Resta Bekisting
Resta Bekisting
45400 3178
55900 3913
59800 418.6
59400 237.6
IDR 152,424
per 1 kg IDR 15,242.39
4050000 81000
17210 6884
50000 10000
4050000 36450
137500 24062.5
100000 100000
45400 29964
55900 18447
59800 1973.4
59400 1960.2
IDR 310,741
890000 979000
300000 300000
60000 60000
45400 47670
55900 15372.5
59800 1674.4
59400 4930.2
IDR1,408,647
PEKERJAAN VOLUME SATUAN HARGA SATUAN PEKERJAAN
PEKERJAAN BETON READY MIX 6.75 M3 IDR 1,408,647
PEKERJAAN PEMBESIAN 549.976 KG IDR 15,242.39
PEKERJAAN BEKISTING 45.18 M2 IDR 310,741.10
JUMLAH
PROFIT= 10%
PAJAK10%
RAB
TOTAL HARGA PEKERJAAN
IDR 9,508,367.93
IDR 8,382,945.93
IDR 14,039,282.90
IDR 31,930,596.76
IDR 35,123,656.43
IDR 38,636,022.07
IDR 38,636,022.07
NO
1
2
3
PEKERJAAN VOLUME SATUAN HARGA SATUAN PEKERJAAN
PEKERJAAN BETON READY MIX 7.8 M3 IDR 1,481,887
PEKERJAAN PEMBESIAN 635.21 KG IDR 15,242
PEKERJAAN BEKISTING 52.3 M2 IDR 1,037,479
JUMLAH
PROFIT= 10%
PAJAK10%
RAB
TOTAL HARGA PEKERJAAN
IDR 11,558,718.60
IDR 9,681,870.82
IDR 54,260,151.70
IDR 75,500,741.12
IDR 83,050,815.23
IDR 91,355,896.76
IDR 91,355,896.76
REKAP PEMBESIAN AAM
ASUMSI DIAMETER 16
KODE PANJANG KEBUTUHAN JUMLAH TOTAL PANJANG (m') BERAT (Kg) KEBUTUHAN LENTE
AHS
KEBUTUHAN SATUAN INDEKS HARGA SATUAN
1kg memasang besi
betonU-24 SNI
7394:2008
Bahan:
1. Besi beton U-24 kg 10.15 13570
2. Kawat Beton kg 0.15 14611
Tenaga kerja
1. Pekerja oh 0.07 45400
2. Tukang Besi oh 0.07 55900
3. Kepala Tukang oh 0.07 59800
4. Mandor oh 0.004 59400
137735.5
2191.65
3178
3913
4186
237.6
Rp151,441.75
Rp15,144.18
SATUAN HARGA SATUAN PEKERJAAN TOTAL HARGA PEKERJAAN
M3 IDR - IDR -
KG IDR 15,144.18 IDR 35,163,606.01
M2 IDR - IDR -
JUMLAH IDR 35,163,606.01
PROFIT= 10% IDR 38,679,966.61
PAJAK10% IDR 42,547,963.27
RAB IDR 42,547,963.27
RAB BEKISTING RESTA
KODE VOLUME SATUAN KETERANGAN NO
1 35.46 m BALOK 1
2 11.16 m DIAFRAGMA 2
3 24.19 m SANDARAN 3
4 33.7 m PELAT BETON
TOTAL 104.51