You are on page 1of 4
™ computer supported planning ll projekt specific calculating ll machine-manufactured just in time delivering ll quick and rational finishing Ma lot of time and money saved ov ABI : ~~ a ° Value in’ Bhs) YRS Antet BE Yea eta ©! SS FLOOR SLA . ."s Pouring concrete Concrete can be poured ‘on slabs at temperatures of 0° C degrees on a sing temperature and §°C on {aling temperatures. Removal of formwork is both time and temperature dependant. After sufficient curing of the concrete, the installation supports con be removed ‘on instruction of the Contract’s Manager (under Consideration of tne DIN Prefabricated ABI Any mottiing or ling 1045) and used elsewhere, balconies ‘works are always to be exe. cuted from the underside of In cose of non-compliance Special core must be taken the soffit with the above, the compo- when instaling balconies, When concreting, the insitu ny executing the works wil The Iso cages for thermal Cabling and conduit for the concrete shall be evenly bbe held liable for any dam- insulation are to be installed electrical installation is fed istriputed with the con. «age caused, ‘according to the manufac- prior fo the appliance of crete pump or the concrete turers recommendation if the upper reinforcement. skp and thoroughiy com not already incorporated Sdoleswintne nian, OMe treatment of the Offsite. After instaling, the underside of the slab installation supports ore #0 be inspected and adjusted where necessary vibrator Attention: No con- crete accumulation! The underside ofthe slabs is Cement laitonce protruded — smocth and ready for fling, ‘through the joints between however not free of pores. ‘the panels isto be removed Prior fo wall papering, the prior to curing, existing joints are to be Closed wit joint fling mate- tial e.g. Asecco. Works after the installation The insitu concrete must be ‘treated with ski, core ond ‘he ceiling surface must be diligence i.e. protected clean and entirely wetted without leaving any dry against frost and rapid cur- ‘areas, but, also not causing ing due to heat, wind ond any puddles. sun Openings are to be meas- ured on-site and the form- ‘work shall reach fo the Upper edge of the top edge of the slab. ‘Additional reinforcement (Connection reinforcement, {op reinforcement accord- ing to the Structural Engineer's bending sched Us) and butt joint reinforce- ment are incorporated in line with the instructions given. Alinformaton proved within this method statement are base on our -nowtodge and experence and axe deemed to be a desertion forthe ‘general use cdo} for spect fold of application When placing on Polystyrene blocks in the ‘order our Genel ferms ans Conattens apply Changes n favour of celing bulic-up are easly progres ove subject fous 1 ete re any tects ques please do not prepared formwork, nesta fo contact cur erofessona sam at AB, PRECAST CONSTRUCTION ABI IS THE FUTURE AB! slab foo's are approx. Installation supports. Te unloading bay for the 50mm thick with o weight lony and the crane is to be of about 130 fo 150 kg/sam. clean and have adequate Depending on imitations of aaa ‘weight and the 826 of the General he unloading of projec. tne slab installation the ABI slabs executed Wil elher be corried out with the crane of the delv- withthe crane of the delv- ery vehicle. Intermediate ety vehicle othe ste siorage onsite is poste crane. however should be avoided due te damage which may be coused to the slabs. necessary. intermediots slorage shall be on even surface with the ad of squored timber etc. Any The crane type wil be determined by the weight of the heaviest panel and ‘the necessary installation depth. The elements can be built 9 comply in sze and damage to the sabs or ‘weight with the capocity of ks caused b} thelrwtloion cone Pio tothe netctcton of radng swf he the slabs, tne installation Lattice girder andintemal supports are to be posi responsbilty of the Contractor or the Client: reinforcement within the tioned at right angles fo prefabricated elements the lattice girders and are become combined with to be property strengthened = on-site top reinforcement in order to prevent any col installed according fo the lapse when instaling the bending schedule slobs.A sight increase in = any onsite additional height of doout 10 to 20 reinforcement mm § fo be prepared in the = on-site instuconcrete centre of the room. The finshed concrete sab. maximum distance for he instalation supports is shown ‘on the installation schedule ee ‘and must be stictly The support areas for the adheored fo. slob fioors (brick wals) are ‘Sbecetnandaretorun —Adistcle dec besa parallel inneight and dis» Ports and defect-free aes squared timber (approx. 100 x 100 mmin sze) shall The beating length of the preferably be used, Planks For unloading the ceiling slab is to be minimum ‘ate not suttatole forthe sup- Slabs, an approx. 4 m long: 40 mm. The sabs are to port, A load-bearing sub- ‘swing type crane set with be placed in mortar if the Construction or concrete 4 ropesis to be used. Idlers support depthis> 40mm Surface are necessary. For ‘MAB ensure uniformly ‘tis is oso used to bridge non-load-bearing floors, spread load. Hooks shall be ‘any unevenness of the wail. squared timber planks, etc. Nooked in the top bending ‘re required. (of the diagonal and not in If thete is reduced support teers a depth (< 35 mm) available, ice girder (see picture) an an edge stud s clways fo ‘Unloading from the lorry ihe distance to the edge of be postioned. The slabs are detvered with V4 10/5 of the panel length suppor deprs crdiocar OOH Guy venice wn TS BE Comeled wh ions for studs ore shown in__Maller) to the building site Under no circumstances the instalation schedule, ON provsionsarelo be should the iting be execut- made by the Clent or he eto the short bent bors or Contract’s Manager that the outside lattice giders, such a vehicle has unre sticted access ond can The diver of the delivery fecch the site without any vehicle wil instruct the borries. Unloading com- team on-site how to cor ences immediately upon rectly postion the crane set ortval forlfing. PRECAST CONSTRUCTION ABI 1S THE FUTURE The iting is to be executed Under the direction of the crane supervisor Installing The elements are marked vith location numbers according to the installation schedule. On the lor the large slabs willbe placed below ond the smaller ones in the midale. Fitting panels balconies. ko cages. etc. «re on top, Work com- mences with the panels or the balconies and contin- tues with the slabs accord- Ing fo the loading sequence necessary for fronsport This & key fo trans- port economics. For the installation, 3 people re required on-site. One is responsible for the conect Unloading from the lony ‘and two accept the stab ‘and position on ste. The slabs must evenly rest ‘on the supports. Any hollow space is to be closed. The butted edges of the slabs must not stow any difer- ences in height at their Underside. Ifnecessary, ‘adjust instalation supports High-Tech with the highest We deliver according to A wolcooidinated produc- Expertise, Specialists and level of flexibility and your specifications and tion know-how, highly qual- Service included quality at factory rates drawings fied staff ond a strict quailty = twin wall panels control guarantee advan- For us, he advice begins AB| This name means = floor slabs tages in quality ond ef before placing of an order. more than what is com = stoicases ciency independent from —_AB| Construction Specialists monly understood by 0 - balconies on-sie conditions Colculate the best and ‘construction material pro- ‘most economical solution ducing company. The increased efficiency is The Architect's design snot _ for the project. They are for small residential buldings restricted by the industrial responsive for the contract ‘AB| This is your exper 8 Significant as for adminis _prefdiorcation, exactly the and ensure a justintime fenced partner offering the trative or industrial buildings, opposite. Abo complicated execution. entire range for the modern layouts can be economi- construction. The use oflorgesze ele- cally manufactured. In por- If requested. we provide: ments reduces the amount ticular for non-tectangulat calculations and certi- These ate coordinated sjs- of bulling components, buildings prefabrication's _cates for the products. tems which entirelymeet iso the kof damage.A superior in accuracy and their constructional and high evel of on-site mon _ efficiency to the fradittonal_—_ Upon appointment, you physical functions. ‘agement and expertise is way of building on-ste. receive a detaled installa transferred into the factory. tion drawing and a method statement, TE Beier 6 om eae @ —Andernacher Bimswerk GmbH & Co. KE He Flillscheuerweg 21 » 56626 Andernach 2 Postfach 1227 - 56602 Andernach & Germany Fon 0049 (0) 26 32.20 06-0 - Fax -35 Value in ce vwb)-beton de infoacb-beton de

You might also like