1. INTRODUCTION
1.1 General
An arch may be defined as a member shaped and supported in such a way that intermediate transverse
loads are transmitted to the supports primarily by axial compressive forces in the arch. The arch form is
intended to reduce bending moments in the superstructure and should be economical in material
compared with an equivalent straight, simply supported girder or truss. The horizontal thrust is resisted by
the foundation or by a girder or truss running longitudinally beneath the deck for the full length of the
span.
The arch has long been acknowledged as an efficient and aesthetically pleasing structural form.
(Conceptual design aspects are discussed in more detail in Lecture 15B.1.) However, a much wider
choice of materials is available to the contemporary designer than was available to his Roman
counterpart.
Table 1 gives a summary of the longest arch bridges. For further information and examples see [1] and
[2].
Steel arch bridges are generally used to support either highways or railways.
The basic arch bridge, with a predominating arch and with the thrust transmitted directly to the
foundation. The arch is subjected to bending, shear and axial forces.
A predominating stiffening girder is subjected to bending moments and axial forces induced by the arch.
The arch itself is mainly loaded in compression.
Though there is a difference in appearance, the mechanical behaviour of the three types is largely similar.
In this lecture only the mechanical behaviour of Type C is discussed in detail.
Figure 1 shows three situations in which the arch lies above the deck. Other equally valid arch forms exist
in which the arch may be situated either entirely below (Figure 2a) or partly below (Figure 2b) the deck.
Wherever the arch lies beneath the deck, the deck is supported by posts (i.e. compression members) rather
than being suspended on hangers.
An elegant alternative is afforded by the use of inclined arches connected in the midspan region of the
arch.
In the basic arch and tied arch configurations (Figure 1) vertical hangers are usually used. As these
hangers are loaded in tension, rolled sections or cables can be used. If hangers are inclined, truss
behaviour develops and upward wind loading may change tensile to compressive loading. Clearly this is
unacceptable where cables are used. The most satisfactory solution to this problem is that the dead load of
the deck should provide sufficient prestress to ensure that net compression never develops in the hangers.
Whilst tied arch bridge structures exist in which both girder and arch are subject to considerable bending
moments, they are relatively uncommon and are not discussed further here.
Where a steep sided valley or gorge is to be crossed the spandrel post arch of Figure 2a provides a
striking and appropriate solution. In flat terrain or where navigation clearances are to be achieved over
significant proportions of the river width, one of the basic or tied arch arrangements of Figure 1 will
generally be preferable.
Where multiple spans are involved, there is a view (voiced by Leonhardt [2]) that repetition of the
spandrel post arch arrangement of Figure 2a rather than of the tied arch (Figure 1) is to be preferred on
aesthetic grounds. A single tied or part tied arch can then be adopted on the main or navigation span, as
used to good effect in the Rogue River Bridge in Oregon, America [2].
3. CHOICE OF ELEMENTS
The tied arch bridge generally consists of the following structural elements:
the arch.
the stiffening girders.
the hangers.
the end portals.
The arch can be either a truss, box girder, plate girder or some form of hollow section (e.g. circular).
Many of these structural elements are discussed in other lectures. No essential differences are to be
expected arising from their use as an arch.
Ideally, for aesthetic reasons the arch should follow a smooth, continuous curved profile. However,
overall curvature of the arch member may also be achieved by means of a series of short straight chords
as indicated in Figure 3a. The hangers are attached at breaks of slope in the arch. In this form of arch out-
of-plane forces are generated in the top and bottom flanges of the arch member, thus necessitating an
internal cross frame or diaphragm (Figure 3a).
Where rolled or fabricated sections rather than cables are used for the hangers, connection of the hangers
to the arch can be carried out using a detail in which splices are formed in extended web plates of the arch
member at the joint (Figure 3).
Even if bracing between arches is present over the larger part of the span, it may have to be omitted near
the ends of the arch to provide clearance for traffic, see Figure 4.
Where wind bracing is not provided, the lateral stability of the arch is somewhat more complicated to
assess than for a truss, for two reasons:
Discrete intermediate restraint is provided to the arch by U-frames (such as BXX'B') comprising
two hangers connected to a cross girder in Figure 4b. The stiffness of these frames varies over the
whole length of the arch because of changes in hanger length;
The lengths of the arch members also change continuously, the bay length generally being
constant with consequential variation in member length.
The energy equation governing this problem and the method of solving it are similar to the approach for a
truss. Computer analysis affords an alternative solution. In practice, frame action at CYY'C' and the
bracing above CC', together with the restraint provided by the end portal CAA'C' (discussed in 3.4), will
generally ensure the stability of points such as B, B'.
Rotation of the stiffening girder about its longitudinal axis effectively reduces the stiffness of the U-
frames (e.g. BXX'B' in Figure 4b). To mitigate this detrimental effect, the end cross girder is sometimes
supported at midspan (Figure 4b).
an I-section.
a box girder or other form of hollow section.
an open "top hat" section, a type of cross-section belonging mainly to the riveting era.
Considering the tied arch more closely, it is to be noted that arch and girder are often in separate vertical
planes; the arch is therefore connected eccentrically to the girder. Any such eccentricity must be taken
into account in design.
For a box stiffening girder, or an open "top hat" section, an excellent connection between the arch and
girder is obtained by using two splice plates, coinciding with the walls of the stiffening girder (Figure 5).
The stress distribution in the plate is complicated. It may be obtained using finite element methods.
I-sections (welded or rolled), circular hollow sections or cables may be used for the hangers. Opinions
differ about the optimum choice of section. Cables are made of high tensile steel e.g. Fe 1800. Due to the
high stress levels which occur and the effects of creep, elongation occurs which is partly elastic (i.e.
recoverable) and partly permanent. However, for highway bridges and railway bridges with or without
continuous ballast, cables have been successfully used.
I-section hangers can be sensitive with respect to flutter whilst hollow sections and cables may vibrate as
a result of vortex shedding. Annex A presents a method of ensuring that undesirable vibrations do not
occur. It is often easier to reduce the effect of vibrations than to suppress them. The most dangerous
vibrations are those with high kinetic energy, i.e. those with short wavelength occurring at high wind
velocity. Such vibrations can be reduced by the use of dampers (Figure 6).
To support the arch laterally and to reduce the buckling length of the arch members, bracing is usually
used for the central region of the arches. Wind forces and stability effects are transmitted to the supports
by rigid end portals (Figure 7a).
Although no stiffness requirements are generally specified, it is considered good practice to limit the
maximum 'lozenging' of an end portal to h/1500 (Figure 7b).
Different methods may be adopted for transmitting these forces back to the supports.
The vertical rigid end portals transmit their forces back to the supports via the deck or wind
bracing at deck level.
The inclined rigid end portal is composed of the two last members of each arch, the reinforced last
member of the wind bracing and the end cross girder. This portal transmits forces directly back to
the supports.
The arch bridge is usually indeterminate. However, simple manual calculations can be used for initial
design.
The tied arch is chosen here as an example. The reasoning can also be applied to most other types of arch
bridge.
Consider the tied arch shown in Figure 8a. The influence line for the horizontal component of the
midspan thrust in the arch, symbol H, is shown in Figure 8b. The line is symmetrical about midspan and
its sign does not change. The greatest thrust clearly develops when the full span is loaded.
Next consider the behaviour of the bridge when subject to four important patterns of loading (Figure 9):
a. full loading
In this case the thrust H reaches a maximum. From computer calculations it will be found that the
stiffening girder acting in bending contributes only about 5% to the load carrying resistance of the bridge.
As a result a very good estimate of the thrust can be obtained from:
H= (1)
where:
The half span of uniformly distributed loading 2q is equivalent to two superimposed loadings (Figure 10):
full loading: +q
anti symmetric loading as follows:
Full loading primarily generates a thrust in the arch and a compensating tensile force in the girder.
Due to the symmetry of the influence line, the second loading does not generate any thrust. As the
deflection under this second loading is composed of two half waves, the girder can be considered to be
composed of two parts with a "hinge" at midspan. The maximum bending moment is therefore
approximately:
Mmax = (2)
Again the equally distributed loading 2q can be considered as being composed of two superimposed
loadings:
full loading +q
full loading on one side of the bridge: +q
Again the full loading primarily generates a thrust, inducing a tensile force in the girder which is
calculated from Equation (1).
The one sided loadings tend to lozenge the bridge cross-section causing horizontal lateral forces on the
arch and deck. These forces create horizontal bending moments in the girders and deck. In an orthotropic
deck the bending moment may lead to stresses greater than the allowable stress.
4.1.4 Alternating Full Loading over Half the Length of the Bridge
Again the equally distributed loading 2q can be considered as being composed of two superimposed
loadings:
full loading: +q
full loading on one side of half the length of the bridge:
on the other side of the bridge again a full loading on half the length of the bridge, but now:
Again full loading primarily generates a thrust, inducing a tensile force in the girder, which is calculated
from Equation (1).
Considering the deformations due to the second loading, in one of the main girders:
there is no thrust
the connection between the arch and girder is subject to rotation only
the arch moves vertically, but also horizontally
the movements of both main girders are in the opposite direction.
If a bracing is inserted, then the horizontal displacements impose an S-shape on the arch, with the
inflection point at midspan. As a consequence there is a shear force in the plane of the bracing.
This shear force is rather moderate, even in large bridges. For the double track railway bridge across the
Amsterdam - Rhine Canal, span 114m, the shear force at midspan is about 100 kN.
The above demonstrates that it is necessary to consider the bridge as a three-dimensional structure in the
final design.
The discussion in the previous section only addresses the primary modes of behaviour of the arch bridge.
There are several secondary actions that need to be considered in design.
The initial analysis has assumed that the connection between the hangers and both the arch and girder are
pinned. In practice these connections are rigid and the displacements in the structure lead to bending
moments in the hangers. Figure 11(a) shows typical influence lines. It can be seen that the greatest
bending moments arise when the arch is partially loaded. The worst cases in this example are the shortest
and the longest hangers. Figure 11(b) shows the displaced shape and distribution of bending moments in
the shortest hanger. Moments in the hangers at midspan are subject to full reversal and are therefore most
likely to influence fatigue life. Their absolute value is, however, low, justifying their neglect in the initial
global analysis. (In the Amsterdam Rhine railway bridge the maximum bending stress was 80 N/mm2).
In order to reduce the magnitude of these fluctuating stresses it is possible to reduce the minimum second
moment of inertia of the hangers by reducing the flange width.
The use of open grid steel decks on railway bridges is now very rare given the contemporary demand for
the provision of ballast. In the few situations in which such a deck arrangement might still be considered,
it is important that any adverse local effects in the deck arising from non-coincidence of the neutral axis
levels of the stiffening girders and any longitudinal stringers or rail bearers should be allowed for and be
combined with global effects. A detailed discussion of such effects is not warranted here; however, a
description is given in Lecture 15B.4.
Type A and B: The hangers are loaded in tension by local live load and, of course, dead load.
Type B and C: The tensile force in the ties causes an elongation which affects the bending moments in the
arch. Since a tie has a smaller cross-section than a stiffening girder, the elongation effect is greater for
type B.
Type A: The elongation effect is assumed to be absent if the abutment carries the thrust.
Type A and B: It is impossible to omit the bracing between the two arches: the portals formed by
connection of the hangers to the cross girders offer very little restraint to the arch to prevent instability.
The erection sequence for the tied arch railway bridge across the Amsterdam-Rhine Canal is shown in
Figures 12 and 13.
It is considered advantageous to use a Type C arch bridge, with a rigid girder, for a railway bridge. The
girder including the deck can often serve as a working area for the erection of the arch.
For a tied arch it is sometimes possible to pre-assemble the bridge completely and erect the structure
using pontoons. An example is the Van Brienenoord Bridge, across the Meuse, Rotterdam.
An arch without ties can be erected in the same way taking out the ties after erection of the bridge.
However, the arch thrust causes some elongation of the ties, an effect which must be taken into account
during fabrication and erection.
During erection of the bridge across the Waal, Nijmegen, a bridge that was erected subsequently at
Dordrecht across the Meuse was used as a temporary working area.
7. CONCLUDING SUMMARY
Arch bridges may be used for both railway and highway bridges.
The behaviour of all types of arch bridges is broadly similar but is influenced by the relative
bending stiffnesses of the arch and the main horizontal girder.
The horizontal thrust from the arch may be carried by the abutments (a pure arch) or by the
horizontal girder (a tied arch).
Either bracing or portal frame action is necessary to stabilise the arches and resist wind loading;
many structures use a combination of both structural solutions.
Initial design can be effectively carried out by assuming pin jointed connections.
Final analysis must take account of joint fixity and the three dimensional behaviour of the
structure.
Load cases must include partially loaded situations which control transverse behaviour, girder
bending, hanger bending and cross-sectional distortion.
Several methods of erection may be adopted for arch bridges.
8. REFERENCES
[1] O'Connor, Colin: Design of Bridge Superstructures, Wiley, New York 1971.
9. ADDITIONAL READING
1. Hartwig, H. J. and Hafke, B.: Die Bogenbrcke ber den Asker_fjord. Stahlbau 30 (1960) 289-
303, 365-377.
2. Stein, P., and Wild, H.: Das Bogentragwerk des Fehmarnsundbrcke. Stahlbau 34 (1965) 171-
186.
3. Wittfoht, H.: "Building Bridges", Beton-Verlag, Dusseldorf, 1984.
The chance of undesirable vibrations is reduced to a large extent if the following condition, partly
empirical and partly theoretical, is satisfied:
.b 8 m/s (A1)
where:
Note: "To a large extent" means that the possibility of vibration is not completely excluded. It is good
practice to take precautionary measures to suppress visually disagreeable vibrations if they still occur.
The requirement given by Equation (A1) is quite onerous for very long hangers.
To use Equation (A1), it is necessary to calculate the bending ( 'b) and torsional ( 'r) natural frequencies.
'b = (A2)
'r = (A3)
An important means of avoiding flutter is to ensure a sufficient difference between the two frequencies.
Difference in frequencies can be achieved by:
using a box or circular hollow section as a hanger, thus increasing the torsion and warping
constants over the full length of the hanger.
using box sections locally for example by adding plates between the flanges of the I section over
part of its length. However such an arrangement can cause maintenance difficulties.
adjusting Ix and Iy.
If cables are used, flutter cannot occur as the torsional mode of vibration cannot occur.
Vortex Shedding
Cables and circular hollow sections can develop significant vibrations from vortex shedding. Vortices are
generated from alternate sides of the cable with a frequency Fw given by:
Fw = 0,2 (A4)
where:
To avoid excitation due to vortex shedding, the cable frequency, Fc, should avoid a domain around:
Fc = 0,1 (A5)