1. Diketahui : Infiltrasi tanah = 5 mm/jam


I = 30 mm/jam
A = 1 km2
Ditanya : Hitung koefisien limpasan dan Debit limpasan ?
Penyelesaian :
Perhitungan Intensitas Hujan
Waktu Tebal Hujan Lama Hujan Intensitas I
NO
Pukul Pukul (mm) (jam) (mm/jam)
1 0.00 1.00 0 1 0
2 1.00 2.00 2 1 2
3 2.00 3.00 2 1 2
4 3.00 4.00 10 1 10
5 4.00 5.00 6 1 6
6 5.00 6.00 4 1 4
7 6.00 7.00 2 1 2
8 7.00 8.00 4 1 4
9 8.00 9.00 0 1 0
10 9.00 10.00 4 1 4
11 10.00 11.00 6 1 6
12 11.00 12.00 2 1 2
13 12.00 13.00 0 1 0
Jumlah Hujan = 42 mm

1
Grafik Intensitas Hujan
24
Intensitas Hujan (mm/jam

20 Kapasitas Infiltrasi
16 5 mm/jam

12

0
1 2 3 4 5 6 7 8 9 10 11 12 13
Waktu (jam)

Jika kapasitas infiltrasi tanah 5 mm/jam, maka hujan < 5 mm/jam akan terserap tanah,
sedangkan hujan > 5 mm/jam sisanya akan menjadi limpasan (Curah Hujan Efektif = Re).
Re = (10 5 mm/jam) x 1 jam + (6 5 mm/jam) x 1 jam + (6 5 mm/jam) x 1 jam
= 7 mm
Perbandingan Curah Hujan efektif (Re) dengan Curah Hujan Total (Rt) menghasilkan
Koefisien Limpasan
7
= = = 0,17
42
Besarnya Debit limpasan hujan dengan intensitas hujan dengan intensitas hujan 30 mm/jam
yang terjadi pada lahan 1 km2 (0,278 m3/det)
Qp = C.I.A
= 0,17 . 30 mm/jam . 0,278 m3/det
= 1,42 m3/det

2
2. Persamaan intensitas Hujan
Penyelesaian :
Formulasi Intensitas Hujan dengan Metode Talbot
Lama
Hujan Intensitas 3 4 5 6 7 8 9 10 11 12
t (menit) I (mm/jam) I.t I^2 I^2 . t Log t Log I Log t . Log I (Log t)^2 t I . t I^2 . t
5 166.46 832.30 27708.9316 138544.66 0.699 2.221 1.553 0.489 2.24 372.22 61959.05
10 136.04 1360.40 18506.8816 185068.82 1.000 2.134 2.134 1.000 3.16 430.20 58523.90
15 126.52 1897.80 16007.3104 240109.66 1.176 2.102 2.472 1.383 3.87 490.01 61996.05
20 116.06 2321.20 13469.9236 269398.47 1.301 2.065 2.686 1.693 4.47 519.04 60239.33
45 96.91 4360.95 9391.55 422619.66 1.653 1.986 3.284 2.733 6.71 650.09 63000.42
60 61.82 3709.20 3821.71 229302.74 1.778 1.791 3.185 3.162 7.75 478.86 29602.86
120 42.47 5096.40 1803.70 216444.11 2.079 1.628 3.385 4.323 10.95 465.24 19758.55
180 34.82 6267.60 1212.43 218237.83 2.255 1.542 3.477 5.086 13.42 467.16 16266.49
360 26.45 9522.00 699.60 251856.90 2.556 1.422 3.636 6.535 18.97 501.85 13274.02
720 22.13 15933.60 489.74 352610.57 2.857 1.345 3.843 8.164 26.83 593.81 13141.02
Jumlah 829.68 51301.45 93111.78 2524193.42 17.356 18.237 29.655 34.568 98.37 4968.46 397761.69
n = 10 Log a = 2.60 a = 546.27
a = 11050.50 a = 5516.61 b = 0.60
b = 71.36 n = 0.45

Metode Talbot Metode Sherman Metode Meotde Ishigoro

(. ). ( 2 ) ( 2 . ). () log . (log ) 2 (log . log ). log (. ). ( 2 ) ( 2 . ). ()


= log = =
( 2 ) ( )2 (log ) 2 ( log )2 ( 2 ) ( )2
(. ). () ( 2 . ) (. ). () . ( 2 . )
= log . log . (log . log ) =
( 2 ) ( )2 = ( 2 ) ( )2
(log )2 ( log )2

3
I Talbot I Sherman I Ishigoro
= a/(t + b) = a/t^n = a/(t + b)
I = 11050,50/(t + 71,36) I = 5516,61/t^0,45 I = 546,27/(t + 0,60)

Lama Hujan Intensitas 13 14 15 16 17 18


I Sherma
t (menit) (mm/jam) I talbot n Ishigoro
5 166.46 144.72 21.74 2678.94 2512.48 192.91 26.45
10 136.04 135.83 0.21 1962.71 1826.67 145.36 9.32
15 126.52 127.96 1.44 1636.15 1509.63 122.24 4.28
20 116.06 120.96 4.90 1437.96 1321.90 107.79 8.27
45 96.91 94.97 1.94 999.27 902.36 74.79 22.12
60 61.82 84.13 22.31 878.23 816.41 65.49 3.67
120 42.47 57.75 15.28 643.43 600.96 47.30 4.83
180 34.82 43.96 9.14 536.37 501.55 38.99 4.17
360 26.45 25.62 0.83 392.97 366.52 27.91 1.46
720 22.13 13.96 8.17 287.91 265.78 19.92 2.21
Jumlah 829.68 85.96 10624.25 86.77
Rerata Penyimpangan = 8,596 1062,425 8,677

Curva Intensitas Hujan Vs Waktu


150
Intensitas Hujan (mm/jam)

100

50

0
1 2 3 4 5 6 7 8 9 10
Lama Curah Hujan t (menit)

Lap Talbot Sherman Ishiguro