Dl 900 t= 0.

6 m footing
Ll 700 t= 0.565 m column
25 8 c= 0.075 m cover
Depth 1.5 = 1
qa 240 1 ratio of long side to short side(column)
f'c 20.7 as= 40
fy 415 d= 0.525 m
Ysoil 15.74 c+d 1.09 m
Yc 23.5 Ktr= 0 (<---Sabi Ni Maam)

1 2
qeff = 211.734 Mu= 490.6
A= 7.556651 m^2 Mu=phiMn
b= 2.8 m w(1-0.59w)= 0.034122
0=w^2-0.59w-I14
qu = 280.61 w+= 0.0348
One Way Shear P= 0.002
Pmax= di ko alam
Vu= 465.53 kN Pmin= 0.003
Vc= 1136.98 kN 0.089
Vu<=phi Vc Use P= 0.003
Vu phiVc As= 4410 mm^2
465.53 < 852.73 ok
Two Way 422.6.5.2 Use 25 mm bar
Vu= 1866.59 kN bo= 4.36 m N= 8.983978
Vc= 3471.44 (a.) Use 9-25 mm dia bars on both sides
Vc= 5207.16 (b.)
Vc= 5915.78 (c.) S= 331.25 mm
Assume 330mm spacing on both sides
Use Vc= 3471.44
Vu<=phiVn
1866.59 < 2603.58 ok

The dimension of the footing is 2.8m by2.8m by 0.6m


3
Ld Available 1.0425 m t 1.3
s 1
(c+ktr)/db = 22.6 > 2.5 e 1
Use = 2.5

Ld required 1.078 m

Ld Available < Ld required

Use Ldb=1.0425 m

(<----Kayo po maglalagay)

n both sides

on both sides
4
Minimum Area of Dowel Reduction Factor
Am= 1596.125 mm2 phi= 0.65

Sqrt(A2/A1) = 2

phiPn= 7301.793 kn

Pu= 2200 kn

Pu < phiPn OK

Minimum Area of Dowel = 1596.125 mm2


Assumed Diameter of Dowel = 16 mm (<---Kayo po Maglalagay)
Number of Dowels = 7.938474
Use 8-16mm bars for dowel

Development Length of Dowel


fy = 275 mPa
Ldc min = 200 mm
Ldc = 232.1019 mm (a)
Ldc = 189.2 mm (b)

Ldc= 232.1019
Say 250 mm
po Maglalagay)