Professional Documents
Culture Documents
Asbu Dat Lot1 (Auto Saved)
Asbu Dat Lot1 (Auto Saved)
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
LOT-1 BT ASBUILT
Reduced
DATA
Design
Stationx y Z Level Elevation
32 478932.548 984090.572 2158.422 2158.75
33 478934.17 984089.784 2158.562 2158.75
34 478936.897 984088.501 2158.405 2158.75
35 478940.466 984087.577 2158.556 2158.75
36 478941.136 984089.355 2158.421 2158.75
37 478938.462 984089.969 2158.48 2158.75
38 478935.897 984090.699 2158.287 2158.75
39 478933.903 984091.881 2158.532 2158.75
40 478933.462 984091.864 2158.173 2158.75
41 478933.878 984093.381 2158.673 2158.75
42 478935.717 984092.548 2158.568 2158.75
43 478936.072 984092.428 2158.32 2158.75
44 478938.947 984091.771 2158.294 2158.75
45 478940.234 984091.674 2158.595 2158.75
46 478941.523 984091.339 2158.368 2158.75
47 478942.265 984091.326 2158.659 2158.75
48 478943.689 984094.495 2158.792 2158.75
49 478941.758 984095.42 2158.74 2158.75
50 478939.337 984096.536 2158.53 2158.75
51 478936.054 984097.714 2158.421 2158.75
52 478936.141 984098.061 2158.725 2158.75
53 478933.074 984099.398 2158.398 2158.75
54 478932.691 984099.118 2158.785 2158.75
55 478934.092 984102.406 2158.386 2158.75
56 478934.563 984102.926 2158.622 2158.75
57 478936.404 984102.018 2158.467 2158.75
58 478936.519 984101.847 2158.609 2158.75
59 478939.695 984100.257 2158.66 2158.75
60 478939.852 984100.091 2158.738 2158.75
61 478943.11 984100.076 2158.74 2158.75
62 478943.238 984099.621 2158.609 2158.75
63 478944.968 984099.392 2158.623 2158.75
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PROJ
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
CONTRACTOR CONSULTANT
Name ___________ Name ___________
Signature_______________ Signature________
Date_______________ Date_____________
KOYE FETCHE WASTE WATER TREATMENT PLANT LOT 1 PR
EMPLOYER CONSULTANT CONTRACT
AAWSA SWS TSEMEX
Differnce
(+) Remark
0.002 A
0.183 A
0.276 A
0.203 A
0.291 A
0.181 A
0.106 A
0.475 A
0.175 A
0.144 A
0.448 A
0.239 A
0.288 A
0.115 A
0.503 A
0.333 A
0.068 A
0.184 A
0.407 A
0.198 A
0.325 A
-0.009 A
0.202 A
0.067 A
0.03 A
0.772 A
0.317 A
0.74 A
0.172 A
0.337 A
0.507 A
0.169 A
ANT
_____________
_________________
_____________
LOT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.328 A
0.188 A
0.345 A
0.194 A
0.329 A
0.27 A
0.463 A
0.218 A
0.577 A
0.077 A
0.182 A
0.43 A
0.456 A
0.155 A
0.382 A
0.091 A
-0.042 A
0.01 A
0.22 A
0.329 A
0.025 A
0.352 A
-0.035 A
0.364 A
0.128 A
0.283 A
0.141 A
0.09 A
0.012 A
0.01 A
0.141 A
0.127 A
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
-0.044 A
0.043 A
0.035 A
0.021 A
0.326 A
0.022 A
0.115 A
0.093 A
0.025 A
0.158 A
0.07 A
0.167 A
-0.11 A
0.343 A
0.152 A
0.8 A
0.14 A
0.292 A
0.19 A
0.372 A
-0.041 A
0.26 A
0.062 A
0.57 A
0.564 A
0.169 A
0.188 A
0.405 A
0.323 A
1.145 A
0.487 A
0.705 A
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.258 A
0.665 A
0.27 A
0.472 A
0.28 A
0.505 A
0.258 A
0.737 A
0.154 A
0.73 A
0.505 A
0.61 A
0.317 A
0.557 A
0.309 A
0.537 A
0.327 A
0.062 A
0.479 A
0.153 A
0.505 A
0.044 A
0.441 A
-0.037 A
0.062 B
0.387 B
-0.042 B
0.296 B
0.078 B
0.326 B
-0.047 B
0.314 B
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.204 B
0.459 B
0.373 B
0.892 B
0.197 B
0.283 B
0.028 B
0.497 B
0.059 B
0.521 B
0.24 B
0.48 B
0.093 B
0.319 B
0.117 B
0.278 B
0.175 B
0.273 B
0.022 B
0.418 B
0.094 B
0.41 B
0.059 B
0.079 B
0.249 B
0.484 B
0.211 B
0.397 B
0.173 B
0.459 B
0.018 B
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.233 B
0.207 B
0.322 B
0.145 B
0.415 B
0.17 B
0.45 B
0.025 B
0.258 B
0.22 B
0.44 B
0.083 B
0.276 B
0.079 B
0.133 B
0.256 B
0.03 B
0.31 B
0.141 B
-0.059 B
-0.115 B
0.309 B
0.066 B
0.291 B
0.01 B
-0.008 B
-0.096 B
0.183 B
0.138 B
0.151 B
0.386 B
-0.001 B
0.198 B
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
-0.028 B
-0.004 B
0.002 B
0.155 B
-0.243 B
-0.002 C
0.305 C
-0.062 C
0.307 C
0.463 C
0.085 C
0.694 C
0.158 C
0.399 C
-0.027 C
0.323 C
0.166 C
0.224 C
-0.079 C
0.245 C
-0.1 C
0.188 C
-0.023 C
0.435 C
-0.043 C
0.391 C
-0.02 C
0.402 C
0.103 C
0.473 C
0.129 C
0.678 C
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.185 C
0.436 C
0.285 C
0.544 C
0.311 C
0.791 C
0.297 C
0.745 C
0.335 C
0.73 C
0.282 C
0.08 D
-0.033 D
0.161 D
0.22 D
0.466 D
0.485 D
0.37 D
0.685 D
0.637 D
0.616 D
0.434 D
0.471 D
0.557 D
0.476 D
0.336 D
0.163 D
0.342 D
0.268 D
0.091 D
0.451 D
0.709 D
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.254 D
0.454 D
0.515 D
0.613 D
0.099 D
0.582 D
0.444 D
0.527 D
0.313 D
0.168 D
0.643 D
-0.024 D
0.485 D
0.177 D
0.348 D
0.198 D
0.262 D
0.009 D
0.343 D
0.058 D
0.352 D
0.174 D
-0.064 D
0.264 D
0.093 D
0.306 D
0.428 D
0.046 D
0.264 D
0.335 E
0.254 E
0.508 E
ANT
_____________
_________________
_____________
1 PROJECT
TRACTOR
SEMEX
Differnce
(+) Remark
0.221 E
0.684 E
0.133 E
0.461 E
0.277 E
0.129 E
0.147 E
0.255 E
0.311 E
0.402 E
0.507 E
0.646 E
0.434 E
0.362 E
0.65 E
0.638 E
0.192 E
0.278 E
0.273 E
0.258 E
0.346 E
0.533 E
0.766 E
1.123 E
0.598 E
0.529 E
0.451 E
0.543 E
0.537 E
0.561 E
0.55 E
0.503 E
0.385 E
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.329 E
0.243 E
0.452 E
0.612 E
0.38 E
0.385 E
0.42 E
0.307 E
0.222 E
0.141 F
0.341 F
0.371 F
0.084 F
0.288 F
0.149 F
0.35 F
0.324 F
0.293 F
0.481 F
0.112 F
0.568 F
0.382 F
0.482 F
0.091 F
0.32 F
0.394 F
0.501 F
0.553 F
0.492 F
0.422 F
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.085 F
0.037 F
0.222 F
0.114 F
0.196 G
0.065 G
0.461 G
0.006 G
0.268 G
0.073 G
0.256 G
0.196 G
-0.053 G
0.207 G
-0.062 G
0.179 G
0.348 G
0.074 G
0.302 G
-0.045 G
0.075 G
0.411 G
0.092 G
0.23 G
0.475 G
0.125 G
0.408 G
0.187 G
0.612 G
0.64 G
0.367 G
0.353 G
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.259 G
0.398 G
0.375 G
0.301 G
0.234 H
0.515 H
0.222 H
0.175 H
0.425 H
0.435 H
0.277 H
0.142 H
0.254 H
0.346 H
0.356 H
0.398 H
0.249 H
0.309 H
0.355 H
0.366 H
0.301 H
0.19 H
0.18 H
0.248 H
0.248 I
0.035 I
0.273 I
0.281 I
0.297 I
0.416 I
0.256 I
0.213 I
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
-0.048 I
0.464 I
0.322 I
0.324 I
0.335 I
-0.004 I
0.344 I
0.328 I
0.406 I
0.109 I
0.357 I
0.386 I
0.377 I
0.663 I
0.284 I
0.361 I
0.15 I
0.197 I
0.481 I
0.307 I
0.406 I
0.444 I
0.261 I
0.464 J
0.219 J
0.241 J
0.426 J
0.278 J
0.299 J
0.234 J
0.103 J
0.325 J
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.65 J
0.413 J
0.382 J
0.015 J
0.403 J
0.425 J
0.205 J
0.37 J
0.055 J
0.414 J
0.118 J
0.204 J
0.588 J
0.796 J
0.423 J
0.462 J
0.42 J
0.088 J
0.446 J
0.579 J
0.407 J
0.525 1
0.106 1
0.136 1
0.223 1
0.65 1
-0.025 1
0.119 1
0.51 1
0.151 1
0.07 1
0.145 1
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.176 1
-0.069 1
0.084 1
-0.047 1
0.207 1
0.050 1
0.425 1
0.002 1
0.137 1
-0.076 1
0.062 1
0.179 1
0.165 1
0.122 1
0.435 1
0.398 1
0.174 1
0.331 1
0.175 1
0.229 1
0.884 1
0.493 1
0.582 1
0.110 1
0.259 1
0.107 1
0.631 2
0.213 2
0.027 2
0.430 2
0.619 2
0.064 2
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.220 2
0.400 2
0.382 2
0.570 2
0.180 2
0.289 2
0.141 2
0.363 2
0.220 2
0.558 2
0.229 2
0.373 2
-0.012 2
0.283 2
0.183 2
0.161 2
-0.116 2
0.414 2
0.017 2
-0.018 2
0.112 2
-0.133 2
0.060 2
-0.120 2
0.097 2
0.066 2
-0.041 2
0.531 2
0.098 2
0.166 2
0.400 2
-0.010 2
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.019 2
0.082 2
-0.018 2
0.472 2
0.073 2
0.160 2
-0.032 2
0.247 2
0.035 2
0.328 2
-0.033 2
0.378 2
0.013 2
0.267 2
0.678 2
0.112 2
0.569 2
-0.046 2
0.279 2
-0.030 2
0.138 2
-0.029 2
0.247 2
-0.023 2
0.177 2
0.013 2
0.527 2
-0.088 2
0.763 3
0.022 3
0.270 3
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.002 3
0.158 3
0.170 3
0.345 3
0.143 3
0.388 3
0.066 3
0.942 3
0.607 3
0.261 3
0.294 3
0.201 3
0.057 3
0.250 3
0.092 3
0.242 3
-0.058 3
0.630 3
0.114 3
0.723 3
0.047 3
0.247 3
0.165 3
0.299 3
0.122 3
0.237 3
0.133 3
0.301 3
0.330 3
0.640 3
0.283 3
0.244 3
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.091 3
0.081 3
0.293 3
0.071 3
0.652 3
-0.051 3
0.568 3
0.097 3
0.162 3
0.160 3
0.098 3
0.364 3
0.069 3
0.597 3
-0.094 3
0.550 3
0.131 3
0.275 3
0.361 3
0.065 3
0.179 3
-0.010 3
0.194 3
0.085 3
0.581 3
0.611 3
0.082 3
0.259 3
0.301 3
0.102 3
0.637 3
0.531 3
0.620 3
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.629 3
0.287 3
0.081 3
0.325 3
0.220 3
0.166 3
0.265 3
0.777 3
0.912 3
0.273 3
0.351 3
0.336 3
0.405 3
0.668 3
1.250 3
1.244 3
0.672 3
1.171 3
0.777 3
0.490 3
0.386 3
0.387 3
0.555 3
0.998 4
0.290 4
0.381 4
0.308 4
0.826 4
0.694 4
1.057 4
0.662 4
0.684 4
0.260 4
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.438 4
0.390 4
0.790 4
0.302 4
0.781 4
0.115 4
0.546 4
0.305 4
0.937 4
0.251 4
0.690 4
0.203 4
0.601 4
0.241 4
0.564 4
0.064 4
0.529 4
0.240 4
0.554 4
0.211 4
0.442 4
0.281 4
0.554 4
0.120 4
0.376 4
0.136 4
0.361 4
0.611 4
0.499 4
0.286 4
0.259 4
0.038 4
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.243 4
0.652 4
0.097 4
0.443 4
0.570 4
0.403 4
0.452 4
0.538 4
0.582 4
0.440 4
0.457 4
0.441 4
0.605 4
0.765 4
0.512 4
0.376 4
0.540 4
0.791 4
0.495 4
0.563 4
0.672 4
0.756 4
0.565 4
0.425 4
0.928 4
0.600 5
0.554 5
0.662 5
0.183 5
0.339 5
0.212 5
0.049 5
0.634 5
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.681 5
0.162 5
0.266 5
0.442 5
0.675 5
0.702 5
0.242 5
0.168 5
0.047 5
0.505 5
0.241 5
0.045 5
0.285 5
0.039 5
0.169 5
0.373 5
0.161 5
0.773 5
0.072 5
0.106 5
0.310 5
0.810 5
0.171 5
0.305 5
0.567 5
0.018 5
0.540 6
0.537 6
0.544 6
0.021 6
0.021 6
0.200 6
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.393 6
0.311 6
-0.014 6
0.131 6
0.110 6
0.470 6
0.056 6
0.145 6
0.183 6
0.285 6
0.287 6
0.038 6
0.107 6
0.231 6
0.210 6
0.540 6
0.161 6
0.347 6
0.171 6
0.201 6
0.714 6
0.377 6
0.198 6
0.390 6
0.181 6
0.159 6
0.198 6
0.338 6
0.221 6
0.241 6
0.042 6
ANT
_____________
_________________
_____________
OT 1 PROJECT
TRACTOR
EMEX
Differnce
(+) Remark
0.178 6
0.308 6
0.298 6
0.541 6
0.618 6
0.100 6
0.782 6
0.097 6
0.707 6
0.191 6
0.511 6
ANT
_____________
_________________
_____________