QUANTITY
NO URAIAN PEKERJAAN PCS / UNIT Minggu 1
SET 1 2 3 4 5
1 2 3 4 5
A. PEKERJAAN PERSIAPAN
1 Persiapan Moulding 1 Lot
2 Persiapan Alat, Tempat & Kelengkapan Kerja 1 Lot
C. PEKERJAAN FINISHING
1 Primer Finishing 1 Lot
2 Total Finishing 1 Lot
D. PEKERJAAN SISTEM
1 Instalasi Mesin Induk 1 Lot
3 Instalasi Steering & Control System 1 Lot
4 Instalasi Propulsi 1 Lot
5 Instalasi Main Power & Distribution Cable 1 Lot
6 Instalasi Navigation & Communication Cable 1 Lot
7 Instalasi Main Switch Board & Distribution Board 1 Lot
8 Intslasi Mesin Penarik Jaring 1 Lot
9 Instalasi Genset & Peralatan Listrik 1 Lot
10 Instalasi Peralatan Navigasi & Komunikasi 1 Lot
E. PERLENGKAPAN
1 Instalasi Perlengkapan Keselamatan 1 Lot
3 Pengurusan Surat-Surat Kapal 1 Lot
3.2. Kusen
2.3.1. Kusen Pintu dan Jendela 1.2541 M3 2,786,375.00 3,494,392.89
3,494,392.89
V. PEKERJAAN PLAFOND
5.1. Balok Plafond
5.1.1. Rangka Plafon 207.0075 M2 36,913.93 7,641,460.07
7,641,460.07
5.2. Memasang Plafond
5.2.1. Memasang Plafond Gypsum 165.6500 M2 64,214.67 10,637,159.53
5.2.2. Memasang Lis Plafond 179.9500 12,394.20 2,230,336.29
12,867,495.82
VI. PEKERJAAN PLASTERAN
6.1. Plasteran
6.1.1. Plasteran Dinding (1:2) 134.5000 M2 26,166.30 3,519,366.81
6.1.2. Plasteran Dinding (1:4) 780.2350 M2 22,553.96 17,597,388.98
6.1.3. Aian 914.7350 M2 4,837.48 4,425,013.64
25,541,769.43
6.2. Turap Porslen
6.2.1. Pasangan Turap Porslent 47.2160 M2 114,875.64 5,423,968.22
5,423,968.22
KAPAL IKAN 10 GT
10 GT SC
No Nama Barang Minggu 1
Jumlah
1 2 3
A. PEKERJAAN PERSIAPAN:
1 Moulding (Lambung) 1 Ls
2 Moulding (Bangunan Atas) 1 Ls
3 Alat kerja 1 Ls
4 Keel Block 15 Bh
C. SISTEM PERPIPAAN
1 Pipa PVC 1,5" 3 Lonjor
2 Stop Kran PVC 1,5" 3 Lonjor
3 Elbow PVC 1,5" 4 Bh
4 Pipa Galvanize 3" 1 Lonjor
5 Pipa Galvanize 2" 2 Lonjor
6 Elbow 0,5" 4 Bh
7 Selang Bening 3/8" 2 Meter
8 Selang Bilga 1" 6 meter
9 Packing TBA 5mm 2 m2
10 Packing Karet 5mm (Air Tawar) 2 m2
11 Lem PVC 4 Bh
D. FINISHING :
1 Amplas 100 25 Meter
2 Amplas 150 25 Meter
3 Amplas 400 25 Meter
4 Kain Kompon 4 Bh
5 Kompon 2 Kg
6 Isolasi Kertas Kecil 25 Bh
7 Isolasi Kertas Besar 25 Bh
8 Koran Bekas 4 Kg
9 Thinner A SPC 14 Liter
10 Cat Putih 6 Kg
B. SISTEM PERMESINAN :
1 Mesin Tempel 25 HP 2 Set
3 Pipa Galvanize 2,5" 1 Lnjr
4 Pipa Galvanize 6" 1 Meter
6 Elbow 2,5" 1 Ls
7 Pipa Galvanize 1" 1 Lnjr
8 Elbow 1" 1 Ls
9 Sea Chest 2" 1 Bh
10 Stop Kran Kuningan 2" 1 Bh
11 Water Strainer 2" 1 Bh
12 Plat Engine Belt 10mm ukuran 40 x 200mm 2 Bh
13 Baut 5/8" x 5cm 1 Ls
14 Ring Pir 5/8" 1 Ls
15 Ring Plat 5/8" 1 Ls
16 Plat Kuningan 5mm ukuran 30x30 1 Bh
17 Racor 500 GPH 1 Bh
18 Selang Solar Ukuran 1/2" 10 Meter
19 Nipple (Cucut) Kuningan Ukuran 1/2" 4 Bh
20 Stop Kran Kuningan 1/2" 1 Bh
21 Double Nipple Galvanize 1/2" 2 Bh
24 Koker + Remes Packing 2 Bh
25 Flange (sesuai Gear Box) 1 Bh
26 Propeller ukuran 24 x 26 (4 Daun) 1 Bh
27 Baut Propeller Kuningan + Spie 1 Bh
28 Penekan Remes Packing 1 Set
33 Hydraulic Single Cylinder 1 Set
34 Selang Hydraulic 3/8" 20 Meter
35 Oli Hydraulic SAE 10 5 Liter
36 Oli Gear Box SAE 90 10 Liter
37 Oli Mesin SAE40 25 Liter
38 Helm Pump 1 Set
39 Steering Whell 1 St
40 Remote Cable 5 Meter
41 Handle Control 1 Bh
42 Ekstenstion Indicator Main Engine 1 Set
43 Water Cooler Pump SS 1" 1 Set
44 Baut 1/2x 10 1 Ls
45 Lossdrat 5/8 1 Ls
47 Zink Anode 2 Bh
48 Accu 120 Ah 2 Bh
49 Kepala Accu 4 Bh
50 Kabel Accu 2 Meter
51 Skun Accu 8 Bh
52 Portable Genset 5000 Watt 1 Set
53 Hand Pump 1 Bh
54 Box Toolkit & Perlengkapan Mesin 1 Set
E. PERLENGKAPAN
1 Life Jacket 10 Bh
2 APAR 2,5 Kg 2 Bh
3 Ring Bouy 2 Bh
4 Kotak P3K & Isinya 1 Bh
5 Perlengkapan Memasak & Makan 1 Paket
6 Jangkar 20 Kg 2 Bh
7 Tali Jangkar 16mm 100 Meter
8 Tali Tambat 16mm 50 Meter
9 Tali Buang 10mm +Bandul 80 Meter
10 Damprah Ban Bekas 6 Bh
11 Surat Kapal 1 Set
DATANGAN MATERIAL
L IKAN 10 GT
SCHEDULE KEDATANGAN MATERIAL
Minggu 1 Minggu 2 Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8
4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
31250000