DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SOIL

USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 07/12/2017

.Title of Test: Compaction of soil with 4% quarry dust and 0.5% Saw dust

Total weight of Sample... 5000g MDD: 1.64g/cm3 OPT.MC: 24.0%

B.S. / C.B.R. Mould.... 1900g


Wt. of mould & wet Soil (W2) g 3450.00 3550.00 3650.00 3700.00 3825.00 3900.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1550.00 1650.00 1750.00 1800.00 1925.00 2000.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.57 1.67 1.77 1.82 1.94 2.02
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 43.60 45.50 36.90 41.50 37.10 41.00 38.40 44.00 28.80 34.90 31.50
Wt. of Dry soil & container (g) 41.20 42.70 34.40 38.40 33.90 37.00 34.70 39.40 26.20 31.00 28.10
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 14.20
Wt. of dry soil (Wd) g 27.70 29.90 20.10 24.10 20.70 24.40 21.90 26.70 12.00 17.30 13.90
Wt. of Moisture (Wm) g 2.40 2.80 2.50 3.10 3.20 4.00 3.70 4.60 2.60 3.90 3.40
Moistur Content 100(Wm/Wd) % 8.66 9.36 12.44 12.86 15.46 16.39 16.89 17.23 21.67 22.54 24.46
Average Moisture Content (m) % 9.01 12.65 15.93 17.06 22.11 25.06
Dry Density = Pb/1+ (m/100) (g/cm3) 1.44 1.48 1.52 1.55 1.59 1.62
C.B.R. (mseen of top & bottom) %

1.65

1.6

1.55

1.5
Dry Density

1.45

1.4

1.35

1.3
5 10 15 20 25 30 35

Moisture Content
LATION OF SOIL

OPT.MC: 24.0%

3900.00 3950.00 3875.00


1900.00 1900.00 1900.00
2000.00 2050.00 1975.00

2.02 2.07 1.99


ld, X = 990cm3
CB6 CT7 CB7 CT8 CB8
37.70 26.30 35.20 28.50 38.80
32.80 23.20 30.30 24.90 33.10
13.70 12.30 13.40 12.70 14.40
19.10 10.90 16.90 12.20 18.70
4.90 3.10 4.90 3.60 5.70
25.65 28.44 28.99 29.51 30.48
25.06 28.72 29.99
1.62 1.61 1.53

9.01 1.44
12.65 1.48
15.93 1.52
17.06 1.55
22.11 1.59
25.06 1.62
28.72 1.61
29.99 1.53

30 35
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 4% QUARRY DUST AND 1.0% SAW DUST
DESCRIPTION DATE: 13/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 25 40 55 68 84 94 118 137 145 178
Load (KN) 0.00 0.27 0.44 0.60 0.74 0.92 1.03 1.29 1.50 1.59 1.95
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 20 35 41 64 88 106 120 135 140 164
Load (KN) 0.00 0.22 0.38 0.45 0.70 0.96 1.16 1.31 1.48 1.53 1.79
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 6.94 7.51
TOP 7.27 7.40
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
192
2.10

12.50
185
2.02

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SOIL
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 07/14/2017

.Title of Test: Compaction of soil with 4% quarry dust and 1.0% Saw dust

Total weight of Sample... 5000g MDD: 1.636g/cm3 OPT.MC: 22.5%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3500.00 3575.00 3650.00 3725.00 3825.00 3900.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1600.00 1675.00 1750.00 1825.00 1925.00 2000.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.62 1.69 1.77 1.84 1.94 2.02
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 51.40 53.50 37.20 43.30 43.10 49.30 34.00 42.50 31.30 41.50 32.10
Wt. of Dry soil & container (g) 48.20 50.00 34.70 40.00 39.30 44.50 30.90 38.00 28.50 36.80 28.70
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 14.20
Wt. of dry soil (Wd) g 34.70 37.20 20.40 25.70 26.10 31.90 18.10 25.30 14.30 23.10 14.50
Wt. of Moisture (Wm) g 3.20 3.50 2.50 3.30 3.80 4.80 3.10 4.50 2.80 4.70 3.40
Moistur Content 100(Wm/Wd) % 9.22 9.41 12.25 12.84 14.56 15.05 17.13 17.79 19.58 20.35 23.45
Average Moisture Content (m) % 9.32 12.55 14.80 17.46 19.96 23.70
Dry Density = Pb/1+ (m/100) (g/cm3) 1.48 1.50 1.54 1.57 1.62 1.63
C.B.R. (mseen of top & bottom) %

1.7

1.65

1.6

1.55
Dry Density

1.5

1.45

1.4

1.35
5 10 15 20 25 30

Moisture Content
1.4

1.35
5 10 15 20 25 30

Moisture Content
LATION OF SOIL

OPT.MC: 22.5%

3900.00 3950.00 3900.00


1900.00 1900.00 1900.00
2000.00 2050.00 2000.00

2.02 2.07 2.02


ld, X = 990cm3
CB6 CT7 CB7 CT8 CB8
43.20 33.40 41.10 28.50 41.40
37.50 29.10 35.30 25.10 35.50
13.70 12.30 13.40 12.70 14.40
23.80 16.80 21.90 12.40 21.10
5.70 4.30 5.80 3.40 5.90
23.95 25.60 26.48 27.42 27.96
23.70 26.04 27.69
1.63 1.64 1.58

9.32 1.48
12.55 1.5
14.8 1.54
17.46 1.57
19.96 1.62
23.7 1.63
26.04 1.64
27.69 1.58

5 30
5 30
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 4% QUARRY DUST AND 1.0% SAW DUST
DESCRIPTION DATE: 13/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 23 34 48 60 72 83 104 130 166 181
Load (KN) 0.00 0.25 0.37 0.53 0.66 0.79 0.91 1.14 1.42 1.82 1.98
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 18 30 42 55 68 73 92 118 136 156
Load (KN) 0.00 0.20 0.33 0.46 0.60 0.74 0.80 1.01 1.29 1.49 1.71
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 5.95 7.12
TOP 5.62 6.47
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
204
2.23

12.50
167
1.83

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SOIL
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 07/17/2017

.Title of Test: Compaction of soil with 4% quarry dust and 1.5% Saw dust

Total weight of Sample... 5000g MDD: 1.632g/cm3 OPT.MC: 24%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3500.00 3600.00 3675.00 3750.00 3850.00 3925.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1600.00 1700.00 1775.00 1850.00 1950.00 2025.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.62 1.72 1.79 1.87 1.97 2.05
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 39.10 42.60 40.80 46.40 33.70 42.00 46.90 55.20 41.30 48.90 31.30
Wt. of Dry soil & container (g) 36.80 39.80 37.70 42.50 30.90 37.90 41.60 48.50 36.40 42.20 27.90
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 14.20
Wt. of dry soil (Wd) g 23.30 27.00 23.40 28.20 17.70 25.30 28.80 35.80 22.20 28.50 13.70
Wt. of Moisture (Wm) g 2.30 2.80 3.10 3.90 2.80 4.10 5.30 6.70 4.90 6.70 3.40
Moistur Content 100(Wm/Wd) % 9.87 10.37 13.25 13.83 15.82 16.21 18.40 18.72 22.07 23.51 24.82
Average Moisture Content (m) % 10.12 13.54 16.01 18.56 22.79 25.12
Dry Density = Pb/1+ (m/100) (g/cm3) 1.47 1.51 1.55 1.58 1.60 1.63
C.B.R. (mseen of top & bottom) %

1.65

1.6

1.55
Dry Density

1.5

1.45

1.4

1.35
5 10 15 20 25 30 35

Moisture Content
1.35
5 10 15 20 25 30 35

Moisture Content
LATION OF SOIL

OPT.MC: 24%

3925.00 3950.00 3875.00


1900.00 1900.00 1900.00
2025.00 2050.00 1975.00

2.05 2.07 1.99


ld, X = 990cm3
CB6 CT7 CB7 CT8 CB8
42.80 33.50 45.80 30.70 45.20
36.90 29.00 38.70 26.60 38.10
13.70 12.30 13.40 12.70 14.40
23.20 16.70 25.30 13.90 23.70
5.90 4.50 7.10 4.10 7.10
25.43 26.95 28.06 29.50 29.96
25.12 27.50 29.73
1.63 1.62 1.54

10.12 1.47
13.54 1.51
16.01 1.55
18.56 1.58
22.79 1.6
25.12 1.63
27.5 1.62
29.73 1.54

30 35
30 35
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 4% QUARRY DUST AND 1.5% SAW DUST
DESCRIPTION DATE: 13/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 20 30 40 55 70 85 100 118 132 157
Load (KN) 0.00 0.22 0.33 0.44 0.60 0.77 0.93 1.09 1.29 1.44 1.72
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 20 28 35 53 65 70 88 96 118 136
Load (KN) 0.00 0.22 0.31 0.38 0.58 0.71 0.77 0.96 1.05 1.29 1.49
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 5.78 6.47
TOP 5.37 5.26
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
185
2.02

12.50
156
1.71

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12
DETERMINATION OF THE MOISTURE/DENSITY RELATION OF SOIL
USING STANDARD COMPACTION

PROJECT: B.ENG Sample No... Sample from Futa Operator

Site: Soil from FUTA Date: 07/17/2017

.Title of Test: Compaction of soil with 4% quarry dust and 2.0% Saw dust

Total weight of Sample... 5000g MDD: 1.632g/cm3 OPT.MC: 24.5%

B.S. / C.B.R. Mould.... 1900g

Wt. of mould & wet Soil (W2) g 3525.00 3600.00 3675.00 3750.00 3825.00 3900.00
Wt. of mould (W1) g 1900.00 1900.00 1900.00 1900.00 1900.00 1900.00
Wt. of wet soil (W2-W1) g 1625.00 1700.00 1775.00 1850.00 1925.00 2000.00

Bulk Density (Pb) (W2-W1)/x g/cm3 1.64 1.72 1.79 1.87 1.94 2.02
MOISTURE CONTENT DETERMINATIONS for B.S. Mould, X = 990cm3
Container No. CT1 CB1 CT2 CB2 CT3 CB3 CT4 CB4 CT5 CB5 CT6
Wt. of wet soil & container (g) 51.40 54.30 45.10 50.80 30.70 37.30 29.00 37.40 40.20 48.50 41.50
Wt. of Dry soil & container (g) 47.80 50.30 41.70 46.70 28.40 34.00 26.60 33.70 35.90 42.60 36.30
Wt. of Container (g) 13.50 12.80 14.30 14.30 13.20 12.60 12.80 12.70 14.20 13.70 14.20
Wt. of dry soil (Wd) g 34.30 37.50 27.40 32.40 15.20 21.40 13.80 21.00 21.70 28.90 22.10
Wt. of Moisture (Wm) g 3.60 4.00 3.40 4.10 2.30 3.30 2.40 3.70 4.30 5.90 5.20
Moistur Content 100(Wm/Wd) % 10.50 10.67 12.41 12.65 15.13 15.42 17.39 17.62 19.82 20.42 23.53
Average Moisture Content (m) % 10.58 12.53 15.28 17.51 20.12 23.68
Dry Density = Pb/1+ (m/100) (g/cm3) 1.48 1.53 1.56 1.59 1.62 1.63
C.B.R. (mseen of top & bottom) %

1.65

1.6

1.55
Dry Density

1.5

1.45

1.4
10 15 20 25 30 35

Moisture Content
1.4
10 15 20 25 30 35

Moisture Content
LATION OF SOIL

OPT.MC: 24.5%

3900.00 3925.00 3850.00


1900.00 1900.00 1900.00
2000.00 2025.00 1950.00

2.02 2.05 1.97


ld, X = 990cm3
CB6 CT7 CB7 CT8 CB8
53.70 32.30 42.70 28.00 42.00
46.00 28.10 36.40 24.60 35.70
13.70 12.30 13.40 12.70 14.40
32.30 15.80 23.00 11.90 21.30
7.70 4.20 6.30 3.40 6.30
23.84 26.58 27.39 28.57 29.58
23.68 26.99 29.07
1.63 1.61 1.53

10.58 1.48
12.53 1.53
15.28 1.56
17.51 1.59
20.12 1.62
23.68 1.63
26.99 1.61
29.07 1.53

30 35
30 35
CALIFONIA BEARING RATIO TEST
SAMPLE NO SAMPLE WITH 4% QUARRY DUST AND 2.0% SAW DUST
DESCRIPTION DATE: 13/08/2017
NOTES O SOIL
TEST ON BOTTOM ( UNSOAKED) SURCHARGE
Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 20 28 38 58 74 83 106 123 138 160
Load (KN) 0.00 0.22 0.31 0.42 0.63 0.81 0.91 1.16 1.35 1.51 1.75
C. B. R. %

TEST ON TOP ( UNSOAKED) SURCHARGE


Penetration (mm) 0.00 0.50 1.00 1.50 2.00 2.50 3.00 4.00 5.00 7.50 10.00
Load Indicator 0 20 25 34 55 69 75 100 116 126 150
Load (KN) 0.00 0.22 0.27 0.37 0.60 0.75 0.82 1.09 1.27 1.38 1.64
C. B. R. %

UNSOAKED
2.5mm 5.0mm
BOTTOM 6.11 6.74
TOP 5.70 6.36
Force on Plunger ( kN )

12
50 40
11

10 30
9
25
8

7
20
6

5 15

4 C.B.R. Per Cent


10 TOP (UNSOAKED)
3
7.5
2
5
4 BOTTOM (UNSOAKED)
1 3
2
0
0 1 2 3 4 5 6 7 8 9 10 11 12
Penetration of Plunger ( mm)
12.50
195
2.13

12.50
186
2.03

TOP (UNSOAKED)

BOTTOM (UNSOAKED)

11 12