You are on page 1of 152
DUBAI HOLDING PROJECT: PT-125 — JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE WORKS Contract Documents Volume 3 — Bill of Quantities December 2014 e mpg? ase Rapes a . ise + teat ROADS CONT. CO. LLC. _ Hamann Dh CoNnsuiT PROJECT: PT-125 — JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE WORKS GENERAL INDEX VOLUME I: CONTRACT CONDITIONS VOLUME 2: SPECIFICATIONS > VOLUME 2 PART 1/3 > VOLUME 2 PART 2/3 > VOLUME 2 PART 3/3 -A > VOLUME 2 PART 3/3 -B > ADDITIONAL DOCUMENTS * APPENDIX 1 - SOIL REPORT + APPENDIX 2- BOREHOLE LOCATION PLAN VOLUME 3: BILL OF QUANTITIES VOLUME 4: DRAWINGS I” Sy oylat CHLMas 3 Wine pence EMIRATES ROADS CONT. CO.LL.C, Hamerain& Al heb ‘SECTION SECTION (a) SECTION (b) ‘SECTION (c) SECTION (6) Port t Part 2a Port2 Pants Part 4 Parts Pant Pant? Part Porta Panto Port 10 Port11 Port 12 Part 13, ‘SECTION (e) SECTION (9 PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE WORKS CONTRACT DOCUMENTS VOLUME 3 - BILL OF QUANTITIES CONTEN’ DESCRIPTION PAGE LIST OF PRINCIPAL QUANTITIES alt -al4 PREAMBLE bit -bi18 DAY WORK SCHEDULE oft -o18 WORK ITEMS. GENERAL ITEMS ann ann DEMOLITION AND SITE CLEARANCE RNR ROADS AND PAVINGS an ‘STREET LIGHTING WORKS 3 - A315 POTABLE WATER WORKS 4-R1 - dl4/9-R1 FIRE FIGHTING MAIN STORMWATER WORKS SEWERAGE WORKS IRRIGATION WORKS IRRIGATION AND FIREFIGHTING RESERVOIR & PUMPING STATION TELECOMMUNICATION POWER WORKS SECURITY NETWORK SPARE DUCTS PROVISIONAL SUMS GRAND SUMMARY PRICE ANALYSIS SCHEDULE ISIN-R1 - d/5/6-R1 dI6/1-R1 - d/6/6-R1 TARA - THAR 8/1 - 418/9-R1 IBAN1-R2 - dIBA2-RZ iar - a9/4 " eR atte EMIRATES ROADS CONT. CO.L.LC. 24 ht Al Oboe: ed Cte 5 1A LE gs t8:10t se Consuit Section (a) List of Principal Quantities pa beyas 52] ino Mauro MT O.LLe, ne (Cape sos WUAS, 3 A aes ‘CONT. CO.L.LE. maran ‘ALDowb BILL OF QUANTITIES PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT LIST OF PRINCIPAL QUANTITIES PACKAGE: INFRASTRUCTURE tem | DESCRIPTION | Section (a) - List of Principal Quantities The following is a general list of the ‘approximate quantities of major work ites within the scheme so the contractor can ‘gauge the size and scope of works. The list ‘should not be used as a basis for the pricing of PART 2: Excavation for cuttings Filling general; selected cut material Filling general; imported natural material PART 3: STREET LIGHTING WORKS ‘Street lighting column foundation Feeder Pillar 4C x 10 mm2 XLPE/CUIMDPE + 10x 10 mm2 (CwPVC-ECC earth cable Earthing system, complete ‘-way, 100mm dia uPVC duct 2eway, 100mm dia uPVC duct ‘4-way, 100mm dia uPVC duct 4: POTABI wi 100 mm dia GRE pipe 150 mm dia GRE pipe 100mm dia GRE pipe through 406mm dia steel sleeve 150mm dia GRE pipe through 457mm dia steel sleeve 200 mm dia uPVC duct ur Sf 100mm dia Gate valve 150mm dia gate valve Double flanged 80mm buttertly valve with worm gear Double orifice flanged air valve 80mm dia Wash Out Valve on 100mm dia GRE pipe Flow meter, On DN 150mm pipes PART 5: FIRE FIGHTING MAIN: 110 mm OD HDPE pipe 200 mm OD HOPE pipe 250 mm OD HOPE pipe Flanged gate valves On 20 CONSULT m3 ‘Quantity a oa Se os ees faze) BILL OF QUANTITIES LIST OF PRINCIPAL ‘QUANTITIES (@) az PART 5; FIRE FIGHTING MAIN (Cont'd) Air Valves Nominal bore; 80mm dia Wash Out Valves On 250mm HDPE line Pillar type fire hydrant PART 6; STORM WATER WORKS 160mm dia uPVC pipes 250mm dia uPVC pipes ‘Manholes Twes +1200mm dia. Depth n.e1.5m 120mm dia. Depth 1.5 - 2m 1200mm dia. Depth 2 - 2.5m ‘Tye 41500mm dia. Depth 3.0 - 3.5m Top entry gully - Type C PART 7: SEWERAGE WORKS: ‘160mm dia uPVC pipes 200mm dia uPVC pipes Manholes Type A 1200mm internal diameter manholes - insitu Concrete Depth 1.5 - 2.0m Depth 2.0- 2.5m Type B 1500 mm internal diameter manholes Depth 2.5 - 3.0m Depth 3.0 - 3.5m ‘Type 1500 mm internal diameter manholes-Insitu cof Depth 3.5 - 4.0m ‘Manholes with one backsrop Type A 120mm intemal diameter manholes - Insitu Concrete Depth 2.0- 2.5m ‘Type B 1500 mm intemal diameter manholes - Insitu Ce Depth 2.5 - 3.0m Depth 3.0- 3.5m Type c 1800 mm internal Insitu Concrete cONSU ne quantity 450 2,250 1,970 k fi i i a BILL OF QUANTITIES LIST OF PRINCIPAL ‘QUANTITIES. PAGE No. as PART 7: SEWERAGE WORKS (Cont'd) ‘Manholes with two backdrop Type B 1500 mm internal diameter manholes -Insitu Concrete Depth 2.5 - 3.0m Depth 3.0 -3.5m PART 8: IRRIGATION WORKS 2 Way 150mm dia uPVC duct pipes 100mm dia uPVC pipe 150mm dia uPVC pipe 200mm dia uPVC pipe Valves and Fitings Gate valve on 100mm dia uPVC pipe Gate valve on 150mm dia uPVC pipe Gate Valves inside Air Valve Chamber Gate valve on 100mm dia uPVC pipe Double Orifice Air Valves Air valve on 100mm dia uPVC pipe Wash Out Valves ‘Wash Out Valve on 150mm dia uPVC pipe Irrigation TSE Water Supply Meter Assembly 9: ‘TION JRC 12 JAC 14 JRC 4 ‘Ducts Two way (DS6) uPVC duct Two way (D54) uPVC duct, ea &. aoe ; ‘EMIRATES ROADS CONT. CO. L Hamarain& Ai Dheeb CONSUL Pars E E E My \ i 4 h i BILL OF QUANTITIES LIST OF PRINCIPAL QUANTITIES. PART No. PAGE No, ala LV duct (Ditferent number of ways) MV duct (Different number of ways) 4-core, 300mm2, 600/1000V, XLPE/PVCIAl armoured Cable 4-core, 185mm2, 600/1000V, XLPE/PVCIAI armoured Cable 4-core, 26mm2, 600/1000V, XLPE/PVCIAI armoured Cable 11KV, 3-core, 300mm2, XLPE insulated armoured copper Cable ‘Substation PART 11 - SECURITY NETWORK 750 x 70mm chamber 1 Way 100mm dia uPVC duct 2 Way 100mm dia uPVC duct ‘PART 12: SPARE DUCTS pS aallorslat oy ne IRATES ROADS CONT. ct Hamaran A Deb ed Oa saat Ayal AL gpd $84 age 7.0.86 490474 Ob, Ud ab Eat 6. 62 =a Section (b) Preamble ght SANG La Siy aes EMRATES ROADS CONT. C0.L..c. 24 Hamarin8 A dhe DS CONT. C0. ‘| Hamarsin 8 AI Dhoed CONSULT |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT rem REF BILL OF QUANTITIES PREAMBLE ITEM DESCRIPTION BIL SECTION] PARTNo| PAGE No © bit Generally The Bill of Quantities herein, including all notes and instructions, form an integral part of the Contract, Documents. However, the descriptions contained in the Bll of Quantities for each item are not necessarily ‘complete. The Contractor is referred to the Conditions of Contract and other Documents, Specifications and Drawings as well as relevant Standards and Codes of Practice for further information as no claim or variation will be considered on account of the Contractors failure to do so. ‘The items in the Bill of Quantities do not necessarily contain full descriptions of the required work. The Contractor is cautioned to familiarise himself with the full content of other Contract Documents including the Instructions to Tenderers, Tender Form, General Conditions, Particular Conditions, Tender Drawings and ‘Specifications or any other information that can be reasonably inferred from any of them and all obligations contained in the documents shall be included in the item rates and sums. The rates will be deemed to include {or the full cost of the work described to provide a complete construction and installation, Drawings, Specifications and Bill of Quantities and all other Contract documents are complementary and if any item is included in any of them, it shall be deemed included in all. The rate for an item shall be inclusive of all steps, components, processes elc., associated with the item as defined in CESMMS. Quantities for components for which the individual cost is small in relation to the overall cost of the item are not given as separate items but are deemed to be included in the main item. Similar ‘components of work have been combined into one item for works which are constructed together. items shall be assumed to include all works necessary to meet the requirements of the specifications and drawings associated with that item. ‘The Contractor's bid for the entire work shall provide for supervision of any or al trades that is not intended to ‘be performed with his own forces. No extra compensation for services as a General Contractor willbe paid. ‘Amendment shall not be made to this Bill of Quantities without the authority, in writing, of the Engineer. The ‘Tenderer is allowed to inser items for Method - Related charges in accordance with CESMM3, The Contractor shall not use this Bill of Quantities as the basis for a construction programme or for the Purposes of ordering materials or arranging sub-contracts. The references for these activities shall be the ‘drawings, specification and instructions issued by the Engineer. The whole of the quantities shall be treated as approximate only and are given to provide a common basis for tendering. The basis of payment will be the actual quantities of work ordered and carried out, as ‘measured by the Engineer or his Representative and valued at the rates or prices quoted in the Bill of Quantities, with the application of the adjustment item if applicable. ‘The prices and rates entered by the Contractor against items in the Bills of Quantities shall apply throughout the duration of the Contract to the execution of these items in any location, and except where otherwise provided for, to any additional work ordered by the Engineer and / or the Employer (CESMNS section 6.22 is not applicable, format for Bill page inthis Bll age format. CESMMS Clause 5.2 is amended to include Section (f)- Schedule of This is a mandatory requirement and breakdowns of all the Bo@ line tender submission A rate or price shall be inserted ag HOY Lay. as, 5] od with th stampesimepae ‘EMIRATES ROADS CONT. CO.L.L.c.| Quantities, mustbe sianed,and impr 70, Box 40474 Dube, Unies a Eales IR a2 2 BF 2 oP =e IPROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES PREAMBLE ITEM DESCRIPTION A ‘The Contractor is to ensure that identical items occuring in separate bills are not priced at different rates unless this Is the Contractors deliberate intention. in such cases the lowest rate will be ‘considered for any variation. The prices and rates entered by the Contractor against items in the Bill of Quantities shall apply throughout the duration of the Contract to the execution of these items in any location and, except where ‘otherwise provided for, to any additional work ordered by the Engineer and/or the Employer. c ‘Any adjustment (addition or deduction) offered by the Tenderer shall be applied uniformly on a pro-rata basis to all items in; the Bill of Quantities and in any other Bill that may be part of the Tender Documents, The Adjustment item shall not be a lump sum. Its to be shown as a percentage of the total tandered sum. 't shall be applied to all tem rates and sums entered in the Bill of Quantities (including any addenda) ‘and adjusted rates and sums willbe applied during re-measurement and the valuation of Variations. ‘Adjustments shall only be applied against items (lump sum), and unit rates in the Tender Bill of Quantities and equally to any increase in quantities therein, ‘The Bill of Quantities and any other document which may be a part of these Tender Documents, shall be priced in United Arab Emirates dirhams. All payments to the Tenderer in accordance with the Contract shall be made in United Arab Emirates ditnams. ‘Any items of work included in either the Bill of Quantities or any other documents that may be part of the Tender Documents which is not carried out, shall be omitted from the interim and final certificates of payment. Interim payments shall only show the proportion of the quantities inthe Bill of Quantities that have been actually ‘executed and completed at the date of the payment. For the purpose of evaluation of the Tenders, the following procedures willbe utlised in resolving arithmetic ‘discrepancies found in the Bill of Quantities submitted by the Tenderer. 1. In the case of discrepancy between unit rate and extended amount, the unit rate will prevail 2. Apparent errors in multiplication of unit rates and quantities will be corrected, ‘5. Apparent errors in addition to tem amounts and extended amounts willbe corrected. Furthermore, for the purpose of Tender evaluation, the Employer will proceed on the assumption that the ‘Tenderer intends his Tender to be evaluated on the basis of the unit rates, extensions and totals arrived at by resolution of arithmetic discrepancies as provided above and the Tender will be so reflected in the Employer's evaluation, kK ‘The Tenderer shall include rates for given Optional items as well as forall the iterss marked as “Rate only’ ib The Tenderer or the Contractor wil be required to provide the Engineer with a full and detailed break Unit rate within 48 hours of being so requested. The breakdown will Lup into labour, material and plant together with all on-costs, overheat EMIRATES ROADS CONT. CO.L.LC, Hamarain & AlDheeb Nine | AATES ROADS CONT. CO.L.LC. BILL OF QUANTITIES ITEM DESCRIPTION ‘Units of Measurement (CESMM3 Clause 5.19 has been deleted and replaced with the following: - Dubai Municipality Dubai Electricity & Water Authority Asbestos Cement British Standards ys California Bearing Ratio am SP 2 © 2s oe Dense Bituminous Macadam Dry Film Thickness Emirates Telecommunication Corporation Equal to or greater than Equal to or less than Glass Fibre Reinforced Plastic Glass Reinforced Epoxy Intemational Standards Organisation Kilowatt per hour Man x Number of Days ‘Maximum Dry Density Ordinary Portland Cement Poly Vinyl Chloride Provisional Quantity Rectangular Hollow Section Square Millimetre Sulphate Resisting Cement! PART No Kwihr ih “pe eer Wants ‘CONT. CO.LL.C. RASH" 1 Dheew Spec. Ae, som rion EMIRAREPROADS CONT.CO.LLe c. a BIL ‘SECTION PAGE No |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT JPACKAGE: INFRASTRUCTURE BILL OF QUANTITIES PREAMBLE ) bia ITEM DESCRIPTION Units of Measurement (Contd) Unit United Arab Emirates Dirhams : DHS, Dhs.,AED Unplasticised Poly Vinyl Chloride : uPVC. Vehicle x Number of Days : veh-day width : w ‘Method of Measurement This Bill of Quantities has been measured generally in accordance with the Rules of the Civil Engineering Method of Measurement Third Edition (CESMM3) approved and sponsored by the Institution of Givi Engineers 1 - 7, Great George Street, London SW1P AA, England and published by Thomas Telford ‘Services Ltd. 1 Heron Quay London E14 4JD. in any particular case, inthe Bill of Quantities where the ‘method of measurement for certain items is modified itis stated in these Preambles. The modified method of measurement expressed for these items must be accepted and measured in accordance with preambles. 8 Method of measurement shall be strictly in accordance with this Bill of Quantities Preamble. Where inconsistent with CESMMS or other Contract Documents; this Bill of Quantities Preamble shall prevailjgovern.” c tems in the Preambles Section of this Bil of Quantities are deemed to qualify and to form part of every ‘description of measured work to which they refer including composite descriptions, D ‘All measurements shall be net and shall be applicable to finished work only as completed, notwithstanding any trade or custom to the contrary. The principle of net measurement shall apply to all Works executed under this Contract, and no allowance shall be made for wastage, working space, bulking, shrinkage, overlaps and the like. E Item reference numbers shown in column 3 for the class of works according to CESMMS generally follow the ‘convention used by CESMMS. Any deviation in the convention used shall not be the basis for a claim. All work ‘and costs inherently required for the execution of the works as shown explicity on the drawings or otherwise ‘necessary, is deemed to be included in the rates for the work as measured in the bill of quantities. F Reference to British Standards in CESMMS are applicable unless otherwise stated in the Contract ‘Specifications in which case the specified reference standard shall apply. 6 ‘The Conditions of Contract applicable to this Contract shall be the Conditions of Contract published by TECOM Investment and amended or supplemented by Conditions of Particular Applications. in the avoidance of doubt, the Conditions of Particular Aplications shall take precedence over the General Conditions in the implementation of the Contract. Reference to clause numbers in CESMM3 are applicable to the corresponding clause numbers which may be different from the FIDIC Conditions of Contract. (CESMMS Clause 1.2 is not applicable ‘Admeasurements of completed work from Drawings and/or work at site shall be considered to the! centimetre or linear dimensions ‘The measurements shall be done by taking the dimension tothe rou Rt a | ‘EM 24 RATES ROADS CONT. CO.LL.C, Hamarain & Al Oheet Epa a2 oP SE i Br SECTION | PARTNo| PAGE No BILL OF QUANTITIES PREAMBLE ©) bs ITEM DESCRIPTION ‘The pricing of the Bill of Quantities shall be executed in such a way to enable reproduction by photocopying to be carried out if required. For the purposes of ths Bill of Quantities, Clause 6.1 of CESMMS shall be modified to read as “Rates and prices shall be inserted in the rate column ofthe Bill of Quantities in United Arab Emirates Dirhams (AED), rounded to the nearest whole Dirham. ‘The prices shall be comprehensive and must include for complying in all respects with the Instructions to Tenderers, Conditions of Contract, Specifications and Drawings and forall matters and things necessary for the proper construction, completion, and maintenance of the whole of the Works. No claims for additional ‘payment willbe allowed for any error or misunderstanding by the Contractor of the work involved. D The rates inserted in the Bill of Quantities shall be deemed to include for the submission of Samples and Product Data, for the execution of Tests and for the provision of Warranties and Guarantees all as stioulated within the Specification and other documentation comprising the Contract Document and for obtaining the Engineer's approval in respect of such, Where the Contractor proposes a material of different dimensions to the dimensions stated in the Contract ‘Documents, and such alternative dimensions are deemed acceptable by the Engineer, appropriate deduction ‘shall be made to the relevant unit rate to reflect the use of such alternative dimensions. In no circumstances will ‘additional costs be payable as a result of Contractor proposed altemative dimensions. F ‘The rates and sums inserted in the Bill of Quantities are deemed to include forthe following: 1. Labour and all costs in connection therewith, 2. The rates shall include cost of water for testing, 3. Materials, goods and all costs in connection therewith (e.g. carriage freightage, all duties, delivery, unloading, storing, retuming packings, handling, hoisting or lowering, replacing work, goods or materials damaged, broken, lost or stolen until the issue of a Certificate of Completion). 4, Fittings and fixing materials or goods in position. ‘5. Plant including transport, fuel, repairing and servicing 6. Customs duties, port dues, import duties, taxes, charges, Insurance's and other dues levied by any authority or imposed by the Government 7. Landing charges and transport charges of whatever description 03 Cedig dS 8. Temporary storage facilities ntl Ryall ALY ges tots 480074, Oita Unig ab Era 8. Waste, bulking, shrinkage and overlaps. 10. Fitting and fixing materials or goods in position, 11. Working in girths, widths or heights of less than 300mm 12. Costs for all necessary sampling at with applicable Speci 1nd testing required to ibid nich al cote eee ‘EMIRATES ROADS CONT. CO..L.L.C, 19. Land required for tp 24 Hamarsn Al Dhoeb Be) E a Ee ee PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE oO) OF: m SECTION] PARTNo| — PAGE No BILL OF QUANTITIES PREAMBLE © bie ITEM DESCRIPTION Pricing (Cont) 114, Dewatering and trench support as required. 15. Preparation and supply of working drawings, shop drawings, As-Built drawings and operation and maintenance ‘manuals. 16. Preparation and supply of as-built Bills Of Quantities in the relevant authority formats, and an overall ‘as-built BOQ for the Project. 17, Allowance for phasing requirements of works, effect on programming of the works of all ratfic diversions and ‘construction activity associated with diversion or installation of services. 18, For taking measures for the support and full protection of pipes, cables and other apparatus required during the progress of the Works as required by Service Authorities or the Engineer. 19. For working alongside and liaising with other Contractors working on the same site. 20. Preparation and supply of shop drawings. 21. Overhead charges and profit. 22. For all other matters or things necessary or required for the work. Lump sums shall not be given where unit rates are applicable. Where the word “allow is used, the cost ofthe item shall be the responsibilty of the Contractor. ‘The amounts for dewatering shall include for all works inconnection with disposal or temporary storage of water. The rates inserted will be used to determine the amount of the Contractors Interim Payments ‘The amounts set against any items of overhead shall include for al costs in connection with letters of credit ‘bank charges, interest charges and insurance after the materials come under the control of the Contractor. Allowance to maintain the requirements of the Health, Safety and Environmental standards including all costs {or providing required monthly reports etc. in order to meet with the policy of the Employer. ‘Any other activities which are not included above and required for completion of the works. The Tenderer shall submit the analysis of "Tender Sum’ with a full and detailed rate breakdown of al the '80Q items including spare parts items, together with their tender submission. The breakdown is to show the ‘actual calculations of the General items, Labour, Plant and Materials costs for the Works, the build-up of ‘measured rates with on-costs and overheads and any other allowances used to arrive at the Tender Price. In addition the tenderer / contractor wil be required to provide the Engineer within 48 hours with a full and detailed breakdown / any other information if requested. ght haplaloyylt Mass Gi eG EMIRATES ROADS CONT. 60 L.c. 24 tamarind ai0hceb cope wena CHV. ‘titan ‘WY EMIRATES ROADS CONT, CO.L.L<, | |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT PACKAGE: INFRASTRUCTURE Tem BILL OF QUANTITIES PREAMBLE ITEM DESCRIPTION a SECTION | PARTNo| PAGE No ©) or Pricing (Gont'd) Where the Contractor is requested to price for ‘Fix Only’ items, his price shall include for all costs associated with and including, (but not limited to) the following; 1. Taking delivery (including unloading, positioning, handling, hoisting, lowering, returning packings and the like) 2. Temporary storage facilities 3, Assembling, fiting and fing materials and goods in position 4, Provision and use of all plant, equipment and tools 5. Straight, raking or circular cutting 6. Wastage on materials 7. Working in girths, widths or heights of less than 300mm ‘8. Short lengths 9. Protection 10. Testing 11. Temporary Works. 12. Replacing goods damaged, broken, lost or stolen 13 Making good 14 Overheads (including site and head office management costs) 15 Profit 16 All other incidental costs to complete the Works The Contractor is to allow in hs rates for the production ofall shop drawings, method statements ‘working drawings,operations and maintenance manual. These shall include but not limited to the folowing: 1. The surveyed location of all existing services. 2. A combined services drawing including all surveyed existing and proposed services showing ‘manholes, drawpits, joint boxes, inspection chambers, lighting column bases, trafic signal bars, scale plus any other possible obstructions. op gaMGY lat GLa eK Aye ‘EMIRATES ROADS CONT. CO.L.LC, ingQapoposed lagaiaNS, Ai heed 3. A combined services working drawings original and new. 4. Separate sets of working drawings for each individual service shi for submission to the service authorities. 5. Existing ground levels, Sanat agp UY gs 70, Box a50074 von, Unie PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES SECTION PREAMBLE ©) 7. Temporary traffic diversions on detour roads. 8. Proposed traffic signal design and fixing details, 9. Mechanical, electrical and other services drawings, diagrams and instructions as required, 10. Temporary work drawings as requested by the Engineer. 11, Shop drawings for compliance with, inter alia, Statutory Authorities, specifications, obtaining NOC’s. Vari ‘The rates inserted in the Bill of Quantities with the application of the adjustment item will be used to value any variations to the Works, whether omissions or additions. The Contractor shall nt be entitled to payment for profit and overheads on the value of Work omitted. ‘Any claim for addtional general Requirements costs or for additional facilities, assistance's and attendances ‘costs and the like on variation works, shall be considered only upon receipt of full, supporting, contemporary, ‘substantiation being presented by the Contractor to the Engineer. Daywork Schedule ‘The cost of any works carried out under the items Dayworks will be assesses al the given rates in the Daywork schedule ‘The rates inserted in the schedule of dayworks shall deemed to be the rates used by the Contractor in making up rates for the work items in all sections of the Bill of quantities. ‘The percentage addition should not only be for “Profits and Overhead” but also for specific procurement for Daywork requirements, Adjustment item The adjustment item, it any, shall apply to all Bill items excluding provisional sums and contingencies unless clearly indicated otherwise. The adjustment items shall not be a lump sum but a percentage ofthe total tendered sum excluding all provisional sums and contingencies or a percentage of the total for the items Indicated. The adjustment item shall be applied to all applicable item rates and sums entered in the Bll of Quantities (including any addenda). The adjusted rates and sums shall be applied during admeasure ‘and for the valuation of variations (CESMMS paragraphs 6.3, 6.4 and 6.5 are not applicable. Provisional Sums The provisional Sums given in the Bill of Quantities may be expended discretion of the Employer, vide Eng fete in all See i 4 q a a |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT. PAGE No BILL OF QUANTITIES. PREAMBLE bo PACKAGE: INFRASTRUCTURE lem] ITEM DESCRIPTION Priging (Conte) RULE AND ITEM REFERENCES All the following rule and item reference numbers are prefixed by the work classification leer to which the rule ‘ item applies. ‘CLASS A- GENERAL ITEMS Payment for General items 1, Payment for Performance Security and Insurance shall be made upon the approval of all he relevant. documents by the Employer. 2, Payment for establishment costs relevant to these items will be by Lump Sum that will be made only after ‘completion and acceptance of al aciities. 3, Payment for maintenance items will be by installments commencing from the completion and acceptance of the establishment items. 4. Payment for the removal of these items will be by lump sum, which will be made only after the completion of their removal and any necessary reinstatement work ‘5. Payment for transport and equipment items shall commence from the time that the specified requirements are provided and approved. 6. Payment for providing attendance upon the Engineer staff will be by installments commencing form ‘such time as the services are provided. The items measure for the supply and maintenance of the vehicles for the Employer and the Engineer shall be ‘paid monthly or part monthly from the day on which the vehicles are delivered to the Employer and Engineer. Part of a month shall be paid on a pro-rata basis should any vehicle be out of service for whatever reason for ‘more than 24 hours a replacement vehicle shall be supplied of equivalent type and condition. The items shall include but not limited to cost of providing and maintaining fully comprehensive insurances, fuel, registration ‘cost and replacement of vehicle during regular service or breakdown. ‘Contractual Requirements tems for insurance classed as contractual requirements shall be deemed to include only provision of insurance in accordance with Contract Conditions, ‘The Contractor shail co-ordinate with the Service Authorities and provide all necessary facilies as may be ‘required and as foreseeable by an experienced Contractor. The cost of such co-ordination and facilites is deemed to be included in the rates inserted in Bill of Quantities, ‘Specified Requirements Payment or etabismen cost reevnt 1 thee tos wl be by uo match iia eae completion and acceptance of alll facilities. as 196 oy j ae 6 Payment for maintenance items vill be in monthly instalments commerciN MSEMNGATEG\AGABS GOMT. CO. LLC, exter eeeisrnese aoe a Wawtee Mies FEI these. itera--be-Sy timp Sen which wil be made only after the completion of H Payment for the remo thelr removal. ¢ ere aml Appl LL aged #1 te 70. Box 40874, ube, Una ab Ean CONSHLT aI SECTION] PARTNo| PAGE No PROJECT: PT-126 - JUMEIRAH HILLS. BILL OF QUANTITIES PREAMBLE ©) bio Payment for providing attendance upon the Engineers staff will be in monthly instalment commencing from ‘such time the services are provided. 8 Payment for testing of materials shall be made in instalments pro-rata to work done against the sums inserted Under the relvant pay items for testing of materials in Bil Section d, General Items, Specified requirements, Testing of Materials as per Specifications. Method of testing and paiticulars of samples are not given in the item description but are contained in the Specifications and/or Drawings. Testing is to be performed strictly in accordance with the relevant specifications. The Contractor shall be responsible for Carrying out laboratory tests and payment of all charges. c Payment for testing of works shall be made in instalments pro-rata to work done relevant to appropriate work section, i.e. length of pipework, cables, etc. laid in the particular month divided by the total length of pipework, cables, etc., required by the Contract multiplied by the relevant testing item sum. Methods of ‘esting and particulars of samples are not given in the item description, but are contained in the ‘Specifications and/or drawings. D Payment for testing of the works (except for the items included in the pay items for testing of work in Bill ‘section d, General items, Specified requirements, Testing of Works) are deemed to be included inthe unit rates of such works. ‘Temporary Works for Traffic Management Payment for temporary works will be in monthly instalments. F ‘The tratfic diversions and traffic management items are not measured but are paid as lump sums. The ‘sums are deemed to cover the costs of the required trafic diversions and traffic management planned and phased by the contractor to complete the permanent works within the Contract Period in accordance with contract documents, 6 ‘All materials supplied by the Contractor for temporary works shall remain the property of the Contractor ‘and their removal trom site is deemed included in the sums and rates. oe JF an H Ail the costs incurred in the provision and removals of protection works to the utitities under detours are ‘deemed to included in the sums of temporary works. Method Related Charges (Section 7 of CESMMS) J Method-Related charges shall be certified and paid pursuant to the relevant Clauses of Conditions of Contract ‘and section 7.7 of CESMM3 is not applicable, Method-Related charges shall be certified and paid pursuant to the relevant Clauses of Conditions of Contract. ‘and section 7.6 of CESMMS is not applicable, L Payment for establishment costs relevant to these items will be by lump sum which will be made only after completion of all facilities. M Payment for maintenance / time related costs willbe in monthly instalments c facilities are made available. N Payments can be suspended, reduced or deleted from any Contract Engineer, the Contractor is not fulfiling his obligations, Bill item for Author P Payment for this item s relevant Authorities sla Y Lat OL WYIAS, 3 CONSULT mn _& J a tm | PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT |PACKAGE: INFRASTRUCTURE TEM REF BILL OF QUANTITIES PREAMBLE ITEM DESCRIPTION SECTION | PART No o Priging (Cont'd) ‘Bil Item for Gongitions of Contract Payment for ths item on interim Payment Certificates willbe pro-rata to the value of work completed and shall cover all costs and expenses including overhead and profits incurred by the Contractor in carrying out the requirements of the Conditions of Contract not otherwise included in the Bill of Quantities. A breakdown of the same shall be submitted together with the Tender Documents. Earthworks The quantities of earthworks shall be computed net using dimensions from the Drawings with no allowance for bulking, shrinkage, waste or working space, the additional width allowance is deemed to included in the rate. ‘The rates for excavation are deemed to include upholding sides of excavation, additional excavation to provide working space and removal of dead services unless measured separatoly. ‘The rate for excavation of artificial hard material is only applicable to the removal of such volumes to 11m ‘below formation level, in volumes exceeding 1 m3. Its also to include for backfilling with suitable material and removal of the excavated artificial material to tip. The rate for imported fill material shall include borrow pit excavation, hauling,placement and compaction in specified layers. The quantities for excavation of rock and artificial hard material are assumed and may not be encountered during excavations. The rates for excavation of material below the final surface and replacement with stabilising crushed material shal include for the disposal of the excavated material to an approved dump site. Pay item for the preparation of the existing ground in respect of fil areas, shall include for all preparation works ‘uch as scarifying, mixing, adding water and compaction and any other works as required by the specification are to be included, Suitable surplus excavated material shall be re-used in embankments (in lieu of imported fil), as opposed to being disposed of offsite, if so directed by the Engineer. In such cases no payment shall be made for disposal of surplus materials (reused). However if surplus material is directed by the Engineer to be stockpiled on site, payment will be made for double handling, if pertinent. Suitable excavated material from any section of the work shall be utilized in the other sections of the work within the project limits. The rate for filing with suitable excavated materia is deemed to include for any haulage within the project limits, Preperation of existing ground to receive fill and/or any other permanent works is not measured separately. The rates for sand fill and/or other permanent works shall include for scarifying, mixing/adding water, buil ‘original level, compacting, etc as specified, Suitable surplus excavated material generated from general and structu bbe a property of the Employer. Pesyee we a) — z maral fg oY at as, 3] el ieapae oat age SU oth t3h Hamarain&ALDhoed | mazacal CONSULT f SEPA) a= Be oe i |PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES PAGE No PREAMBLE bre ‘The Contactor shall seek approval forall the sites proposed for disposal of surplus or unsuitable excavated ‘materials from all concemed departments in RTA and other local authorities before the work commences. The rate {or disposal of surplus excavated material shall include for compliance with all applicable regularities for TA borrow pts. ‘The Employer wishes to reuse the excavated road foundation material (such as sub base! road base/ wet mix, etc.) {for new foot path construction works or else where within the project. The unit rates for such excavation shall include for keeping the material free from contaminated asphalt materials and other hard particles and stock pile as. site in approved manner. payment will be made for double handling only for reused volumes. Concrete Ancillaries Construction joints and associated water stops have not been measured seperately and are deemed to be included in the rates for insitu concrete works. Formwork is also deemed to be included. ‘The rate for placing of concrete for blinding and steps are deemed to include excavation, fotmwork, fair finish and all other civil works as necessary and backiiling, complete. ‘Boads and Pavings Pavement Construction ‘The Department of Transport (Dpt-T) specifications for “sub-bases, flexible road bases and surfacing” as Noted in CESMMS are not applicable to this Contract, the Contractor is required to refer to the relevant Contract Specification Clauses. ‘Kerfos, channels and Edaings Rates for Kerbs,Channels and Edgings shall include excavation, filing, formwork, concrete beds and backing, Ancillaries ‘The Unit of measurement for guide signs and supplementary plates (Sign 589) isin number. ‘The sign panels shall be measured by numbers as shown on the drawings ‘or as approved by the Engineer. The rates shall also include supply of sign panel with reflective sheeting, ‘messages and symbols as shown in the drawings,all necessary hardware and fitings,materials,tools, land equipment necessary or incidental to the fabrication of the completed sign. Removal of existing waming and regulatory signs shall be measured by the number as approved by the Engineer. The rate shall allow for the removal and transportation of the signs to RTA stores . eels ‘EMIRATES ROADS CONT. ¢ (SOO tay 24 Seer pc ec niacin 1.0, Boxers, ub mana ees Siphtlcy lat YAS, ATES ROADS CONT. co. Hamarain § Al Dheeb rea] BL SECTION] PARTNo| PAGE No |PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT BILL OF QUANTITIES PREAMBLE Cy) bis PACKAGE: INFRASTRUCTURE tem] ITEM DESCRIPTION A Trial Pits and Trenches to locate existing services as instructed by the Engineer will be measured and paid {or the actual quantity of work carried out. The rates shall include the costs of dewatering.reinstatement, preparation and submission of records and results ‘The rates shall include the costs associated with all necessary liaison with the Services Authorities, obtaining NOG and the preparation of site records ofall existing services and providing attendance to specialist approved sub-contractors where applicable, ‘The rates for services work shall allow for providing and laying of plastic waming / route marker tapes as per the specification for all newly installed services and existing services which are adjusted inline andlor level. D The rates for ducts shall also include for colour-coded drawcords, end caps or plugs and Type 1 and/or ‘Type 2 Duct markers. The rates for breaking out and/or removal of any existing redundant manholes, lighting foundations, ducts, pipes and cables ‘shall unless otherwise stated include for excavation, backflling, compaction, dewatering and disposal to tip of non-salvageable material The rates for pipelines shall include cleaning and sterilisation as specified ‘The commencing surtace for excavating for pipelines shall be the original ground level or, tin cutting, the excavated final surface of the cutting, Length of ducts or cables shown in the Bill of Quantities are based on actual crossing length. Actual length of ducts, number of draw-cords etc. required for the crossing are based on multiplying the crossing length by the. ‘number of ducts in the crossing. For example, it a quantity of 20m is indicated for a 4 way duct, then 80m of duct will be needed for that crossing (4 ducts x 20m) ‘The Bo item for bedding includes the preparation of the bottom level of the trench where pipes are to be laid bby comparing the area prior to laying the pipes. ‘The rates for pipelines shall include cost of water for testing. For new pipelines installed by open cut the unit of measurement shall be the linear metre measured between the intemal faces of adjoining structures and the rate shall also include for building pipe through wall or base of a structue, flexible joints adjacent to structures, any pipeline bull beyond the intemal surface of structure, preliminary and infitration test as specified. uM ‘The rates shall include welding and jointing as necessary. N ‘The rates for excavation are deemed to include upholding sides of excavation, adltional excavation to p ‘working space, no additional payment shall be entertained in this rege ‘The Contractor shall allow forall costs involved in testing to be cat Hamarain 8 Al Dhaeb =__ om 2 _ ie me = Se oe ee UP Le BIL SECTION] PARTNo| PAGE No BILL OF QUANTITIES. PREAMBLE © bis ‘The rates for drainage gullies and connections should allow for supply and installation of gully, cover, connecting pipe,concrete surrounding, cover and connection to the dain line as shown on the drawings. The rates shall also include for all itings,excavation,backfling and compaction. The rates for all Utities work shall allow for jointing and connecting to the existing ducts/pipes. ‘The rates shall include welding and jointing as necessary. ‘The rates for excavation are deemed to include upholding sides of excavation, additional excavation to provide working space, excavation in rock and removal of dead services unless measured separately. ‘The rates for all concrete structures such as manholes, valve chamber, inspection chambers, inlets, gullies, Catch basin, outfall chamber, protection slabs and surround etc. shall include as appropriate for = 1. Earthworks as stated earior. 2. Forming concrete to the slopes and falls shown on the Drawings. 3. Any addtional concrete used in excess of the net requirements. 4. Forming construction joints 5. Providing expansion joint fil 6. Epoxy coated reinforcement. 7. Formwork. 8, Protection and curing as specified 9. Internal and extemal protection to concrete as specified. 10. Rates for storm water manholes shall include additional inlets and ports for future connections and connections to other lines 11, Rates for Sewer manholes and collection chambers shall include ports for Future connections ‘and connections to other lines 12, Rates for Sewer and storm water manholes. and pipelines shall include cost for connection to any existing lines if necessary. ‘Stage payments for manholes and chambers shall be made as follows: ‘sealing compound and waterstop PS Cetin 5 (i) Completion of base slab 20% of bill rate (i) Completion of walls/shatts 80% of bill rate (ii) Completion of roof slab 90% of bill rate (iv) Installation of frame, cover and completion 100% of bill rate ‘The Contractor shall allow forall costs involved in testing to be carried out by the independent Laboratory or an Employer's approved specialist testing laboratory ig His pricing of the relevant item in Section d - Part 1 General items. For the purpose of measurement, the ground level and inlets. 4 |PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT |PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES SECTION | PARTNo| PAGE No PREAMBLE bis ITEM DESCRIPTION Rates for excavation of pipe trenches (whether measured separately or not) shall include forall temporary sheet piling, excavation in any material, battered excavation, stockpiling of excavated material, dewatering and backfiling. 8 Depths used for classification of pipes in trenches are measured from the commencing surface to the inverts of the pipes. The Tendered rates shall be deemed to include for all necessary excavation below the pipe invert to ‘accommodate the pipe and pipe bedding material. The stage payments for pipes laid in trenches shall be made as follows: 1. 70% of the contract Bill rate of the pipeline, less retention, will be paid after pipes have been laid and bedded, subject where applicable to preliminary air, water and deflection tests all to the satisfaction of the Engineer 2. 90% of the contract bill rate of the pipeline less rtention will be paid after the pipes have been backliled up to {ground or formation level allo the satisfaction of the Engineer. 3. 100% of the contract bill ate ofthe pipeline less retention will be paid after the pipes have been subject where applicable to water, infiltration and deflection tests, cleaningldisinfection and completion of all tidying up and surface reinstatement, all to the satisfaction of the Engineer. c The items for pipe work within structures relate to the pipe work, specials, fitings and plant shown on the Drawings. The Contractor shall ensure that all the items are compatible and shall adjust the lengths of specials or provide adjustment pieces as necessary to sult the actual fitings and plan supplied. Payment will however only 'be made against those items listed in the Bill of Quantities. Rates shall include for shop and site painting as specified. Pipes are sized by "Nominal bore" which refers to and means “Intemal diameter’. E Pipes are measured nett as laid and are to include for all cuttings, etc for laying in trenches of any depth, and building into sides of inspection chambers. Cost of Pipes fittings deemed to be included within pipe rates, of valve rates unless measured seperately. 6 Rates for drain fitings on all types of drain pipes are to include for extra joints of all types and cutting and waste on all pipes: For new pipelines installed by open cut, the unit of measurement shall be the linear metre measured between the internal faces of adjoining structures (manholes, chambers etc). The average depth to invert between structures shall be calculated as Reinstatement ‘The Contractor shall allow for all costs involved in testing to be carried out by a Municipality approved. ‘specialist-testing laboratory in hs pricing of the relevant tem in Section D/1 General items. ‘The reinstatement shall be measured as follows: 1. For trenches, linear metre measured between the internal faces of (manholes, chambers etc.) 2. Any reinstatement beyond these CONSULT Bes aS i i i q fl arr SECTION © IPROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT BILL OF QUANTITIES, PREAMBLE |PACKAGE: INFRASTRUCTURE PARTNo| PAGE No bis Tem] ITEM DESCRIPTION Concrete or special backiil that may be ordered shall (unless otherwise indicated) be measured on a volume basis within the plan area of a mass excavation or within the plan dimensions of a structure or within the specified width of a trench. 8 Abortive excavation for pipelines due to the relocation of works instructed by the Engineer shall be measured in cubic metres. The volume shall be calculated as the product ofthe length of the excavation to be backfilled and the average depth of the actual excavation as calculated for pipelines over this length and the specified width of the trench excluding any over excavation, for Dubai : jsion (DEW) o The rates shall allow for phasing the works to maximise the reuse of recovered pipes etc. where pertinent. For diversion works Contractor is to procure all materials. Contractors rates are to include for all fixing items including connections, valves and fittings. ‘The rates for operations relating to water supply house connections shall include for excavation, dewatering it necessary, installation, backfiling, compaction and reinstatement. ‘All works concering DEWA - ED shall be executed by Contractors/ subcontractors approved by DEWA-ED. 6 ‘All diversion works for DEWA - ED LV cables shall be carried out by a DEWA approved Contractor under DEWA ‘supervision. The rates shall alow for the supply of cables, cable laying, trench excavation and backfling, beds and surrounds etc. to group of cables in a single trench of varying width, where pertinent. The final Commissioning of the diverted cables will be carried out by DEWA. ‘The rates for recovery of cables, relocation / removal of diferent sizes shall include for the following: () For 11 KV power cables - proper re-drumming and sealing of ends and all precautions against ‘damage to allow the option of reuse by the Employer, including delivery to DEWA (ED) Stores or to any other location as directed by the Engineer. The rate for recovery shall include for backing of trenches. (il) For cable relocation works the rates shall allow for the necessary attendance and superintendence upon DEWA (ED) approved sub-contractors. ‘The rates shall allow for phasing of the works to accommodate restrictions to power outage per (iv) The existing cables to be relocated must be in good condition and ap Rate for relocation must include any excess material to be retumed to DI Sabha vias, 3] senna Rapa SAL og bl Unig ab ats TAMDEENLLG, BL PROJECT: PT-125 - JUMEIRAH HILLS eee aetna PREAMBLE CO) coded draw ropes and duct marker in conformace with the requirements of DU Supervisor. For DU works, DU shall provide free of charge all ducts, endcaps, draw cords, route marker ‘Works for DM Drainage, Sewerage and Irigation Departments For new pipelines installed by open cut, the rate shall also include for building pipe through Unless measured seperately The rates shall also include for al fitings, excavation, backfiling and compaction. protection slabs and surround etc. shall include as appropriate for :- () Earthworks including dewatering i necessary as stated earlier. (i) Forming concrete to the slopes and falls shown on the Drawings, (ii) Any additional concrete used in excess of the net requirements, (iv) Forming construction joints. (¥)_ Providing expansion joint filer, sealing compound and waterstop (vi) Epoxy coated reinforcement. (vil) Formwork. (ill) Protection and curing as specified (i) Internal and external protection to concrete as specified. The Contractor shall allow for all costs involved in testing to be carried o Laboratory or a Municipality approved specialist testing laboratory in his pit Section d - Part 1 General items. ‘The rates for breaking up, ter areas shall include for removal, oe Hamacain & Al Dhee ‘The rates shall include for laying of ducts, trench excavation and backlilling, endcaps, waming tape, colour 3S tape and joint boxmanhole furniture. The rate shall allow for taking delivery of these materials from DU store. For new pipelines installed by open cut the unit of measurement shall be the linear metre measured between the internal faces of adjoining structures (manholes, chambers etc.). The average depth to invert between structures shall be calculated as the arithmetic mean of the measurement of depth from ‘commencing surface to the invert of pipes taken at the structures. wall or base of a structure, flexible joints adjacent to structures, any pipeline built beyond the internal surface of structure, preliminary and infitration test as specified. Cost of pipe tings deemed to be included within pipe rates ‘The rates for drainage gullies and connections should allow for supply and installation of gully, cover, connecting pipe,concrete surrounding, cover and connection to the drain line as shown on the drawings. Depths used for classification of manhole are measured from the cover level to the inverts of the manholes. The rates for all concrete structures such as manholes, valve chamber, inspection chambers, gullies, ENIRATES ROADS CONT. CO.LLC, "‘damarsin ADhoes fi l 2 fe ae 2 se |PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES PREAMBLE Br SECTION] PARTNo| PAGE No ) bie em] ITEM DESCRIPTION REF. The rates for inigation ducts / pipelines shall include for paint treatment of the outsided of all the pipes for Identification purposes but shall not included for final “cleaning and sterilization” as defined in the specification. B ‘The rates for supplying and laying pipes infil are to include building up embankments to 1.3m above crown of pipes, excavating pipe trench to 150mm below invert of pipe, laying sand bed pipe and surround including hand compaction upto 300mm above the crown of pipe unless a concrete bed and surround is required and plate ‘compaction upto 1.3 m above crown of pipe. Normal embankment works then to recommence 1.3m above ‘crown of pipe. The rates for drainage section gullies and connections shall allow for the supply and installation of gully, cover, connecting adaptor and concrete surrounding, as shown on the drawings. The rates shall also include for fitings, excavation, backing and compaction. D ‘The rates forall trenches and pits shall include all necessary earthwork support/shest pling as required by the conditions on site. e ‘The rates for cover level adjustment shall include careful removal of existing frame and cover, removal of corbels, carefully breaking aexisting shaft (if required) and reconstruction of same to the new level by reinstating all waterproofing, laminations, plastering, grid blasting and painting work to the approval of the Engineer. F The rate of manhole cover shall included the cost of al related works, concrete, steel reinforcement, iting hooks, ‘and protective coating, as shown on the utility drawings. ‘The rates for removal of existing irrigation pipe lines shall include for necessary, temporary continuous water supply during the construction period to existing trees landscaping works as required. H Where “non-destructive” pipe installation is NOT specifically called for on the drawings for any length of pipe the Tenderer/Contractor may choose to use "Non Destructive" method. However payment shall be made as if the pipes where installed by trenching methods. ‘Spare Ducts All spare ducts shall be 2 way 200mm diameter uPVC pipes. ‘The rates for ducts shall include for colour coded drawcords, end caps or plugs and duct markers. ‘Security Network The rates shall include for laying of ducts, trench excavation and backfiling, end caps, waming tape, colour ‘coded draw ropes and duct marker in conformance with the requirements of authority. Gas works ‘The gas network for the project shall be developed as Design and Buil L installation, testing and commissioning of complete network to be don specication. MN EMIRATES ROADS CONT. CO.LL.C. Hamarain & Al Oheeb Say OY lat oy 4 ppd Gd anal Ayal SL LAY ghd ANE hae 70, Box 0474, Oia. Une ab Eman Hamarein 8 Al Dae 2 = SS. se ee 2 _ fo _=_ae_eo} oa. CONSULT Section (c) Schedule of Dayworks IPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES DAYWORK SCHEDULE DESCRIPTION FED). ‘Section (co) - Dayworks Generally Dayworks willbe administered strictly in accordance with the Conditions of Contract a ‘The Daily Works Schedule shail only be for labour, materials and plant outside of or in addition to the scope of the ‘works as required or reasonably implied by all Contract Documents and will be as approved by the Employer/Department land the Engineer. ‘The Contractor will be paid for Daily Works Schedule Items carried out during the course of the Contract at the rates. tendered in this Schedule. Profit and overheads are not to be included in the actual rates but stated as a percentage to be added at the end of Labour, Materials, and Plant Sections of this Schedule of Rates. = ‘The basic rates to be inserted in the Daywork Schedules shall be the Rates which the Contractor has used in determining his Unit Rates inserted in all sections ofthe Bill of Quantities, ‘The time engaged in the authorized works will be certified and paid. n the event of labour or plant having to be brought to the site specially for an item of the Daily Works Schedule, then a reasonable allowance will be made for travelling time. The allowance for traveling time is to be agreed before the Daily Works Schedule Item is executed. No work carried out on a Daywork basis will be measured unless, betore starting work, the Contractor has obtained the written approval of the Engineer. Daily Works Schedule Rates tendered by the Contractor will be carefully taken into account at the time ‘Tenders are being considered. Rates for labour ‘The Dally Works Schedule Rates tendered for Labour shall be the NET rates payable, including, but not by way of limitation, the fumishing and use of hand tools and ofall ordinary non-mechanical plant, staging, scaffolding tarpaulins, Use of electric light and water for the Works, etc.,and all special inducements. The cost ofall supervisory staif {including engineers, superintendents, and foreman), instruments, home office and site overheads, clerks, storemen, Watchmen, timekeepers, or any similar Contractor's employees shall be included in the percentage addition for profit and overheads. ‘The NET rates for labour shall be the rates for persons directly engaged in the work on the site or inthe Site or in the Contractor's workshops located in Abu- Dhabi ates for Plant Hire ‘The definition of hire terms are as follows: i. Hourly hire- any hour of any period less than eight hours. a2 = == li, Daily hire-an eight-hour day. In the event that more than eight hours in less than twent ‘consecutively (excluding normal breaks, etc.) the excess hours will be paid foras Plant (her than smal 08 and workshop equipment and operatives) be paid fora the rates included nthe Dally Works Schedule oa he Fat 1 the execution ofthe work. The Contractor shall present othe Enger hi t included nthe Daly Works Scheduo as lear he bev | such plant, ’ — CONSULT | |PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES DAYWORK SCHEDULE omr DESCRIPTION ‘Section (c) - Dayworks (Cont'd...) Plant hire rate shall include all costs for drivers, attendants, and operators, and maintenance to keep the plant in proper working order at all imes, attendance in starting up and shutting down, refueling, all fuel and/ or electric power, oils, ‘greases, cleaning materials, replacement and/or sharpening of tools including provision of the tools, and all other ancilary items including consumable spares. ‘Note: Payment wil not be made by the Employer/Department for mechanics or maintenance time which shall be included in, and spread over, the rates included in the Schedules, Rates for Materials ‘Materials used as Items of the Daily Works Schedule shall be as specified for the works. The rates shall include elivery tothe site. In the event any materials are required for use as Items of the Daily Works Schedule which are not included in the Schedule, the current NET market price shall apply, plus a percentage for profit and Overhead, which shall include all costs for collecting from the site store yard, loading, transporting, tunloading at the works. ‘The NET unit cost of materials shall be the actual cost of materials purchased speotically for the Works, or materials, used from the contractors stock charged at current market prices plus a reasonable allowance for delivery to the site. f f f fi i A i a A cf ddakaOYylat Lavias, a] eee EMIRATES ROADS CONT. CO. LLC, | Hamarain ALDheeb pS QuNOY lat CONSULT RE lea |PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES BILL DEVELOPMENT SECTION x) |PACKAGE: INFRASTRUCTURE DAYWORK SCHEDULE ° co ITEM DESCRIPTION es Labourer (Skiled) Labourer (Un skiled) Banksman/Greaser Stoo! fixer ‘Mason / Concrete finisher Driver (Light Duty) Driver (Heavy Duty) Plant operator: Heavy Plant operator: Light Carpenter Electrician Pipe fitter Welder Jointor Plumber ‘Addition for profit and overheads on Labour tO alg ob Lge tO oe f See Ba eT, Os nied ab Eman PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES | evetormenr PACKAGE: INFRASTRUCTURE DAYWORK SCHEDULE 4 iT REF, za ITEM DESCRIPTION Grader loss than 140 H.P. with scarifier attachment Grader 140 H.P. or greater with sacrifier attachment Motor scraper up to 10m3 Motor scraper over 10m3 Vibratory roller up to 3 tons Vibratory roller over 3 tons ‘Tandem roller up to 10 tons ‘Tandem roller over 10 tons Pneumatic roller over 10 tons ‘Bucket loader up to 3 m3 Bucket loader over 3 m3 Dump truck up to 5 tons ‘Dump truck up to 5 tons to 10 tons Dump truck over 10 tons Generator up to 200KW/Hr Compressor 5000-6000 litres capacity with small tools Excavator up to 1 m3 Excavator over 1 m3 Water tanker, minimum 10,000 litres (Excluding water) Concrete vibrator (pokeriscreed) up to dia S0mm RATE UAE. DIRHAMS 145-00 210-00 320-00 360: 40.00 85:00 40:00 85:00 100-00 110.00 130-00 60-00 45:00 loo.00 (50-00 80.08 loo ed 140-00 o.oo [5.00 BILL OF QUANTITIES PAGE NO. IPROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT IPACKAGE: INFRASTRUCTURE DAYWORK SCHEDULE os = ITEM | ITEM DESCRIPTION UNIT RATE REF. UAE. DIRHAMS Bob cat, capacity < 1m3 42:08 Hiab truck, 6 tonne or greater capacity with lifting arm h 1o.0d Concrete mixer, 6m3 h 40-00 \g-00 a a * Plate compactor 4o-08 52.00 4o-00 34-00 200-00 Water pump 2 inch Water pump 3 inch Dumper up to 1 m3 ‘Asphalt paver Lomy mounted crane up to 25 Tonne capacity Pick up truck up to 2 tonnes 400 Pick up truck over 3 tonnes capacity h 60.00 ‘Asphalt coring machine (up to dia 200mm) h 105-00 z #1 ‘Spray tanker for tack or prime coat minimum 10,000 litres lo 08 40.08 50.00 Welding plant Asphalt/conerete saw = oe oe ee ee 2 es es Pneumatic breaker cy 40.00 ozo Portable lighting set with generator h 1G0.00 jzze'l T | Mechanical road broom h 145.00 U__| Wheeled excavator with backhoe and shovel (JCB) h 40-00 a = V__ | Addition for profit and overheads on Plant ee aa ep ET FO Box 4ba7s, ube Utes ab as TAMDEENLLG BILL OF QUANTITIES DAYWORK SCHEDULE 6 Sao os > ° Ee Oso ve ea ai Water Brakish Water, Fresh Borrow material, load bearing Borrow material, non load bearing Concrete class 30/20 SR cement Concrete class 15/40 SR cement Concrete class 40/20 SA cement Concrete clase 40/20 OP cement 100 mm diameter uPVC pipe Class C 150 mm diameter uPVC pipe Class C 200 mm diameter uPVC pipe Class C Hardwood Softwood (teated) Bitumen 60170 Bitumen 40/50 Subbase material CBR > 90% Aggregate base material CBR > 80% Ordinary portland cement (OPC) UNIT ppd Geta td RATE UAE. DIRHAMS, ous o-20 60-00 50-00 250-00 240-00 10-00 300-00 850-00 1,600.00 200-00 3000-00 45:00 40.00 Bho-0d dana gyal LY ga tort ee FO. Box 4067s, ub Unis ad Eis RAMPR DS Hamarain 8 AI Dhoab A F I 4 ‘ i a a t= | PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES DEVELOPMENT ‘SECTION PACKAGE: INFRASTRUCTURE DAYWORK SCHEDULE PART NO. Ne PAGE NO. o7 ITEM | ITEM DESCRIPTION REF, Sulphate resisting cement (SRC) Moderate sulphate resistant portland cement (MSAPC) C | Coarse aggregate (dry) Fine aggregate (dry) 200 mm thick hollow concrete blocks +100 mm thick solid concrete blocks | 100 mm thick hollow concrete blocks | 200 mm thick solid concrete blocks Asphalt concrete wearing course ‘Concrete paving blocks 60 mm thick Concrete paving blocks 80 mm thick Precast upstand kerb (200 x 250 mm ) Plywood 12 mm Standard grade Plywood 12 mm marine ply Plywood 20 mm Standard grade R__| Plywood 20 mm marine ply Granular Material for pipe bedding ‘Stone material for land drains (max.. Size 100mm) ‘Addition for profit and overheads on Material sepa QaaeS uni fr BR m2 RATE UAE. DIRHAMS: 42-00 3-00 5-00 250-00 40-00 43-00 58.00 7. a _ en _ IPROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES. DEVELOPMENT |PACKAGE: INFRASTRUCTURE DAYWORK SCHEDULE ITEM REF. ITEM DESCRIPTION ‘Section (c) - Dayworks (Cont’d..) ADDITIONAL RATES (for items which the Contractor may consider likely to be employed) BILL PAGE NO. SECTION c oe RATE UAE. DIRHAMS, CO.L.L¢, famarain & Al Dhdeb SEE susie | SS 2 eee ee ee Oe ee ee ee __ Section (d) Work Items a= ce Sa Wz srs COLL, consuLt t a Sata ri ssi. acral Se = SS BS ws ee ee ee ee 2 ue 2 ___oee_ Section (d) Work Items a art 1 — General Items Pa WIGY apo, .| «RC: ra EMIRATES ROADS CONT, C.LLc, 24 Hamarain & Al Dheeb CONSULT pp saOH ca eas, | Roscoe yee, EMIRATES ROADS CONT, CO.LLC, 24 an 8 Al Dhow #4 = rs) oS => aS 6D 2S a - f JpRovecr: Pr-125 - JUMEIRAH BILL OF QUANTITIES BILL | PARTNo | PAGE No ILLS DEVELOPMENT SECTION GENERAL ITEMS 6 1 ann JPACKAGE: INFRASTRUCTURE TEM TTEM DESCRIPTION CESMMS] UNIT [QUANTITY| RATE | AMOUNT Ret. AED ps NERAL ITEM: Contractual requirements A. | Performance Bond A110 | sum te ae 155,000-00] 8 | Insurance of the Works. A120 | sum ce €4,500-00 © | Third Panty insurance 1301 | sum i 43,000 -00] 1D | Workmen's Compensation insurance 41302 | sum ee 30,000-00 Specified requirements Empl a ‘Representative's and Engineer's staff E | Establishment of temporary offices aztit | sum 1 - 195,000. F | Maintenance of temporary offices. aan | day 270 | 286.00 | 69,120-00 G | Removal ofthe temporary offices aaa | sum 1 - 1,000-00 11 | Establishment and removal of laboratory and laboratory equipments aztat | sum ‘i - *s,000-04 J | Maintenance ofaboratory and laboratory equipment az22 | day | 270 | 95.00 |20,250-00 Ss 1's, Employer Re Engineer's staff @ including fue, all rT ‘replacement incase of breakdown, inaccordance. veh zy complete | 4W0 Jeep or Equivalent, latest model in brand new | 4221.1 | day 270 [450 00 | 121,500-0d) condition L_ | 1No. double cai day 270 | 390-00 |105,800. with and inclu oe cal M_ | 1No. single cain say 270 [345.00 |I01,250. with and inclu aaa rr auhetyaa ASRS La HUYIAS, 3] hg 1234, S20-04] 230 Rae Stshitogy 2-118 e eens eee | “ES EWRATES ROADS COMT.cO.LLC) TAMDEENLLG, amarain Al Dhoeb 3 Ott A pet SIS TET “ To Part Sullnfi. 5075, toa norm IpROJECT: PT-125 - JUMEIRAH BILL OF QUANTITIES BILL | PARTNo | PAGE No ‘SECTION GENERAL ITEMS @ 1 ae TEM TEM DESCRIPTION CESMMS | UNIT [QUANTITY] RATE | AMOUNT et. ‘AED PART 1- GENERAL ITEMS (Cont) Specified Requirements Cont'd A. | Subcription, installation and removal of telephone, | Az22.1 | sum _ és 15,000:00 telefax, computer, printers, intemet, mobile phones, radio equipments etc including connection charges ‘as per specication. B_ | Maintenance of telephone, teletax, computer, 222 | day 270 |138.09 | 36,450.00 printers, internet, mobile phones, radio equipments etc C | Monthly progress photographs a a) 8 |1,000:00] 9,000-00 (site locations) as required per Contract ‘Equipment for use by the Employer's and Engineer's. ‘tat D_ | Establishment of office and safety equipment A2ai.1 | sum 4 = 295,000+1 E | Maintenance of office and safety equipment n2si2 | day 270 | 140-00 | 37,800:00 F | Removal of ofice and satety equipment 42313 | sum 1 = 1000-00 | Establishment of surveying equipment 4233.1 | sum 1 S 80,000-00) 11 | Maintenance of surveying equipment 42332 | day 270 | 45.00 | 20,2504 J | Removal of surveying equipment 1233.3 | sum 1 = 659-1 Attenda incor’ | Drivers (1 No as required) 4241 | manday| 270 | 90-00 | 24,200:00 L | Chainmen as required A242 | man-day 270 100-00 | 24,000-00f Office attendants az | manday| 270 | 90-00 | 24,300:00 EMIRATES RORDS CONT. COLL LAMDEEN tig A | 26 HamaraingA1Dheeb PROJECT: PT-125 - JUMEIRAH BILL OF QUANTITIES BILL SECTION GENERAL ITEMS @ 1 wus Trew TTEM DESCRIPTION ‘CESMMS | UNIT [QUANTITY] RATE] AMOUNT Ret. AED PART 1 - GENERAL ITEMS (Cont) Method - Related Charges (To be inserted by the Tenderer) ‘Accommodation and builings for the Contractor asio A Establishment (fixed) ‘A310.1 sum 1 - 195,000:00 8 | Maintenance (time related) asioz | day | 270 | 00-00 |216,000-00 | Removal (xed) asi03 | sum 1 = 1000-00 ‘Services for the Contractor's Site Offices A320 . Establishment (fixed) 320.1 | sum 1 - 25,000-00 e Maintenance (time related) ase02 | day 270 |1,560-00] 418,600:00 F | Removal (ixed) 53203 | sum i - 1000-00 : esata ry Ped Ceti 3 ¢ 9p \ FeimaTes ROADS CONT. Cp.L.L¢. i liesweuLB Soin ci Haparain& Dhol "F.0,to48074, Ot Une an / consutt TAMDEEN ic To Part Summary amarsin AlDhoeb om. a 2 ee ee ee gi a | PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT |PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES GENERAL ITEMS BILL SECTION @ PART No TEM TTEM DESCRIPTION CESMIS Ret. ‘QUANTITY RATE ‘PART 1 - GENERAL ITEMS (Cont'd) Method - Related Charges (Cont'd) (To be inserted by the Tenderer) Plant & Vehicles Est yment (fixed) Maintenance (time related) Removal (fixed) Hamarain& a |75,0c0-00 54,250:00 500-00 Fo ba 1S os OT it Summary Ds.coit Hamarsin 8 AIDieeb 0. a) | > 2 SP op oP a HILLS PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES BILL | PARTNo DEVELOPMENT SECTION GENERAL ITEMS @ 1 PAGE No TEM TTEM DESCRIPTION CESWNG ] UNIT | QUANTITY Ret. PART 1 - GENERAL ITEMS (Cont'd) ‘Method - Related Charges (Cont'd) (To be inserted by the Tenderer) ‘Temporary Works Ags A. | Establishment (fixed) 350.1 | sum 1 B_ | Maintenance (time related) 49502 | day 270 | 5a5.00 © | Removal ixed) 3503 | sum 1 (Note : Temporary Works in each category to bbe inserted by the Tenderer and specified Whether ‘Time Related’ or Fixed’ next to the items) lan gasha on as 3] ‘EMIRATES ROADS CONT. C0.L.L¢, a he. BILL OF QUANTITIES: Bit | PARTNo | PAGE No SECTION GENERAL ITEMS @ 1 ave TTEM DESCRIPTION ‘CESMMS] UNIT [QUANTITY] RATE] AMOUNT el she AED ‘PART 1 - GENERAL ITEMS (Cont'd) Method - Related Charges (Cont'd) (To be inserted by the Tenderer) ‘Supervision and labour. mobilisation and usage. ‘durin the Contract Period and demobilisation (Time. ‘elated charges) ae (Organisation chart to be included) Establishment (fixed) 370.1 sum 1 os is.002-en: Maintenance (ime related) 3702 | day 270 | 1@,269-00| 3.512, 080- Removal (xed) 43703 | sum 1 a) CONSULT Rt ROADS} 24 Mamarsie® 1,000.00 IRATES ROADS CONT,CO.LL.C.| hs. 3.328, 090. = Sea Se f= & Ss Lf - - 25 Authority Fees 1G slat byLeyias, 3 PROJECT: PT-125 - JUMEIRAH BILL OF QUANTITIES BILL | PARTNo | PAGENo HILLS DEVELOPMENT SECTION GENERAL ITEMS @ ; ane |PACKAGE: INFRASTRUCTURE Tew TTEM DESCRIPTION CESMMS] UNIT | QUANTITY] RATE "AMOUNT Ret AED PART 1 - GENERAL ITEMS (Cont'd) = ad 18 CONT. C0.LL.C, ik WeniRATES ROADS o BILL OF QUANTITIES BILL | PARTNo | PAGE No PROJECT: PT-125 - JUMEIRAH SECTION HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE GENERAL ITEMS @ 1 anno TTEM DESCRIPTION ‘CESMIMS | UNIT | QUANTITY| RATE “AMOUNT Ret. AED PART 1 - GENERAL ITEMS (Cont'd) A | Compliance with the Conditions of Contract and ‘Specification Ag00.2 | sum 1 — [crue Sgades nll Ag all LL oy AOE coe Jae _ a, ped Qe corer rea BILL OF QUANTITIES Bit | PARTNo | PAGE No SECTION GENERAL ITEMS @ 1 ann TEM TTEM DESCRIPTION ‘CESWMS |_UNIT [QUANTITY] RATE] AMOUNT Rel. AED PART SUMMARY PART 1- GENERAL ITEMS. Page ait 934,920-04 Mi ci 570,454-11 res 299,500-0d Page ai/4 155,000:00 Page atis 836,500-0¢ Page d1/6 '49,150-00 Page di? 192,450:00} eae 33RE,O90-0} Page d/o ~ Page a/1/10 6,464, 267-11 Section (d) Work Items Part 2A - Demolition and Site Clearance a a. sues GARATESA ROADS CONT.CO.L.L 24 PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT JPACKAGE: INFRASTRUCTURE. BILL OF QUANTITIES DEMOLITION AND SITE CLEARANCE PAGE No. d2N1-Rt vem REF. ITEM DESCRIPTION Break-out and remove existing building/room/shed, set aside salvage items to return back to owner, including excavation and cart to tip of foundations, bbackfiling of voids etc. complete all as per drawings and specifications. Breakout and remove existing boundary wall and ‘gate, including excavation and cart to tip of foundations, backfiling of voids etc. all complete {as per drawings and specification BILL | PARTNO. SECTION d 2A ceswas | unt | quantity | RATE REF. 09001 | sum 1.00 900.2 87-00 AMOUNT AED 43,259.00 '15.660-00 p-sautar cof plat cy tavias| Pacts 58,919.00 SP coNnsuLT ese oe Section (d) Work Items Part 2 - Roads and Pavings a0 sols MT.C0.LLC| 24 EMIRATES rosea eno co.Lbe _ 5a, aa, & |PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTI DEVELOPMENT |PACKAGE: INFRASTRUCTURE ROADS AND PAVINGS TIES PART NO. PAGE NO. dan ITEM DESCRIPTION ‘A | Excavation for cutings, material other than top soil, rock or artificial hard material Excavation ancillaries: ‘Trimming of excavated surfaces to receive no Permanent works; material other than top sol, rock, or artificial hard material | Double -haneling of excavated materia material other than top soi, rock or artical hard mater (provisional) Elling, Filling general; selected cut material other than top soil or rock, CBR > 15% Filling general; imported natural material other than top soil or rock, CBR > 15% Filling ancillaries “Trimming of filed surfaces to receive no permanent works; material other than top soll, rock, or artificial hard material rhs consury £220 E512 E542 E635 en2 m3 | 23000 | 8-69 m2 | 5,100.00 | 113 20000 | 1-4 15.20 m3 | 31,850.00 | 25-31 87,140.00 | 113 1,994+10 5,163.00 2694-00 3496-00 le18, 863.50 98,468: 20 f Ei RE lee & cra TorF Urea Ae wos ‘omarai Ai Dheeb Section (d) Work Items Part 3 — Street Lighting Works pp SabiiGY at onbyras, c= EMIRATES ROADS CONT. CO.L.LC. ind. AlDheeb OR geek f cP 2 oP ee 7 PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES si | pantNo | PAGENO. LOPMENT SECTION STREET UGHTING JpAcKAGE: INFRASTRUCTURE a 3 as trem] rreMOESCRIPTION ceswwa| un] auantmy | Rare ‘awount er. er. ne eect PARTS: STREET LIGHTING WORKS (CLASS Hl: PRECAST CONCRETE FOUNDATIONS ‘Mass concrete lishting column bases complete. ‘2s. delaled on drawing. including excavation, ‘backfiling compaction formworkconcrete, ‘holding down bolts with 12mm rebar lin, protection ‘ot holding down bolts, nuts and washers with, densa tape before casting and after erection). ‘aceased filed PVC eaps for 25m mast bitumen ‘aintete. and all other necessary works, A. | 4m high tighting column foundation x900:1 | ne ss | 656-00 | 38,048-00 8 | 6 mhih toting column foundation xew2} | 35 | 828-00 |28, 960-00 ‘Mass concrete feeder pillar foundation ‘including excavation, beckfiling, concrete. ‘formwork holding down chemical anchor Bots, ‘stainless stovel cover plat, protection of holding. ‘down bolts, nuts and washers with denso plate, ‘bitumen pant and all other necessary works, | renter ptarounsaton x03] m | 2 [as-00| 4:48.00 ‘CLASS K PIPEWORK -MANHOLES AND PIPEWORK ANCILLARIES ucts Uu-PVC cable ducts nan jointed in trench incucing ‘ond caps, craw cords, warning tape an duct ‘matkers as por specticatons and se shown on ‘rawings | t-way, 10mm ca, depth not exceeding 1.5m xsi2 | m| 10 [207 |%107/00 E | 2.way, 100mm dia, depth not exceecing 1.5m kez} m| 2 |iarer |2424-40 | 4-way, 100mm da, depth not exceecing 1.5m xsz|m] 2 |te.8s |3634-00 conguct | Leo ee DS CONT. CO.LLC, 8 SILL OF QUANTITIES aut | PartNo | PAGENo. f SECTION STREET UGHTING 4 3 ave E C ITEMDESCRIPTION cesuwa| unr | auanrey | are sour a} usta} m | 9% | 489 | 440-10 tsn2}m| 2 |eas |I35.60 tsa] m] 1 |9-52 | 26-20 ee Lsii4 | om wo (654 85-40 us| m| 10 |Rai-48 /2214-80 oe 2 Pp 2 2 a fl ut Aft dasa LWP oa st8-t¥4 gee Tar WEHTE_ Diba Using Aa Eo \ [Pega Paaporstoifavias, F ret. ee ‘To Pat Summary Z pares nouns cour cote] |®93t- 40 ENLLG TA‘ Namaraln A Dhoeb we (CUPVC-ECC earth cable aps nl All LL gpd 0:40 AC x 10 mma XLPE/CUMDPE + 10x 16 mm2 ‘Route marker tape 250mm wie with English and ‘Arabic witen ae approved ty RTA, Road Lighting ON xe004 x9005 usin x9008 x9007 x9008 «| 2 |13,459-0q 26,916:00 m | 300 |I5-62 m | s70 |6tig m | 30 [4251 JPROJECT: PT-126 - JUMEIRAH HILLS BILL OF QUANTITIES eu. | PanTNo | PAGENO. SECTION ‘STREET LIGHTING ‘ 3 ass {TEM DESCRIPTION ceswas| un | quantiry | RATE ‘AMOUNT EF. PARTS; STREET LIGHTING WORKS (Cont’s) (CLASS X: MISCELLANEOUS WORK {Installation of feeder pillar, signal post 46,860-00 24,540°00 |R26,218-00 12,543-00 '2,455:00 alc lay HAV eueares nouns ot co Lic 349,832.00 (24 Hamarain&AlDhaab IPROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES: But | PaRTNO | PAGENO. JOEVELOPMENT ‘SECTION STREET UGHTING ‘ 3 aaa & amen ee | amir 260 a a A | 1¢x10mm2.carh cabieforconnecion oar is | xsons} m | eo |26-24 |1,694°40 Ezrthing System 8 | Supply and install complete earthing system including earthing, it covers, earting fo, — protection, excavator, backfting, compaction ‘ anahanaing xoo010] ar | 9 [4482-00] 35,376 = 22 22 Bp fe @ of saya iat Shes | eR Py EMIRATES ROABS CONT, CO, LLC. Pe Gta A CONFULT 24 | Hamaraif a1Dheeb an ya Lost [Peaster oa teen 39,070. 40 PAB Gey wenn a —— [24 © Homaran8 Drs i = BILL OF QUANTITIES STREET LIGHTING PO tig S Bent 8 AU es toviv col INsuLT 86,908 -40 2941-40 349,852-00 33,010: 40 of Part 3 - Street Lighting Section (d) Work Items Part 4 — Potable Water Works tl Cf> at a eT fl TAs EMIRATES ROADS CONT. fue : Re es CONSULT 24 tamarind A Dheeb - [ uavias, a] 7 ia a PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES DEVELOPMENT POTABLE WATER WORKS IPACKAGE: INFRASTRUCTURE ITEM DESCRIPTION Nominal bore 100 mm dia GRE pipe through 406mm dia stee! sleeve, depth not exceeding 2.0 m ‘Nominal bore 150 mm dia GRE pipe through 457mm dia steel sleeve, depth not exceeding 2.0m EMIRATES ROADS CONT. CO.LL.C, Hamerain& Al Deeb bora 1913.2 2.266-00} 2835-04 410-00 9914,480-00 lig000-00 633,565.80 195, 122.00 13,431.00 15,585.50 TAMPER USS Hamarsn & Ai Dhoeb JPROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES DEVELOPMENT POTABLE WATER WORKS PACKAGE: INFRASTRUCTURE PAGE NO. aro-r1 ITEM DESCRIPTION {iling., testing, commissioning complete as per drawinas,. uirements. 200 mm dia uPVC duct AND VALVES ‘100mm aia, 90° Bend; GRE 100mm aa, 45° Bond; GRE 100mm ia 22.5* Bend; GRE (Provisional) 100mm dia 11.25* Bend; GRE (Provisional) 160mm a, 90° Bend: GRE 150mm dia, 45° Bend: GRE 150mm dia 22.5* Bends GRE (Provisional) 150mm dia 11.25" Bend; GRE (Provisional) Junctions and branches. GRE Junctions, 100mm dia GRE Tee with 100mm branch 150 mm dia GRE Tee with 100mm 1138.00 12-00 1,302-00] 1,302.00] 1439-09] 1,499:00 1435-0 1,435-00] 1,362.00] 1850-00} 12,020:0 as4-0¢ 1,281-00 l2056-0q 26,194 00 52,264.00 2604-00 2604-00 3438-00 14,990-00 2,870.00 2,810:00 12,334-00 3,100:00 24,240:00 3,254 00 17,934.00 62-00 amarain Aloe 191,248 -80 PROJECT: PT-126 - JUMEIRAH HILLS. DEVELOPMENT IPACKAGE: INFRASTRUCTURE BILL OF QUANTITIES POTABLE WATER WORKS. ITEM DESCRIPTION Nominal bore 100mm ‘Nominal bore 150mm, Nominal bore 100mm dia Gate vaive Nominal bore 150mm dia gate valve ‘equirements/anoroval Double Spigot Sluice Valve ‘Nominal bore 100mm dia Gate valve Nominal bore 150mm dia gate valve ‘quantity 4354-0 2468-00 3,748-00 4,610-04 4,640°00 [5202-00] 5,202.00 85,532.00 5287-04 21,148. 00 4639-09 18,556-00 29.460: 00 EEE = IPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES: IDEVELOPMENT POTABLE WATER WORKS IPACKAGE: INFRASTRUCTURE PAGE No. (On 100mm dia GRE pipe line ‘On 150mm dia GRE pipe line (Provisional) Flow meter, On DN 150mm pipes (Provisional) CLASS K : PIPEWORK - MANHOLES AND PIPEWORK ITEM DESCRIPTION ‘quantity Hoos 18,465-0q '6,930-00 1056-04 22,10-00 2403504 48,066-00 62, 485-09 68,485.00 le,e03. of 8897-00 19,094.00 poe bag GY yLat OLY. IS, 3} oe nee [EMIRATES ROADS CONT. CO.LLC. amaran AID (62, 582.00 IPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES BILL DEVELOPMENT SECTION POTABLE WATER WORKS PACKAGE: INFRASTRUCTURE a ITEM DESCRIPTION Washout chamber on 100mm dia GRE pipeline Depth not exceeding 1.5 m ‘Washout chamber on 100mm dia GRE pipeline Depth 1.5-2.0m Airvaive chamber on 100mm dia GRE pipeline Depth not exceeding 1.5 m Arvalve chamber on 100mm dia GRE pipeline Depth 1.5 -2.0m \2,207-00 8,297-00 Airvalve chamber on 150mm dia GRE pipeline Depth 1.5 -2.0 m (provisional) 18,297-00| §207-00 ‘Construction of ar valve chamber as specified 3, 260-04 7,260:00 fa oor el GRE -20m 8352.00 FEE ot ages tot 51,409.00 |PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES BILL |PARTNO| PAGE NO. DEVELOPMENT SECTION POTABLE WATER WORKS. PACKAGE: INFRASTRUCTURE a 4 as Tem | ITEM DESCRIPTION ceswas | unit A. | Flowmeter chamber on 150mm dia pipe; 2131 | ne 1 |i9aa6-on]19,226-00 depth 2.0- 2.5m ae ee oe | | | 8 | Flowmeter chamber on 150mm cia pipe; Ke1s2] or | 1 |Ig40709 19,707-00 depth 2.0-2.5m «| eee acer enn | © | ere xoa|w| 2 fessodancee-oo wal xh sable MBE vias, 3 | spe ae ‘EMIRATES .CO.LLC, > ° 51,619.00 Warnares )ADS CONT. CO.LILC. Hamsesin § AID fa = ee oe OM BF ee es PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT |PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES. POTABLE WATER WORKS, SECTION aan ITEM DESCRIPTION A | 100mm ia GRE pipe Lez 150mm dia GRE pipe Ls2i2 ¢ | 200mm dia upvc duct Ls213 Provide mass concrete Class 40/20/S surround to ‘ducts. where depth is less than 0,90 m including. ploythene sheet etc. complete.as per specification. and drawing (Provisional), D_ | 200mm dia uPve duct Ls213 Concrete (Class 30/20/S) support (thrust blocks) for, ‘tings including formwork.etc complete... ‘a8 per authority requirements, specifications and drawings E | Volume not exceeding 0.1m* L710 F | Volume 0.1 10 0.2m3 L720 G | Volume 0.2 to 0.5m3 L730 © or 3,060 120 108 "7 16-81 19.06 93 58-83 e-00 |1@3-00 385.00 51,458: 60 12,289-00 1431-60 576.60 12,528.00 3,100 385.00 TAMDEENLLGZ See peda GY a Oy 84,459.80 2 A1Dhoeb |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES BILL | PART NO| SECTION POTABLE WATER WORKS 4 4 PAGE NO. Tem ITEM DESCRIPTION (On 100mm GRE tine (On 180mm GRE line s921.6 | nr ut ceswma| unt | quantity] RATE seas] or | 62 |eigoo ¢ ght Spy Lat EMIRATESIROADS Hal 5 |e90- 00] oh arin & A 18,146.70 22,136.00 50,716.00 4,450°00 FReaTarpares eee = fe se Se Pp ee em |PROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT |PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES POTABLE WATER WORKS PAGE NO. wart COLLECTION To GRAND SUMMARY 191,248-80 168,824. 60] 168,562.00 51,409:00 7,619.00 84,4590 95,4480 ‘WEwRATES ROADS CONT, CO.L.L ff 160mm gia. Depth 1.5-2m 140:99 | $4,605. 90 ; 160mm da. Depth 2.0- 2.5m 179.64 |44,344- 10 E | 160mm dia. Depth 2.5- 3m 1815.1 | m eo |2ig-16 |12,885-60 F | 160mm dia. Depth 3.0-3.5m ister | om 80 las4.co |20,368:00 : | G | 160mm cia. Depth 3.5- 4m a pau 6 faoyz) |I4,e5¢60- H__ | 200mm dia. Depth not exceeding| r - to Jiaq-as |L344-s0 | J | 200mm dia. Depth 1.5 - 2m 24 en 70 |1e1-4O | 11,298-00 Kk — | 200mm dia. Depth 2 - 2.5m 680 201-96 |134,526-00 L Depth 2 .5- 3.0m 15152 | m 560 [Rse10 [133,33 6-00} M Depth 3 - 3.5m lad 15162 | m 350 279-26 [99,741.00 [os consurt| isiz2 | m 220 {326-00 |41,420:00 P 1518 | om 80 6398-99 03/9. 20 TT STI aT (9 PaarbGummaryise: Unies ob Eran phot 9a sad GY had LY 2S, 409, 981-40 Veunares A006 C0NT.C0.L..¢] lpRovecT: HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE PT-125 - JUMEIRAH BILL OF QUANTITIES BILL SECTION SEWERAGE a Tem REF, ITEM DESCRIPTION ‘250mm dia. Depth 3.0 - 3.5m (Provisional) ‘250mm dia. Depth 3.5 - 4m (Provisional) ‘250mm dia. Depth 4.0 - 4.5m (Provisional) 315mm dia. Depth 3 - 3.5m (Provisional) 315mm dia. Depth 3.5 - 4m (Provisional) ‘815mm dia. Depth 4.0 - 4.5m (Provisional) ceswMs REF unit | quantity 1526 | m 20 ise7 | om 20 1528 | om 20 1538 | om 20 1537 | om 20 1538 | m 20 PARTNO | PAGE NO. 7 wre RATE AMOUNT AED 312-15 | 6243-00 360-64 |7,212-80 415.49 [8309.80 Be4-55 | 4,351.00 41632 |@266.40 415-60 | 9512.00 ‘400mm ia. Depth 3 - 3.5m (Provisional) 400mm dia. Depth 3.5 - 4m (Provisional) ‘400mm dia. Depth 4.0 - 4.8m (Provisional) (ned Qed 3 Sal Apel) LLP ogg 18-11 se co 1637 | om 20 1,094: 00 12,290 80 (3625-20 Jer4-54 681-26 N 4 ctf diol SY kat fy C Lee EMIRATES ROADS CONT. CO. L.L.c, smarain& A heed Part Summary 84,005-00 ae ae [PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES SEWERAGE BILL | PARTNO | PAGENO. SECTION a 7 7s-Rt Tem REF. a End Caps Depth 1.5-2.0m Depth 2.0- 2.5m 1m al Depth 2.5-3.0m 160 mm dia end cap ITEM DESCRIPTION ‘Nominal bore not exceeding 200mm, Nominal bore not exceeding 250mm (Provisional) ceswas | UNIT REF yet | or quantity | RATE ‘AMOUNT AED 102 | 143-00 |17,646-00 652.00 BI6-00 "Nominal bore not exceeding 315mm (Provisional) | J9e2 | nr Nominal bore not exceeding 400mm (Provisional) | J963 | nr UPVC pipe fittings to BS 5481 133.1 | nr k1341 | nr K135 | or = ae 2 1484-00] 968-00 2 11,1540 | 2,308.00 316-00 2,644-00)34,952.00 13. |14,59401] 189,422.00 4 [R2,649.cb 299596:00 3 |? 864-0g 74,592-00 24158-0d 81,444.00 JPROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES SEWERAGE ‘ ‘ BILL | PARTNO PAGE No. aia vem REF. ITEM DESCRIPTION Depth 2.0- 2.5m Depth 2.5 - 3.0m 1500 mm diameter manholee-Type © Depth 3.5- 4.0m Pes Oe \ CONS ceswms REF unt | quantity | RATE k1332 | nr 1 14,481-00] K1342 or 1 K1362 | nr : pales Ee ‘2 EMIRATES Hambrain& Al Dhee 2a, 535:0p 22,555.00 27,045-04 27,045-00 AMOUNT ‘ED 4481-00 Dy ToT a Par Suninnary 01. Unio nab PPAR hat OU AvIaS, 3 £4, 06:00 PROJECT: PT-125 - JUMEIRAH [HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES SEWERAGE BILL ‘SECTION PART NO 4 PAGE NO. — Tem REF, ITEM DESCRIPTION REF Depth 2.0- 2.5m K143.1 1500 mm diameter manholes-Type B Depth 2.5- 3.0m Depth 3.0-3.5m 1500 mm diameter manholes-Type C Depth 3.5- 4.0m Depth 4.0- 4.5m Kra74 K143.2 ceswas unt | quantity | RATE Ar 2 |16,290:00 24,911-00) 28,409-04 30,099.00] or 2/33 20.0d ‘AMOUNT 32,580:00 114,397 -00 95,227-00 60,198.00 65,458-00 '6 44-00 URATES ROADS CONT, Ct O.LLC.| 634,342.00 BILL OF QUANTITIES BILL ‘SECTION ‘SEWERAGE 174-2100] 17,4-21-00 Depth 2.0 - 2.5m (Provisional) 1500 mm diameter manholes-Type B Depth 25 -3.0m r [26,607 00] 53,214.00 Depth 3.0- 3.6m 130;383-0f 60,174-00 1500 mm diameter manholes-Type C Depth 3.5 - 4.0m (Provisional) '3a,589-0q 32,587-00 JY slat cL ae DS CONT. CO, ind AlDheeb Depth 2.0-2.5m (provisional 13,308-00] | 1 fF manh { F | Depth 25- 3.0m (provisional) K1443 | or 1 [6,494.00 26,494-00 | 1500 mm diameter manholes-Type ¢ | Depth 35- 4.0m (provisional) «14683 | ar 1 Ba44-00] 32,.444-00 ppd Gee ay aah ogee eae To“Pai Sima SSM Bl: nies ab Eris IMRATES ROADS CONT. CO,LL.G smarain&AiDhaas Se eo $n 26s on JPROJECT: PT-125 - JUMEIRAH SEWERAGE BILL OF QUANTITIES. BILL ‘SECTION PART NO. ITEM DESCRIPTION Depth not exceeding 1.5m ‘Twpe 8: GRP Lamination for Internal Surfaces Depth 1.5 - 2m ‘Type C: GRP Lamination for internal Surfaces Depth 2.0 - 2.5m Depth 2.5- 3.0m 28, Depth not exceeding 1.6m ‘Type B: GRP Lamination for Internal Surfaces Depth 1.5- 2m 1 Surface c:6R Depth 2.0- 2.6m Depth 2.5- 3.0m Ped Cpe 35 ceswas REF kea1.1 K 233.1 204.4 kK 2332 Kk 2342 unit nr or ‘quantity 8 12 10 Saban ypia RATE 4,00 | 24,666 -00 Je,1a3-00 | 12,845-00 11,324- 00] 135, 924-00 13,@22-00] 64, 15-00 14 225.00 |83, 800-00 18,236-00 123,540-00 11,44.0°00| 114, 4.00-00 13936-0451, 144.00 = HO War B0UTE iba, ed a To Part Summary 610,034.00 BILL OF QUANTITIES ‘SEWERAGE BILL | PARTNO | PAGENO. SECTION a - a7 ITEM DESCRIPTION Depth not exceeding 1.5m (Provisional) ‘Tape B: GAP Lemination for Internal Surfaces Depth 1.5 - 2m (Provisional) ‘Type C: GRP Lamination for Internal Surfaces Depth 2.0 - 2.5m (Provisional) Depth not exceeding 1.5m (Provisional) ‘Type B: GRP Lamination for Internal Surfaces Depth 1.5 - 2m (Provisional) ‘Type ©: GRP Lamination for internal Surfaces Depth 2.0 - 2.5m (Provisional) =: REF ceswMs 2934] nr 1 unt | quantity | RATE AMOUNT Kosta | nr 1 [g07@00 | 5,042.00 K2023 | nr 1 |9.332-00] 9,342.00 k2333 | nr 1 la,@66-0d 12,¢66-00 5186-00] 5 186-00 2,486-00] 9,486-00 12,948-09 18,938-00 f { x RSERADEEN LH PPADS TAOIST A |PROJECT: PT-125 - JUMEIRAH ‘SEWERAGE BILL OF QUANTITIES PARTNO | PAGE NO. ‘a a7 Depth not exceeding 1.5m (Provisional) 649-00] 5649-00 19,949-00| 9,949-00 Depth not exceeding 1.5m (Provisional) 231.5 ‘Type 8: GRP Lamination for Internal Surfaces Depth 1.5 - 2m (Provisional) 232.5 ‘Type C: GRP Lamination for Internal Surfaces Depth 2.0 - 2.6m (Provisional) K2336 13,442.00] 13,442-00 IS 463-00 tq062.04 10,062.00 ‘Tape B: GRP Lamination for internal Surfaces Depth 1.5 - 2m (Provisional) 292.6 c:aRP rts Depth 2.0 - 2.5m (Provisional) 293.6 15,556-04 15,555.00 5,463.00 Part Summary TAMDEENLLC BILL OF QUANTITIES BILL. SEWERAGE 4 ‘SECTION a8 __ BER, = =D Connect 200 mm dia uPVC pipe to external DM ae PP ‘Nominal bore not exceeding 200mm, Nominal Bore 200 - 300mm (Provisional) a= ‘Nominal Bore 300 - 600mm (Provisional) Nominal bore not exceeding 200mm Nominal Bore 200 - 300mm (Provisional) ‘Nominal Bore 300 - 600mm (Provsional) ed Ge unt | quantity RO Fe ‘EMIRATES ROADS. SS amarsn & A Doe Kes2 | or 1 |4¢91.00 tsae | om 5/5425 tsa | om 10 | BLAS usa | om 10/2844 543 | om 10 |BIF04 24 smacsn bl z23) Ser Ss 2 Ff HP Hi HP HEF Fs =a PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES. SEWERAGE PAGE NO. amir COLLECTION TO GRAND SUMMARY PART 7: SEWERAGE Page d7/1-81 Page a7/2 Page a7e-R1 Page a7/4 Page d7/5-R1 Page 37/8 Page a7 Page 7/8 Page d/7/9 Page d7/10 709,991-40 84,005. 00 502,006.00 €4,061-00 644,342-00 240,242.00 670,034.00 54,960-cO 5e,4.20:00 161,262.90 of Pat Seba wrkRa Cartiod to Grand Summary fi { i rl & rt | PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT IPACKAGE: INFRASTRUCTURE BILL OF QUANTITIES IRRIGATION WORKS: BILL SECTION PAGE NO. vem REF, ITEM DESCRIPTION Depth not exceeding 1.5m 2 Way 150mm dia uPVC duct, ‘1! way 300mm dia uPVC duct CONSULT "EMIRATES ROADS CONT, Hharaing On ab fe > PaaS os Untied Aad Emcee” 319,535. 60 LAMDEEN ic, Z IPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES IRRIGATION WORKS PART NO 100mm dia uPVC 150mm dia uPVC 200mm dia uPVC 100mm dia uPVC 160mm dia uPVC 200mm dia uPVC Depth 1.5m-2.0 m 100mm dia uPVC 150mm dia uPVC 200mm dia uPVC 248-00 10,965-00 1,009 -40 44,911.00 1224,230-00 (3346-30 B2,577:00 45024-40 3525-40 Tanya aL gs te ‘BuMTMBANLAT EO, Unis Em 284,524.50 |PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES BILL PAGE NO. IRRIGATION WORKS: SECTION 4 weer 100 mm dia X 90" Degree Bend 100 mm dia X 45° Degree Bend 150mm dia X 90° Degree Bend 150 mm dia X 45" Degree Bend 200 mm dia X 90" Degree Bend PS Cs 100 mm dia X 22.5" Degree Bend (Provisional) 100 mm dia X_ 11.25" Degree Bend (Provisional) 150 mm dia X 22.5" Degree Bend (Provisional) 150 mm dia X 11.25" Degree Bend (Provisional) consut ‘Quantity AMOUNT ‘AED 592-00 2,986-00 536-00 510-00 \940:00 5453-00 950°00 292.00 824.00 o a PRTE TONLE OL UYAS, 2] IPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES. BILL | PARTNO DEVELOPMENT JPACKAGE: INFRASTRUCTURE IRRIGATION WORKS SECTION a ITEM DESCRIPTION 100x100x 100 mm dia tee 180x150x 100 mm dia tee 150x150x 150 mm dia tee 200x200x 150 mm dia tee (Provisional) 200x200x 200 mm dia toe ‘Tapers 150x100 mm dia reducer 200x150 mm dia reducer End Caps. | 100mm dia end cap 150 mm dia end cap K_ | Gate valve on 100mm dia uPVC pipe CON hs UL | Gate valve on 150mm dia uPVC pipe M_| Gate valve on 200mm dia uPVC pipe (Provisional) Gate Veives inside Air Valve Chamber N_ | Gate valve, nominal bore 80mm on 100 mm dia uPVC pipe Gate valvefor dia uPVC pipe ‘quantity s4g1t | or " 1€6:00} |160.00 9491.2 | nr 29 |244-00]4,946-00 Rt a EMIRATES RC Jai4 | nr 2 sans] on | 2 |b ‘CONT. co) 24 Hamarhin & A Dheeb sent] «| 4 [614200]326¢8-00 ya2] o | 6 |9,6:5-00154,678-00 sens} | 1 fi9sas-04 19,535.00 12,497-00] 24,904.00 442004 76,240.00 pene RATES ROADS CONT, CO. Re sssees> | 169,404.00] | ‘ |PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES DEVELOPMENT IRRIGATION WORKS PACKAGE: INFRASTRUCTURE BILL SECTION PAGE NO. TEM | ITEM DESCRIPTION REF. Air valve on 100mm dia uPVC pipe Air valve on 150mm dia uPVC pipe (Provisional) a dA =. op Wash Out Valve on 100mm dia uPVC pipe (Provisional) Wash Out Valve on 150mm dia uPVC pipe Irrigation TSE Water Supply Meter Assembly Ul Supply & Install complete se for rigetion TSE water supply meter assembly (wihin 8 chambers) as indicated in drawing no. U3805-MUOO'T45, including Nlanged gate va ‘motorized buttrty valve, adaptor, puddle flange, coupling, Short pipe, pressure sensor, pressure reducing and sustaining check valve, electto magnetic flow sensor, pressure guage, basket strainer, operating spindler/extension Spindler etc. The works also includes connection to DM external irrigation network, excavation, backfiling, Te Connections, thrust block. shutdown, testing, handing over to DM drainage and irigation department etc, alin accordance wih specification and DM Drainage and Irigation department 2884-00 3125-00 803.00 3410-00 xpos Wns OL 4 i arain& 41 Dn }48,048-00| 5468-00 &,250:00 8895-00 2410-00 48,065-00 AB,686-00 PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES. PAGE NO, IRRIGATION WORKS: ITEM DESCRIPTION Depth 1.5-2.0m Depth 2.0-2.5m Washout chamber, Depth 2.0-2.5m Airvaive chamber. Depth not exceeding 1.5m (On 100 mm dia pipe (On 150 mm dia pipe (Provisional) Spa yak SH LAS Ue feRATES ROADS CONT. CO.LLLC. 24 Hamarsin&AlDheeb Depth 1.5-2.0m Depth 2.0-2.5m Washout chamber! Depth 2.0-2.5m Airvalve chamber (On 100 mm dia pips ‘quantity 2,458-00|33,282-00 10,243-00) 21,4.86-00 13,49 5:00] (5,195.00 10,545-00) 10,545:00 10,545-00} lO, 575-00 12,133-00 |24,399-00 11,536-00}23,072-00 14,4:20°04 14,490:00 | 4586-00 13, 113-00 198,803-00 o_o IPROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES IRRIGATION WORKS. BILL SECTION a PART NO CONT. C rain & A Dheeb 201,843-00 inl Ayal SOUP aga det pe S047, Gib Unie eb Eaton IPROJECT: PT-125 - JUMEIRAH HILLS. DEVELOPMENT |PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES IRRIGATION WORKS moon» xe ron ITEM DESCRIPTION For 100mm dia uPVC For 160mm dia uPVC For 200mm dia uPVC For 2 Way 150mm dia uPVC duct For 1 way 300mm dia uPVC duct For 100mm dia uPVC (provisional) For 150mm dia uPVC (provisional) For 200mm dia uPVC (provisional) For 2 Way 150mm dia uPVC duct (provisional) For 1 way 300mm dia uPVC duct (Provisional) Volume not exceeding 0.1m? Volume 0.1 to 0.2m3 Volume 0.2 to 0.5m3 CONSULT ae ped Cede Md Lean Lane L523 us2i.4 Lssi2 Lsais Usai4 Ls2 quantiy| RATE m| eo |+e8 [4619-20 m | 1300 [9-54 — |1%441-00 m| 7 |t-s — |ao40 m | 1540 |1340 |21,098-00 m) 350 fiat |4,959-50 m 1196-20 m| 10 igo-42 |L404-20 my} 10 fieray [,era-10 m] 10 |1@4-61 |1,846-10 m| 10 |Ro558 |Z055.20 L710 L720 L730 oa 19 nr 19 a | 64 TAMDEENtLCZ —_ CONT. CO.LLS, Homann AID | PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES IRRIGATION WORKS. ‘COLLECTION TO GRAND SUMMARY PART SUMMARY. PART-8 IRRIGATION WORKS (Cont’d.) Page wat 319,545.60 Page weet 267,324.50 Page e/8/3-F1 14,685-00 Page di8/4-R1 169,704.00 Page dV 48,686.00 Page 8/6 17@808-00 Page we7 201,843-00 Page 8/8 84,850 -50 ipa Babalu lat Oy 1,355,001-60 1 WYEWIRATES ROADS CONT. CO. LLC. 24 amarsn & AID Section (d) Work Items Part 8A - Irrigation and Fire Fighting Reservoir & Pumping Station ct Say —- a ieee MATES RoADSONT.co.L.Lc Haman AD CONSULT > f t i — PrOvECT P-15 - AMERAH LS wu OF GUANTTES eu | rarTno| aaewo feeonenr mera HRIGKTON AD PRERCHTHG PACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION da BA ‘A/BA/1-R2 ica ltl aa are (cairn ae = my REF. =. 32 ee Oe ee ° a ‘Excavation for foundations; depth does not exceeding 10m, ‘material other than top sol, rock or artificial hard material Excavation ancillaries Preparation of excavated surface to receive permanent works. Disposal of excavated surplus material to tip, materia other, than top soil rock or artificial hard material Filling Filing to structure using suitable excavated material, Filling Ancillaries ‘Trimming of filed surfaces not to receive permanent work Preparation of filed surface to receive permanent works. 4 24 TAMDEENLLG — a al £320 | ma | 7,650 e522 | m2 | 930 esce | ma | 7,950 e614 | ma | 300 e712 | m2 | 200 E722 | m2 | 100 13-58 Rees 24-56 B01 459 103,887- 00 4,082.70 13,300 - 50 4368-00 2408-00 439-00 SP aM GYyR GHLYNS, 2| ye Hamarain&AlDhoeb 261,595.20 BE: Tem REF, Se _ ea aes = Se eS EP Ee eS ITEM DESCRIPTION 125mm blinding including formwork waterproofing ‘membrane and curing after completion. Placing of reinforced concrete including curing after application, all tests complete in accordance with. ‘drawings and specifications Reservoir and Pumping station foundation [MCC building foundation [MCC building suspended slab Reservoir and pumping station suspended slab Reservoir and pumping station walls MCC building columns and piers MCC building parapets and upstands opened jc REF. F240 | ms F2e0 | ms | 2,380 F511 | ma | 100 Fe241] ma | 950 Fe2n2| ma | 70 Fez | ms | 15 Fees | ms | 490 Fea | ma | 850 Fess | ms | 2 res | ms | 3 || PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES Bi. | PARTNO| PAGE NO. [DEVELOPMENT ‘SECTION IRRIGATION AND FIREFIGHTING PACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION 4 8A 8Ar2-R2 ceswaa| unit | quantity) RATE ‘AMOUNT 384-52 1563-93 288-39 525.29 1,283.63 667-62 455-36 865.14 ‘AED BI,627:00 915,157-60 126,303.00 243,950-50 36,812.30 19,254.45 336,253-80 384,413.00 L430. 34 Ler Io TAMDEEN LLG To Part 4 Hamarain& Al Dheeb 340,683.09 aT Fair Finish - Plane Horizontal MCC building suspended slab Reservoir and pumping station suspended stab aicFinish - Plane Vertical MCC building parapets and upstands MCC building columns and piers Reservoir and pumping station walls Reservoir and Pumping station foundation MCC building foundation Reinforcement Det h Nominal bore exceeding 6mm. \ Saal Ayal Nimes cON e213 a2 2243.1 G243.2 G2se 6245.1 62452 PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES: BILL | PARTNO| PAGENO. DEVELOPMENT SECTION IRRIGATION AND FIREFIGHTING PACKAGE: INFRASTAUCTURE RESERVOIR & PUMPING STATION d 8A WeAIS-R2 ITEM | ITEM DESCRIPTION ceswma | UNIT | QUANTITY | RATE AMOUNT REF. ‘AED m2 m2 so |624-29 |31,214-50 850 [580-18 |493,153-00 wo \20%45 | 3698-00 a0 [284-2] 6618-10 2as0 203-45 [726,252.50 130 |262.44 | 36,356.20 50 |283-88|4,194-00 4139-09] 1,200, 310-00 ip mean imei) Hamarain & AIDheab =e. PROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT DACKAGE: INFRASTRUCTURE BILL OF QUANTITIES BILL SECTION IRRIGATION AND FIREFIGHTING RESERVOIR & PUMPING STATION ‘ PART NO | PAGE NO. eA 23 _ Sp IP Ee ae rreM | ITEM DESCRIPTION ceswas| unit | Quantity EF. REF. ‘A | DN 100mm DI Pipes tata | om 10 [1433-60] 14,336-00 8 | DN 150mm DI Pipes isi2| m | 30 |1,98499] 59,659.10 ‘Supply, installation, test and commissioning of the. f i ‘drawings and specifications. © | DN 60mm Steel Pipes tata | om 10 [1804-44 1504440 D_ | ON 150mm Steel Pipes vait2] m | 50 |a3es-eq] 1,102. 00 E | 0N200mm steel Pipes vata] m | 20 |2633-01]4¢,990-30 i 1 ning of all wings a ‘specifications. F | DN25 mm uPVC Pipes. 1511 | m to [F018 | 701-80 tion, test and commis the in incl specifications. G | DN 100mm GRP Pipes vera | om 10 |L504-44 15,044-40 H_| DN 150mm GAP Pipes vez | om 10 |4,443-60| 14,436 -00 4 | 0N 200mm GRP Pipes 16113 | m 18 |RO41-ei| 30,687.15 k_ | DN 300mm GRP Pipes 16114] m 15 |3u6. 54] 46,448: lo cf babatioy sat obuyras,a| Mime ROADS CONT. CO.L.Lc, eG “ae : Wamerain & Al Dheeb 400,459.25 PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES. BILL | PARTNO | PAGENO. DEVELOPMENT SECTION IRRIGATION AND FIREFIGHTING 2 ACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION a 8A dBA/S-R2 ("rem | ITM DESCRIPTION ceswms| unt | quantity | RATE AMOUNT REF, EF. AED DN 110 mm HDPE Pipes ia] m | 35 [456-60 15,981: 40 i (CLASS J: PIPEWORK- FITTINGS AND VALVES ‘Supply and install the following 01 pipe fitinas including joints, making eut pleces, adapters. ‘neoprene rubber wrap, testing etc. complete 8s per. i ‘specification and.as shown on drawings. Bends a B | 100mm dia X 45" Degree Bend Jatt | one 2 861-00 | 1722-00 | 150mm dia x 90° Degree Bend uati2| om | 9 |Loz-00]9,1@2-00 Junctions and Branches: { D | DN 150 mm; TEE saat | oor 4 |1,569-00 6236-00 E | DN 100mm; TEE ser2| © | 1 tys44-00] 1344-00 I Tapers F | DN 10080 mm: concent reducer svi | mw | 2 [asRe-c0] 5,052.00 Bell Mouth © | @ | on 150 mm; Bet mouth ssris] a | 2 [968-00] 936-00 {| | N20 mm; Bet! mouth sa7i2| om 2 |185-00] 3366-00 ©) 5. | DN 100 mm; Dismanti le 4 [059-00] 4,286-00 | DN 150 mm; Dismantihg 4 s3oi2| mw | 8 |yasa-00] 9,896.00 || L |0N150 mm; Expansion bellow soa} © | 2 |,e2q-e¢ 3654-00 M_ | DN 200 mm; Expansion below sso4| mr | 6 [2096-00 12,526-00 (on | N 150 mm; Blank lange sss] m | 3 |802-00]2421-00 P| DN 150mm; ¥-Strainer sss} mo | 2 |5188-00) 19,316.00 2 | pn 200mm: ¥-5 yaoi7] on | 2 lg@aa-od 13,454.00 To Par Suef eg te ae | 100,649.40 | {ENRATES ROADS CONT COLL, Haman &AlDheeb TAMDEEN LA, S2_S2 2? SP E> = = TAMDEEN uc, a ad PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES ai. | PARTNO | PAGENO. DEVELOPMENT SECTION IRRIGATION AND FIREFIGHTING 2ACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION 4 8A wene-R2 trea | ITEM DESCRIPTION ceswas| unr | quantity] RATE | AMOUNT REF. REF. ED ‘A | 150 mm dia X 90° Degree Bend Jst13| nr to |1,021-00 |1@,210-00 8 | 200mm dia x 90° Degree Bend sata | ne 8 |i,ae1-00 | 10,328-00 || sunctions and Branches | | ON 150 mm; TEE Jens} ar 3 |a150-00] 4450-00 D_| ON 200 mm; TEE vena | or 3 |295e-0q 6862-00 Miscellaneous | DN-200mm; Blank Flange Jaen | or 1 |@61-00 | 861-00 ‘Supply and install the following HDPE pipe fittings ineluding joints, making cut pieces, adapters. f as per it as. 0 Bends F | 110 mm dia X 90° Degree Bend J6nt cd 2 1,291-00| 2,582.00 eR... suit EMIRATES ROADS 24 | Hamarsind Oneed wba ny ua civ. | eracce z 32,299. ‘EMIRATES ROADS CONT. CO. LLC. Bae SaaIRRaRA »ROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES Bi. | PARTNO DEVELOPMENT ‘SECTION IRRIGATION AND FIREFIGHTING °ACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION a 8A cs PAGE NO. ien/8-R2 roa] rev ossoneon ‘concrete formworks, blinding, screeds. damp proof ‘membrane, protective coatinas complete as shown on. drawings and as per specifications (valves measured elsewhere) © | Depth 1.5-2.0m Inlet: ont dia ui an din a ud built t ling, reinforcer 01 ind br ive coating hh | Depth 1.5-2.0m 2 Vis ted Oped \ 2022] or | 1 [i0885-0q 10,595 -00 ae qe: sohsuuT x2s23] mw | 5 |a824-00 To Part Sumipary 0 cf Spall OY ga Gr LAYS yeep 204,084.00} = TAMDEEN tic, 4 y Sf ‘EMIRATES ROADS CONT. CO.LLC, 5 & AD | PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES BILL | PARTNO | PAGE No. | [DeveLtopment SECTION i! IRRIGATION AND FIREFIGHTING PACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION d 8A renso-R2 ceswma | unit | quantity] RATE ‘AMOUNT Tem | ITEM DESCRIPTION REF, AED REF. | Pressure vessel capacity 300 litres 25244 w | 1 |6u¥00}t6,u2-00 aI | Ausomatic cleaning fiter zs42] a 2 — [61,241.00 122,462.00 |e | biese et tan, capacty 2509aHlons 25243 | nr 1 |19,340-0) 19,340:00 | © | rconcmioring ute, copacty 2.5Tonnee zor | mw | 3 |t5520.04 46737-00 J] | suetancapscty 100m zai] mw | 2 frogisiod 40,880-00 1) H | exhaust tan cay 633.2] nr 2 [22,563-0q 45126-00 {5 | overhead Crane zeso | or + [249,199.04 349,179.00 rs Fe a oe Pie ere 27012] wm | 1 |2,488-0d m,49@-00 eee Ch: ee ol ee ye sae a ee Ser 81510380 FNRATES ROADS CONT. C0.LLC, - eROJECT:PT-126 -JUMEIRAH HILLS BILL OF QuANTES aut | PartNo] PAGE NO. _ [DEVELOPMENT ‘SECTION IRRIGATION AND FIREFIGHTING °ACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION 4 sa | deano-re rem | ITEM DESCRIPTION ceswma| unr | quantity | RATE REF. FEF PART -8A IRRIGATION AND FIREFIGHTING RESERVOIR & PUMPING STATION Contd ‘CIVIL ENGINEERING WORKS i ‘Supply, instalation, test and commissioning of the. in ings | ‘Specifications | li | ‘A. | Power factor correction capacitor 27815) m 1 |egeseod)22,658-00 l Lightning protection system z781.6| or 1 |ieu4-00) 16, u4-00 | Moc panel as per SLD zreiz| om| 1 | - |#56ei8-00 i | HVAC contro pane! zreis| sum] 1 | = @,596:00 | Fire alarm control pane! 781.9 | Sum 1 is 1G,ut-00 ; if F | Lighting and small power DB 2781.10] Sum 1 - 644700 fl G | Small power switches and sockets: 2782 | Sum 1 = 26,861: OO + | sain Fire Pump (Electic drive) capacity 1250GPM @ 8.Sbar| 2623.1 | nr 1 [res,228-04 263,228-00 a 4 | Jockey Pump capacity 20GPM @ 8.5bar 523.2] 1 1 |48,549-0b 48,349-00 ‘Stand by Fire Pump (Diesel crive) Capacity 1250 GPM @ pp * | esbar zea} a | 1 |resasoc 295,459-0 L._| irigation Pump sets capacity 24L/s @ Sbar z523.4| nr 2 |@9,937-09 139,674.00 j | M | Dean pumps capacity 10.18 @ 15m zseas | nr 2 |19,555-0q 39,110:00 eR. aia ‘eHIRATES ROADS CONT. CO.LL.C,| | |PROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES BILL | PARTNO| PAGENO. DEVELOPMENT SECTION IRRIGATION AND FIREFIGHTING PACKAGE: INFRASTRUCTURE RESERVOIR & PUMPING STATION 4 8A east 1-R2, I uit : ITEM DESCRIPTION quantry| rate | AMOUNT Allow for all Civil works for reservoir, pumping station and MCC room which has not measured separately within ths bil par, including but not imited to excavation, baci, r foundation, concrete, formwork, masonry, trenches, pints, _ {A | doors and window, all finishing works, drainage works, ‘waterproofing, dewatering, painting, al ancillaries, busing permit, pile foundation (if necessary), testing & Commissioning etc complete as per specification, drawings {Ovig Pet. U3700-MU001 146 to US729-MU0O1 146) and authority requirements, x9001 | sum] 4 - }490,650°00 nn _ rman nanteenaenare armaments Fae i specification and authority standards. x9002| sum} 4 a Allow for all mechanical works which has not measured ‘separately within this bill part and shown in the drawings | (Dwg Ret. U3600-MU001 146 to U9627-MU001 146) including testing and commissioning all in acordance with specification ‘and authority standards. x 900.3 | Sum 1 7B,059-00 Internal and external light fitings with the necessary switches| “fp | & fixtures including testing and commissioning as per the standards and complete in accordance with the drawings (Dwg Ret. U3650-MU001 146 to U3661-MUO01 146) , schedules and specification. x 900.4 | Sum 1 3 Incoming main power cables from substation including e terminations, cable management, connections and all necessary accessories to MCC, testing and commissioning all in accordance with the Drawings (Dwg Ref. U3650- 24 Had ‘MU001146 to U3661-MUOO1 146) and specification fSum | 85,952.00 53,421.00 t Power cables from MCC to Pumps, lighting and small DB, DG contro! panel, all equipment including terminations, cable| ‘management, connections and all necessary accessories, testing and commissioning all in accordance with the Drawings (Dwg Ref. U3650-MU001146 to U3661- Mu001746) and 64,464.00 x-900.6 | Sum pees 806, 195-00 016450074, Duo aa a EMIRATES ROADS CONT. CO.LLC, TAMDEEN ic 24 tamarind A Ded [> JPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES. Bi. | PARTNO | PAGENO. | [pevetopment SECTION IRRIGATION AND FIREFIGHTING PACKAGE: INFRASTRUCTURE. RESERVOIR & PUMPING STATION a 8A eat2-R2 COLLECTION TO GRAND SUMMARY ‘AMOUNT AED a a Se. Se oe Oe es ee en Page d/SA/1-R2 Page d/8A/2-R2 Page d/8A/3-R2 Page d/8A/4-R2 Page d/8A/5-R2 Page d/8A/6-R2 Page dlBA7-R2 Page d/BA/8-R2 Page d/8A/9-R2 Page di8A/10-R2 Page d/8A/11-R2 ayerrent) Banat Aug LL ag REI545 -20 2)140,683-09 524,896 -30 400,450.25 1©9619-40 39,299.00 154,965:00 204,084:00 815,103 80 1,340, 214-00 806,195.00 LST 8A -Inigation and Firelighting Fi 6811,154. 34 2 ee ee ee ee CONSULT Section (d) Work Items Part 9 - Telecommunication BILL OF QUANTITIES TELECOMMUNICATION k2st1] nr | 20 [3605-00] 4900-00 252 | ne 4 16,009.00 | 24,036.00 k2i2] ar 1 |Q163-08 | 2163-00 raja acs Sh gL) ans t¥t 7 eefargma peo eam 98, 277-00 | ROADS CONT, CO. TAMDENTE Tamarain Fa 3 OY ks2a1] m Ks222] m co 2820 Pd pla Nas, C= CO.LLG “Peart Saramany isda Erion T BILL OF QUANTITIES: put | PaRTNO | PAGENO. HILLS DEVELOPMENT SECTION TELECOMMUNICATION |PACKAGE: INFRASTRUCTURE. ‘ ° aoe unr} quawnry | are ‘AUOUNT ‘60 193 454-20} 116,254 50 AU 5164 -ROJECT: PT-125 - JUMEIRAH BILL OF QUANTITIES TELECOMMUNICATION PAGE No, “Two way (054) uPVC duct “Two way (056) uPVC duct A I { f ft i teins] m ton] m tse | om co Lat Si, Lvi CONT. CO.LLC, ‘ADheeb ‘awount 6,660: 00 5 bly 40 544200 4 1016-40 f f I f i f f t i ose} JpROJECT: pT-125 - JUMEIRAH HILLS DEVELOPMENT PACKAGE: INFRASTRUCTURE BILL OF QUANTITIES Bu SECTION TELECOMMUNICATION PART NO hed Cede 3 P OTearet ran aame Carried to Grand Summary Section (d) Work Items Part 10 — Power Works = 2 8 ee ee Se Se 8 Se 2 oe ee c o@ Pe Sab GY Lat Usha) Ind = EMIRATES ROADS CONT. COLL. | 24 ita 4 CONSULT [ b { = 2 Gp ee Ee Ee & BILL OF QUANTITIES. POWER WORKS PART NO PAGE NO, anon Power network shall be done according to standard EWA specifications and drawings as wel as attached project drawings. In case of any discrepancy, DEWA standard specication and drawings are prevailing. (CLASS K : PIPEWORK - MANHOLES AND PIPEWORK ANCILLARIES 1. Way 180mm dia uPVC duct 2 Way (1x2) 150mm dia uPVC duct 8. Way (13) 150mm dia uPVC duct 4 Way (1x4) 160mm dia uPVC duct {6 Way (2x3) 150mm dia uPVC duct 8 Ways (2x4) 150mm dia uPVC duct 410 Way (2x6) 150mm dia uPVC duct, MVPIKV Duct Depth not exceeding 1.5m 1 Way 150mm dia uPVC duct 2 Way (1x2) 160mm dia uPVC duct 3 Way (13) 150mm dia uPVC duct 4 Way (1x4) 180mm dia uPVC duct {6 Way (2x3) 150mm dia uPVC duct quantity l00-56 63-44 Q24: 34 254-40 j368.S4 100-60 1634-40 Q243-40 44, 310:00 95820. 64085: 20 14,614-60 005-60 4836-40 gats-40 44,241-¢0 8 Joya cy PEP San em Ervin IpROVECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES DEVELOPMENT POWER WORKS IPACKAGE: INFRASTRUCTURE U sem | ITEM DESCRIPTION er. § CLASS L : PIPEWORK - SUPPORTS AND Vy PROTECTION ANCILLARIES TO LAYING AND EXCAVATION | g ‘Beds and surrounds as per drawings and specification ‘Depth not exceeding 1.5m Imported sand bed & surround to two way duct, 150mm dia Imported sand bed & surround to four way duct, 150mm dia uy Selected excavated mate bed & suround to \ beoway ct, 160m da four way duct, 150mm dia . | ff ‘Selected excavated material bed & surround to ie Selected excavated mater bed & surround 1o stxway duct, 150mm dia ‘Selected excavated material bed & surround to eight way duc, 150mm da q Sa este see taacrioomes Provide mass concrete Class 25/20 surround to ducts, 0,90 m includ polythene sheet and bituminous paint 10 Way (2x6) 150mm dia uPVC duct PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES. PAGE NO. POWER WORKS: anos AMOUNT ‘40x 800mm2, 600/1000V, XLPE/PVCIAI armoured. Cable 4G 185mm2, 600/1000V, XLPE/PVCIAI armoured Cable ‘4x 25mm2, 600/1000V, XLPEJPVC/AI armoured Cable 14K, 3-core, 300mm2, XLPE insulated armoured ‘copper Cable ‘Supply of 11KV straight through joint for 3¢300mm2, Cu, XLPE cable, as per Specification and drawings PROJECT: PT-125 - JUMEIRAH HILLS POWER WORKS: BILL OF QUANTITIES: ITEM DESCRIPTION PART 10- POWER (Cont'd...) CLASS X : MISCELLANEOUS WORKS (CONT'D) Installation Works Installation, testing and commisioning ofthe following ‘cables in prepared trench, draw through road crossing and underbridge ducts, service entry ducts, cable ‘basement, trays including cable supports, clamps, ‘trays and as per Specification and drawings, for following sizes: ‘4x 200mm2, 600/1000V, XLPE/PVCIAI armoured Cable ‘4Cx 185mm2, 600/1000V, XLPE/PVCIA armoured Cable 4Cx 25mm2, 600/1000V, XLPE/PVCIAI armoured Cable 11K, 8-Core, 300mm2, XLPE/PVCICU insulated armoured copper Cable Installation, testing and commissioning of 11kV. straight through joint for SCx800mm2, Cu, XLPE cable, ‘8s per Specification and drawings Installation, testing and commissioning of 11kV indoor type cable termination for 3Cx300mm2, Cu XLPE cable 5 per Specification and drawings 62, 486-20) 3030-45 8185-50 TAMDEEN Lc, pt fi f i. 3p. Ee lpROJECT: PT-125 - JUMEIRAH HILLS DEVELOPMENT BILL OF QUANTITIES POWER WORKS PACKAGE: INFRASTRUCTURE BILL SECTION PAGE NO. w108-Rt ITEM DESCRIPTION PART 10- POWER (Contda..) (CLASS X : MISCELLANEOUS WORKS (CONT'D) ‘Supply and laying of PVC cable cover tiles, 10003200%2.5mm for 1 1KV cables, as per Specification land drawing ‘Supply and laying of warning tape, 250mm width and 4150 microns thick, along the cable trench for 11kV and. LV cables, as per Specification and drawings Trench Excavation ‘Trench excavation in all type of sol including green {area in any formation for single or multiple cable laying inthe same trench including dewatering for installation of cables and provision of sand bedding ‘cover, backfling of trench, well consolidate and reinstate, as per Specification and drawings. ‘Substation ‘Service connections to aistribution Substations Including supply and instalation of al fitings, excavation, backfiling, testing, commissioning, ‘extemal connections etc.complete as per authority standard and specification and drawings Sut AMOUNT UAE. DIRKAMS | PROJECT: PT-125 - JUMEIRAH HILLS. BILL OF QUANTITIES PAGE No, DEVELOPMENT POWER WORKS JPACKAGE: INFRASTRUCTURE - ‘COLLECTION To GRAND SUMMARY an06-R1 AMOUNT UAE. DIRHAMS Part 10 - Power Works Begin 63,323.20 Page a2 QB P1240 Page d/103 37507672! Page aia 91g,310-0) Page a/10/s-R1 AU 15-4! [5 2 an exe L eis) |... ee | _.S2 @2 2S 8 B Sf. wee ES eS SS PS _S_ pe Section (d) Work Items Part 11 — Security Network fi I = P BP fP EP aa Provecr pres. amenan Bi oF uarmes sur | ranrno | Pace no Juts ocveLormenT seeTion SECURITY NETWORK packace: WFRASTRUCTURE « " ann rave | swoune neo —}-——— iy Ka se |9644-00 |100,4%2-00 . sie 2am | B-c0 |!96,800-00 c Ks22 4060 | 126+ 2y 51,5344 4, 660-00 ° Lens aan | 490 |e € ust aceo | 6-1 [QyHF2-S0 +00 r Lens soo | 123-44 [19,84F 6 Leta woo |1gg.43 |15,843-00 on, em Section (d) Work Items Part 12 - Spare Ducts = aac re erases onoscor co Luc Hamarain Al heed BILL OF QUANTITIES SPARE DUCTS BILL PART NO 12 PAGE NO. anai-rt vem | ITEM DESCRIPTION laid and jointed in trenches including end caps, fittings draw ropes and duct markers, excavation, backliling testing, etc. as detailed in specification and drawing, A | 2 way spare duct depth not exceeding 1.5m | Imported sand bed and surround to 2 way 200mm dia UPVC spare duct C_| Selected excavated material bed and surround to 2 way 200mm dia uPVC spare duct ‘Supply and install uPVC "Class C* spare ducts 200mm dia ceswms | unr REF. k 522 Lsi2 Ls22 ‘quantity 193-48 saa B36 ‘AMOUNT ‘AED 167,652.80 605-20 S45: 20 gph anes one eee IW EERATES HODDSOON = a ee ee ee oe Oe Se ee _ ee. Section (d) Work Items Part 13 — Provisional Sum a eta ae Re ies Lue ae ee JPROJECT: PT-125 - JUMEIRAH HILLS BILL OF QUANTITIES: BILL | PARTNO | PAGENO. DEVELOPMENT SECTION PROVISIONAL SUMS PACKAGE: INFRASTRUCTURE a 13 ansnt Teo | ITEM DESCRIPTION ceswms| unit | quantiry| — RATE ‘AMOUNT REF. REF. eS _ ee fea Allow for Provisional Sum for design and Construction of gas network and storage tank complete in all respects as per the scheme design ‘drawings and as per Authority requirements and A | standards. Aaz0.1 | Sum Contingencies Allow for Provisional sum for contingencies to be| ‘expended in full or part or not at all atthe discretion B | ofthe Employer. 94202 | Sum a cabor@an 19-Provsenal sume \ Carries to-Grand Summarys crise 2,500,000.00 Section (e) Grand summary = = a. fe pan GRAND SUMMARY JPACKAGE: INFRASTRUCTURE ‘Section (e) - Grand Summary Part 1 - GENERAL ITEMS. Part 2A - DEMOLITION AND SITE CLEARANCE Part 2- ROADS AND PAVINGS. Part 3 - STREET LIGHTING WORKS Part 4- POTABLE WATER WORKS Part 5 - FIRE FIGHTING MAIN Part 6 - STORMWATER WORKS Part7 - SEWERAGE WORKS Part 8 - IRRIGATION WORKS Parl 8A - IRRIGATION AND FIREFIGHTING RESERVOIR & PUMPING STATION Part 9 - TELECOMMUNICATION Part 10 - POWER WORKS Part 11 - SECURITY NETWORK Part 12- SPARE DUCTS ar9-R1 5/6-R1 dBAN2-RO wera a106-A1 ann anan-ry 6,464, 267-11 56,919.00 931,238: 80 456,182. 20 2,564,815: 6 13,684,068. 6 676, 224-70 3239, 334-30 1,335,001. Go 8.81, 154-34 356, 350:10 5554, 731-25 642,159. 20 12,933 -20 SUB TOTAL 6,101,000-00 ee ‘Adjustment Item (. 9) AddiDelete NET TOTAL AMOUNT 36,101,000-00 2,500,000.00 tn words) iS AED. THIRTY EIGHT MILLION, Six ea |UNDRED 9 PPI DMION OLN a| ‘EMIRATES ROADS CONT. CO.L.L¢. Hamarain & AIDheeb Section (f) Schedule of rate I{ TAMDEEN.. Cf Spat OY slat GL 91s, | ‘EMIRATES ROADS CONT. CO. LLC. 24 A ae Hamerain 8 AI Ohh BILL OF QUANTITIES BILL] PAGEN lprouscr :pr-126-JUMEIRAK tts oeveLoPwent SCHEDULE OF RATE BREAKDOWN secTion PACKAGE: INFRASTRUCTURE FOR WORK ITEMS 1 | Tm Wr, | — Labour —| — Plant | Material | —Gverheas G3] —]— From} —Taar % % ‘4 [Wain Ofice [Ske OFica] % wna | = = es ae 10 | 105 ane | — = 8s is to | 10 anc | = 35 5 = 10 100 ano | si as | 5 2 to_| 160 wine | 4 39 5 e im oes wine | 10 9 | 56 5 = ee ain-6 9 qe = a = lo 100. ain-k | 10 o | = | 5 = 12 | 100 ans [| 10 ‘is | se 5 = 10 | 100 wink 2 ge | 5s = to | 100 aint t 2 82 5 » 10 100 | anim ! 2 Sas = to | 160 aia-a | 25 atid oe = 10 \oo wae | 5 ee = 10 | wo wa-c | is 2 eS = 1o__| 100 wa-o |e x ao | 5 = © 100 an-= | 10 19 se | 5 = 10 too ana-F | 90 65 | - s = | 16 100 am-o | 2 4 ao | 5 = [16 100) wan | 50 zo | 5 5 alae too wns | R60 e5 [= 5 = |e 100) ania-K es = = 5 5 to | wo ant es = = [5 2 10 | 160 ain-m 85 = = 5 = © too wia-a | Bo 45 | S 5 io | 165 ws-8 | 80 45 | 10 5 E 10. 160 anne 20. 45 | 10 5 = lo | teo win-0 5) 45 | 10 5 S 1o | 160 ane 30) |S 5 3 10 a wa-F 3O 45 | to 5 = to | 160 ain-< 30 45 | 10 Ss a 10 too ai-H 30 45 | 10 5 z to] 1es-} ae e |S eee eo 3 aia K Zo. 45| 10 S z Seo ui Hat 30. 4s 10 5 = 10 Anes ana- 10 5 Serena es aia-N to s1t- ra me 7) Consutr ‘BILL OF QUANTITIES BIL PAGE WT lprovecr : pr 128-JUMEIRAN E ILLS DeveLoPmeNT SCHEDULE OF RATE BREAKDOWN ‘secTion PACKAGE: INFRASTRUCTURE FOR WORK ITEMS. : Fle item Rr] —Cabour | — Plant —] —Wateral”| overran Pap Prot] Tout % % % [Wain Office [She Oca] % * wa-A = S = is nm r \ aime | ag | 40 S = ir 100 fi wa a i a = = = =: . ana-o | 1@ 3a zo | & to | too aime | 18 ay 30 5 = to | too f aia-F | ae 38 as | 5 = 1o | 0 { wm | 5 10 30 s = 10 too. wan | 20 15 | 50 5 = to | 100 awa | 2 4 79 6 = to | wo i SEB 1 !9 Se | 5 = 1o | too | 5-6 Io 5 = s = 12 too < aws-> | 10 40 | 35 S = 1o | two i avs-€ | go as | 40 | 5 = to | toe as-F | Ro 65 = s = 10 | ton fy tiene ee ge we-8 |S 35 | 45 | 5 = wo | wo | ane-6 | to 35 = 5 = lo too. if ana | 3 @ a4 5 = lo 1co | a air | to a5 50 5 = o 00 ae Fo = s = 12 Co. il we-a_ | 15 RO [50 5 = 1o__| 160 s we-68 | 85 = = 5 im 1 100. I ane-¢ | 85 = = 5 = 12 100 l j ae-A = = = = és S = AHO-A Si is = 5 = = a wan | 15 FO = 5 = te one | 15 70 = 5 = 10. * wan-a_ | 4 a = $s = f aan-8 5 = tl aan-e 5 eS a4 aan- 3 eo] sft SauMI ONL UNAS, reese ( fewrates noans; a eae = i im =e a Banat Ryall LLY gd AYE eae ramoeenug4A SS BILL OF GUANTITIES BILL PAGE lPRosecr : Pr- 125-JUMEIRAH HILLS DEVELOPMENT ‘SCHEDULE OF RATE BREAKDOWN SECTION [PAGRAGE: INFRASTRUCTURE FOR WORK ITEMS _ | as item We Tabour | —Piant Profit] —Totar % % % % @n-e 2 3I to 100 aan-F 1 3a 10 too an-a | 16 ED 48 5 10 (oo) wan-8 | a Re 46 5 10 loo aan-c | 23 33 @ 5 to 100 ean-o | 29 34, ee 5 to '00 wane | 29 26 30 s 1 (eo wir | 30 a 38 5 to 100 enna | 29 41 5 ra io ase - 8 EJ 43 5 40 oo aaa-c | 32 45 5 10 ipo. | wa-p | tt 57 5 to too wane | 35 5 3 10 too _| waa | @ a 5 lo 160 wn-6 | 18 os 5 10 lo a/3i3 - C 19 a 5 to. too aan-0 | ae 16 s to (20 33 -E ig q 5 a 160 wan-F | Ob T 5 te 120 ana | 3B Ba 5 0 100 aan-8 | 4 45 5 to | 100 aan-a | 29 13 5 to eo wns | ie 1s s lo 160 aan = C le i Ss lo too wan-o | 10 1 5 lo 100. oan e 8 5 to (oo wan-r | ip 15 5 2) 100 wait A u 5 ana | 2h 23 5 a4i2-B Ea 1 s aiar2-C 26 I 5 wn-0 | 22 5 wan-e | 22 © S 10 to SapbNOY lat oyLevias, 3] een Nn ROADS CONT. CO.L.L¢, Haman & A Des } consutr oe) = ee Ep ae BILL OF QUANTITIES BILL] PAGE W PROJECT : Pr-126- JUMEIRAH ILLS DEVELOPMENT SCHEDULE OF RATE BREAKDOWN SECTION PACKAGE: INFRASTRUCTURE FOR WORK ITEMS | Fle Tem We Labour | Plant] Material | — Overheads Profit | —Totar % % % [Wain Office | Ske Offee] —% % wan ig 1 66 5 is to. 100 anc | 2h o es 5 = 1 100 aua-K | 2h L 6s 5 3 to 100 wn-s | a! : 63 s e to 100 eun-« | 2s 1 59 5 to loo wn | 25 7 55 5 . to 100 wn | es 1 er 5 * lo 100 wan | 15 1 63 5 'o 160 aT te 7 ie to | 100 awa | le 1 42 5 es to 160 aaa | 34 2 46 5 = ieoclaee wars - 8 33 2 50 5 = to 100 anc | 1a 4 on 5 a 1 Too was-o | 6 3s ee 5 = lo leo dar -E 7 4 La 5 = 10 too wars - F 16 3 Se s = to 100 ais -G a 1 a7 5 ca lo loo a3 a i as Ss = e. loo war | 6 7 3g. 5 i 1o__| 100 wae c 1 Ag 5 = 10 100 daa e i 3g 5 a to 00 aia -0 6 1 ag 5 = 10 100) ane | es 4 58 5 = 10 too oman-F | Re 4 54 5 = 10 100 ais - 23 4 58 5 =: [y too aas-8 | 2 4 57 s = 10 100 re 23 7: 6a 6 z 1S 100 ‘ais - D a3 4 58 5 = to eo. wise 25 4 53 [5 = to | leo ais -D as | 4 a = Teil ages, aus-A | 29 = 52 = = aae-8 | 29 ie || = aae-¢ | Ig BB 5 = wank t 5G s = uo : Bunt Repl UP ges 101M wage | peal pon EMIRATES ROADS CONT, C0.L.L.C. | 24 Hamaaind Ahn MAMIDERN GZ CONSULT BILL OF QUANTITIES BLL] PAGE lPROJECT : PT. 125- JUMEIRAH MILLS DEVELOPMENT ‘SCHEDULE OF RATE BREAKDOWN SECTION PACKAGE: INFRASTRUCTURE FOR WORK ITEMS ls Tam — aoa —] — Pit wat] — overs nj —]} att] ra % % ‘% [Wain office | ste office] % % oan -B ie 54 12 s = jo too war ~C 1g 59 s 5 2 10 100 [sro | a6 4 45 5 = to [| 100 ware | 25 to 50 s = to _[ ‘00 ean-F | 25 10 50 5 = to | too E wane | RS 10 50 = to | too f awe-a | RE Be 23 5 = io | wo we-8 | 32 44 3 5 = ir) 100 . aue-¢_| 20 5 Si ia) = to 100 | aun-0 | 26 4 55 S = TO 160 a Sit =A Ro is 45 5 . 18 100 asi -8 1g a2 45 5 = 10 100) anc 10 2 es 5 = 10 100 eA -0 uw is_ | 59 s = 10 too ane " is | 5 5 = 10 100 | a i8i2-® 14 16 55 5 x 10 100 aise - B 4 16 SS 5 = 10 100 a 52-6 13 15 Sz Ss is 10. 100 | “asa 13 15 ST = loca | wea | aa a7 a4 | 5 = 10 | too . aan F Es aa 34 5 = 10 | loo 952-G 25 Be 3ée 3S * to 100 as 13 15 I 5 io: | jae a3 € q ge | 5 to [too as2-K 13 i+ Be = = io | 100 isa - 5 Ss as 5 = 10 100 | sa e 3 36 s = to (eo a=W 4 3 48 = = 10 190 | wsr-P. = 2 = 5 = to loo, waa | 2 ( 82 s = 1o | 100 5-8 é s 6 = = 10 a A : an-C BB a 45 | 6 = i ee f aa Z. ane = $A0ADS COM. 0.LLc | ass 23 5 = \ (OBmnardin’ Ai0he0 | a53-F S eS to [100 ral bADheo | hal Aa \ ppd apallay iat ayLaIaS, 2 4] : € es y UMRATS ROADS CONT, CO.LLE [eee

You might also like