Proposal Problem

Plan the workover for the Dryhole21 #2

Proposed pay zone is 9568 9589, a clean dolostone limestone formation with
an ave. porosity of 12%.

Dryhole21 #2 was drilled to 11,004 and P&A.

Surface casing 12 cement circulated

Intermediate casing 8 5/8 cement circulated

Production home drilled with a 7 7/8 bit, 9.9# mud with a final waterloss of
10cc.