You are on page 1of 25

ADDITIONAL MATHEMATICS PROJECT WORK

FORM 5 YEAR 2017

BY: RAVIND S/O VIJAYANDRAN


5USM
IC NUMBER: 000515070797
TEACHER’S NAME: PN.ONG MEEI CHING
GROUP MEMBERS: 1. VAITHESVARY KRISHINASAMY
2. ANAND GOPI
3. LEE YI YUN
4. RAVIND VIJAYANDRAN
Ackowledgement

The success and the final outcome of this assignment required a lot of
guidance and assistance from many people, including my teacher, parents and
my fellow friends. The Add Math project work 2017 does not only test my
capabilities to just solve an equation but makes me realise the variation in each
and every question. Thank you Pn. Ong for giving me this amazing assignment
and for all the guidance you have given which made me complete the
assignment on time.

I am really grateful because I have managed to complete the assignment


within the given time by Pn. Ong. This assignment cannot be completed
without the cooperation and support of my group members. Last but not least,
I would like to express my gratitude to all of those who have lend their support
and help upon completing the assignment.
Content
Introduction
Presentation
Assignment 1
Assignment 2
Assignment 3
Assignment 4
Conclusion
Reflection
References and
Attachments
Introduction
We students, taking Additional Mathematics are required to carry out a project
work while we are in Form 5. This year , the school has prepared a few tasks
for us. We are to complete the tasks, assignments to be more specific. We are
assigned into groups to complete the given tasks.
1) Apply and adapt a variety of problem solving
2) Enhance acquisition of mathematical knowledge and skills through
problem solving
3) Cultivate creativity towards additional mathematics.
4) Prepare ourselves for the demands of the future undertakings
5) Use technology , especially ICT appropriately and properly
We are expected to submit the project work within one week from the first
day the task is being administered to us.
Assignment NO.1
COMPANY A
Starting monthly pay: RM900.00 a=900
Monthly increament: RM50.00 d=50

COMPANY B
Starting monthly pay: RM750.00 a=750
Monthly increament : RM60.00 d=60

a) Method 1
𝑇𝑛 = 𝑎 + 𝑛 − 1 𝑑

Company A Company B
𝑇𝑛 = 900 + n − 1 50 𝑇𝑛 = 750 + 𝑛 − 1 60

900 + 𝑛 − 1 50 = 750 + 𝑛 − 1 60
900 + 50𝑛 − 50 = 750 + 𝑛 − 1 60
850 + 50𝑛 = 690 + 60𝑛
850 − 690 = 60𝑛 − 50𝑛
160 = 10𝑛
𝑛 = 16
Company A(Ali) Company B(Ahmad)
𝑇16 = 900 + 16 − 1 50 𝑇16 = 750 + 16 − 1 60
= RM1650 = RM1650

Monthly salary of Ali and Ahmad will be the same at the 16th month of working
when both their salaries reach RM1650
Method 2
Ali Ahmad
900 + 50n = 750 + 60n
900 + 50𝑛 = 750 + 60𝑛
900 − 750 = 60𝑛 − 50𝑛
150 = 10𝑛
150
𝑛=
10
𝑛 = 15
Including first year = 15+1
=16

Company A(Ali) Company B(Ahmad)


𝑇16 = 900 + 16 − 1 50 𝑇16 = 750 + 16 − 1 60
= RM1650 = RM1650

On the 16th month of working , Ali and Ahmad will obtain the same salary
which is RM1650
Method 3

MONTHS MONTH;LY SALARY IN COMPANY A MONTHLY SALARY IN COMPANY B


1 900 750
2 950 810
3 1000 870
4 1050 930
5 1100 990
6 1150 1050
7 1200 1110
8 1250 1170
9 1300 1230
10 1350 1290
11 1400 1350
12 1450 1410
13 1500 1470
14 1550 1530
15 1600 1590
16 1650 1650
17 1700 1710
18 1750 1770
19 1800 1830
20 1850 1890

Based on the table above, Ali and Ahmad will obtain the same salary at the 16th
month of working when both salaries in company A and company B is RM1650
b) Justification
Salary scale ofcompany B is a better deal. The monthly increament in
company B is higher than in company A. Thus, in a short period
of time company A provides a higher salary than comapany B.
Yet, in a longer period of time company B offers higher salary
than company A and prooving that company B is the better
salary deal
Assignment No 2
a) Method 1

𝑇𝑛 𝐴𝑖𝑑𝑖𝑙 > 𝑇𝑛 𝐴𝑧𝑟𝑖𝑛


(300)(1.15)𝑛−1 > (500)(1.1)𝑛−1
1.15
( )𝑛−1 > 53
1.1
5
(n-1)log10 ( 1.15
1.1
)> log10 ( )
3
(n-1)> 11.49
𝑛 > 12.49
𝑛 = 13

Thus, this method has proof that Aidil's salary will be more than Azrin's salary in 13th month.

b) Method 2

Number Aidil's
of Monthly
Azrin's Monthly Salary(RM)
Months salary (RM)

1 300.00 500.00
2 345.00 550.00
3 396.75 605.00
4 456.26 665.50
5 524.70 732.05
6 603.41 805.26
7 693.92 885.78
8 798.01 974.36
9 917.71 1071.79
10 1055.37 1178.97
11 1213.67 1296.87
12 1395.72 1426.56
13 1605.08 1569.21
14 1845.84 1726.14
15 2122.72 1898.75

Thus, this table proves that Aidil's salary will be more than Azrin's salary in the 13th month.
Thus, this table proves that Aidil's salary will be more than Azrin's salary in the 13th month.
alary in 13th month.

n the 13th month.


n the 13th month.
(a)
Assignment 3
Number of Years .n 1 2 3 4
Yearly Salary Increment(RM) 11280 12240 13200 14160

12240-11280=960
Difference Between
13200-12240=960
Each Salary Increment
14160-13200=960

Graph of Yearly Salary Increment Against Number of Years

16000
14000
Yearly Salary Increment

12000
10000
8000
6000
4000
2000
0
0 1 2 3 4
Number of years

The graph above shows a gradual increase in the


increment of the salary. this proves that the
increment of the salary is an arithmetic progression
with the common difference d=960

(b)
Number of Monthly
years,n Salary

3 1003.52
4 1123.94
5 1258.82
6 1409.87
7 1579.06

Number Of Month 1 2 3 4
Monthly Salary Increment 120.42 134.87 151.05 169.18

Difference Between Each


Salary Increment
134.87/120.42=1.12
151.05/134.87=1.12
169.18/151.05=1.12

Graph Of Monthly Increment Against the Month

180
Monthly Salary Increment

160
140
120
100
80
60
40
20
0
0 1 2 3 4 5
Number Of Month

The increment in this salary increment is a goemetric progression


whereby the increament i got here is a common ratio of r=1.12.
Then the graph shows a gradual increase which that this is a
geometric progression
Assignment 4
(a) 𝑇10 55
𝑇11 82
𝑇12 144
𝑇13 233
𝑇14 377
𝑇15 610

(b) 𝑇9 34 𝑎
𝑆𝑖𝑛𝑓𝑖𝑛𝑖𝑡𝑦 =1−𝑟
=
𝑇8 21 = 1−1.6
1

=1.619047619 =-1..666666667
Conjecture: The ratio is recurring decimal

Numbe
r of Value of Tn d
© Terms
1 1 1
2 1 2
3 2 1.5
4 3 1.667
5 5 1.6
6 8 1.625
7 13 1.615
8 21 1.619
9 34 1.618
10 55 1.618
11 89 1.618
12 144 1.618
13 233 1.618
14 377 1.618
15 610 1.618

𝑇𝑛
Let y= lim
𝑛→∞ 𝑇𝑛−1
𝑇𝑛
1 lim =
y=1+ 𝑛→∞ 𝑇𝑛−1
𝑦
𝑇𝑛 +𝑇𝑛 −1
𝑦2 = 𝑦 + 1 = lim (
𝑛→∞ 𝑇𝑛

𝑦2 − 𝑦 − 1 = 0 𝑇𝑛 𝑇𝑛 −1
= lim +
𝑛→∞ 𝑇𝑛 𝑇𝑛
𝑏 ± 𝑏2 4
2
y= −𝑏 ± 𝑏 − 4𝑎𝑐
𝑇𝑛−1
2𝑎 = lim 1 +
𝑛→∞ 𝑇𝑛
1± 12 +4
=
2(1)

− −1 + (−1)2 −4(1)(−1) − −1 − (−1)2 −4(1)(−1)


𝑦1 = 𝑦2 =
2(1) 2(1)
= 1.618 = −0.618

(d) phonesType of phoneslength width length/width value


iphone 5 4.87 2.31 4.87/2.31 2.108
iphone 5s 4.89 2.31 4.89/2.31 2.116
iphone iphone 6 15.8 7.71 15.8/7.71 2.031
iphone 6s 15.8 7.78 15.8/7.78 2.031
iphone 7 13.8 6.71 13.8/6.71 3.719
huawei y8 15.43 7.7 15.43/7.7 2.003
huawei nexus 6p15.93 7.78 15.93/7.78 2.048
huawei huawei p8 14.49 7.41 14.49/7.41 1.955
huawei p9 14.5 7 14.5/7 2.071
huawei p10 14.5 6.9 14.5/6.9 2.101
oppo A37 14.3 7 14.3/7 2.042
oppo A57 14.9 7.3 14.9/7 2.129
oppo oppoF3 15.3 7 15.3/7 2.156
oppo neo 7 14.27 7.17 14.27/7 2.028
oppo F1s 7.1 14.6 7.1/14 0.5071
sumsung j7 15.2 7.8 15.2/7.8 1.948
sunsung corby 10.3 6.36 10.3/6.36 1.6184
sumsung sunsung y 10.4 5.8 10.4/5.8 1.79
sumsung s8 14.8 6.8 14.8/6.8 2.176
sunsung s8+ 15.9 7.3 15.9/7.3 2.178
honor 4X 15.29 7.7 15.29/7.7 1.985
honor 8 14.5 7.1 14.5/7.1 2..042
honor honor 6x 15 7.6 15/7.6 1.973
honor 7 14 8.65 14/8.65 1.61849
honor 8lite 14.7 7.2 14.7/7.2 2.042

e) (i)

𝒳 𝑐𝑚
𝒴 𝑐𝑚

𝒳 𝒳+1
=
1 𝒳

𝑥2 − 𝓍 − 1 = 0
−(−1)± (−1)2 −4(−1)(1)
𝒳=
2(1)
𝓍1 = 1.618 𝓍2= 0.618

1.618𝑐𝑚

1 𝑐𝑚

1𝑐𝑚 0.618𝑐𝑚

For small rectangle:


1
𝜙=
0.618

(iii) Method 1:
𝑦
= 1.618
𝑥

When x=8,

𝑦
= 1.618
8

y=12.94
Method 2:
𝒴 𝒳−𝒴
=
𝒳 𝒴

8−𝒴
1.618=
𝒴
1.618𝒴 = 8 − 𝒴

8
𝒴=
0.618
= 12.94

Thus, the length of the golden rectangle is 12.94.

Method 2:

𝒳𝑐𝑚

8𝑐𝑚

8𝑐𝑚 𝒳 − 8𝑐𝑚

8 𝒳
=
𝒳−8 8

𝑥 2 − 8𝒳 − 64 = 0

−(−8) ± (−8)2 −4(1)(−64)


𝒳=
2(1)
𝒳1 = 12.94 𝒳2 = −4.94

Method 2:

2𝒳 + 2𝒴 = 20
𝒳 = 10 − 𝒴........................(1)

𝐴 = 𝒳𝒴 … … … … … … (2)

Sub (1) into (2),

𝐴 = 10 − 𝒴 𝒴
=10𝒴 − 𝒴 2

𝑑𝐴
𝑊ℎ𝑒𝑛 = 0,
𝑑𝑥

10 − 2𝒴 = 0
𝒴 = 5 … … (3)

Sub (3) into (1),


𝒳 = 10 − 5
=5
Length(cm)
Width(cm),y=10-x Perimeter(cm) Area
1 9 20 9
2 8 20 16
3 7 20 21
4 6 20 24
5 5 20 25
6 4 20 24
7 3 20 21
8 2 20 16

Method 1:

𝑦
=1.618
𝑥
𝑦 = 1.618𝑥 … … … … … … . 1

2y+2x=20.........................(2)

Sub (1) into (2),


2(1.618x)-2x=20
x=3.82..................(3)

Sub (3) into (1),

y= (1.618)(3.82)
=6.181

Hence, it is shown that the golden rectangle has a


width of 3.82cm and a lenghof 6.181cm
Conclusion
After doing research, answering the questions, planning a table , drawing
graphs and some problem solving, I realised that progressions is important in
our daily lives and business activities. It is not only used in the business facility
but also widely used in banking account skills. I learnt a lot through the
Additional Mathematics project work such as the golden ratio and the
fibronacci sequence which are widely used on the products in the market
today.
Reflection
Add Math
You are a killer subject
Yet with hard work,
Youre nothing else than just
Satisfying

Add Math,
Intergration, Diffrentiation,
You Roar,
Yet I can tame,
The almighty roar you claim,
Progression.

Arithmetic, Geometric,
All in my veins,
Giuding me with knowledge,
More to attain

Add Math,
You’re a companion, you’re a friend
Above all, you’re the knowledge I crave,
To attain
References
1) addmathsprojectwork.blogspot.com/
2) https://www.scribd.com/doc/34117115/Add-Maths-Folio-
Form-5

You might also like