KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR

EMPLOYER CONSULTANT CONTRACT


AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
0 478929.498 984068.459 2158.748 2158.75
1 478932.618 984067.461 2158.567 2158.75
2 478930.301 984070.555 2158.474 2158.75
3 478932.616 984070.871 2158.547 2158.75
4 478933.907 984070.482 2158.459 2158.75
5 478931.507 984073.617 2158.569 2158.75
6 478932.642 984073.916 2158.644 2158.75
7 478932.765 984072.759 2158.275 2158.75
8 478934.693 984072.602 2158.575 2158.75
9 478932.393 984076.084 2158.606 2158.75
10 478934.032 984074.946 2158.302 2158.75
11 478935.548 984074.493 2158.511 2158.75
12 478933.268 984078.362 2158.462 2158.75
13 478935.428 984077.161 2158.635 2158.75
14 478936.372 984077.603 2158.247 2158.75
15 478936.813 984079.066 2158.417 2158.75
16 478934.033 984079.822 2158.682 2158.75
17 478934.834 984081.666 2158.566 2158.75
18 478936.332 984081.348 2158.343 2158.75
19 478937.306 984081.326 2158.552 2158.75
20 478938.11 984081.132 2158.425 2158.75
21 478929.731 984083.161 2158.759 2158.75
22 478931.341 984082.547 2158.548 2158.75
23 478932.773 984081.986 2158.683 2158.75
24 478930.495 984085.201 2158.72 2158.75
25 478934.917 984083.366 2157.978 2158.75
26 478937.354 984082.637 2158.433 2158.75
27 478937.903 984084.159 2158.01 2158.75
28 478939.371 984084.877 2158.578 2158.75
29 478936.397 984085.935 2158.413 2158.75
30 478934.775 984086.525 2158.243 2158.75
31 478931.475 984087.805 2158.581 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT
Reduced
DATA
Design
Stationx y Z Level Elevation
32 478932.548 984090.572 2158.422 2158.75
33 478934.17 984089.784 2158.562 2158.75
34 478936.897 984088.501 2158.405 2158.75
35 478940.466 984087.577 2158.556 2158.75
36 478941.136 984089.355 2158.421 2158.75
37 478938.462 984089.969 2158.48 2158.75
38 478935.897 984090.699 2158.287 2158.75
39 478933.903 984091.881 2158.532 2158.75
40 478933.462 984091.864 2158.173 2158.75
41 478933.878 984093.381 2158.673 2158.75
42 478935.717 984092.548 2158.568 2158.75
43 478936.072 984092.428 2158.32 2158.75
44 478938.947 984091.771 2158.294 2158.75
45 478940.234 984091.674 2158.595 2158.75
46 478941.523 984091.339 2158.368 2158.75
47 478942.265 984091.326 2158.659 2158.75
48 478943.689 984094.495 2158.792 2158.75
49 478941.758 984095.42 2158.74 2158.75
50 478939.337 984096.536 2158.53 2158.75
51 478936.054 984097.714 2158.421 2158.75
52 478936.141 984098.061 2158.725 2158.75
53 478933.074 984099.398 2158.398 2158.75
54 478932.691 984099.118 2158.785 2158.75
55 478934.092 984102.406 2158.386 2158.75
56 478934.563 984102.926 2158.622 2158.75
57 478936.404 984102.018 2158.467 2158.75
58 478936.519 984101.847 2158.609 2158.75
59 478939.695 984100.257 2158.66 2158.75
60 478939.852 984100.091 2158.738 2158.75
61 478943.11 984100.076 2158.74 2158.75
62 478943.238 984099.621 2158.609 2158.75
63 478944.968 984099.392 2158.623 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
64 478945.387 984100.434 2158.794 2158.75
65 478946.132 984101.63 2158.707 2158.75
66 478941.702 984103.167 2158.715 2158.75
67 478938.355 984104.258 2158.729 2158.75
68 478936.469 984104.966 2158.424 2158.75
69 478936.285 984105.553 2158.728 2158.75
70 478934.929 984105.97 2158.635 2158.75
71 478943.377 984104.695 2158.657 2158.75
72 478944.782 984104.567 2158.725 2158.75
73 478945.142 984104.572 2158.592 2158.75
74 478946.018 984104.24 2158.68 2158.75
75 478947.048 984103.254 2158.583 2158.75
76 478947.279 984102.987 2158.86 2158.75
77 478946.776 984106.892 2158.407 2158.75
78 478946.749 984107.558 2158.598 2158.75
79 478946.753 984108.029 2157.95 2158.75
80 478946.305 984108.206 2158.61 2158.75
81 478943.663 984109.538 2158.458 2158.75
82 478942.939 984109.774 2158.56 2158.75
83 478942.914 984109.252 2158.378 2158.75
84 478940.46 984110.273 2158.791 2158.75
85 478940.703 984109.829 2158.49 2158.75
86 478941.476 984113.017 2158.688 2158.75
87 478942.158 984112.947 2158.18 2158.75
88 478942.09 984112.989 2158.186 2158.75
89 478942.238 984112.658 2158.581 2158.75
90 478943.943 984112.638 2158.562 2158.75
91 478944.18 984112.807 2158.345 2158.75
92 478946.179 984112.291 2158.427 2158.75
93 478947.93 984112.658 2157.605 2158.75
94 478948.797 984114.532 2158.263 2158.75
95 478947.101 984116.412 2158.045 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
96 478945.922 984116.814 2158.492 2158.75
97 478946.782 984117.476 2158.085 2158.75
98 478948.528 984118.002 2158.48 2158.75
99 478950.856 984117.343 2158.278 2158.75
100 478951.224 984116.613 2158.47 2158.75
101 478951.404 984116.392 2158.245 2158.75
102 478951.749 984118.132 2158.492 2158.75
103 478952.81 984118.31 2158.013 2158.75
104 478953.448 984118.727 2158.596 2158.75
105 478951.949 984119.449 2158.02 2158.75
106 478950.343 984120.377 2158.245 2158.75
107 478949.581 984120.709 2158.14 2158.75
108 478950.432 984122.991 2158.433 2158.75
109 478950.705 984122.633 2158.193 2158.75
110 478951.863 984122.357 2158.441 2158.75
111 478952.173 984122.685 2158.213 2158.75
112 478951.449 984125.087 2158.423 2158.75
113 478952.617 984125.128 2158.688 2158.75
114 478954.274 984124.811 2158.271 2158.75
115 478952.373 984127.297 2158.597 2158.75
116 478953.399 984126.814 2158.245 2158.75
117 478955.036 984129.324 2158.706 2158.75
118 478955.898 984127.97 2158.309 2158.75
119 478952.936 984129.784 2158.787 2158.75
120 478936.241 984069.206 2158.688 2158.75
121 478937.005 984068.555 2158.363 2158.75
122 478936.06 984066.114 2158.792 2158.75
123 478937.252 984066.874 2158.454 2158.75
124 478938.708 984067.936 2158.672 2158.75
125 478940.645 984067.185 2158.424 2158.75
126 478940.168 984064.44 2158.797 2158.75
127 478941.281 984065.974 2158.436 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
128 478942.906 984065.808 2158.546 2158.75
129 478943.435 984065.622 2158.291 2158.75
130 478945.103 984066.045 2158.377 2158.75
131 478945.701 984064.304 2157.858 2158.75
132 478945.558 984063.689 2158.553 2158.75
133 478947.074 984062.503 2158.467 2158.75
134 478947.513 984061.992 2158.722 2158.75
135 478948.754 984062.091 2158.253 2158.75
136 478949.108 984061.303 2158.691 2158.75
137 478951.132 984062.84 2158.229 2158.75
138 478951.723 984063.724 2158.51 2158.75
139 478953.176 984062.302 2158.27 2158.75
140 478953.609 984062.756 2158.657 2158.75
141 478954.855 984061.902 2158.431 2158.75
142 478954.456 984061.131 2158.633 2158.75
143 478954.951 984060.014 2158.472 2158.75
144 478956.971 984061.015 2158.575 2158.75
145 478958.24 984059.784 2158.477 2158.75
146 478959.303 984057.92 2158.728 2158.75
147 478960.508 984059.083 2158.332 2158.75
148 478961.066 984059.763 2158.656 2158.75
149 478960.869 984057.908 2158.34 2158.75
150 478960.349 984056.74 2158.691 2158.75
151 478962.216 984056.078 2158.671 2158.75
152 478962.903 984057.499 2158.501 2158.75
153 478962.602 984059.313 2158.266 2158.75
154 478963.236 984058.748 2158.539 2158.75
155 478965.863 984057.849 2158.353 2158.75
156 478965.312 984057.093 2158.577 2158.75
157 478965.097 984055.665 2158.291 2158.75
158 478964.376 984055.432 2158.732 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
159 478966.275 984054.39 2158.517 2158.75
160 478966.658 984055.316 2158.543 2158.75
161 478967.604 984057.102 2158.428 2158.75
162 478970.465 984056.559 2158.605 2158.75
163 478969.739 984055.738 2158.335 2158.75
164 478969.396 984054.219 2158.58 2158.75
165 478968.817 984054.476 2158.3 2158.75
166 478968.634 984053.368 2158.725 2158.75
167 478970.326 984053.009 2158.492 2158.75
168 478970.741 984054.325 2158.53 2158.75
169 478970.755 984055.755 2158.31 2158.75
170 478974.488 984054.298 2158.667 2158.75
171 478973.382 984053.256 2158.474 2158.75
172 478972.776 984051.816 2158.671 2158.75
173 478974.349 984051.577 2158.617 2158.75
174 478974.804 984052.715 2158.494 2158.75
175 478975.164 984053.9 2158.72 2158.75
176 478976.954 984053.463 2158.44 2158.75
177 478976.151 984051.899 2158.609 2158.75
178 478976.092 984050.52 2158.809 2158.75
179 478978.045 984049.848 2158.865 2158.75
180 478978.868 984052.224 2158.441 2158.75
181 478979.104 984052.678 2158.684 2158.75
182 478980.837 984051.491 2158.459 2158.75
183 478980.225 984050.341 2158.74 2158.75
184 478979.923 984049.097 2158.758 2158.75
185 478981.076 984048.727 2158.846 2158.75
186 478981.961 984050.277 2158.567 2158.75
187 478982.379 984051.229 2158.612 2158.75
188 478986.144 984050.087 2158.599 2158.75
189 478985.425 984049.28 2158.364 2158.75
190 478985.929 984048.621 2158.751 2158.75
191 478985.119 984047.688 2158.552 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
192 478984.763 984047.169 2158.778 2158.75
193 478988.388 984046.002 2158.754 2158.75
194 478989.169 984048.465 2158.748 2158.75
195 478988.926 984049.497 2158.595 2158.75
196 478989.839 984049.005 2158.993 2158.75
197 478976.791 984070.181 2158.752 2158.75
198 478976.783 984067.694 2158.445 2158.75
199 478974.732 984070.427 2158.812 2158.75
200 478974.073 984068.199 2158.443 2158.75
201 478971.942 984069.037 2158.287 2158.75
202 478972.292 984071.072 2158.665 2158.75
203 478970.405 984072.549 2158.056 2158.75
204 478970.092 984071.942 2158.592 2158.75
205 478967.909 984070.766 2158.351 2158.75
206 478968.289 984070.457 2158.777 2158.75
207 478968.01 984073.033 2158.427 2158.75
208 478965.341 984074.661 2158.584 2158.75
209 478964.107 984072.884 2158.526 2158.75
210 478963.253 984072.424 2158.829 2158.75
211 478963.885 984072.1 2158.505 2158.75
212 478961.79 984072.549 2158.85 2158.75
213 478962.47 984074.018 2158.562 2158.75
214 478961.801 984074.779 2158.773 2158.75
215 478959.005 984076.69 2158.315 2158.75
216 478959.226 984077.191 2158.793 2158.75
217 478957.287 984074.51 2158.359 2158.75
218 478956.385 984074.763 2158.77 2158.75
219 478953.099 984076.043 2158.348 2158.75
220 478953.587 984077.903 2158.647 2158.75
221 478953.09 984078.926 2158.277 2158.75
222 478951.277 984080.067 2158.621 2158.75
223 478950.144 984079.061 2158.072 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
224 478948.768 984077.991 2158.565 2158.75
225 478948.246 984078.23 2158.314 2158.75
226 478947.151 984079.765 2158.465 2158.75
227 478946.532 984078.65 2158.206 2158.75
228 478946.097 984081.59 2158.439 2158.75
229 478945.067 984080.515 2157.959 2158.75
230 478945.281 984082.259 2158.453 2158.75
231 478945.465 984082.538 2158.005 2158.75
232 478942.203 984080.332 2158.415 2158.75
233 478942.585 984080.45 2158.02 2158.75
234 478941.617 984082.479 2158.468 2158.75
235 478945.096 984099.287 2158.67 2158.75
236 478944.586 984097.165 2158.783 2158.75
237 478947.328 984098.411 2158.589 2158.75
238 478947.764 984096.91 2158.53 2158.75
239 478949.263 984095.595 2158.284 2158.75
240 478950.399 984097.196 2158.265 2158.75
241 478951.33 984096.322 2158.38 2158.75
242 478950.872 984095.279 2158.065 2158.75
243 478951.71 984094.663 2158.113 2158.75
244 478953.918 984095.747 2158.134 2158.75
245 478953.269 984094.359 2158.316 2158.75
246 478954.578 984093.723 2158.279 2158.75
247 478955.962 984094.56 2158.193 2158.75
248 478956.459 984092.039 2158.274 2158.75
249 478958.066 984094.19 2158.414 2158.75
250 478959.929 984092.841 2158.587 2158.75
251 478960.195 984090.924 2158.408 2158.75
252 478961.85 984089.555 2158.482 2158.75
253 478963.805 984092.123 2158.659 2158.75
254 478964.238 984089.455 2158.299 2158.75
255 478965.838 984088.715 2158.041 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
256 478969.218 984089.955 2158.496 2158.75
257 478969.185 984088.254 2158.296 2158.75
258 478969.725 984086.09 2158.235 2158.75
259 478970.469 984086.158 2158.137 2158.75
260 478971.399 984086.525 2158.651 2158.75
261 478972.181 984088.09 2158.168 2158.75
262 478973.885 984087.98 2158.306 2158.75
263 478974.916 984085.865 2158.223 2158.75
264 478977.848 984085.959 2158.437 2158.75
265 478977.419 984083.556 2158.582 2158.75
266 478979.629 984084.538 2158.107 2158.75
267 478980.124 984084.505 2158.774 2158.75
268 478982.827 984084.848 2158.265 2158.75
269 478982.046 984083.042 2158.573 2158.75
270 478984.576 984085.034 2158.402 2158.75
271 478983.773 984082.52 2158.552 2158.75
272 478985.543 984081.596 2158.488 2158.75
273 478985.638 984083.074 2158.741 2158.75
274 478987.064 984082.634 2158.407 2158.75
275 478989.249 984082.811 2158.692 2158.75
276 478989.295 984081.878 2158.398 2158.75
277 478991.291 984081.544 2158.576 2158.75
278 478990.51 984079.525 2158.814 2158.75
279 478991.662 984078.835 2158.486 2158.75
280 478997.691 984079.519 2158.657 2158.75
281 478999.724 984079.743 2158.444 2158.75
282 478998.578 984076.034 2158.322 2158.75
283 478999.784 984075.611 2158.704 2158.75
284 479000.397 984078.642 2158.486 2158.75
285 478989.303 984099.048 2158.415 2158.75
286 478988.059 984097.131 2158.496 2158.75
287 478986.783 984097.25 2158.242 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PROJ
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
288 478987.541 984099.95 2158.529 2158.75
289 478984.276 984100.587 2158.066 2158.75
290 478983.473 984098.49 2158.617 2158.75
291 478982.084 984102.041 2158.289 2158.75
292 478980.607 984100.383 2158.473 2158.75
293 478977.776 984100.6 2158.621 2158.75
294 478979.286 984103.636 2158.603 2158.75
295 478976.463 984101.589 2158.495 2158.75
296 478976.167 984103.575 2158.439 2158.75
297 478974.251 984105.743 2158.348 2158.75
298 478972.72 984103.292 2158.243 2158.75
299 478972.551 984105.654 2158.104 2158.75
300 478970.112 984107.123 2158.316 2158.75
301 478968.611 984104.088 2158.388 2158.75
302 478966.723 984107.996 2158.1 2158.75
303 478965.715 984106.4 2158.112 2158.75
304 478962.527 984106.524 2158.558 2158.75
305 478964.457 984109.048 2158.472 2158.75
306 478958.675 984108.795 2158.477 2158.75
307 478958.364 984111.777 2158.492 2158.75
308 478955.27 984109.14 2158.404 2158.75
309 478955.105 984112.056 2158.217 2158.75
310 478952.929 984112.752 2157.984 2158.75
311 478952.426 984110.654 2157.627 2158.75
312 478956.714 984124.863 2158.152 2158.75
313 478958.167 984127.533 2158.221 2158.75
314 478960.898 984126.976 2158.299 2158.75
315 478960.331 984124.449 2158.207 2158.75
316 478963.853 984125.268 2158.213 2158.75
317 478963.88 984123.097 2158.189 2158.75
318 478967.261 984123.883 2158.2 2158.75
319 478967.016 984122.119 2158.247 2158.75
320 478970.255 984122.599 2158.365 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
321 478970.586 984119.589 2158.421 2158.75
322 478973.748 984121.94 2158.507 2158.75
323 478973.055 984119.323 2158.298 2158.75
324 478974.828 984118.497 2158.138 2158.75
325 478976.059 984120.416 2158.37 2158.75
326 478978.552 984119.648 2158.365 2158.75
327 478977.479 984116.79 2158.33 2158.75
328 478981.285 984119.105 2158.443 2158.75
329 478980.434 984115.455 2158.528 2158.75
330 478985.456 984117.594 2158.609 2158.75
331 478984.966 984115.468 2158.409 2158.75
332 478988.72 984112.965 2158.379 2158.75
333 478990.007 984114.114 2158.666 2158.75
334 478990.635 984115.288 2158.462 2158.75
335 478994.413 984114.08 2158.601 2158.75
336 478994.756 984113.832 2158.4 2158.75
337 478994.052 984111.641 2158.426 2158.75
338 478997.809 984112.598 2158.457 2158.75
339 478996.916 984110.55 2158.269 2158.75
340 479000.34 984111.992 2158.638 2158.75
341 478999.257 984108.492 2158.182 2158.75
342 479002.031 984111.156 2158.368 2158.75
343 479000.924 984108.014 2158.268 2158.75
344 479004.276 984109.847 2158.659 2158.75
345 479003.726 984107.249 2158.43 2158.75
346 479007.19 984107.262 2158.356 2158.75
347 479005.844 984104.899 2158.249 2158.75
348 479010.437 984105.992 2158.197 2158.75
349 479009.735 984103.328 2158.258 2158.75
350 479010.294 984102.293 2158.328 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
351 478972.238 984056.54 2158.665 2158.75
352 478973.72 984055.999 2158.713 2158.75
353 478975.236 984056.206 2158.528 2158.75
354 478976.978 984057.933 2158.636 2158.75
355 478973.707 984059.35 2158.554 2158.75
356 478976.861 984059.053 2158.685 2158.75
357 478976.158 984060.375 2158.289 2158.75
358 478974.665 984061.018 2158.744 2158.75
359 478975.162 984062.276 2158.482 2158.75
360 478975.598 984062.099 2158.677 2158.75
361 478977.993 984061.497 2158.494 2158.75
362 478978.452 984063.662 2158.554 2158.75
363 478977.958 984064.526 2158.803 2158.75
364 478977.626 984064.667 2158.543 2158.75
365 478976.864 984064.544 2158.812 2158.75
366 478976.014 984064.75 2158.571 2158.75
367 478977.199 984066.933 2158.402 2158.75
368 478977.918 984067.404 2158.676 2158.75
369 478979.058 984067.101 2158.448 2158.75
370 478979.743 984067.056 2158.795 2158.75
371 478980.177 984067.021 2158.675 2158.75
372 478980.99 984070.005 2158.339 2158.75
373 478979.1 984070.742 2158.658 2158.75
374 478978.421 984071.046 2158.52 2158.75
375 478978.894 984072.312 2158.275 2158.75
376 478979.706 984072.294 2158.625 2158.75
377 478981.028 984072.756 2158.342 2158.75
378 478982.074 984072.294 2158.563 2158.75
379 478982.03 984073.261 2158.138 2158.75
380 478980.399 984074.214 2158.11 2158.75
381 478979.656 984074.609 2158.383 2158.75
382 478980.84 984077.744 2158.397 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
383 478983.152 984077.098 2158.491 2158.75
384 478983.005 984077.414 2158.352 2158.75
385 478984.541 984079.451 2158.375 2158.75
386 478982.325 984079.937 2158.449 2158.75
387 478987.674 984085.561 2158.516 2158.75
388 478986.042 984087.088 2158.235 2158.75
389 478985.452 984087.386 2158.528 2158.75
390 478988.399 984088.069 2158.575 2158.75
391 478987.526 984088.29 2158.325 2158.75
392 478986.27 984088.72 2158.315 2158.75
393 478989.449 984091.783 2158.473 2158.75
394 478986.923 984092.899 2158.608 2158.75
395 478990.623 984094.925 2158.496 2158.75
396 478989.842 984095.286 2158.404 2158.75
397 478988.148 984096.02 2158.394 2158.75
398 478989.329 984096.882 2158.352 2158.75
399 478991.223 984096.405 2158.501 2158.75
400 478992.871 984100.303 2158.441 2158.75
401 478990.182 984100.26 2158.395 2158.75
402 478991.426 984104.92 2158.384 2158.75
403 478993.394 984103.14 2158.449 2158.75
404 478994.602 984106.287 2158.56 2158.75
405 478992.295 984106.664 2158.57 2158.75
406 478992.948 984107.835 2158.502 2158.75
407 478981.645 984052.192 2158.502 2158.75
408 478982.851 984051.869 2158.715 2158.75
409 478983.597 984051.058 2158.477 2158.75
410 478988.823 984050.339 2158.469 2158.75
411 478989.617 984051.542 2158.453 2158.75
412 478988.282 984053.055 2158.334 2158.75
413 478985.871 984054.203 2158.494 2158.75
414 478983.62 984055.832 2158.537 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
415 478983.047 984056.093 2158.798 2158.75
416 478984.526 984060.268 2158.286 2158.75
417 478987.223 984058.899 2158.428 2158.75
418 478988.802 984058.401 2158.426 2158.75
419 478991.051 984057.78 2158.415 2158.75
420 478992.881 984056.77 2158.754 2158.75
421 478993.704 984059.77 2158.406 2158.75
422 478991.249 984060.869 2158.422 2158.75
423 478987.484 984062.267 2158.344 2158.75
424 478985.453 984063.047 2158.641 2158.75
425 478986.195 984065.728 2158.393 2158.75
426 478989.021 984065.024 2158.364 2158.75
427 478994.489 984063.293 2158.373 2158.75
428 478994.619 984065.234 2158.087 2158.75
429 478990.958 984066.974 2158.466 2158.75
430 478989.786 984066.693 2158.389 2158.75
431 478988.928 984071.07 2158.6 2158.75
432 478991.631 984069.951 2158.553 2158.75
433 478995.546 984069.755 2158.269 2158.75
434 478997.864 984070.19 2158.443 2158.75
435 478998.377 984071.996 2158.344 2158.75
436 478995.827 984072.883 2158.306 2158.75
437 478990.551 984075.8 2158.489 2158.75
438 478993.05 984083.079 2158.286 2158.75
439 478998.727 984081.646 2158.531 2158.75
440 479000.698 984081.81 2158.509 2158.75
441 479002.977 984085.231 2158.324 2158.75
442 479000.686 984085.86 2158.472 2158.75
443 478997.378 984087.604 2158.451 2158.75
444 478995.332 984088.192 2158.516 2158.75
445 478995.868 984090.982 2158.647 2158.75
446 478997.672 984090.333 2158.425 2158.75

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
447 479001.584 984088.333 2158.1 2158.75
448 479003.963 984087.551 2158.337 2158.75
449 479004.233 984088.8 2158.368 2158.75
450 479001.408 984091.667 2158.735 2158.75
451 479000.232 984092.29 2158.347 2158.75
452 478999.205 984094.154 2158.325 2158.75
453 478998.563 984097.165 2158.545 2158.75
454 479000.039 984095.934 2158.38 2158.75
455 479004.21 984094.507 2158.695 2158.75
456 479004.726 984094.341 2158.336 2158.75
457 479006.727 984094.015 2158.632 2158.75
458 479007.588 984097.905 2158.546 2158.75
459 479006.264 984098.037 2158.162 2158.75
460 479005.215 984098.901 2157.954 2158.75
461 479003.847 984100.209 2158.327 2158.75
462 479002.196 984100.607 2158.288 2158.75
463 479001.228 984100.464 2158.33 2158.75
464 479001.321 984104.439 2158.662 2158.75
465 479003.225 984104.024 2158.304 2158.75
466 479006.45 984102.58 2158.171 2158.75
467 479010.27 984102.333 2158.343 2158.75
468 478972.181 984056.541 2158.675 2159.200
469 478972.027 984058.014 2159.094 2159.200
470 478973.653 984062.418 2159.064 2159.200
471 478975.253 984066.552 2158.977 2159.200
472 478976.017 984066.652 2158.55 2159.200
473 478969.32 984063.008 2159.225 2159.200
474 478968.313 984058.952 2159.081 2159.200
475 478962.589 984060.399 2158.69 2159.200
476 478963.212 984061.264 2159.049 2159.200
477 478964.236 984064.966 2159.13 2159.200
478 478964.748 984068.801 2159.055 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
479 478961.16 984071.561 2159.024 2159.200
480 478959.157 984068.677 2159.269 2159.200
481 478958.367 984067.852 2159.116 2159.200
482 478957.316 984065.119 2159.247 2159.200
483 478956.928 984064.257 2158.993 2159.200
484 478956.907 984062.731 2159.15 2159.200
485 478953.675 984063.809 2158.775 2159.200
486 478954.036 984066.598 2159.198 2159.200
487 478954.923 984070.247 2159.063 2159.200
488 478955.21 984071.387 2159.276 2159.200
489 478955.182 984074.487 2159.138 2159.200
490 478951.468 984075.814 2159.021 2159.200
491 478949.945 984073.621 2159.035 2159.200
492 478949.36 984070.966 2159.078 2159.200
493 478948.438 984068.818 2158.765 2159.200
494 478947.058 984066.06 2158.802 2159.200
495 478943.224 984067.878 2159.026 2159.200
496 478943.74 984069.864 2158.869 2159.200
497 478943.983 984073.331 2159.025 2159.200
498 478943.768 984075.526 2158.971 2159.200
499 478940.324 984080.482 2158.316 2159.200
500 478939.902 984079.86 2158.707 2159.200
501 478938.351 984076.049 2158.618 2159.200
502 478937.616 984074.706 2159.09 2159.200
503 478936.251 984071.136 2158.941 2159.200
504 478936.493 984070.305 2159.093 2159.200
505 478940.521 984084.775 2158.569 2159.200
506 478941.287 984085.874 2158.987 2159.200
507 478941.709 984088.366 2159.173 2159.200
508 478942.519 984090.125 2158.77 2159.200
509 478943.513 984092.384 2158.581 2159.200
510 478944.524 984095.446 2159.136 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
511 478948.237 984093.9 2158.98 2159.200
512 478948.055 984091.577 2158.8 2159.200
513 478947.492 984089.36 2158.818 2159.200
514 478947.012 984088.336 2158.63 2159.200
515 478946.55 984083.265 2159.02 2159.200
516 478950.094 984081.265 2158.911 2159.200
517 478951.217 984084.357 2159.059 2159.200
518 478952.099 984087.438 2158.837 2159.200
519 478953.446 984091.656 2158.98 2159.200
520 478956.544 984090.451 2158.642 2159.200
521 478956.354 984089.698 2158.971 2159.200
522 478955.727 984086.583 2158.827 2159.200
523 478954.972 984081.25 2159.212 2159.200
524 478954.958 984080.605 2158.917 2159.200
525 478957.713 984078.822 2159.017 2159.200
526 478958.356 984080.482 2159.039 2159.200
527 478959.75 984083.733 2159.316 2159.200
528 478961.285 984086.489 2158.786 2159.200
529 478961.94 984088.573 2159.183 2159.200
530 478965.269 984087.23 2159.218 2159.200
531 478964.526 984085.741 2159.088 2159.200
532 478963.073 984082.803 2159.333 2159.200
533 478962.571 984080.326 2159.14 2159.200
534 478962.36 984078.666 2159.32 2159.200
535 478961.508 984077.182 2159.103 2159.200
536 478964.571 984076.065 2159.134 2159.200
537 478965.288 984080.284 2159.241 2159.200
538 478965.778 984082.685 2158.669 2159.200
539 478966.702 984086.13 2159.102 2159.200
540 478969.87 984085.311 2159.034 2159.200
541 478968.902 984082.486 2158.8 2159.200
542 478966.862 984075.263 2159.21 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
543 478970.381 984073.581 2159.181 2159.200
544 478971.732 984077.914 2159.118 2159.200
545 478972.917 984080.679 2159.218 2159.200
546 478974.995 984083.749 2158.728 2159.200
547 478974.51 984083.371 2159.127 2159.200
548 478976.61 984082.712 2159.04 2159.200
549 478977.305 984082.058 2159.232 2159.200
550 478977.026 984081.185 2158.953 2159.200
551 478976.068 984080.229 2159.165 2159.200
552 478975.933 984080.711 2158.872 2159.200
553 478974.384 984077.137 2159.233 2159.200
554 478974.03 984075.086 2158.822 2159.200
555 478973.482 984075.371 2159.187 2159.200
556 478972.677 984072.821 2158.933 2159.200
557 478972.192 984072.265 2158.522 2159.200
558 478976.016 984071.272 2159.088 2159.200
559 478975.904 984071.105 2158.631 2159.200
560 478977.192 984072.9 2159.246 2159.200
561 478976.875 984072.656 2158.921 2159.200
562 478978.136 984075.768 2159.23 2159.200
563 478977.986 984075.649 2159.062 2159.200
564 478978.681 984077.67 2159.229 2159.200
565 478979.17 984077.461 2158.953 2159.200
566 478978.912 984079.157 2159.223 2159.200
567 478979.037 984079.63 2159.023 2159.200
568 478979.459 984082.125 2159.187 2159.200
569 478979.57 984082.67 2158.673 2159.200
570 478980.821 984081.599 2159.288 2159.200
571 478983.018 984085.614 2158.437 2159.200
572 478982.988 984086.461 2159.178 2159.200
573 478984.193 984089.017 2158.93 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
574 478983.877 984089.358 2159.198 2159.200
575 478984.06 984091.321 2159.042 2159.200
576 478984.653 984092.757 2159.03 2159.200
577 478984.727 984093.477 2158.855 2159.200
578 478985.523 984093.63 2159.057 2159.200
579 478985.936 984095.681 2158.812 2159.200
580 478986.076 984096.444 2159.134 2159.200
581 478985.668 984097.5 2158.258 2159.200
582 478982.416 984098.142 2158.593 2159.200
583 478982.229 984097.447 2158.939 2159.200
584 478981.454 984095.469 2158.906 2159.200
585 478979.879 984093.6 2158.999 2159.200
586 478978.801 984092.052 2159.143 2159.200
587 478978.244 984090.958 2158.95 2159.200
588 478977.855 984090.06 2159.108 2159.200
589 478977.722 984089.785 2158.958 2159.200
590 478977.357 984087.86 2159.258 2159.200
591 478977.455 984087.161 2158.57 2159.200
592 478974.401 984088.957 2159.086 2159.200
593 478974.208 984088.5 2158.477 2159.200
594 478973.199 984089.788 2159.153 2159.200
595 478973.391 984089.988 2158.953 2159.200
596 478973.746 984091.503 2159.035 2159.200
597 478973.701 984092.352 2158.901 2159.200
598 478974.407 984094.765 2159.078 2159.200
599 478975.159 984096.088 2158.963 2159.200
600 478975.679 984098.363 2159.067 2159.200
601 478976.262 984099.696 2158.899 2159.200
602 478975.279 984100.601 2158.87 2159.200
603 478975.04 984101.515 2158.56 2159.200
604 478972.14 984101.299 2158.917 2159.200
605 478972.591 984099.155 2158.956 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
606 478971.634 984097.446 2159.109 2159.200
607 478970.785 984094.544 2159.119 2159.200
608 478970.026 984092.348 2158.907 2159.200
609 478969.546 984091.08 2159.129 2159.200
610 478969.333 984090.389 2158.548 2159.200
611 478966.402 984092.262 2159.251 2159.200
612 478966.261 984091.643 2158.632 2159.200
613 478967.438 984094.307 2159.103 2159.200
614 478968.145 984095.134 2159.038 2159.200
615 478968.146 984095.129 2159.04 2159.200
616 478969.059 984098.254 2159.102 2159.200
617 478969.81 984099.466 2158.836 2159.200
618 478970.192 984101.81 2159.131 2159.200
619 478970.25 984103.323 2158.603 2159.200
620 478969.344 984103.14 2159.294 2159.200
621 478966.706 984104.792 2158.65 2159.200
622 478966.635 984104.495 2159.069 2159.200
623 478965.975 984102.802 2158.925 2159.200
624 478965.321 984102.174 2158.839 2159.200
625 478964.678 984100.248 2159.135 2159.200
626 478964.168 984098.724 2159.021 2159.200
627 478963.421 984097.045 2159.21 2159.200
628 478962.52 984094.984 2159.006 2159.200
629 478961.636 984093.807 2159.115 2159.200
630 478961.285 984093.258 2158.619 2159.200
631 478958.346 984094.721 2158.589 2159.200
632 478959.423 984095.5 2159.118 2159.200
633 478959.907 984096.504 2158.941 2159.200
634 478960.358 984098.134 2158.899 2159.200
635 478961.884 984101.467 2159.098 2159.200
636 478962.554 984102.445 2158.563 2159.200
637 478963.377 984103.924 2158.669 2159.200
638 478963.391 984105.343 2158.58 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
639 478961.124 984107.194 2158.571 2159.200
640 478960.252 984106.197 2158.913 2159.200
641 478960.351 984106.082 2159.119 2159.200
642 478959.897 984104.292 2158.875 2159.200
643 478958.365 984100.762 2158.98 2159.200
644 478957.115 984097.838 2159.034 2159.200
645 478956.03 984096.509 2158.935 2159.200
646 478955.839 984095.519 2158.423 2159.200
647 478952.697 984096.721 2158.288 2159.200
648 478953.045 984097.533 2158.927 2159.200
649 478953.433 984100.491 2158.849 2159.200
650 478954.058 984103.144 2158.864 2159.200
651 478954.153 984105.903 2158.795 2159.200
652 478955.247 984108.424 2158.532 2159.200
653 478952.638 984109.895 2157.95 2159.200
654 478951.71 984109.834 2157.956 2159.200
655 478951.635 984109.497 2158.528 2159.200
656 478950.242 984107.617 2158.029 2159.200
657 478950.424 984106.735 2158.423 2159.200
658 478949.881 984104.784 2158.71 2159.200
659 478949.524 984101.037 2158.814 2159.200
660 478949.506 984101.044 2158.813 2159.200
661 478949.133 984098.508 2158.645 2159.200
662 478951.841 984114.596 2158.202 2159.200
663 478952.547 984114.868 2158.91 2159.200
664 478954.042 984117.962 2158.819 2159.200
665 478954.736 984120.175 2158.892 2159.200
666 478955.496 984121.55 2158.374 2159.200
667 478956.906 984124.135 2158.506 2159.200
668 478956.877 984124.753 2158.143 2159.200
669 478959.429 984123.284 2158.538 2159.200
670 478959.067 984121.052 2158.516 2159.200
671 478958.471 984118.715 2158.94 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
672 478956.819 984115.43 2158.762 2159.200
673 478955.533 984113.822 2158.81 2159.200
674 478955.401 984113.528 2158.41 2159.200
675 478957.521 984113.116 2158.898 2159.200
676 478957.644 984112.752 2158.419 2159.200
677 478959.212 984115.776 2159.085 2159.200
678 478960.148 984116.698 2158.654 2159.200
679 478961.791 984120.12 2158.895 2159.200
680 478963.025 984121.994 2158.263 2159.200
681 478965.023 984120.41 2158.949 2159.200
682 478965.085 984120.674 2158.51 2159.200
683 478963.212 984117.163 2158.997 2159.200
684 478963.225 984116.646 2158.599 2159.200
685 478961.914 984114.597 2158.959 2159.200
686 478961.399 984114.445 2158.636 2159.200
687 478960.198 984112.625 2159.136 2159.200
688 478959.614 984111.559 2158.671 2159.200
689 478963.404 984110.534 2158.96 2159.200
690 478963.285 984110.166 2158.646 2159.200
691 478963.9 984112.115 2158.989 2159.200
692 478964.154 984111.847 2158.758 2159.200
693 478965.628 984114.55 2158.919 2159.200
694 478966.117 984115.212 2158.646 2159.200
695 478967.221 984117.393 2159.08 2159.200
696 478967.487 984117.621 2158.824 2159.200
697 478967.797 984119.152 2159.064 2159.200
698 478970.68 984118.753 2158.839 2159.200
699 478971.737 984118.058 2158.589 2159.200
700 478971.396 984115.799 2158.701 2159.200
701 478971.144 984113.49 2158.914 2159.200
702 478970.94 984111.729 2158.941 2159.200
703 478970.924 984110.501 2159.162 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
704 478970.723 984110.366 2158.957 2159.200
705 478970.248 984107.563 2158.548 2159.200
706 478971.166 984107.849 2159.103 2159.200
707 478974.156 984107.691 2158.757 2159.200
708 478975.93 984110.143 2158.63 2159.200
709 478976.859 984112.064 2158.797 2159.200
710 478978.358 984113.929 2158.748 2159.200
711 478979.751 984114.771 2158.662 2159.200
712 478982.398 984113.21 2158.618 2159.200
713 478981.487 984109.579 2158.76 2159.200
714 478980.778 984107.026 2158.743 2159.200
715 478980.453 984106.156 2158.759 2159.200
716 478980.607 984103.142 2158.595 2159.200
717 478982.141 984102.608 2158.435 2159.200
718 478983.948 984105.447 2158.688 2159.200
719 478984.985 984108.231 2158.824 2159.200
720 478986.655 984111.409 2158.66 2159.200
721 478988.493 984112.36 2158.409 2159.200
722 478988.489 984109.223 2158.705 2159.200
723 478986.712 984104.411 2158.637 2159.200
724 478988.828 984100.59 2158.528 2159.200
725 478988.339 984100.154 2158.444 2159.200
726 478990.631 984104.927 2158.635 2159.200
727 478991.495 984107.771 2158.775 2159.200
728 478992.846 984111.462 2158.272 2159.200
729 478976.11 984054.526 2158.6 2159.200
730 478978.678 984054.004 2158.646 2159.200
731 478980.956 984053.322 2158.538 2159.200
732 478980.859 984054.386 2159.017 2159.200
733 478980.248 984054.977 2158.861 2159.200
734 478979.331 984055.445 2158.988 2159.200
735 478977.143 984055.414 2159.151 2159.200
736 478977.102 984057.318 2158.566 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
737 478977.722 984058.886 2158.519 2159.200
738 478978.09 984058.744 2159.038 2159.200
739 478980.214 984058.69 2158.934 2159.200
740 478981.264 984058.571 2158.758 2159.200
741 478983.576 984058.068 2158.525 2159.200
742 478984.864 984061.879 2158.498 2159.200
743 478983.397 984062.678 2158.958 2159.200
744 478981.371 984063.716 2159.032 2159.200
745 478979.767 984064.12 2159.153 2159.200
746 478979.262 984064.353 2158.695 2159.200
747 478980.797 984067.325 2158.959 2159.200
748 478981.934 984067.12 2159.155 2159.200
749 478984.248 984066.273 2158.915 2159.200
750 478984.96 984066.387 2159.161 2159.200
751 478987.071 984070.126 2159.031 2159.200
752 478986.051 984070.554 2158.827 2159.200
753 478982.972 984072.3 2159.039 2159.200
754 478982.497 984072.374 2158.427 2159.200
755 478984.536 984076.19 2159.128 2159.200
756 478986.367 984076.026 2159.094 2159.200
757 478988.419 984075.197 2158.89 2159.200
758 478989.33 984074.816 2158.39 2159.200
759 478990.024 984077.853 2159.029 2159.200
760 478988.11 984078.983 2158.895 2159.200
761 478985.959 984080.358 2158.633 2159.200
762 478985.946 984079.708 2159.182 2159.200
763 478987.239 984084.084 2158.66 2159.200
764 478989.167 984083.144 2158.663 2159.200
765 478992.317 984082.261 2158.656 2159.200
766 478992.215 984082.709 2159.179 2159.200
767 478990.628 984083.895 2159.179 2159.200
768 478988.942 984084.511 2159 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
769 478987.914 984085.049 2158.807 2159.200
770 478988.848 984086.691 2158.889 2159.200
771 478990.813 984086.216 2159.214 2159.200
772 478992.719 984085.816 2159.069 2159.200
773 478993.541 984085.597 2159.09 2159.200
774 478993.992 984085.403 2158.73 2159.200
775 478994.265 984088.114 2159.144 2159.200
776 478992.799 984088.532 2159.055 2159.200
777 478990.705 984089.624 2159.017 2159.200
778 478989.847 984090.187 2158.915 2159.200
779 478991.113 984093.317 2158.913 2159.200
780 478991.475 984093.128 2159.162 2159.200
781 478993.013 984092.263 2159.093 2159.200
782 478994.77 984091.506 2158.969 2159.200
783 478995.559 984090.869 2158.99 2159.200
784 478995.828 984090.955 2158.66 2159.200
785 478996.646 984093.683 2159.039 2159.200
786 478995.913 984093.939 2158.853 2159.200
787 478994.141 984095.003 2159.029 2159.200
788 478992.186 984095.096 2158.999 2159.200
789 478991.974 984094.828 2158.486 2159.200
790 478992.74 984097.918 2158.823 2159.200
791 478994.76 984096.806 2159.002 2159.200
792 478995.617 984096.154 2158.81 2159.200
793 478997.281 984095.26 2159.019 2159.200
794 478998.487 984098.617 2159.041 2159.200
795 478996.074 984099.939 2159.002 2159.200
796 478993.788 984100.797 2158.862 2159.200
797 478995.005 984103.961 2158.979 2159.200
798 478997.455 984102.636 2158.959 2159.200
799 478999.647 984101.799 2159.158 2159.200

CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX

LOT-1 BT ASBUILT DATA


Reduced Design
Stationx y Z Level Elevation
800 479000.829 984104.334 2159.022 2159.200
801 478998.259 984105.657 2158.892 2159.200
802 478996.274 984106.569 2158.902 2159.200
803 478995.895 984107.061 2158.659 2159.200
804 478996.8 984108.976 2158.582 2159.200
805 478997.041 984108.603 2159.1 2159.200
806 478998.636 984107.863 2158.418 2159.200
807 478998.561 984107.509 2159.103 2159.200
808 479000.838 984107.618 2158.493 2159.200
809 479000.709 984107.104 2159.009 2159.200
810 479001.494 984106.784 2158.689 2159.200
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.002 A
0.183 A
0.276 A
0.203 A
0.291 A
0.181 A
0.106 A
0.475 A
0.175 A
0.144 A
0.448 A
0.239 A
0.288 A
0.115 A
0.503 A
0.333 A
0.068 A
0.184 A
0.407 A
0.198 A
0.325 A
-0.009 A
0.202 A
0.067 A
0.03 A
0.772 A
0.317 A
0.74 A
0.172 A
0.337 A
0.507 A
0.169 A

ANT
_____________
_________________
_____________
LOT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.328 A
0.188 A
0.345 A
0.194 A
0.329 A
0.27 A
0.463 A
0.218 A
0.577 A
0.077 A
0.182 A
0.43 A
0.456 A
0.155 A
0.382 A
0.091 A
-0.042 A
0.01 A
0.22 A
0.329 A
0.025 A
0.352 A
-0.035 A
0.364 A
0.128 A
0.283 A
0.141 A
0.09 A
0.012 A
0.01 A
0.141 A
0.127 A

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
-0.044 A
0.043 A
0.035 A
0.021 A
0.326 A
0.022 A
0.115 A
0.093 A
0.025 A
0.158 A
0.07 A
0.167 A
-0.11 A
0.343 A
0.152 A
0.8 A
0.14 A
0.292 A
0.19 A
0.372 A
-0.041 A
0.26 A
0.062 A
0.57 A
0.564 A
0.169 A
0.188 A
0.405 A
0.323 A
1.145 A
0.487 A
0.705 A

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.258 A
0.665 A
0.27 A
0.472 A
0.28 A
0.505 A
0.258 A
0.737 A
0.154 A
0.73 A
0.505 A
0.61 A
0.317 A
0.557 A
0.309 A
0.537 A
0.327 A
0.062 A
0.479 A
0.153 A
0.505 A
0.044 A
0.441 A
-0.037 A
0.062 B
0.387 B
-0.042 B
0.296 B
0.078 B
0.326 B
-0.047 B
0.314 B

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.204 B
0.459 B
0.373 B
0.892 B
0.197 B
0.283 B
0.028 B
0.497 B
0.059 B
0.521 B
0.24 B
0.48 B
0.093 B
0.319 B
0.117 B
0.278 B
0.175 B
0.273 B
0.022 B
0.418 B
0.094 B
0.41 B
0.059 B
0.079 B
0.249 B
0.484 B
0.211 B
0.397 B
0.173 B
0.459 B
0.018 B

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.233 B
0.207 B
0.322 B
0.145 B
0.415 B
0.17 B
0.45 B
0.025 B
0.258 B
0.22 B
0.44 B
0.083 B
0.276 B
0.079 B
0.133 B
0.256 B
0.03 B
0.31 B
0.141 B
-0.059 B
-0.115 B
0.309 B
0.066 B
0.291 B
0.01 B
-0.008 B
-0.096 B
0.183 B
0.138 B
0.151 B
0.386 B
-0.001 B
0.198 B

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
-0.028 B
-0.004 B
0.002 B
0.155 B
-0.243 B
-0.002 C
0.305 C
-0.062 C
0.307 C
0.463 C
0.085 C
0.694 C
0.158 C
0.399 C
-0.027 C
0.323 C
0.166 C
0.224 C
-0.079 C
0.245 C
-0.1 C
0.188 C
-0.023 C
0.435 C
-0.043 C
0.391 C
-0.02 C
0.402 C
0.103 C
0.473 C
0.129 C
0.678 C

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.185 C
0.436 C
0.285 C
0.544 C
0.311 C
0.791 C
0.297 C
0.745 C
0.335 C
0.73 C
0.282 C
0.08 D
-0.033 D
0.161 D
0.22 D
0.466 D
0.485 D
0.37 D
0.685 D
0.637 D
0.616 D
0.434 D
0.471 D
0.557 D
0.476 D
0.336 D
0.163 D
0.342 D
0.268 D
0.091 D
0.451 D
0.709 D

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.254 D
0.454 D
0.515 D
0.613 D
0.099 D
0.582 D
0.444 D
0.527 D
0.313 D
0.168 D
0.643 D
-0.024 D
0.485 D
0.177 D
0.348 D
0.198 D
0.262 D
0.009 D
0.343 D
0.058 D
0.352 D
0.174 D
-0.064 D
0.264 D
0.093 D
0.306 D
0.428 D
0.046 D
0.264 D
0.335 E
0.254 E
0.508 E

ANT
_____________
_________________
_____________
1 PROJECT
TRACTOR
SEMEX

Differnce
(+) Remark
0.221 E
0.684 E
0.133 E
0.461 E
0.277 E
0.129 E
0.147 E
0.255 E
0.311 E
0.402 E
0.507 E
0.646 E
0.434 E
0.362 E
0.65 E
0.638 E
0.192 E
0.278 E
0.273 E
0.258 E
0.346 E
0.533 E
0.766 E
1.123 E
0.598 E
0.529 E
0.451 E
0.543 E
0.537 E
0.561 E
0.55 E
0.503 E
0.385 E

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.329 E
0.243 E
0.452 E
0.612 E
0.38 E
0.385 E
0.42 E
0.307 E
0.222 E
0.141 F
0.341 F
0.371 F
0.084 F
0.288 F
0.149 F
0.35 F
0.324 F
0.293 F
0.481 F
0.112 F
0.568 F
0.382 F
0.482 F
0.091 F
0.32 F
0.394 F
0.501 F
0.553 F
0.492 F
0.422 F

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.085 F
0.037 F
0.222 F
0.114 F
0.196 G
0.065 G
0.461 G
0.006 G
0.268 G
0.073 G
0.256 G
0.196 G
-0.053 G
0.207 G
-0.062 G
0.179 G
0.348 G
0.074 G
0.302 G
-0.045 G
0.075 G
0.411 G
0.092 G
0.23 G
0.475 G
0.125 G
0.408 G
0.187 G
0.612 G
0.64 G
0.367 G
0.353 G

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.259 G
0.398 G
0.375 G
0.301 G
0.234 H
0.515 H
0.222 H
0.175 H
0.425 H
0.435 H
0.277 H
0.142 H
0.254 H
0.346 H
0.356 H
0.398 H
0.249 H
0.309 H
0.355 H
0.366 H
0.301 H
0.19 H
0.18 H
0.248 H
0.248 I
0.035 I
0.273 I
0.281 I
0.297 I
0.416 I
0.256 I
0.213 I

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
-0.048 I
0.464 I
0.322 I
0.324 I
0.335 I
-0.004 I
0.344 I
0.328 I
0.406 I
0.109 I
0.357 I
0.386 I
0.377 I
0.663 I
0.284 I
0.361 I
0.15 I
0.197 I
0.481 I
0.307 I
0.406 I
0.444 I
0.261 I
0.464 J
0.219 J
0.241 J
0.426 J
0.278 J
0.299 J
0.234 J
0.103 J
0.325 J

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.65 J
0.413 J
0.382 J
0.015 J
0.403 J
0.425 J
0.205 J
0.37 J
0.055 J
0.414 J
0.118 J
0.204 J
0.588 J
0.796 J
0.423 J
0.462 J
0.42 J
0.088 J
0.446 J
0.579 J
0.407 J
0.525 1
0.106 1
0.136 1
0.223 1
0.65 1
-0.025 1
0.119 1
0.51 1
0.151 1
0.07 1
0.145 1

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.176 1
-0.069 1
0.084 1
-0.047 1
0.207 1
0.050 1
0.425 1
0.002 1
0.137 1
-0.076 1
0.062 1
0.179 1
0.165 1
0.122 1
0.435 1
0.398 1
0.174 1
0.331 1
0.175 1
0.229 1
0.884 1
0.493 1
0.582 1
0.110 1
0.259 1
0.107 1
0.631 2
0.213 2
0.027 2
0.430 2
0.619 2
0.064 2

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.220 2
0.400 2
0.382 2
0.570 2
0.180 2
0.289 2
0.141 2
0.363 2
0.220 2
0.558 2
0.229 2
0.373 2
-0.012 2
0.283 2
0.183 2
0.161 2
-0.116 2
0.414 2
0.017 2
-0.018 2
0.112 2
-0.133 2
0.060 2
-0.120 2
0.097 2
0.066 2
-0.041 2
0.531 2
0.098 2
0.166 2
0.400 2
-0.010 2

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.019 2
0.082 2
-0.018 2
0.472 2
0.073 2
0.160 2
-0.032 2
0.247 2
0.035 2
0.328 2
-0.033 2
0.378 2
0.013 2
0.267 2
0.678 2
0.112 2
0.569 2
-0.046 2
0.279 2
-0.030 2
0.138 2
-0.029 2
0.247 2
-0.023 2
0.177 2
0.013 2
0.527 2
-0.088 2
0.763 3
0.022 3
0.270 3

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.002 3
0.158 3
0.170 3
0.345 3
0.143 3
0.388 3
0.066 3
0.942 3
0.607 3
0.261 3
0.294 3
0.201 3
0.057 3
0.250 3
0.092 3
0.242 3
-0.058 3
0.630 3
0.114 3
0.723 3
0.047 3
0.247 3
0.165 3
0.299 3
0.122 3
0.237 3
0.133 3
0.301 3
0.330 3
0.640 3
0.283 3
0.244 3

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.091 3
0.081 3
0.293 3
0.071 3
0.652 3
-0.051 3
0.568 3
0.097 3
0.162 3
0.160 3
0.098 3
0.364 3
0.069 3
0.597 3
-0.094 3
0.550 3
0.131 3
0.275 3
0.361 3
0.065 3
0.179 3
-0.010 3
0.194 3
0.085 3
0.581 3
0.611 3
0.082 3
0.259 3
0.301 3
0.102 3
0.637 3
0.531 3
0.620 3

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.629 3
0.287 3
0.081 3
0.325 3
0.220 3
0.166 3
0.265 3
0.777 3
0.912 3
0.273 3
0.351 3
0.336 3
0.405 3
0.668 3
1.250 3
1.244 3
0.672 3
1.171 3
0.777 3
0.490 3
0.386 3
0.387 3
0.555 3
0.998 4
0.290 4
0.381 4
0.308 4
0.826 4
0.694 4
1.057 4
0.662 4
0.684 4
0.260 4

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.438 4
0.390 4
0.790 4
0.302 4
0.781 4
0.115 4
0.546 4
0.305 4
0.937 4
0.251 4
0.690 4
0.203 4
0.601 4
0.241 4
0.564 4
0.064 4
0.529 4
0.240 4
0.554 4
0.211 4
0.442 4
0.281 4
0.554 4
0.120 4
0.376 4
0.136 4
0.361 4
0.611 4
0.499 4
0.286 4
0.259 4
0.038 4

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.243 4
0.652 4
0.097 4
0.443 4
0.570 4
0.403 4
0.452 4
0.538 4
0.582 4
0.440 4
0.457 4
0.441 4
0.605 4
0.765 4
0.512 4
0.376 4
0.540 4
0.791 4
0.495 4
0.563 4
0.672 4
0.756 4
0.565 4
0.425 4
0.928 4
0.600 5
0.554 5
0.662 5
0.183 5
0.339 5
0.212 5
0.049 5
0.634 5

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.681 5
0.162 5
0.266 5
0.442 5
0.675 5
0.702 5
0.242 5
0.168 5
0.047 5
0.505 5
0.241 5
0.045 5
0.285 5
0.039 5
0.169 5
0.373 5
0.161 5
0.773 5
0.072 5
0.106 5
0.310 5
0.810 5
0.171 5
0.305 5
0.567 5
0.018 5
0.540 6
0.537 6
0.544 6
0.021 6
0.021 6
0.200 6

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.393 6
0.311 6
-0.014 6
0.131 6
0.110 6
0.470 6
0.056 6
0.145 6
0.183 6
0.285 6
0.287 6
0.038 6
0.107 6
0.231 6
0.210 6
0.540 6
0.161 6
0.347 6
0.171 6
0.201 6
0.714 6
0.377 6
0.198 6
0.390 6
0.181 6
0.159 6
0.198 6
0.338 6
0.221 6
0.241 6
0.042 6

ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX

Differnce
(+) Remark
0.178 6
0.308 6
0.298 6
0.541 6
0.618 6
0.100 6
0.782 6
0.097 6
0.707 6
0.191 6
0.511 6
ANT