You are on page 1of 1

1. Pressure source and test gauge should be upstream of check valve.

If pressure
source is downstream, check valve should have flapper removed or jacked?up.
(Pressure must be released downstream of check valve after test completion.)

2. Ensure that test blinds installed are the Correct thickness. Ensure that all
items such as control valves, relief valves, rupture disks, orifice plates,
diaphragm instruments, expansion joints, etc., which could be damaged during
pressure test have been removed or isolated, as indicated on the pressure test flow
diagram. Ensure that equipment, such as filters, which have internals that may be
damaged during pressure.