0.30 0.30

30
1.00

0.
+912.14 +912.04
+911.64 +911.54 +911.54
0.60 0.30 0.60 0.30 0.50 0.30
+911.20 +911.15 +911.15
0.60

0.60

0.30 3.64 5.25 1.00 1.10


2.50 POTONGAN H - H POTONGAN G - G
Skala 1 : 50 Skala 1 : 50
POTONGAN A - A
Skala 1 : 100

1.00 1.00
0.30 0.30
Provinsi
+911.67 +911.54 +911.64 +911.54 +911.67
+911.44 +911.40 +911.40 +911.44 Sumatera Utara
+911.25 +911.25 +911.20 +911.25 +911.25
0.60

0.60

Proyek Irigasi
0.60 0.60
Sisuar-Suar
2.50 0.90 1.50 0.450.57 1.50 0.600.500.60 1.50 0.570.45 1.50 0.90 2.50
PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten
IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR

POTONGAN B - B
KABUPATEN TOBA SAMOSIR Toba Samosir

GAMBAR : No. Lembar : -

Skala 1 : 100 No. Register : -

Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
U

BS.5

SITUASI BANGUNAN S, 1 : 2000

LEGENDA :

1:4
PASANGAN BATU KALI

BS.4 - BS.5
BS.5 Ka
A = 143.63 Ha m = 1.00 1:3
A = 143.63 Ha m = 1.00 PASANGAN BATU KALI
Q = 99.74 l/dt k = 50
Q = 208.26 l/dt k = 35
b = 0.50 m v = 0.286m/dt
b = 0.50 m v = 0.340m/dt
h = 0.39 m i = 0.000250
h = 0.57 m i = 0.000500 1:2:3
w = 0.50 m PASANGAN BETON BERTULANG
w = 0.23 m
+907.20

1:2:4
PASANGAN BETON TUMBUK

+907.20
+908.45

+907.95

+907.98
0.20

C D SKALA 1:100
1.00

+908.45 B

1.00
+907.56

+907.98
Bang. Ukur A 0 2 4 6 8 10 m
A
1:1
0.50

0.50
+907.56 +907.18
1:1

+907.18
SKALA 1:50

+907.98
+908.45

1.00
+907.75
D +907.98
1.00

+908.45 B 0 1 2 3 4 5 m
C

+907.20
+907.20

DENAH
Skala 1 : 100

0.20 0.20
0.20 0.30
+908.45 +908.45 +908.45 +908.45
+908.45 +908.45 0.20 0.20

+907.98 +907.98

0.89
1:

1.27
+907.95 +907.85

1
0.89 +907.75

30

0.80
1
1:
0.
1.00 0.30

1:
1
+907.56

30
0.30 0.30
+908.45

0.
+907.18 +907.18

0.30 0.30

0.30 0.30
+907.95 +907.85 +907.98
+907.75
+907.56
+907.39
0.60

+907.18 +907.18

0.60
0.30 0.50 0.60
0.60 0.30 0.60 0.30 0.50 0.30
0.30 3.59 5.25 0.60
1.00 1.10 1.71 0.63 1.50 1.26 2.50

POTONGAN A - A POTONGAN B - B POTONGAN C - C POTONGAN D - D


Skala 1 : 100 Skala 1 : 50 Skala 1 : 50 Skala 1 : 50

Provinsi

Sumatera Utara

Proyek Irigasi

Sisuar-Suar

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
KABUPATEN TOBA SAMOSIR Toba Samosir

GAMBAR : No. Lembar : -

No. Register : -

Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
K.02 K.03

K .0
2
BS.6 - BS.2a

A = 143.63 Ha m = 1.00 0.20 0.30

Jalur K Q = 13.76 l/dt k = 50 +932.57 +932.57


b = 0.50 m v = 0.286m/dt +932.10
A = 0.00 Ha m = 1.00

1.00
h = 0.39 m i = 0.000250
Q = 99.74 l/dt k = 50

1:
30

1
w = 0.55 m

0.
b = 1.00 m v = 0.000m/dt

+932.07
h = 0.80 m i = 0.000250 +931.30

0.30 0.30
w = 0.20 m
SITUASI BANGUNAN S, 1 : 2000

+932.10+932.07
0.30 1.00 0.65
+932.57

0.20
1.00

+932.57 D

+930.65
B C
+931.30
E

1.00
F +930.65
+932.57

A POTONGAN D - D

1:1

1:1
A

1:1

1:1
Skala 1 : 50
1.00

0.50
+929.41 +929.71
+931.30

1:1

1:1

+929.71
1:1

1:1

+930.10

+930.65

1.00
+932.57

+930.65
E
1.00

+932.57 D F LEGENDA :
+932.07

G G I I
1:4

+932.07
PASANGAN BATU KALI
H H

+932.57
+932.57
+931.38
1:1 1:1

1:3
PASANGAN BATU KALI
0.20

+932.57 +932.57

1:2:3
PASANGAN BETON BERTULANG

0.20 1:2:4
0.20 0.20 PASANGAN BETON TUMBUK
J J +932.57 +932.57

+931.43
+930.65 +930.65
+932.10

1.00
1:1 1:1

0.94
+930.10 SKALA 1:100

30
0.
+931.30
+929.71 0 2 4 6 8 10 m

0.30 0.30

0.30 0.30
0.60 0.55 0.60
0.30 0.50 0.30
SKALA 1:50
POTONGAN F - F
POTONGAN E - E
0 1 2 3 4 5 m
Skala 1 : 50
Skala 1 : 50
+932.57

+932.57

+932.23

+932.23
B C
0.80
0.20 0.20 0.20
0.50
BS.6 - BS.7 +931.38 BS.6 Ki
+931.43 +932.57 +932.57 +932.57 +932.57
A = 492.87 Ha m = 1.00 +932.00 +932.00 A = 677.58 Ha m = 1.00
+932.07 +932.07 +932.00
Q = 342.27 l/dt k = 50 +932.23 +932.23 Q = 208.26 l/dt k = 35

1.19
+932.00

1.19
+932.57 +932.57

30
b = 0.80 m v = 0.389m/dt b = 0.50 m v = 0.340m/dt

0.

1
1:

1:
1
1.00 1.00
h = 0.62 m i = 0.000250 1.00 1.00 h = 0.57 m i = 0.000500
w = 0.57 m w = 0.23 m +931.38 +931.38

0.30 0.30

0.30 0.30
0.60 0.80 0.60 0.30 0.80 0.30

POTONGAN G - G POTONGAN H - H
1.00
1.00 Skala 1 : 50 Skala 1 : 50
+932.57
+932.10
1:1

+931.30
0.60

+930.65
0.20
0.20 0.20

1:1
0.30 3.70 10.90 +930.10 +930.10
+932.57 +932.57 +932.57 +932.57
+929.71 +932.23 +932.23
1:4
0.60

+929.41 +932.00
+932.00

0.67
POTONGAN A - A

0.80
1
1:

1:
1
2.50

30
1.00 1.10 2.50 1.20

Skala 1 : 100

0.
+931.43 +931.43

0.30 0.30

0.30 0.30
0.60 0.30 0.60 0.30 0.50 0.30
1.00
+932.57
+932.10 +932.00
+932.57
+932.00 POTONGAN I - I POTONGAN J - J
0.60 1.00

1:1

+931.30 +931.38 +931.38 Skala 1 : 50 Skala 1 : 50


0.60

2.50

POTONGAN B - B
0.60 1.00 0.60 1.40 1.10

Skala 1 : 100 Provinsi

Sumatera Utara

Proyek Irigasi

Sisuar-Suar
1.00 0.30 PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten
+932.57 IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
+932.10 +932.00 +932.13
+931.90 KABUPATEN TOBA SAMOSIR Toba Samosir
0.60 1.00

+930.43 +930.64 +930.43 GAMBAR : No. Lembar : -


+931.30
0.60

No. Register : -
0.60
1.71 0.63 1.50
0.60 1.00 0.60 1.40 1.10 1.26 2.50
Tanggal No. Kontrak

POTONGAN C - C Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Skala 1 : 100 Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
L.28 L.29 L.30
U

1.00 1.00 BS.7 Ki

A = 592.36 Ha m = 1.00
+922.52 +922.52
+922.29 +922.26+922.29 Q = 123.57 l/dt k = 35
+921.82 b = 0.50 m v = 0.300m/dt
SITUASI BANGUNAN S, 1 : 2000
h = 0.44 m i = 0.000500
0.50
w = 0.26 m
B

+922.52

+922.52
LEGENDA :

1:4
PASANGAN BATU KALI
0.20 0.30

+923.03 +923.03
1:3
PASANGAN BATU KALI

+921.82

1.19
+922.46

30
1:1 1:1

0.

1:
1
BS.6 - BS.7
G G 1:2:3
BS.7 - BS.8 +921.84 PASANGAN BETON BERTULANG

0.30 0.30
A = 492.87 Ha m = 1.00
A = 407.65 Ha m = 1.00
Q = 342.27 l/dt k = 50
Q = 283.09 l/dt k = 50
b = 0.80 m v = 0.389m/dt 1:2:4
b = 0.70 m v = 0.371m/dt 0.30 0.80 0.60
PASANGAN BETON TUMBUK
h = 0.62 m i = 0.000250
h = 0.59 m i = 0.000250
w = 0.57 m
w = 0.52 m
POTONGAN C - C
+922.29

Skala 1 : 50 SKALA 1:100

+922.29
0 2 4 6 8 10 m
+923.03

+922.46

0.20

+921.98
1.00

+923.03 C F F

1.00
+923.03
E +921.98
+921.84

D
A
1:1

1:1

1:1

1:1
A SKALA 1:50
0 1 2 3 4 5 m
0.80

0.70
+921.84 +920.57 +920.87
1:1

1:1

1:1

1:1

+920.87
D +923.03 +923.03

+921.46

+921.98
+923.03

1.00
B +923.03
1.00

+923.03 C E +921.98

1:1

1:1
0.20 0.20

+922.29
+921.98 +921.98
+922.29

+921.98 +921.98
+921.84

1.11
+921.46 +921.46

30

1
1:
0.

1:
DENAH

1.41

1
+920.87
Skala 1 : 100

0.30 0.30
+920.87

0.30 0.30
0.30 0.70 0.30

0.60 0.70 0.60

POTONGAN D - D POTONGAN E - E
Skala 1 : 50 Skala 1 : 50
1.19
1.00
+923.03

+922.46
1:1

+921.98
+921.84
0.60

+921.46 0.20 0.20


1:1

+921.46

+920.87 +923.03 +923.03 +923.03 +923.03


1:4
0.60

0.30 3.89 4.95 +920.87 0.20 0.20

+922.52 +922.52

1.21
+922.36
1.10 2.50 1.20 2.16 0.30 +922.26

0.70
1
1:

1:
1
30
+921.82 +921.82

0.
0.30 0.30

0.30 0.30
POTONGAN A - A
Skala 1 : 100 0.60 0.30 0.60 0.30 0.50 0.30

0.30 1.00
POTONGAN F - F POTONGAN G - G
+923.03
Skala 1 : 50 Skala 1 : 50
1.19

+922.52 +922.46
+922.26 +922.36
+922.03
+921.82 +921.82 +921.84
0.60
0.60

0.60
2.50 1.26 1.50 0.63 1.32 1.50 0.60 0.80 0.60

Provinsi

POTONGAN A - A Sumatera Utara

Skala 1 : 100
Proyek Irigasi

Sisuar-Suar

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
KABUPATEN TOBA SAMOSIR Toba Samosir

GAMBAR : No. Lembar : -

No. Register : -

Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
L.
46
U

SITUASI BANGUNAN S, 1 : 2000

+913.93 1.00 1.00 +913.93 BS.8 Ki

+913.25 +913.25 A = 369.42 Ha m = 1.00


+913.05
Q = 323.26 l/dt k = 35
+912.35 b = 0.50 m v = 0.380m/dt
h = 0.70 m i = 0.000500
0.50
w = 0.20 m
B

+913.25

+913.25
LEGENDA :

1:4
PASANGAN BATU KALI

1:3
PASANGAN BATU KALI

1:2:3
PASANGAN BETON BERTULANG

+912.35
1:2:4
PASANGAN BETON TUMBUK
1:1 1:1

G G
BS.7 - BS.8

A = 407.65 Ha m = 1.00 SKALA 1:100


BS.8 - BS.9
Q = 283.09 l/dt k = 50
A = 184.71 Ha m = 1.00
0 2 4 6 8 10 m
b = 0.70 m v = 0.371m/dt
Q = 128.27 l/dt k = 50
h = 0.59 m i = 0.000250
b = 0.55 m v = 0.304m/dt
w = 0.52 m
h = 0.43 m i = 0.000250
w = 0.53 m SKALA 1:50
+913.93

+913.93
0 1 2 3 4 5 m
+913.77

+913.25

0.20

F F

+913.68
1.00

+913.77 C

1.00
D E +913.68
+912.66

A
1:1

1:1

1:1

1:1

0.55
0.70

+912.66 +912.72

1:1

1:1
0.20 0.30 0.20

+912.72
1:1

1:1

0.20 0.20 0.20

+913.15
+913.77 +913.77

+913.68
+913.77 +913.77 +913.77 +913.77
+913.77

1.00
B +913.68 +913.68 +913.68
D E

1:
1.00

1
+913.77

1.05
+913.25

1.11

0.96
+913.93
+913.15 +913.15

30
+913.93

30
0.

1
1:
0.

1:
1
DENAH +912.66 +912.72 +912.72

0.30 0.30

0.30 0.30
0.30 0.30
Skala 1 : 100
0.30 0.70 0.60 0.60 0.50 0.60 0.30 0.55 0.30

POTONGAN C - C POTONGAN D - D POTONGAN E - E


Skala 1 : 50 Skala 1 : 50 Skala 1 : 50

1.11
1.00
+913.77 +913.68
0.20 0.20
+913.25
1:1

1:1

+913.15 +913.15
+913.77 +913.77 +913.77 +913.77
+912.66 +912.72 +912.72
0.20 0.20
0.60
0.60

+913.25 +913.25
+913.15

1.42
2.50 +913.05
0.30 3.81 5.30 1.00 1.10

0.90
1
1:

1:
1
30
0.
POTONGAN A - A +912.35 +912.35

0.30 0.30

0.30 0.30
Skala 1 : 100
0.60 0.30 0.60 0.30 0.50 0.30

POTONGAN F - F POTONGAN G - G
Skala 1 : 50 Skala 1 : 50
0.30 1.00 Provinsi

+913.77 Sumatera Utara


1.11

+913.25 +913.15 Proyek Irigasi


+913.05
+912.55 Sisuar-Suar
0.60

+912.35 +912.35
0.60

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
0.60 KABUPATEN TOBA SAMOSIR Toba Samosir
2.50 1.20 1.00 0.60 2.10 1.50 0.60 0.70 0.60 No. Lembar : -
GAMBAR :

No. Register : -

POTONGAN B - B
Skala 1 : 100 Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution
U

SITUASI BANGUNAN S, 1 : 2000

LEGENDA :

1:4
PASANGAN BATU KALI

BS.8 - BS.9

A = 184.71 Ha m = 1.00 BS.9 Ki 1:3


PASANGAN BATU KALI
Q = 128.27 l/dt k = 50 A = 184.71 Ha m = 1.00
b = 0.55 m v = 0.304m/dt Q = 267.83 l/dt k = 35
h = 0.43 m i = 0.000250 b = 0.50 m v = 0.360m/dt
1:2:3
w = 0.53 m h = 0.64 m i = 0.000500 PASANGAN BETON BERTULANG
w = 0.26 m
+912.51

+912.51
1:2:4
PASANGAN BETON TUMBUK
+913.32

+912.79

+912.85
0.20
1.00

+913.32 B C

1.00
D +912.85
+912.36

Bang. Ukur SKALA 1:100


A A
1:1

1:1

1:1
0 2 4 6 8 10 m
0.55

0.50
+912.36 +911.95
1:1

1:1

1:1

+911.95

+912.85
+913.32

1.00
+912.59 +912.51
+912.85
1.00

+913.32 B SKALA 1:50


C D
0 1 2 3 4 5 m
+912.51

DENAH
Skala 1 : 100

0.20 0.20

+913.32 +913.32 +913.32 +913.32


0.20 0.30 0.20 0.20
+913.32 +913.32 +912.85 +912.85

1:
+912.69

1.37
1
+912.59

0.96

0.90
1
1:
+912.79

1:
1
30

30
0.

0.
+912.36 +911.95 +911.95

0.30 0.30

0.30 0.30

0.30 0.30
0.96
1.00
0.30
+913.32
+912.79 +912.85 0.30 0.55 0.60 0.60 0.30 0.60 0.30 0.50 0.30
+912.69 +912.59
+912.36
+912.16
0.60

+911.95 +911.95
0.60

0.30 3.66 1.25 4.00 0.60


POTONGAN B - B POTONGAN C - C POTONGAN D - D
1.00 1.10 1.92 0.63 1.50 1.26 2.50
Skala 1 : 50 Skala 1 : 50 Skala 1 : 50
POTONGAN A - A
Skala 1 : 100

Provinsi

Sumatera Utara

Proyek Irigasi

Sisuar-Suar

PAKET : SURVEI INVESTIGASI DAN DESAIN PENINGKATAN INFRASTRUKTUR Kabupaten


IRIGASI PADA DAERAH IRIGASI SISUAR-SUAR
KABUPATEN TOBA SAMOSIR Toba Samosir

GAMBAR : No. Lembar : -

No. Register : -

Tanggal No. Kontrak

Direncana Ir. Yuli Giswantoro 30 Juli 2015 022/KPA-RB/2015

Diperiksa Pengawas Marolo Hutajulu


Addendum No. Addendum

PPTK Pasihar L. Toruan, ST.


- -
No. REV. TGL. YG DIREV. OLEH DIRENC. KPA Ir. Miswar Nasution