Fax: Phone: +62254372584 Fax: +62254372539 CC: Mr. Anwar Ali (PTKE) Mr. Istamar (PTKS) Mr. Hendro P. (PTKE) Mr. Herri Suprapto (PTKS) Mr. Ade Sumantri (PTKS) Page: 1 Date: 2016-12-13 No: Subject:
Dear Mr. Zhao Qijun,
According to actual construction of blast furnace project railway, some of railway is build using wooden sleepers and concrete structure, since wooden sleepers in site will has short life time because some of them has already cracked, To react this work faster, PTKS suggest CERI to design railway by using concrete structure including dilatation (see attachment) for all railway construction which faster to build & has longer life time compare with wooden type then easy for maintenance in the future.